Attach 9_AF Form 66 Submittal Register.pdf

Air Force Form PDF 89 KB Posted

Attached to
PKAA Dorm Water Damage Repair (Construction)
Solicitation number
FA461326R0006
Issued by

About this file

This is an AF Form 66, Schedule of Material Submittals, for a repair contract addressing water damage to Building 223 (Tririga #GHLN 26-9332). The form establishes the submission requirements and timelines for various materials, plans, and documentation required throughout the project execution.

The contractor must submit electronic submittals for multiple items and categories. Initial submissions are due 10 days after Notice to Proceed (NTP) for scheduling and planning documents including AF 3064 Contractor Progress Schedule, Quality Control Plan, Accident Prevention Plan, and Activity Hazard Analysis. Progress reports must be submitted 5 days after each month end. Material and product submittals for concrete, vanity cabinets, vanity countertops, sinks, faucets, miscellaneous plumbing, paint, and wallboard/texture/joint compound are due 30 days after NTP and require architect-engineer approval and contract administrator review. Additional submittals including Hazardous Material Authorization Requests and Safety Data Sheets are due 30 days after NTP, while Operating and Maintenance manuals, hazmat usage sheets, and warranty documentation are due 30 days after project completion. The form tracks submission status through columns for contractor notification, contractor resubmittal, and final approval (approved or disapproved). All submittals are to be submitted electronically unless otherwise noted.

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 09-AF form 66 03.27.2025.pdf Mar 27, 2025 B611 HVAC Repair
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIAL SUBMITTALS SOLICITATION/CONTRACT NO.

AF FORM 66 Page 1 of 1

TO BE COMPLETED BY ARCHITECT-ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

CO

N

TR

AC

TO

R

RE

SU

BM

IT

TA

L

FI

N

AL

A

PP

RO

VA

L

App'd Disapp'd

AF 3064 Contractor Progress Schedule X 10 days after

NTP

AF 3065 Contractor Progress Reports X 5 days after month end

QC Plan X 10 days after

NTP

Accident Prevention Plan (APP) X 10 days after

NTP

Activity Hazard Analysis (AHA) X 10 days after

NTP

Hazardous Material Authorization Request and

SDS

X X 30 days after

NTP

Concrete X X X X 30 days after

NTP

Vanity Cabinet X X X X 30 days after

NTP

Vanity Countertop X X X X 30 days after

NTP

Sink X X X X 30 days after

NTP

Faucet X X X X X X X 30 days after

NTP

Misc. Plumbing X 30 days after

NTP

Paint X X 30 days after

NTP

Wallboard, Texture, Joint Compound X X 30 days after

NTP

Hazmat Usage Sheet X X 30 days after completion

O&M's X X X X X 30 days after completion

Warranty X 30 days after completion

REMARKS

CE

RT

IF

IC

AT

IO

N O

F

CO

M

PL

IA

N

CE

RE

Q

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E

RE

CE

IV

ED

IN

C O

N

TR

AC

TI

N G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

RI

N

G

RE

TU

RN

S

U

SP

EN

SE

D

AT

E

SU

BM

IT

TA

L N

U M

BE

R

Repair Water Damage Bldg. 223 Tririga #GHLN 26-9332

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

**ALL SUBMITTALS TO BE ELECTRONIC UNLESS

NOTED OTHERWISE

SC

H

ED

U

LE

S, R

EP

O

RT

S, P

LA

N

S

SH

O

P

DR

AW

IN

G S

SA

M

PL

ES

CO

LO

R

SE

LE

CT

IO

N

SC

H

ED

U

LE

O

F M

AT

ER

IA

LS

TE

CH

N

IC

AL

D

AT

A

IN

ST

AL

LA

TI

O

N

IN

ST

RU

CT

IO

N S

O

PE

RA

TI

N G

IN

ST

RU

CT

IO

N

S

SD

S

SH

EE

TS

TE

ST

R

EP

O

RT

S

M

AN

U

FA

CT

U

RE

R'

S W

AR

RA

N

TY

CONTRACTOR

NOTIFIED

Section 01

File details come from the government source that posted it. Updated .