AF Form 66 (Schedule of Material Submittals) is a tracking template used by the Air Force to manage contractor submissions throughout a construction project. This form is populated for Solicitation FA480326Q0040 for the Replace Chapel Windows B912 project at Shaw Air Force Base, South Carolina, and documents all required material submittals, approvals, and associated timelines.
The form identifies five key submittal items required from the contractor: a Construction Schedule (due within 5 days of Notice to Proceed), Operation & Maintenance Manuals, Window Shop Drawings, Glass Cut Sheet, and As-Built Drawings. For each submittal, the form provides columns to track submission dates, dates received by the contracting office, return suspense dates, submittal numbers, contractor resubmittal dates, and final approval status with remarks indicating whether items were approved or disapproved. This template serves as the administrative tool for the Contracting Officer and Project Engineer to monitor compliance with material submittal requirements and ensure all submittals are completed in accordance with the contract schedule during the 60-calendar-day period of performance for this small business set-aside construction project.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NCOC-A
| PROJECT NUMBER : | PROJECT TITLE: | SOLICITATION/CONTRACT NO.: | |
| SCHEDULE OF MATERIAL SUBMITTALS | |||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR |
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | OTHER | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DIS- APPROVED | |||||||||||||||||||
| 1 | Construction Schedule | x | Within 5 days of NTP | |||||||||||||||||
| 2 | O&M Manuals | x | ||||||||||||||||||
| 3 | Window Shop Drawings | x | ||||||||||||||||||
| 4 | Glass Cut Sheet | x | ||||||||||||||||||
| 5 | As-Built Drawings | x | ||||||||||||||||||
| 6 | ||||||||||||||||||||
| 7 | ||||||||||||||||||||
| 8 | ||||||||||||||||||||
| 9 | ||||||||||||||||||||
| 10 | ||||||||||||||||||||
| 11 | ||||||||||||||||||||
| 12 | ||||||||||||||||||||
| 13 | ||||||||||||||||||||
| 14 | ||||||||||||||||||||
| 15 | ||||||||||||||||||||
| 16 | ||||||||||||||||||||
| 17 | ||||||||||||||||||||
| 18 | ||||||||||||||||||||
| 19 |
Solicitation No. F38604-99-1480 Attachment 6
AF FORM 66
(Computer Generated) PAGE &P of &N