Attachment 4 - AF Form 66 Submittal Register.pdf

PDF 83 KB Posted

Attached to
Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Solicitation number
FA461326R0003
Issued by

About this file

This is an AF Form 66, Schedule of Material Submittals, used to track and manage contractor submissions for the Building 65 Telephone Office renovation project (Tririga #1157290). The form is a template designed for use in federal construction contracts to document the submission requirements and approval status of materials and documentation throughout a project.

The form identifies 11 line items requiring contractor submittals: Paint (lines 1 and 11), Carpet Tiles, Rubber Base, Health and Safety Plan, Work Schedule Plan, Warranty, Door Hardware, Acoustical Ceiling System, Lighting, and Porcelain Stone Wall Tile. The form provides checkboxes for 15 different submittal types, including Certification of Compliance, Shop Drawings, Samples, Color Selections, Schedule of Materials, Technical Data, Installation Instructions, Operating Instructions, MSDS Sheets, Test Reports, and Manufacturer's Warranty. The right side of the form includes columns for tracking the required submission date, date received in contracting, date forwarded to civil engineering, return suspense date, submittal number, contractor notification status, contractor resubmittal status, final approval status (approved or disapproved), and remarks. This form functions as a management tool to ensure all required materials and documentation are submitted, reviewed, and approved before installation or use in the construction project.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIAL SUBMITTALS SOLICITATION/CONTRACT NO.

AF FORM 66 Page 1 of 1

TO BE COMPLETED BY ARCHITECT-ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

CE

RT

IF

IC

AT

IO

N O

F

CO

M

PL

IA

N

CE

SH

O

P

DR

AW

IN

G S

SA

M

PL

ES

CO

LO

R

SE

LE

CT

IO

N

SC

HE

DU

LE

O F

M

AT

ER

IA

LS

TE

CH

N

IC

AL

D

AT

A

IN

ST

AL

LA

TI

O

N

IN

ST

RU

CT

IO

N S

O

PE

RA

TI

N G

IN

ST

RU

CT

IO

N

S

M

SD

S

SH

EE

TS

TE

ST

R

EP

O

RT

S

M

AN

U

FA

CT

U

RE

R'

S W

AR

RA

N

TY

RE

Q

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

DA

TE

R

EC

EI

VE

D

IN

C O

N

TR

AC

TI

N G

DA

TE

T O

C

IV

IL

E

N G

IN

EE

RI

N

G

RE

TU

RN

S

U

SP

EN

SE

D

AT

E

SU

BM

IT

TA

L N

U M

BE

R

CO

N

TR

AC

TO

R

RE

SU

BM

IT

TA

L

FI

N

AL

A

PP

RO

VA

L

REMARKS

App'd Disap p'd 1 Paint

2 Carpet Tiles

3 Rubber Base

4 Health and Safety Plan

5 Work Schedule Plan

6 Warranty

7 Door Hardware

8 Acoustical Ceiling System

9 Lighting

10 Porcelain Stone Wall Tile

11 Paint

PROJECT: Bldg. 65 - Renovate Telephone Offi Tririga # 1157290

CONTRACTOR

NOTIFIED

Section 01

File details come from the government source that posted it. Updated .