Attachment 7 - AF Form 66.xlsx

Air Force Form XLSX spreadsheet 27 KB Posted

Attached to
Replace Chapel Windows B912
Solicitation number
FA480326Q0040
Issued by

About this file

AF Form 66 (Schedule of Material Submittals) is a tracking template used by the Air Force to manage contractor submissions throughout a construction project. This form is populated for Solicitation FA480326Q0040 for the Replace Chapel Windows B912 project at Shaw Air Force Base, South Carolina, and documents all required material submittals, approvals, and associated timelines.

The form identifies five key submittal items required from the contractor: a Construction Schedule (due within 5 days of Notice to Proceed), Operation & Maintenance Manuals, Window Shop Drawings, Glass Cut Sheet, and As-Built Drawings. For each submittal, the form provides columns to track submission dates, dates received by the contracting office, return suspense dates, submittal numbers, contractor resubmittal dates, and final approval status with remarks indicating whether items were approved or disapproved. This template serves as the administrative tool for the Contracting Officer and Project Engineer to monitor compliance with material submittal requirements and ensure all submittals are completed in accordance with the contract schedule during the 60-calendar-day period of performance for this small business set-aside construction project.

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 09-AF form 66 03.27.2025.pdf Mar 27, 2025 B611 HVAC Repair
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NCOC-A

PROJECT NUMBER :PROJECT TITLE:SOLICITATION/CONTRACT NO.:
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSOTHERREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS- APPROVED
1Construction SchedulexWithin 5 days of NTP
2O&M Manualsx
3Window Shop Drawingsx
4Glass Cut Sheetx
5As-Built Drawingsx
6
7
8
9
10
11
12
13
14
15
16
17
18
19