This is an AF Form 66 Schedule of Material Submittals for the B972 Renovate UOQ Community Commons project (EEPZ254664), dated June 15, 2026. The document outlines the contractor's submittal requirements across multiple disciplines including General, Environmental, Architectural, Civil, Mechanical, Electrical, and Special Systems categories. The form tracks 76 line items specifying materials, components, and documentation that require submission and approval before installation or use on the project.
Submittals are categorized by discipline with specific approval workflows tracked through columns indicating submission dates, KTR (presumably Key Technical Representative) approval dates, Civil Engineering review dates, contractor notification dates, and final approval. General submittals include Work/Construction Phasing Plans, As-Built Drawings, Progress Schedules, Guarantees and Warranties, and Superintendent's Qualifications. Environmental submittals require Safety Data Sheets (SDS), Hazardous Waste Reports, AF Form 3000 Hazardous Material Reports, Recycled Material/Construction Debris Reports, Storm Water Pollution Prevention Plans, Weekly Inspection Reports, and Green Procurement Reports. Architectural submittals encompass flooring materials (LVT, Rubber Cove Base, Floor Tiles), interior/exterior doors with frames and hardware, gypsum products, suspended ceiling systems, paint primers, cabinets with hardware, and solid surface countertops. Civil submittals include shop drawings for lean-to roof extensions, concrete slabs, and wooden fencing. Mechanical submittals cover HVAC components, piping, thermostats, controls, faucets, and water systems. Electrical submittals include conductors, conduit, switches, receptacles, LED fixtures, sensors, and photometric analysis. The form also includes a HAZMAT Tracking Sheet template requiring contractors to document all hazardous materials used during construction with product names, manufacturers, part numbers, container types, quantities, and EESOH Material Stock Numbers, to be submitted prior to construction start and updated upon project completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFIs_B972_FA302226R0024.pdf | ||
| Sign-in Sheet_Site Visit.pdf | ||
| Solicitation - FA302226R0024.pdf | ||
| SOW_EEPZ254664-B972 UOQ_06July2026.pdf | ||
| EAL Form 2026.pdf | ||
| Contractors CUI Training Slides.pptx | PPTX presentation | |
| MFR CUI Contractor Training Acknowledgment July 2024.pdf | ||
| Appendix A - Cost Breakdown.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General
| Project No: | Project Title: | Date: | |||||||||||||||||
| EEPZ254664 | Renovate UOQ Community Commons, B972 | 15-Jun-26 | |||||||||||||||||
| LINE NO. | ITEM DESCRIPTION | SPEC REF | NUMBER OF COPIES REQUIRED | DATE KTR REQUIRES APPROVAL | DATE RECEIVED KTR | DATE TO CIVIL ENG | DATE RECEIVED FROM CE | DATE CONTRACTOR NOTIFIED APR DISAPR | CONTRACT RESUBMIT DUE | CONTRACT RESUBMITTAL RECEIVED | FINAL APPROVAL RCVD KTR NOTIFIED | ||||||||
| Certificate of Compliance | Shop Drawings | Samples | Color Selction | Manufacturer's Recommendations | Manufacturer's Warranty | Catalog Data | Operating Instructions | Other | |||||||||||
| GENERAL | |||||||||||||||||||
| 1 | Work/Construction/ Phasing Plan | BASIC | X | ||||||||||||||||
| 2 | As-Built Drawings | BASIC | X | ||||||||||||||||
| 3 | Progress Schedule | BASIC | X | ||||||||||||||||
| 4 | Guarantees and Warranties | BASIC | X | ||||||||||||||||
| 5 | Superintendent's Qualifications and Experience | BASIC | X |
AF Form 66 (Substitute) GENERAL Page&Pof&N
SCHEDULE OF MATERIAL SUBMITTALS
Environmental
| Project No: | Project Title: | Date: | |||||||||||||||||
| EEPZ254664 | Renovate UOQ Community Commons, B972 | 15-Jun-26 | |||||||||||||||||
| LINE NO. | ITEM DESCRIPTION | SPEC REF | NUMBER OF COPIES REQUIRED | DATE KTR REQUIRES APPROVAL | DATE RECEIVED KTR | DATE TO CIVIL ENG | DATE RECEIVED FROM CE | DATE CONTRACTOR NOTIFIED APR DISAPR | CONTRACT RESUBMIT DUE | CONTRACT RESUBMITTAL RECEIVED | FINAL APPROVAL RCVD KTR NOTIFIED | ||||||||
| Certificate of Compliance | Shop Drawings | Samples | Color Selction | Manufacturer's Recommendations | Manufacturer's Warranty | Catalog Data | Operating Instructions | Other | |||||||||||
| GENERAL | |||||||||||||||||||
| 6 | Appropriate SDS | BASIC | X | ||||||||||||||||
| 7 | Hazardous waste report | BASIC | |||||||||||||||||
| 8 | Hazardous Material Report (AF Form 3000) | BASIC | |||||||||||||||||
| 9 | Recycled Material Report/Construction Debris report | BASIC | |||||||||||||||||
| 10 | Storm Water Pollution Prevention Plan with Best Management Practices Identified | BASIC | |||||||||||||||||
| 11 | Weekly Inspection Reports for Projects | BASIC | |||||||||||||||||
| 12 | Green Procurment Report | BASIC | X |
AF Form 66 (Substitute) Environmental Page&Pof &N
SCHEDULE OF MATERIAL SUBMITTALS
Architectural
| Project No: | Project Title: | Date: | |||||||||||||||||
| EEPZ254664 | Renovate UOQ Community Commons, B972 | 15-Jun-26 | |||||||||||||||||
| LINE NO. | ITEM DESCRIPTION | SPEC REF | NUMBER OF COPIES REQUIRED | DATE KTR REQUIRES APPROVAL | DATE RECEIVED KTR | DATE TO CIVIL ENG | DATE RECEIVED FROM CE | DATE CONTRACTOR NOTIFIED APR DISAPR | CONTRACT RESUBMIT DUE | CONTRACT RESUBMITTAL RECEIVED | FINAL APPROVAL RCVD KTR NOTIFIED | ||||||||
| Certificate of Compliance | Shop Drawings | Samples | Color Selction | Manufacturer's Recommendations | Manufacturer's Warranty | Catalog Data | Operating Instructions | Other | |||||||||||
| GENERAL | |||||||||||||||||||
| 12 | Transition Strips | BASIC | X | X | |||||||||||||||
| 13 | LVT | BASIC | X | X | X | X | |||||||||||||
| 14 | Rubber Cove Base | BASIC | X | X | X | ||||||||||||||
| 15 | Interior Doors, Frames, and Hardware | BASIC | X | X | |||||||||||||||
| 16 | Gypsum Wallboard | BASIC | X | ||||||||||||||||
| 17 | Studs & Framing | BASIC | X | ||||||||||||||||
| 18 | Gypsum Tape | BASIC | X | ||||||||||||||||
| 19 | Gypsum Plaster | BASIC | X | ||||||||||||||||
| 20 | Suspended Ceiling System | BASIC | X | ||||||||||||||||
| 21 | Interior Wall Primer/Paint | BASIC | X | X | |||||||||||||||
| 22 | Interior Door Primer/Paint | BASIC | X | X | |||||||||||||||
| 23 | Exterior Doors, Frames, and Hardware | X | X | ||||||||||||||||
| 24 | Exterior Door Primer/Paint | BASIC | X | X | |||||||||||||||
| 25 | Floor Tiles/ Grout | BASIC | X | X | X | ||||||||||||||
| 26 | Utility Access Panel | X | |||||||||||||||||
| 27 | Parcel Shelving | X | |||||||||||||||||
| 28 | Insulation | X | |||||||||||||||||
| 29 | Cabinet Shop Drawings | X | |||||||||||||||||
| 30 | Cabinets | BASIC | X | X | X | X | |||||||||||||
| 31 | Cabinets Hardware | BASIC | X | X | |||||||||||||||
| 32 | Solid SurfaceCountertops/ Backsplash | BASIC | X | X | X |
AF Form 66 (Substitute) Architectural Page&Pof&N
Civil
| Project No: | Project Title: | Date: | |||||||||||||||||
| EEPZ254664 | Renovate UOQ Community Commons, B972 | 15-Jun-26 | |||||||||||||||||
| LINE NO. | ITEM DESCRIPTION | SPEC REF | NUMBER OF COPIES REQUIRED | DATE KTR REQUIRES APPROVAL | DATE RECEIVED KTR | DATE TO CIVIL ENG | DATE RECEIVED FROM CE | DATE CONTRACTOR NOTIFIED APR DISAPR | CONTRACT RESUBMIT DUE | CONTRACT RESUBMITTAL RECEIVED | FINAL APPROVAL RCVD KTR NOTIFIED | ||||||||
| Certificate of Compliance | Shop Drawings | Samples | Color Selction | Manufacturer's Recommendations | Manufacturer's Warranty | Catalog Data | Operating Instructions | Other | |||||||||||
| GENERAL | |||||||||||||||||||
| 33 | Lean to Roof Extension | X | X | X | |||||||||||||||
| 34 | Concrete Slab | X | |||||||||||||||||
| 35 | Outdoor Wooden Fencing | X | X |
AF Form 66 (Substitute) CIVIL Page&Pof &N
Mechanical
| Project No: | Project Title: | Date: | |||||||||||||||||
| EEPZ254664 | Renovate UOQ Community Commons, B972 | 15-Jun-26 | |||||||||||||||||
| LINE NO. | ITEM DESCRIPTION | SPEC REF | NUMBER OF COPIES REQUIRED | DATE KTR REQUIRES APPROVAL | DATE RECEIVED KTR | DATE TO CIVIL ENG | DATE RECEIVED FROM CE | DATE CONTRACTOR NOTIFIED APR DISAPR | CONTRACT RESUBMIT DUE | CONTRACT RESUBMITTAL RECEIVED | FINAL APPROVAL RCVD KTR NOTIFIED | ||||||||
| Certificate of Compliance | Shop Drawings | Samples | Color Selction | Manufacturer's Recommendations | Manufacturer's Warranty | Catalog Data | Operating Instructions | Other | |||||||||||
| GENERAL | |||||||||||||||||||
| 36 | HVAC TAB Report | BASIC | X | ||||||||||||||||
| 37 | Chilled and heating water piping/fittings | BASIC | X | ||||||||||||||||
| 38 | Condensate drain piping | BASIC | X | ||||||||||||||||
| 39 | Piping insulation | BASIC | X | ||||||||||||||||
| 40 | Thermostats | BASIC | X | X | |||||||||||||||
| 41 | Duct Insulation | BASIC | X | ||||||||||||||||
| 42 | Metal Ductwork | BASIC | X | ||||||||||||||||
| 43 | Dampers | BASIC | X | ||||||||||||||||
| 44 | Diffusers | BASIC | X | X | |||||||||||||||
| 45 | Grilles | BASIC | X | X | |||||||||||||||
| 46 | Controls | BASIC | X | X | |||||||||||||||
| 47 | Exahust Fan | BASIC | X | X | X | ||||||||||||||
| 48 | Faucets/Sinks | BASIC | X | ||||||||||||||||
| 49 | Piping | BASIC | X | ||||||||||||||||
| 50 | Pipe Fittings | BASIC | X | ||||||||||||||||
| 51 | Drinking Fountain | BASIC | X | ||||||||||||||||
| 52 | Water Lines | BASIC | X | ||||||||||||||||
| 53 | Vents | BASIC | X | ||||||||||||||||
| 54 | Traps | BASIC | X | ||||||||||||||||
| 55 | Drains | BASIC | X | ||||||||||||||||
| 56 | Shut-off Valves | BASIC | X | ||||||||||||||||
| 57 | Gas Piping and Fittings | X | |||||||||||||||||
| 58 | Air Handling Unit and Accessories | X | X | X |
AF Form 66 (Substitute) Mechanical Page&Pof&N
Electrical
| Project No: | Project Title: | Date: | |||||||||||||||||
| EEPZ254664 | Renovate UOQ Community Commons, B972 | 15-Jun-26 | |||||||||||||||||
| LINE NO. | ITEM DESCRIPTION | SPEC REF | NUMBER OF COPIES REQUIRED | DATE KTR REQUIRES APPROVAL | DATE RECEIVED KTR | DATE TO CIVIL ENG | DATE RECEIVED FROM CE | DATE CONTRACTOR NOTIFIED APR DISAPR | CONTRACT RESUBMIT DUE | CONTRACT RESUBMITTAL RECEIVED | FINAL APPROVAL RCVD KTR NOTIFIED | ||||||||
| Certificate of Compliance | Shop Drawings | Samples | Color Selction | Manufacturer's Recommendations | Manufacturer's Warranty | Catalog Data | Operating Instructions | Other | |||||||||||
| GENERAL | |||||||||||||||||||
| 59 | Conductor | BASIC | X | ||||||||||||||||
| 60 | Conduit | BASIC | X | ||||||||||||||||
| 61 | Riser Clamps | BASIC | X | ||||||||||||||||
| 62 | Junction Boxes | BASIC | X | ||||||||||||||||
| 63 | Electric Metallic Tubing | BASIC | X | ||||||||||||||||
| 64 | Switch Devices | BASIC | X | X | |||||||||||||||
| 65 | Receptacles | BASIC | X | X | |||||||||||||||
| 66 | Faceplates | BASIC | X | X | |||||||||||||||
| 67 | Wall Jacks | BASIC | X | X | |||||||||||||||
| 68 | Cable Supports | BASIC | X | ||||||||||||||||
| 69 | Circuit Breakers | BASIC | X | ||||||||||||||||
| 70 | Safety Swtiches | BASIC | X | ||||||||||||||||
| 71 | Interior/Exterior LED Fixtures | BASIC | X | X | |||||||||||||||
| 72 | Seismic Wire Support For Light Fixtures | BASIC | X | ||||||||||||||||
| 73 | Fixture Whips | BASIC | X | ||||||||||||||||
| 74 | Occupancy Sensor | BASIC | X | X | |||||||||||||||
| 75 | Electrical Identification/Nameplates/Markers | BASIC | X | ||||||||||||||||
| 76 | Photometric Analysis | BASIC | X |
AF Form 66 (Substitute) Electrical Page&Pof &N
Special Systems
| Project No: | Project Title: | Date: | |||||||||||||||||
| EEPZ254664 | Renovate UOQ Community Commons, B972 | 15-Jun-26 | |||||||||||||||||
| LINE NO. | ITEM DESCRIPTION | SPEC REF | NUMBER OF COPIES REQUIRED | DATE KTR REQUIRES APPROVAL | DATE RECEIVED KTR | DATE TO CIVIL ENG | DATE RECEIVED FROM CE | DATE CONTRACTOR NOTIFIED APR DISAPR | CONTRACT RESUBMIT DUE | CONTRACT RESUBMITTAL RECEIVED | FINAL APPROVAL RCVD KTR NOTIFIED | ||||||||
| Certificate of Compliance | Shop Drawings | Samples | Color Selction | Manufacturer's Recommendations | Manufacturer's Warranty | Catalog Data | Operating Instructions | Other | |||||||||||
| GENERAL | |||||||||||||||||||
| none |
AF Form 66 (Substitute) Special Systems Page&Pof &N
Other&Misc
| Project No: | Project Title: | Date: | |||||||||||||||||
| EEPZ254664 | Renovate UOQ Community Commons, B972 | 15-Jun-26 | |||||||||||||||||
| LINE NO. | ITEM DESCRIPTION | SPEC REF | NUMBER OF COPIES REQUIRED | DATE KTR REQUIRES APPROVAL | DATE RECEIVED KTR | DATE TO CIVIL ENG | DATE RECEIVED FROM CE | DATE CONTRACTOR NOTIFIED APR DISAPR | CONTRACT RESUBMIT DUE | CONTRACT RESUBMITTAL RECEIVED | FINAL APPROVAL RCVD KTR NOTIFIED | ||||||||
| Certificate of Compliance | Shop Drawings | Samples | Color Selction | Manufacturer's Recommendations | Manufacturer's Warranty | Catalog Data | Operating Instructions | Other | |||||||||||
| GENERAL | |||||||||||||||||||
| NONE |
AF Form 66 (Substitute) Other and Misc Page&Pof &N
HAZMAT Tracking Sheet
| Contractor Hazardous Materials Usage Tracking Form | |||||
| Return this form to Contracting/Project Manager with Manufacturers original SDS | |||||
| EEPZ254664 | Renovate UOQ Community Commons, B972 | Contract # | |||
| Start Date: | End Date: | Cotractor: | |||
| Product Name as seen on SDS | |||||
| Process (How is material used) | Part # | Manufacturer | Type of | ||
| Container | Size of Container | Total |
Quantity
| Used | EESOH MSN | |
| 1 | ||
| Process: | ||
| 2 | ||
| Process: | ||
| 3 | ||
| Process: | ||
| 4 | ||
| Process: | ||
| 5 | ||
| Process: | ||
| 6 | ||
| Process: | ||
| 7 | ||
| Process: | ||
| 8 | ||
| Process: | ||
| 9 | ||
| Process: | ||
| 10 | ||
| Process: | ||
| 11 | ||
| Process: | ||
| 12 | ||
| Process: | ||
| 13 | ||
| Process: | ||
| 14 | ||
| Process: | ||
| 15 | ||
| Process: | ||
| 16 | ||
| Process: | ||
| 17 | ||
| Process: | ||
| 18 | ||
| Process: | ||
| 19 | ||
| Process: | ||
| 20 | ||
| Process: | ||
| 21 | ||
| Process: | ||
| 22 | ||
| Process: | ||
| 23 | ||
| Process: | ||
| 24 | ||
| Process: | ||
| 25 | ||
| Process: | ||
| 26 | ||
| Process: | ||
| 27 | ||
| Process: | ||
| 28 | ||
| Process: |
Example and Instructions
| WORKSHEET INSTRUCTIONS | ||
| BLOCK | DESCRIPTION | INFORMATION REQUIRED |
| A | Project Number | Project number or Opportunity number assigned to the project by Civil Engineering. |
| B | Project Title | The title of the project. |
| C | Contract Number | The contract number or delivery order assigned by contracting. |
| D | Product Name | The name of the product as listed on the SDS. |
| E | Process | A Brief description of the work performed with each material. |
| F | Part # | The part number as listed on the SDS. |
| G | Manufacturer | The name of the Manufacturer of the product (not the distributor) |
| H | Type of Container | The type of container that the product comes in. Example: can, barrel, bottle, container, cylinder, drum, etc… |
| I | Size of Container | Size as listed on container. Example: oz, lbs, Liter, Quart, Gallon, etc… |
| J | Total Quantity Used | This will be the amount that you anticipate using for the first submission. At the conclusion of the project you will need to provide a final list with updated quantities. |
| K | EESOH MSN | This is the Material Stock Number assigned for EESOH-MIS tracking. (The Air Force Hazardous Materials Manager will provide this number) |
NOTE: Complete the HAZMAT Tracking Sheet located on the first TAB of this Excel spreadsheet with all hazardous materials to be used during the duration of the construction project. Once completed, save the sheet as a .pdf file and submit to the contracting officer with an AF Form 3000 Submittal form. This data will need to be submitted prior to construction start. When construction is complete, you will submit a final revised report with updated quanties.