This is an AF Form 66 Schedule of Material Submittals for the RENOVATE/CONVERT 50th 49th SQ OPS, B230 project (Project No. EEPZ252131), dated 22 January 2026. The form establishes comprehensive submission and approval requirements for materials and work products across seven discipline categories: General, Environmental, Architectural, Civil, Mechanical, Electrical, and Special Systems.
The General section requires submission of foundational project documents including work/construction plans, phasing plans, demolition plans, as-built drawings, progress schedules, guarantees and warranties, and superintendent qualifications. The Environmental section mandates 11 items including Safety Data Sheets (SDS), green procurement reports, hazardous waste and material reports (AF Form 3000), air emission specifications, recycled material reports, storm water pollution prevention plans, weekly inspection reports, state demolition/renovation notices, and asbestos-containing material (ACM) disposal manifests. The Architectural section details 42 line items covering interior and exterior finishes, insulation types, flooring materials (LVT, carpet, tiles), wall assemblies, doors, hardware, ceilings, paint, bathroom fixtures, cabinets, and hardware. The Mechanical section specifies 26 items including HVAC components (ductwork, dampers, diffusers, controls, split systems, exhaust fans), plumbing fixtures (lavatories, faucets, water closets, showers), and related piping and drainage components. The Electrical section requires 18 submittals for conductors, conduit, junction boxes, switch devices, receptacles, circuit breakers, LED fixtures, occupancy sensors, and photometric analysis. The Special Systems section addresses fire protection with submittals for sprayed fireproofing, firestopping, fire alarm components (detectors, strobes, horns), and testing reports. The form includes columns for tracking submission dates, contractor approval dates, civil engineering review dates, approvals/disapprovals, resubmittal requirements, and final approvals. Additionally, a HAZMAT Tracking Sheet is included requiring contractors to document all hazardous materials usage with product names, processes, part numbers, manufacturers, container types, quantities, and EESOH Material Stock Numbers, with submission required prior to construction start and a final revised report due upon project completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B230_Remaining RFIs.pdf | ||
| Solicitation Amendment FA302226R00070002 SF 30.pdf | ||
| Solicitation Amendment FA302226R00070001 SF 30.pdf | ||
| Appendix A - Cost Breakdown.xlsx | XLSX spreadsheet | |
| B230_RFI-Answers.pdf | ||
| B230_Sign in Sheet.pdf | ||
| EAL Form.pdf | ||
| MFR CUI Contractor Training Acknowledgment.pdf | ||
| SOW_B230 Renovate Convert 50th 49th SQ OPS.pdf | ||
| Solicitation - FA302226R0007.pdf | ||
| Contractors CUI Training Slides.pptx | PPTX presentation | |
| Wage determination.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General
| Project No: | Project Title: | Date: | |||||||||||||||||
| EEPZ252131 | RENOVATE CONVERT 50th 49th SQ OPS, B230 | 22-Jan-26 | |||||||||||||||||
| LINE NO. | ITEM DESCRIPTION | SPEC REF | NUMBER OF COPIES REQUIRED | DATE KTR REQUIRES APPROVAL | DATE RECEIVED KTR | DATE TO CIVIL ENG | DATE RECEIVED FROM CE | DATE CONTRACTOR NOTIFIED APR DISAPR | CONTRACT RESUBMIT DUE | CONTRACT RESUBMITTAL RECEIVED | FINAL APPROVAL RCVD KTR NOTIFIED | ||||||||
| Certificate of Compliance | Shop Drawings | Samples | Color Selction | Manufacturer's Recommendations | Manufacturer's Warranty | Catalog Data | Operating Instructions | Other | |||||||||||
| GENERAL | |||||||||||||||||||
| 1 | Work/Construction Plan | BASIC | X | ||||||||||||||||
| 2 | Phasing Plan | BASIC | X | ||||||||||||||||
| 3 | Demolition Plan | BASIC | X | ||||||||||||||||
| 4 | As-Built Drawings | BASIC | X | ||||||||||||||||
| 5 | Progress Schedule | BASIC | X | ||||||||||||||||
| 6 | Guarantees and Warranties | BASIC | X | ||||||||||||||||
| 7 | Superintendent's Qualifications and Experience | BASIC | X |
AF Form 66 (Substitute) GENERAL Page&Pof&N
SCHEDULE OF MATERIAL SUBMITTALS
Environmental
| Project No: | Project Title: | Date: | |||||||||||||||||
| EEPZ252131 | RENOVATE CONVERT 50th 49th SQ OPS, B230 | 22-Jan-26 | |||||||||||||||||
| LINE NO. | ITEM DESCRIPTION | SPEC REF | NUMBER OF COPIES REQUIRED | DATE KTR REQUIRES APPROVAL | DATE RECEIVED KTR | DATE TO CIVIL ENG | DATE RECEIVED FROM CE | DATE CONTRACTOR NOTIFIED APR DISAPR | CONTRACT RESUBMIT DUE | CONTRACT RESUBMITTAL RECEIVED | FINAL APPROVAL RCVD KTR NOTIFIED | ||||||||
| Certificate of Compliance | Shop Drawings | Samples | Color Selction | Manufacturer's Recommendations | Manufacturer's Warranty | Catalog Data | Operating Instructions | Other | |||||||||||
| GENERAL | |||||||||||||||||||
| 8 | Appropriate SDS | BASIC | X | ||||||||||||||||
| 9 | Green Procurment Report | BASIC | X | ||||||||||||||||
| 10 | Hazardous waste report | BASIC | X | ||||||||||||||||
| 11 | Hazardous Material Report (AF Form 3000) | BASIC | X | ||||||||||||||||
| 12 | Air Emission Source Specifications for equipment removed | BASIC | X | ||||||||||||||||
| 13 | Recycled Material Report/Construction Debris report | BASIC | X | ||||||||||||||||
| 14 | Storm Water Pollution Prevention Plan with Best Management Practices Identified | BASIC | X | ||||||||||||||||
| 15 | Weekly Inspection Reports for Projects | BASIC | X | ||||||||||||||||
| 16 | State Notification for Demolition & Renovation 10 day notice | BASIC | X | ||||||||||||||||
| 17 | Work Plan | BASIC | X | ||||||||||||||||
| 18 | Copy of ACM Disposal Manifest | BASIC | X |
AF Form 66 (Substitute) Environmental Page&Pof &N
SCHEDULE OF MATERIAL SUBMITTALS
Architectural
| Project No: | Project Title: | Date: | |||||||||||||||||
| EEPZ252131 | RENOVATE CONVERT 50th 49th SQ OPS, B230 | 22-Jan-26 | |||||||||||||||||
| LINE NO. | ITEM DESCRIPTION | SPEC REF | NUMBER OF COPIES REQUIRED | DATE KTR REQUIRES APPROVAL | DATE RECEIVED KTR | DATE TO CIVIL ENG | DATE RECEIVED FROM CE | DATE CONTRACTOR NOTIFIED APR DISAPR | CONTRACT RESUBMIT DUE | CONTRACT RESUBMITTAL RECEIVED | FINAL APPROVAL RCVD KTR NOTIFIED | ||||||||
| Certificate of Compliance | Shop Drawings | Samples | Color Selction | Manufacturer's Recommendations | Manufacturer's Warranty | Catalog Data | Operating Instructions | Other | |||||||||||
| GENERAL | |||||||||||||||||||
| 19 | Interior Wall Insulation | BASIC | X | X | X | ||||||||||||||
| 20 | Exterior Wall Insulation | BASIC | X | X | X | ||||||||||||||
| 21 | Ceiling Insulation | BASIC | X | X | X | ||||||||||||||
| 22 | Exterior Wall Assemblies | BASIC | X | X | X | X | X | ||||||||||||
| 23 | Cement/Concrete | BASIC | X | X | X | X | |||||||||||||
| 24 | Hard Surface Transition Strips | BASIC | X | X | X | X | X | ||||||||||||
| 25 | Concrete Stain | BASIC | X | X | X | X | X | X | |||||||||||
| 26 | Epoxy | BASIC | X | X | X | X | X | X | |||||||||||
| 27 | Floor Tiles | BASIC | X | X | X | X | X | ||||||||||||
| 28 | Cementitious Backerboard | BASIC | X | X | X | ||||||||||||||
| 29 | Wall Tiles | BASIC | X | X | X | X | X | ||||||||||||
| 30 | Profiles/Transitions (For Inside Wall Corners and Floor/Wall Transitions) | BASIC | X | X | X | X | X | ||||||||||||
| 31 | Grout | BASIC | X | X | X | X | X | ||||||||||||
| 32 | LVT | BASIC | X | X | X | X | X | ||||||||||||
| 33 | Carpet | BASIC | X | X | X | X | X | ||||||||||||
| 34 | Rubber Cove Base | BASIC | X | X | X | X | X | ||||||||||||
| 35 | Interior Man Doors | BASIC | X | ||||||||||||||||
| 1. Doorframes | BASIC | X | X | X | |||||||||||||||
| 2. Cased Openings | BASIC | X | X | ||||||||||||||||
| 3. Doors | BASIC | X | X | X | X | ||||||||||||||
| 4. Hardware | BASIC | X | X | ||||||||||||||||
| 5. Thresholds and Weatherstripping | BASIC | X | X | ||||||||||||||||
| 36 | Concrete Masonry Unit (CMU) | BASIC | X | X | X | X | X | ||||||||||||
| 37 | Gypsum Wallboard | BASIC | X | X | X | ||||||||||||||
| 38 | Galvanized Steel Furring | BASIC | X | X | X | ||||||||||||||
| 39 | Galvanized Steel Studs & Framing | BASIC | X | X | X | X | |||||||||||||
| 40 | Galvanized Steel Bracing Strips | BASIC | X | X | X | X | |||||||||||||
| 41 | Gypsum Tape | BASIC | X | X | X | ||||||||||||||
| 42 | Gypsum Plaster | BASIC | X | X | |||||||||||||||
| 43 | Suspended Ceiling | BASIC | X | ||||||||||||||||
| 1. Ceiling Grid | BASIC | X | X | X | X | ||||||||||||||
| 2. Ceiling Tiles | BASIC | X | X | X | X | ||||||||||||||
| 3. Grid Supports | BASIC | X | X | X | |||||||||||||||
| 4. Seismic Supports | BASIC | X | X | X | X | ||||||||||||||
| 44 | Exterior Wall Primer/Paint | BASIC | X | X | X | X | X | ||||||||||||
| 45 | Interior Wall Primer/Paint | BASIC | X | X | X | X | |||||||||||||
| 46 | Exterior Door Primer/Paint | BASIC | X | X | X | X | X | ||||||||||||
| 47 | Interior Door Primer/Paint | BASIC | X | X | X | X | |||||||||||||
| 48 | Bathroom Vanity | BASIC | X | X | X | ||||||||||||||
| 49 | Vanity Handles | BASIC | X | X | X | X | X | ||||||||||||
| 50 | Cabinets | BASIC | X | X | X | X | X | ||||||||||||
| 51 | Cabinets Hardware | BASIC | X | X | X | X | X | ||||||||||||
| 52 | Shelving | BASIC | X | X | X | X | X | ||||||||||||
| 53 | Solid SurfaceCountertops/ Backsplash | BASIC | X | X | X | X | X | ||||||||||||
| 54 | Stall Partitions | BASIC | X | X | X | X | X | ||||||||||||
| 55 | Grab Bars | BASIC | X | X | X | ||||||||||||||
| 56 | Mirrors | BASIC | X | X | X | ||||||||||||||
| 57 | Napkin/Tampon Recepticles | BASIC | X | X | X | ||||||||||||||
| 58 | Toilet Tissue Dispenser | BASIC | X | X | X | ||||||||||||||
| 59 | Hardware | BASIC | X | X | X | ||||||||||||||
| 60 | Fasteners | BASIC | X | X | X |
AF Form 66 (Substitute) Architectural Page&Pof&N
Civil
| Project No: | Project Title: | Date: | |||||||||||||||||
| EEPZ252131 | RENOVATE CONVERT 50th 49th SQ OPS, B230 | 22-Jan-26 | |||||||||||||||||
| LINE NO. | ITEM DESCRIPTION | SPEC REF | NUMBER OF COPIES REQUIRED | DATE KTR REQUIRES APPROVAL | DATE RECEIVED KTR | DATE TO CIVIL ENG | DATE RECEIVED FROM CE | DATE CONTRACTOR NOTIFIED APR DISAPR | CONTRACT RESUBMIT DUE | CONTRACT RESUBMITTAL RECEIVED | FINAL APPROVAL RCVD KTR NOTIFIED | ||||||||
| Certificate of Compliance | Shop Drawings | Samples | Color Selction | Manufacturer's Recommendations | Manufacturer's Warranty | Catalog Data | Operating Instructions | Other | |||||||||||
| GENERAL | |||||||||||||||||||
| NONE |
AF Form 66 (Substitute) CIVIL Page&Pof &N
Mechanical
| Project No: | Project Title: | Date: | |||||||||||||||||
| EEPZ252131 | RENOVATE CONVERT 50th 49th SQ OPS, B230 | 22-Jan-26 | |||||||||||||||||
| LINE NO. | ITEM DESCRIPTION | SPEC REF | NUMBER OF COPIES REQUIRED | DATE KTR REQUIRES APPROVAL | DATE RECEIVED KTR | DATE TO CIVIL ENG | DATE RECEIVED FROM CE | DATE CONTRACTOR NOTIFIED APR DISAPR | CONTRACT RESUBMIT DUE | CONTRACT RESUBMITTAL RECEIVED | FINAL APPROVAL RCVD KTR NOTIFIED | ||||||||
| Certificate of Compliance | Shop Drawings | Samples | Color Selction | Manufacturer's Recommendations | Manufacturer's Warranty | Catalog Data | Operating Instructions | Other | |||||||||||
| GENERAL | |||||||||||||||||||
| 61 | HVAC TAB Report | BASIC | X | X | X | X | |||||||||||||
| 62 | Duct Insulation | BASIC | X | X | X | X | |||||||||||||
| 63 | Metal Ductwork | BASIC | X | X | X | X | X | X | |||||||||||
| 64 | Dampers | BASIC | X | X | X | X | X | ||||||||||||
| 65 | Diffusers | BASIC | X | X | X | X | X | X | |||||||||||
| 66 | Grilles | BASIC | X | X | X | X | X | X | |||||||||||
| 67 | Controls | BASIC | X | X | X | X | X | X | |||||||||||
| 68 | Split Systems | BASIC | X | X | X | X | X | X | |||||||||||
| 69 | Exahust Fan | BASIC | X | X | X | X | X | X | |||||||||||
| 70 | Lavatories | BASIC | X | X | X | X | X | X | |||||||||||
| 71 | Faucets | BASIC | X | X | X | X | X | ||||||||||||
| 72 | Piping | BASIC | X | X | X | X | |||||||||||||
| 73 | Pipe Fittings | X | X | X | |||||||||||||||
| 74 | Water Closets | BASIC | X | X | X | X | X | ||||||||||||
| 75 | Flush Handles | BASIC | X | X | X | X | X | ||||||||||||
| 76 | Carriers | BASIC | X | X | X | ||||||||||||||
| 77 | Hardware | BASIC | X | X | X | ||||||||||||||
| 78 | Fasteners | BASIC | X | X | X | ||||||||||||||
| 79 | Drinking Fountain | BASIC | X | X | X | X | |||||||||||||
| 80 | Showers | BASIC | X | X | X | X | X | ||||||||||||
| 81 | Water Lines | BASIC | X | X | X | ||||||||||||||
| 82 | Vents | BASIC | X | X | X | ||||||||||||||
| 83 | Traps | BASIC | X | X | X | ||||||||||||||
| 84 | Copper Caps | BASIC | X | X | X | ||||||||||||||
| 85 | Drains | BASIC | X | X | X | ||||||||||||||
| 86 | Shut-off Valves | BASIC | X | X | X | X |
AF Form 66 (Substitute) Mechanical Page&Pof&N
Electrical
| Project No: | Project Title: | Date: | |||||||||||||||||
| EEPZ252131 | RENOVATE CONVERT 50th 49th SQ OPS, B230 | 22-Jan-26 | |||||||||||||||||
| LINE NO. | ITEM DESCRIPTION | SPEC REF | NUMBER OF COPIES REQUIRED | DATE KTR REQUIRES APPROVAL | DATE RECEIVED KTR | DATE TO CIVIL ENG | DATE RECEIVED FROM CE | DATE CONTRACTOR NOTIFIED APR DISAPR | CONTRACT RESUBMIT DUE | CONTRACT RESUBMITTAL RECEIVED | FINAL APPROVAL RCVD KTR NOTIFIED | ||||||||
| Certificate of Compliance | Shop Drawings | Samples | Color Selction | Manufacturer's Recommendations | Manufacturer's Warranty | Catalog Data | Operating Instructions | Other | |||||||||||
| GENERAL | |||||||||||||||||||
| 87 | Conductor | BASIC | X | ||||||||||||||||
| 88 | Conduit | BASIC | X | ||||||||||||||||
| 89 | Riser Clamps | BASIC | X | ||||||||||||||||
| 90 | Junction Boxes | BASIC | X | X | X | ||||||||||||||
| 91 | Electric Metallic Tubing | BASIC | X | ||||||||||||||||
| 92 | Switch Devices | BASIC | X | X | X | X | X | ||||||||||||
| 93 | Receptacles | BASIC | X | X | X | ||||||||||||||
| 94 | Faceplates | BASIC | X | X | X | X | |||||||||||||
| 95 | Wall Jacks | BASIC | X | X | X | ||||||||||||||
| 96 | Cable Supports | BASIC | X | ||||||||||||||||
| 97 | Circuit Breakers | BASIC | X | X | X | X | X | ||||||||||||
| 98 | Safety Swtiches | BASIC | X | X | X | X | X | ||||||||||||
| 99 | Interior LED Fixtures | BASIC | X | X | X | X | X | ||||||||||||
| 100 | Seismic Wire Support For Light Fixtures | BASIC | X | X | X | X | |||||||||||||
| 101 | Fixture Whips | BASIC | X | X | X | ||||||||||||||
| 102 | Occupancy Sensor | BASIC | X | X | X | X | X | ||||||||||||
| 103 | Electrical Identification/Nameplates/Markers | BASIC | X | ||||||||||||||||
| 104 | Photometric Analysis | BASIC | X |
AF Form 66 (Substitute) Electrical Page&Pof &N
Special Systems
| Project No: | Project Title: | Date: | |||||||||||||||||
| EEPZ252131 | RENOVATE CONVERT 50th 49th SQ OPS, B230 | 22-Jan-26 | |||||||||||||||||
| LINE NO. | ITEM DESCRIPTION | SPEC REF | NUMBER OF COPIES REQUIRED | DATE KTR REQUIRES APPROVAL | DATE RECEIVED KTR | DATE TO CIVIL ENG | DATE RECEIVED FROM CE | DATE CONTRACTOR NOTIFIED APR DISAPR | CONTRACT RESUBMIT DUE | CONTRACT RESUBMITTAL RECEIVED | FINAL APPROVAL RCVD KTR NOTIFIED | ||||||||
| Certificate of Compliance | Shop Drawings | Samples | Color Selction | Manufacturer's Recommendations | Manufacturer's Warranty | Catalog Data | Operating Instructions | Other | |||||||||||
| GENERAL | |||||||||||||||||||
| 104 | Sprayed Fireproofing | BASIC | X | X | X | X | |||||||||||||
| 105 | Firestopping | BASIC | X | X | X | X | |||||||||||||
| 106 | Fiber Card (Notifier 320 Capatable) | BASIC | X | X | X | X | X | X | |||||||||||
| 107 | Heat/Smoke Detectors | BASIC | X | X | X | X | X | ||||||||||||
| 108 | Strobes and Horns, ADA | BASIC | X | X | X | X | X | ||||||||||||
| 109 | Preliminary Testing Reports | BASIC | X | ||||||||||||||||
| 110 | Acceptance Testing Reports | BASIC | X | X |
AF Form 66 (Substitute) Special Systems Page&Pof &N
Other&Misc
| Project No: | Project Title: | Date: | |||||||||||||||||
| EEPZ252131 | RENOVATE CONVERT 50th 49th SQ OPS, B230 | 22-Jan-26 | |||||||||||||||||
| LINE NO. | ITEM DESCRIPTION | SPEC REF | NUMBER OF COPIES REQUIRED | DATE KTR REQUIRES APPROVAL | DATE RECEIVED KTR | DATE TO CIVIL ENG | DATE RECEIVED FROM CE | DATE CONTRACTOR NOTIFIED APR DISAPR | CONTRACT RESUBMIT DUE | CONTRACT RESUBMITTAL RECEIVED | FINAL APPROVAL RCVD KTR NOTIFIED | ||||||||
| Certificate of Compliance | Shop Drawings | Samples | Color Selction | Manufacturer's Recommendations | Manufacturer's Warranty | Catalog Data | Operating Instructions | Other | |||||||||||
| GENERAL | |||||||||||||||||||
| NONE |
AF Form 66 (Substitute) Other and Misc Page&Pof &N
HAZMAT Tracking Sheet
| Contractor Hazardous Materials Usage Tracking Form | |||||
| Return this form to Contracting/Project Manager with Manufacturers original SDS | |||||
| EEPZ252131 | RENOVATE CONVERT 50th 49th SQ OPS, B230 | Contract # | |||
| Start Date: | End Date: | Cotractor: | |||
| Product Name as seen on SDS | |||||
| Process (How is material used) | Part # | Manufacturer | Type of | ||
| Container | Size of Container | Total |
Quantity
| Used | EESOH MSN | |
| 1 | ||
| Process: | ||
| 2 | ||
| Process: | ||
| 3 | ||
| Process: | ||
| 4 | ||
| Process: | ||
| 5 | ||
| Process: | ||
| 6 | ||
| Process: | ||
| 7 | ||
| Process: | ||
| 8 | ||
| Process: | ||
| 9 | ||
| Process: | ||
| 10 | ||
| Process: | ||
| 11 | ||
| Process: | ||
| 12 | ||
| Process: | ||
| 13 | ||
| Process: | ||
| 14 | ||
| Process: | ||
| 15 | ||
| Process: | ||
| 16 | ||
| Process: | ||
| 17 | ||
| Process: | ||
| 18 | ||
| Process: | ||
| 19 | ||
| Process: | ||
| 20 | ||
| Process: | ||
| 21 | ||
| Process: | ||
| 22 | ||
| Process: | ||
| 23 | ||
| Process: | ||
| 24 | ||
| Process: | ||
| 25 | ||
| Process: | ||
| 26 | ||
| Process: | ||
| 27 | ||
| Process: | ||
| 28 | ||
| Process: |
Example and Instructions
| WORKSHEET INSTRUCTIONS | ||
| BLOCK | DESCRIPTION | INFORMATION REQUIRED |
| A | Project Number | Project number or Opportunity number assigned to the project by Civil Engineering. |
| B | Project Title | The title of the project. |
| C | Contract Number | The contract number or delivery order assigned by contracting. |
| D | Product Name | The name of the product as listed on the SDS. |
| E | Process | A Brief description of the work performed with each material. |
| F | Part # | The part number as listed on the SDS. |
| G | Manufacturer | The name of the Manufacturer of the product (not the distributor) |
| H | Type of Container | The type of container that the product comes in. Example: can, barrel, bottle, container, cylinder, drum, etc… |
| I | Size of Container | Size as listed on container. Example: oz, lbs, Liter, Quart, Gallon, etc… |
| J | Total Quantity Used | This will be the amount that you anticipate using for the first submission. At the conclusion of the project you will need to provide a final list with updated quantities. |
| K | EESOH MSN | This is the Material Stock Number assigned for EESOH-MIS tracking. (The Air Force Hazardous Materials Manager will provide this number) |
NOTE: Complete the HAZMAT Tracking Sheet located on the first TAB of this Excel spreadsheet with all hazardous materials to be used during the duration of the construction project. Once completed, save the sheet as a .pdf file and submit to the contracting officer with an AF Form 3000 Submittal form. This data will need to be submitted prior to construction start. When construction is complete, you will submit a final revised report with updated quanties.