Atch__22_-_BLANK_SAMPLE_AF_Form_66_SUBMITTAL_REGISTER.pdf
PDF 32 KB Posted
- Attached to
- Mechanical Electrical IDIQ Federal contract opportunity
- Solicitation number
- FA8501-18-R-0003
About this file
This document contains a submittal schedule and material submittal list for a construction project at Robins Air Force Base. Key submittals and due dates include topographic and utility surveys, 60% and final design submittals, check sets, welding and safety checklists, stormwater permits, work plans, time schedules, lists of subcontractors and values, functional test reports, as-built drawings, warranties, and catalog data, samples, certifications, operating instructions, and manufacturer recommendations for listed materials. The related federal contract opportunity is a mechanical-electrical indefinite-delivery/indefinite-quantity construction contract to provide maintenance, repair, alteration, and new construction work for facilities at Robins Air Force Base, including HVAC, controls, distribution systems, boilers, lighting, fire suppression, and alarm systems. The Air Force Materiel Command Lifecycle Management Center at Robins AFB will award task orders against the IDIQ.
Attachment #22 - Blank AF Form 66
View the file
Other files for this federal contract opportunity
Show all 49
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4600-11-B-0025
Attachment 3
PROJECT NO.
UHHZXXXXXX
APPROVED DISAPPROVED
1 Topographic and Utility Surveys D-NTP + XX
2 60% Design Submittal D-NTP + XX
60% Design List of Material Submittals (see Material Submittals below) D-NTP + XX
4 First Final Design Submittal D-NTP + XX
First Final Design List of Material Submittals (see Material Submittals below) D-NTP + XX
6 Check-Set Design Submittal D-NTP + XX
7 Corrected Final Design Submittal D-NTP + XX
8 AF2519 Welding and Safety Checklist D-NTP + XX
9 ODS (by CEMACC AE) D-NTP + XX
10 Contractor's Kickoff Meeting Checklist At Kick-off Meeting
11 Stormwater Permit Application C-NTP + 14
12 Work Plan C-NTP + 15
13 Solid Waste Disposal Plan C-NTP + 16
14 Storage and Trailer Request C-NTP + 17
15 Time Schedule C-NTP + 18
16 List of Values C-NTP + 19
17 AF Form 3064 & 3065 C-NTP + 20
18 List of Proposed Subcontractors C-NTP + 21
19 Superintendent & Certified Formen (if req'd) C-NTP + 22
20 Systems Functional Test Report 7 Days prior to Pre-Final Insp.
21 Request for Final Inspection 7 Days prior to Pre-Final Insp.
22 Operations and Maintenance Manuals Prior to Closeout 23 As-built Drawings Prior to Closeout 24 Warranties Prior to Closeout
Construction List of Material Submittals (see Material Submittals below) Prior to Closeout
Construction List of Material Submittals (see Material Submittals below) Prior to Closeout Material Submittals List below all mat. submittals (design and constr.)
C
AT
AL
O
G D
AT
A
LI
N
E N
U M
BE
R
SA
M
PL
ES
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
AN
D
C
LO
SE
O U
T
C
LO
SE
O
U T
O
PE
R
AT
IN
G
ST
R
U C
TI
O
N
S DATE
TO
CIVIL
ENGR.
SH
O
P D
R
AW
IN
G
S
FOLLOW-UPREQUIRED
SUBMITTAL
DATE
DATE
RECEIVED
IN
CONTRACT
ING
O
TH
ER
M
AT
ER
IA
L
O R
AT
A
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
ER
'S
EC
O M
M
EN
D
AT
IO
N
S
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
RETURN
SUSPENSE
DATE
DATE CONTRACTOR NOTIFIED REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
BEFORE CONSTR AFTER CONSTR
M
AN
U
FA
C
TU
R
W
AR
R
AN
TY
SOLICITATION/CONTRACT NO.PROJECT TITLE
XXXX FA8501-XXXX
SAMPLE SCHEDULE OF MATERIAL SUBMITTALS
ROBINS AFB
NO. OF COPIES REQUIRED
TO BE COMPLETED BY CEMACC CONTRACTOR
FA4600-11-B-0025
Attachment 3
1B-2
PROJECT NO.
UHHZXXXXXX
APPROVED DISAPPROVEDC
AT
AL
O
G D
AT
A
LI
N
E N
U M
BE
R
SA
M
PL
ES
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
AN
C
LO
SE
O U
T
C
LO
SE
O
U T
O
PE
R
AT
G
ST
R
U C
TI
O
N
S DATE
TO
CIVIL
ENGR.
SH
O
P D
R
AW
IN
G
S
FOLLOW-UPREQUIRED
SUBMITTAL
DATE
DATE
RECEIVED
IN
CONTRACT
ING
O
TH
ER
M
AT
ER
IA
L
O
AT
A
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
EC
O M
M
EN
D
AT
IO
N
S
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
RETURN
SUSPENSE
DATE
DATE CONTRACTOR NOTIFIED REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
BEFORE CONSTR AFTER CONSTR
M
AN
U
FA
C
TU
R
W
AR
R
AN
TY
SOLICITATION/CONTRACT NO.PROJECT TITLE
XXXX FA8501-XXXX
SAMPLE SCHEDULE OF MATERIAL SUBMITTALS
ROBINS AFB
NO. OF COPIES REQUIRED
TO BE COMPLETED BY CEMACC CONTRACTOR
NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements.
LEGEND:
D-NTP = Design NTP, C-NTP = Construction NTP
Sheet1
File details come from the government source that posted it. Updated .