Atch__22_-_BLANK_SAMPLE_AF_Form_66_SUBMITTAL_REGISTER.pdf

Air Force Form PDF 32 KB Posted

Attached to
Mechanical Electrical IDIQ
Solicitation number
FA8501-18-R-0003
Issued by

About this file

This document contains a submittal schedule and material submittal list for a construction project at Robins Air Force Base. Key submittals and due dates include topographic and utility surveys, 60% and final design submittals, check sets, welding and safety checklists, stormwater permits, work plans, time schedules, lists of subcontractors and values, functional test reports, as-built drawings, warranties, and catalog data, samples, certifications, operating instructions, and manufacturer recommendations for listed materials. The related federal contract opportunity is a mechanical-electrical indefinite-delivery/indefinite-quantity construction contract to provide maintenance, repair, alteration, and new construction work for facilities at Robins Air Force Base, including HVAC, controls, distribution systems, boilers, lighting, fire suppression, and alarm systems. The Air Force Materiel Command Lifecycle Management Center at Robins AFB will award task orders against the IDIQ.

Attachment #22 - Blank AF Form 66

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

File Type Posted
RFI__6_Answers.pdf PDF
FA8501-18-R-0003-0002.pdf PDF
Atch__8_-_AF_Form_3052.xlsx XLSX spreadsheet
Atch__10_-_AF_Form_3065.xlsx XLSX spreadsheet
Atch__9_-_AF_Form_3064.xlsx XLSX spreadsheet
Atch__14_-_Schedule_of_Values.xlsx XLSX spreadsheet
Atch__34_-_Revised_Project_Table_of_Contents_22_Mar_18.pdf PDF
Atch__35_-_09_29_00_-_Gypsum_Board.pdf PDF
RFI__5_Answer.pdf PDF
Atch__33_-_Addendum__2_Mech_Elec.pdf PDF
RFI__4_Answers.pdf PDF
RFI__3_Answers.pdf PDF
RFI__2_Answers.pdf PDF
FA8501-18-R-0003-0001.pdf PDF
Atch__30_-_VPP_DART-TCIR_Chart.xlsx XLSX spreadsheet
Atch__32_-_CIP_Concrete_Specifications.pdf PDF
Atch__31_-_Addendum__1_Mech-Elec.pdf PDF
RFI__1_Answers.pdf PDF
Site_Visit_Slides_&_Sign_In_Sheet.pdf PDF
Atch__12_-_01560_Environmental_Requirements_2018.pdf PDF
Atch__20_-_Best_Practices_for_Landscape_Guidelines_Robins_AFB_3-15-2011.pdf PDF
Atch__14_-_BLANK_SAMPLE_Schedule_of_Values_Template_UNLOCKED.pdf PDF
Atch__19_-_AFSC_Energy_Metering_Requirements_24_June_2016.pdf PDF
Atch__9_-_BLANK_SAMPLE_AF_Form_3064.pdf PDF
Atch__23_-_AFI_31-204_RAFB_Sup_1_Motor_Vehicle_Traffic_Supervision.pdf PDF
Atch__7_-_Robins_AFB_Asbestos_Management_Plan_-_January_2015.pdf PDF
Atch__30_-_VPP_DART-TCIR_Chart.xlsx XLSX spreadsheet
Atch__15_-_BLANK_SAMPLE_Dig_Permit_Form_v3.0.pdf PDF
Atch__8_-_BLANK_SAMPLE_AF_Form_3052.pdf PDF
Atch__13_-_Wage_Determination.pdf PDF
FA8501-18-R-0003.pdf PDF
Atch__16_-_BLANK_SAMPLE_Master_Utility_Outage.pdf PDF
Atch__2_-_App_C_UHHZ_170241.pdf PDF
Atch__17_-_BLANK_SAMPLE_DD_Form_1354_Transfer_and_Acceptance_of_DoD_Real_Property.pdf PDF
Atch__24_-_Air_Force_Manual_32_1084_Civil_Engineering_Facility_Requirements.pdf PDF
Atch__1_-_Mech-Elec_SOW.pdf PDF
Atch__5_-_UHHZ170241_BIDDING_SCHEDULE_(TEP).pdf PDF
Atch__26_-_UFC_4_010_05_Sensitive_Compartmented_Information_Facilities_Planning,_Design,_and_Construction.pdf PDF
Atch__11_-_BLANK_SAMPLE_AF_Form_3000_with_digital_signatures.pdf PDF
Atch__10_-_BLANK_SAMPLE_AF_Form_3065.pdf PDF
Atch__25_-_AF_Form_2586_Flightline_Driving_Request.pdf PDF
Atch__27_-_BFS-RAFB_16_FEB_17.pdf PDF
Atch__21_-_Form20SP.STANDARDSensitiveEquipmentPropertyRequest.Revised15July2016.pdf PDF
Atch__3_-_PROCEDURAL_GUIDE_FOR_DESIGNERS_INCLUDING_AE_FIRMS_29_May_15.pdf PDF
Atch__6_-_Robins_AFB_Architectural_Compatiblity_Standards_18_Aug_2015.pdf PDF
Atch__18_-_Technical_Spec_for_ICD705_version1.2_April_23_2012.pdf PDF
Atch__28_-_UHHZ090516_Combined_Specifications.pdf PDF
Atch__4_-_Robins_AFB_Division_1_Specs_and_Forms_REVISED_24_April_2017.pdf PDF
Atch__29_-_UHHZ090516_Combined_Drawings.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4600-11-B-0025

Attachment 3

PROJECT NO.

UHHZXXXXXX

APPROVED DISAPPROVED

1 Topographic and Utility Surveys D-NTP + XX

2 60% Design Submittal D-NTP + XX

60% Design List of Material Submittals (see Material Submittals below) D-NTP + XX

4 First Final Design Submittal D-NTP + XX

First Final Design List of Material Submittals (see Material Submittals below) D-NTP + XX

6 Check-Set Design Submittal D-NTP + XX

7 Corrected Final Design Submittal D-NTP + XX

8 AF2519 Welding and Safety Checklist D-NTP + XX

9 ODS (by CEMACC AE) D-NTP + XX

10 Contractor's Kickoff Meeting Checklist At Kick-off Meeting

11 Stormwater Permit Application C-NTP + 14

12 Work Plan C-NTP + 15

13 Solid Waste Disposal Plan C-NTP + 16

14 Storage and Trailer Request C-NTP + 17

15 Time Schedule C-NTP + 18

16 List of Values C-NTP + 19

17 AF Form 3064 & 3065 C-NTP + 20

18 List of Proposed Subcontractors C-NTP + 21

19 Superintendent & Certified Formen (if req'd) C-NTP + 22

20 Systems Functional Test Report 7 Days prior to Pre-Final Insp.

21 Request for Final Inspection 7 Days prior to Pre-Final Insp.

22 Operations and Maintenance Manuals Prior to Closeout 23 As-built Drawings Prior to Closeout 24 Warranties Prior to Closeout

Construction List of Material Submittals (see Material Submittals below) Prior to Closeout

Construction List of Material Submittals (see Material Submittals below) Prior to Closeout Material Submittals List below all mat. submittals (design and constr.)

C

AT

AL

O

G D

AT

A

LI

N

E N

U M

BE

R

SA

M

PL

ES

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

AN

D

C

LO

SE

O U

T

C

LO

SE

O

U T

O

PE

R

AT

IN

G

ST

R

U C

TI

O

N

S DATE

TO

CIVIL

ENGR.

SH

O

P D

R

AW

IN

G

S

FOLLOW-UPREQUIRED

SUBMITTAL

DATE

DATE

RECEIVED

IN

CONTRACT

ING

O

TH

ER

M

AT

ER

IA

L

O R

AT

A

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

ER

'S

EC

O M

M

EN

D

AT

IO

N

S

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

RETURN

SUSPENSE

DATE

DATE CONTRACTOR NOTIFIED REMARKSFINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

BEFORE CONSTR AFTER CONSTR

M

AN

U

FA

C

TU

R

W

AR

R

AN

TY

SOLICITATION/CONTRACT NO.PROJECT TITLE

XXXX FA8501-XXXX

SAMPLE SCHEDULE OF MATERIAL SUBMITTALS

ROBINS AFB

NO. OF COPIES REQUIRED

TO BE COMPLETED BY CEMACC CONTRACTOR

FA4600-11-B-0025

Attachment 3

1B-2

PROJECT NO.

UHHZXXXXXX

APPROVED DISAPPROVEDC

AT

AL

O

G D

AT

A

LI

N

E N

U M

BE

R

SA

M

PL

ES

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

AN

C

LO

SE

O U

T

C

LO

SE

O

U T

O

PE

R

AT

G

ST

R

U C

TI

O

N

S DATE

TO

CIVIL

ENGR.

SH

O

P D

R

AW

IN

G

S

FOLLOW-UPREQUIRED

SUBMITTAL

DATE

DATE

RECEIVED

IN

CONTRACT

ING

O

TH

ER

M

AT

ER

IA

L

O

AT

A

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

EC

O M

M

EN

D

AT

IO

N

S

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

RETURN

SUSPENSE

DATE

DATE CONTRACTOR NOTIFIED REMARKSFINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

BEFORE CONSTR AFTER CONSTR

M

AN

U

FA

C

TU

R

W

AR

R

AN

TY

SOLICITATION/CONTRACT NO.PROJECT TITLE

XXXX FA8501-XXXX

SAMPLE SCHEDULE OF MATERIAL SUBMITTALS

ROBINS AFB

NO. OF COPIES REQUIRED

TO BE COMPLETED BY CEMACC CONTRACTOR

NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements.

LEGEND:

D-NTP = Design NTP, C-NTP = Construction NTP

Sheet1

File details come from the government source that posted it. Updated .