Atch__34_-_Revised_Project_Table_of_Contents_22_Mar_18.pdf

PDF 18 KB Posted

Attached to
Mechanical Electrical IDIQ Federal contract opportunity
Solicitation number
FA8501-18-R-0003
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

This document contains a project table of contents and description for a mechanical-electrical indefinite-delivery indefinite-quantity construction contract to provide maintenance, repair, alteration, and new construction work at Robins Air Force Base in Georgia. The contract will consist of HVAC repairs, renovations and upgrades, controls work, underground piping systems, boiler repairs and replacements, airfield and exterior lighting work, lightning protection, fire suppression and alarm systems. The contractor will furnish all materials, equipment, labor and general conditions to complete the work required in individual task orders. The work will support real property facilities at Robins Air Force Base in areas including HVAC, utilities, fire protection and electrical systems. The Department of the Air Force Materiel Command Lifecycle Management Center at Robins Air Force Base is the contracting agency.

Attachment #34 - Revised Project Table of Contents

View the file

Other files for this federal contract opportunity

Other files attached to Mechanical Electrical IDIQ, newest first.
File Type Posted
RFI__6_Answers.pdf PDF
Atch__33_-_Addendum__2_Mech_Elec.pdf PDF
RFI__5_Answer.pdf PDF
Atch__35_-_09_29_00_-_Gypsum_Board.pdf PDF
Atch__8_-_AF_Form_3052.xlsx XLSX spreadsheet
Atch__10_-_AF_Form_3065.xlsx XLSX spreadsheet
Atch__9_-_AF_Form_3064.xlsx XLSX spreadsheet
FA8501-18-R-0003-0002.pdf PDF
Atch__14_-_Schedule_of_Values.xlsx XLSX spreadsheet
RFI__4_Answers.pdf PDF
RFI__3_Answers.pdf PDF
Atch__31_-_Addendum__1_Mech-Elec.pdf PDF
Atch__30_-_VPP_DART-TCIR_Chart.xlsx XLSX spreadsheet
Atch__32_-_CIP_Concrete_Specifications.pdf PDF
RFI__2_Answers.pdf PDF
FA8501-18-R-0003-0001.pdf PDF
Site_Visit_Slides_&_Sign_In_Sheet.pdf PDF
RFI__1_Answers.pdf PDF
Atch__29_-_UHHZ090516_Combined_Drawings.pdf PDF
Atch__4_-_Robins_AFB_Division_1_Specs_and_Forms_REVISED_24_April_2017.pdf PDF
Atch__28_-_UHHZ090516_Combined_Specifications.pdf PDF
Atch__15_-_BLANK_SAMPLE_Dig_Permit_Form_v3.0.pdf PDF
Atch__17_-_BLANK_SAMPLE_DD_Form_1354_Transfer_and_Acceptance_of_DoD_Real_Property.pdf PDF
Atch__2_-_App_C_UHHZ_170241.pdf PDF
Atch__1_-_Mech-Elec_SOW.pdf PDF
Atch__10_-_BLANK_SAMPLE_AF_Form_3065.pdf PDF
Atch__14_-_BLANK_SAMPLE_Schedule_of_Values_Template_UNLOCKED.pdf PDF
Atch__20_-_Best_Practices_for_Landscape_Guidelines_Robins_AFB_3-15-2011.pdf PDF
Atch__12_-_01560_Environmental_Requirements_2018.pdf PDF
Atch__9_-_BLANK_SAMPLE_AF_Form_3064.pdf PDF
Atch__23_-_AFI_31-204_RAFB_Sup_1_Motor_Vehicle_Traffic_Supervision.pdf PDF
Atch__30_-_VPP_DART-TCIR_Chart.xlsx XLSX spreadsheet
Atch__8_-_BLANK_SAMPLE_AF_Form_3052.pdf PDF
Atch__13_-_Wage_Determination.pdf PDF
Atch__5_-_UHHZ170241_BIDDING_SCHEDULE_(TEP).pdf PDF
Atch__11_-_BLANK_SAMPLE_AF_Form_3000_with_digital_signatures.pdf PDF
Atch__26_-_UFC_4_010_05_Sensitive_Compartmented_Information_Facilities_Planning,_Design,_and_Construction.pdf PDF
Atch__18_-_Technical_Spec_for_ICD705_version1.2_April_23_2012.pdf PDF
Atch__19_-_AFSC_Energy_Metering_Requirements_24_June_2016.pdf PDF
Atch__7_-_Robins_AFB_Asbestos_Management_Plan_-_January_2015.pdf PDF
FA8501-18-R-0003.pdf PDF
Atch__16_-_BLANK_SAMPLE_Master_Utility_Outage.pdf PDF
Atch__24_-_Air_Force_Manual_32_1084_Civil_Engineering_Facility_Requirements.pdf PDF
Atch__22_-_BLANK_SAMPLE_AF_Form_66_SUBMITTAL_REGISTER.pdf PDF
Atch__3_-_PROCEDURAL_GUIDE_FOR_DESIGNERS_INCLUDING_AE_FIRMS_29_May_15.pdf PDF
Atch__21_-_Form20SP.STANDARDSensitiveEquipmentPropertyRequest.Revised15July2016.pdf PDF
Atch__27_-_BFS-RAFB_16_FEB_17.pdf PDF
Atch__25_-_AF_Form_2586_Flightline_Driving_Request.pdf PDF
Atch__6_-_Robins_AFB_Architectural_Compatiblity_Standards_18_Aug_2015.pdf PDF
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UHHZ090516- Repair/Replace HVAC System, B-908 Revised 22 March 2018

Project Table of Contents - 1

PROJECT TABLE OF CONTENTS

UHHZ090516, RPR/RPL HVAC SYSTEM, B/908

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 15 List of Drawings

DIVISION 01 – GENERAL REQUREMENTS

01 00 50 Statement of Work 01 04 00 Site Requirements 01 30 00 Submittals Contractor-Furnished Items 01 31 00 CADD As-Built Drawings 01 56 00 Environmental Requirements 01 57 20 Construction and Demolition Waste Management 01 58 00 Safety Requirements 01 60 00 Product Requirement 01 61 90 Demolition of Existing Facilities 01 65 00 Phasing 01 70 00 Execution Requirements 01 73 00 Operations and Maintenance Data

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition

DIVISION 03 - CONCRETE

03 30 53 Cast In Place Concrete

DIVISION 04 - MASONRY

04 20 00 Masonry

DIVISION 05 - METALS

05 50 13 Miscellaneous Metal Fabrications

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 53 23 Ethylene-Propylene-Diene-Monomer Roofing 07 92 00 Joint Sealants

DIVISION 08 - OPENINGS

08 11 13 Steel Doors and Frames 08 71 00 Door Hardware

DIVISION 09 – FINISHES

09 29 00 Gypsum Board 09 51 00 Acoustical Ceilings 09 90 00 Paints and Coatings 09 90 05 Painting of Mechanical Systems

UHHZ090516- Repair/Replace HVAC System, B-908 Revised 22 March 2018

Project Table of Contents - 2

DIVISION 22 - PLUMBING

22 07 00 Plumbing Piping Insulation 22 10 00 Plumbing Piping 22 30 00 Plumbing Equipment

DIVISION 23 – HEATING, VENTILATION, AND AIR CONDITINING (HVAC)

23 01 30.51 Duct Cleaning 23 05 00 General Mechanical Requirements 23 05 13 Motors 23 05 48 Vibration Isolation 23 05 53 Mechanical Identification 23 05 93 Testing, Adjusting, and Balancing for HVAC 23 07 13 Ductwork Insulation 23 07 19 HVAC Piping Insulation 23 09 13 Instruments and Control Elements (Electronic) 23 09 23 Digital Control Equipment 23 21 13 Hydronic Piping 23 23 00 Refrigerant Piping and Specialties 23 31 00 Ductwork 23 33 00 Ductwork Accessories 23 34 23 Power Ventilators 23 37 00 Air Outlets and Inlets 23 81 12 Packaged Air Conditioners and Heat Pumps 23 81 26 Unitary Split System Air Conditioners 23 82 00 Terminal Heat Transfer Units

DIVISION 26 - ELECTRICAL

26 00 00 Electrical 26 22 10 Pad-Mount Transformers, Three-Phase 26 41 13 E.D.S. Surge (Lightning) Arresters

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 92 19 Seeding

SUBMITTAL REGISTERS

File details come from the government source that posted it. Updated .