Attach 9_AF Form 66 Submittal Register.pdf

PDF 89 KB Posted

Attached to
PKAA Dorm Water Damage Repair (Construction)
Solicitation number
FA461326R0006
Issued by

About this file

This is an AF Form 66, Schedule of Material Submittals, for a repair contract addressing water damage to Building 223 (Tririga #GHLN 26-9332). The form establishes the submission requirements and timelines for various materials, plans, and documentation required throughout the project execution.

The contractor must submit electronic submittals for multiple items and categories. Initial submissions are due 10 days after Notice to Proceed (NTP) for scheduling and planning documents including AF 3064 Contractor Progress Schedule, Quality Control Plan, Accident Prevention Plan, and Activity Hazard Analysis. Progress reports must be submitted 5 days after each month end. Material and product submittals for concrete, vanity cabinets, vanity countertops, sinks, faucets, miscellaneous plumbing, paint, and wallboard/texture/joint compound are due 30 days after NTP and require architect-engineer approval and contract administrator review. Additional submittals including Hazardous Material Authorization Requests and Safety Data Sheets are due 30 days after NTP, while Operating and Maintenance manuals, hazmat usage sheets, and warranty documentation are due 30 days after project completion. The form tracks submission status through columns for contractor notification, contractor resubmittal, and final approval (approved or disapproved). All submittals are to be submitted electronically unless otherwise noted.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIAL SUBMITTALS SOLICITATION/CONTRACT NO.

AF FORM 66 Page 1 of 1

TO BE COMPLETED BY ARCHITECT-ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

CO

N

TR

AC

TO

R

RE

SU

BM

IT

TA

L

FI

N

AL

A

PP

RO

VA

L

App'd Disapp'd

AF 3064 Contractor Progress Schedule X 10 days after

NTP

AF 3065 Contractor Progress Reports X 5 days after month end

QC Plan X 10 days after

NTP

Accident Prevention Plan (APP) X 10 days after

NTP

Activity Hazard Analysis (AHA) X 10 days after

NTP

Hazardous Material Authorization Request and

SDS

X X 30 days after

NTP

Concrete X X X X 30 days after

NTP

Vanity Cabinet X X X X 30 days after

NTP

Vanity Countertop X X X X 30 days after

NTP

Sink X X X X 30 days after

NTP

Faucet X X X X X X X 30 days after

NTP

Misc. Plumbing X 30 days after

NTP

Paint X X 30 days after

NTP

Wallboard, Texture, Joint Compound X X 30 days after

NTP

Hazmat Usage Sheet X X 30 days after completion

O&M's X X X X X 30 days after completion

Warranty X 30 days after completion

REMARKS

CE

RT

IF

IC

AT

IO

N O

F

CO

M

PL

IA

N

CE

RE

Q

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E

RE

CE

IV

ED

IN

C O

N

TR

AC

TI

N G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

RI

N

G

RE

TU

RN

S

U

SP

EN

SE

D

AT

E

SU

BM

IT

TA

L N

U M

BE

R

Repair Water Damage Bldg. 223 Tririga #GHLN 26-9332

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

**ALL SUBMITTALS TO BE ELECTRONIC UNLESS

NOTED OTHERWISE

SC

H

ED

U

LE

S, R

EP

O

RT

S, P

LA

N

S

SH

O

P

DR

AW

IN

G S

SA

M

PL

ES

CO

LO

R

SE

LE

CT

IO

N

SC

H

ED

U

LE

O

F M

AT

ER

IA

LS

TE

CH

N

IC

AL

D

AT

A

IN

ST

AL

LA

TI

O

N

IN

ST

RU

CT

IO

N S

O

PE

RA

TI

N G

IN

ST

RU

CT

IO

N

S

SD

S

SH

EE

TS

TE

ST

R

EP

O

RT

S

M

AN

U

FA

CT

U

RE

R'

S W

AR

RA

N

TY

CONTRACTOR

NOTIFIED

Section 01

File details come from the government source that posted it. Updated .