Atch__31_-_Addendum__1_Mech-Elec.pdf

PDF 169 KB Posted

Attached to
Mechanical Electrical IDIQ Federal contract opportunity
Solicitation number
FA8501-18-R-0003
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

This addendum pertains to a mechanical-electrical indefinite-delivery indefinite-quantity construction contract for Robins Air Force Base in Georgia. The addendum provides seven clarifications and additions to the statement of work, including designating an alternate as part of the project rather than optional, requiring asbestos and lead-based paint surveys of the construction area with ten sample locations each, specifying humidity control requirements for one rooftop unit, addressing positive building pressurization issues through minor design and construction work, and incorporating a provided concrete specification. Bidders should account for the costs of the asbestos and lead-based paint surveys and reports in their pricing. Any required abatement work would be handled through a subsequent contract modification after award.

Atch #31 - Addendum #1 to Mech-Elec

View the file

Other files for this federal contract opportunity

Other files attached to Mechanical Electrical IDIQ, newest first.
File Type Posted
RFI__6_Answers.pdf PDF
Atch__8_-_AF_Form_3052.xlsx XLSX spreadsheet
Atch__10_-_AF_Form_3065.xlsx XLSX spreadsheet
Atch__9_-_AF_Form_3064.xlsx XLSX spreadsheet
Atch__33_-_Addendum__2_Mech_Elec.pdf PDF
RFI__5_Answer.pdf PDF
Atch__35_-_09_29_00_-_Gypsum_Board.pdf PDF
Atch__34_-_Revised_Project_Table_of_Contents_22_Mar_18.pdf PDF
FA8501-18-R-0003-0002.pdf PDF
Atch__14_-_Schedule_of_Values.xlsx XLSX spreadsheet
RFI__4_Answers.pdf PDF
RFI__3_Answers.pdf PDF
Atch__30_-_VPP_DART-TCIR_Chart.xlsx XLSX spreadsheet
Atch__32_-_CIP_Concrete_Specifications.pdf PDF
RFI__2_Answers.pdf PDF
FA8501-18-R-0003-0001.pdf PDF
RFI__1_Answers.pdf PDF
Site_Visit_Slides_&_Sign_In_Sheet.pdf PDF
Atch__15_-_BLANK_SAMPLE_Dig_Permit_Form_v3.0.pdf PDF
Atch__17_-_BLANK_SAMPLE_DD_Form_1354_Transfer_and_Acceptance_of_DoD_Real_Property.pdf PDF
Atch__2_-_App_C_UHHZ_170241.pdf PDF
Atch__1_-_Mech-Elec_SOW.pdf PDF
Atch__10_-_BLANK_SAMPLE_AF_Form_3065.pdf PDF
Atch__14_-_BLANK_SAMPLE_Schedule_of_Values_Template_UNLOCKED.pdf PDF
Atch__20_-_Best_Practices_for_Landscape_Guidelines_Robins_AFB_3-15-2011.pdf PDF
Atch__12_-_01560_Environmental_Requirements_2018.pdf PDF
Atch__29_-_UHHZ090516_Combined_Drawings.pdf PDF
Atch__4_-_Robins_AFB_Division_1_Specs_and_Forms_REVISED_24_April_2017.pdf PDF
Atch__28_-_UHHZ090516_Combined_Specifications.pdf PDF
Atch__9_-_BLANK_SAMPLE_AF_Form_3064.pdf PDF
Atch__23_-_AFI_31-204_RAFB_Sup_1_Motor_Vehicle_Traffic_Supervision.pdf PDF
Atch__30_-_VPP_DART-TCIR_Chart.xlsx XLSX spreadsheet
Atch__8_-_BLANK_SAMPLE_AF_Form_3052.pdf PDF
Atch__13_-_Wage_Determination.pdf PDF
Atch__5_-_UHHZ170241_BIDDING_SCHEDULE_(TEP).pdf PDF
Atch__11_-_BLANK_SAMPLE_AF_Form_3000_with_digital_signatures.pdf PDF
Atch__26_-_UFC_4_010_05_Sensitive_Compartmented_Information_Facilities_Planning,_Design,_and_Construction.pdf PDF
Atch__18_-_Technical_Spec_for_ICD705_version1.2_April_23_2012.pdf PDF
Atch__19_-_AFSC_Energy_Metering_Requirements_24_June_2016.pdf PDF
Atch__7_-_Robins_AFB_Asbestos_Management_Plan_-_January_2015.pdf PDF
FA8501-18-R-0003.pdf PDF
Atch__16_-_BLANK_SAMPLE_Master_Utility_Outage.pdf PDF
Atch__24_-_Air_Force_Manual_32_1084_Civil_Engineering_Facility_Requirements.pdf PDF
Atch__22_-_BLANK_SAMPLE_AF_Form_66_SUBMITTAL_REGISTER.pdf PDF
Atch__3_-_PROCEDURAL_GUIDE_FOR_DESIGNERS_INCLUDING_AE_FIRMS_29_May_15.pdf PDF
Atch__21_-_Form20SP.STANDARDSensitiveEquipmentPropertyRequest.Revised15July2016.pdf PDF
Atch__27_-_BFS-RAFB_16_FEB_17.pdf PDF
Atch__25_-_AF_Form_2586_Flightline_Driving_Request.pdf PDF
Atch__6_-_Robins_AFB_Architectural_Compatiblity_Standards_18_Aug_2015.pdf PDF
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page 1 of 2 UHHZ 170241

Addendum No. 1

FOR

UHHZ 170241

MECHANICAL ELECTRICAL (MECH/ELEC) IDIQ CONTRACT

ROBINS AIR FORCE BASE, GEORGIA

12 March 2018

PLEASE INCLUDE THE FOLLOWING IN THE STATEMENT OF WORK:

1. The design shown on Alternate No. 1 is now considered part of this project and is no longer an alternate.

2. The existence of ACM in the construction area has not been independently verified. The Contractor shall disregard in Section 1.01, Part K “Asbestos Abatement” and instead perform ACM survey of the construction area. The Contractor shall assume ten (10) sample locations for the purpose of bidding. The Contractor shall include in their price the cost of ACM survey and report to identify the existence and extent of ACM materials. The abatement portion of the work, if required, shall be handled with a subsequent contract modification after award.

3. The existence of LBP in the construction area has not been independently verified. The Contractor shall disregard in Section 1.01, Part L pertaining to LBP protection and instead perform LBP survey of the construction area. The Contractor shall assume ten (10) sample locations for the purpose of bidding. The Contractor shall include in their price the cost of LBP survey and report to identify the existence and extent of LBP materials. The abatement portion of the work, if required, shall be handled with a subsequent contract modification after award.

4. The HVAC controls sequence shall not include economizer operations on any of the HVAC systems being installed. Outdoor air economizers will not be utilized for this facility.

5. RTU-4 shall include humidity control. RTU 1 has a dehumidification sequence listed, this sequence also applies to RTU-4. Provide all hardware and software as needed to accomplish dehumidification control.

6. The Contractor shall provide minor design services and construction to analyze and address any positive building pressurization issues. The design shall provide and maintain a building static

Page 2 of 2 UHHZ 170241 pressure of approximately 0.05 inches (12.5 Pa) positive static pressure near the building entries. No additional roof penetrations will be permitted in this project.

7. The GOV has provided specification 03 30 53 “Cast In Place Concrete”.

George Davis Huckabee PE, PMP Electrical Engineer, Project Manager Project Execution Section Robins AFB: 78 CEG/Engineering Division

2018-03-12T09:46:26-0400
HUCKABEE.GEORGE.D.1539563900

File details come from the government source that posted it. Updated .