Attach 9_AF Form 66 Submittal Register.pdf
PDF 89 KB Posted
- Attached to
- PKAA Dorm Water Damage Repair (Construction)
- Solicitation number
- FA461326R0006
About this file
This is an AF Form 66, Schedule of Material Submittals, for a repair contract addressing water damage to Building 223 (Tririga #GHLN 26-9332). The form establishes the submission requirements and timelines for various materials, plans, and documentation required throughout the project execution.
The contractor must submit electronic submittals for multiple items and categories. Initial submissions are due 10 days after Notice to Proceed (NTP) for scheduling and planning documents including AF 3064 Contractor Progress Schedule, Quality Control Plan, Accident Prevention Plan, and Activity Hazard Analysis. Progress reports must be submitted 5 days after each month end. Material and product submittals for concrete, vanity cabinets, vanity countertops, sinks, faucets, miscellaneous plumbing, paint, and wallboard/texture/joint compound are due 30 days after NTP and require architect-engineer approval and contract administrator review. Additional submittals including Hazardous Material Authorization Requests and Safety Data Sheets are due 30 days after NTP, while Operating and Maintenance manuals, hazmat usage sheets, and warranty documentation are due 30 days after project completion. The form tracks submission status through columns for contractor notification, contractor resubmittal, and final approval (approved or disapproved). All submittals are to be submitted electronically unless otherwise noted.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF MATERIAL SUBMITTALS SOLICITATION/CONTRACT NO.
AF FORM 66 Page 1 of 1
TO BE COMPLETED BY ARCHITECT-ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
CO
N
TR
AC
TO
R
RE
SU
BM
IT
TA
L
FI
N
AL
A
PP
RO
VA
L
App'd Disapp'd
AF 3064 Contractor Progress Schedule X 10 days after
NTP
AF 3065 Contractor Progress Reports X 5 days after month end
QC Plan X 10 days after
NTP
Accident Prevention Plan (APP) X 10 days after
NTP
Activity Hazard Analysis (AHA) X 10 days after
NTP
Hazardous Material Authorization Request and
SDS
X X 30 days after
NTP
Concrete X X X X 30 days after
NTP
Vanity Cabinet X X X X 30 days after
NTP
Vanity Countertop X X X X 30 days after
NTP
Sink X X X X 30 days after
NTP
Faucet X X X X X X X 30 days after
NTP
Misc. Plumbing X 30 days after
NTP
Paint X X 30 days after
NTP
Wallboard, Texture, Joint Compound X X 30 days after
NTP
Hazmat Usage Sheet X X 30 days after completion
O&M's X X X X X 30 days after completion
Warranty X 30 days after completion
REMARKS
CE
RT
IF
IC
AT
IO
N O
F
CO
M
PL
IA
N
CE
RE
Q
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E
RE
CE
IV
ED
IN
C O
N
TR
AC
TI
N G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
RI
N
G
RE
TU
RN
S
U
SP
EN
SE
D
AT
E
SU
BM
IT
TA
L N
U M
BE
R
Repair Water Damage Bldg. 223 Tririga #GHLN 26-9332
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
**ALL SUBMITTALS TO BE ELECTRONIC UNLESS
NOTED OTHERWISE
SC
H
ED
U
LE
S, R
EP
O
RT
S, P
LA
N
S
SH
O
P
DR
AW
IN
G S
SA
M
PL
ES
CO
LO
R
SE
LE
CT
IO
N
SC
H
ED
U
LE
O
F M
AT
ER
IA
LS
TE
CH
N
IC
AL
D
AT
A
IN
ST
AL
LA
TI
O
N
IN
ST
RU
CT
IO
N S
O
PE
RA
TI
N G
IN
ST
RU
CT
IO
N
S
SD
S
SH
EE
TS
TE
ST
R
EP
O
RT
S
M
AN
U
FA
CT
U
RE
R'
S W
AR
RA
N
TY
CONTRACTOR
NOTIFIED
Section 01
File details come from the government source that posted it. Updated .