B730 Renovate Convert Comm to SAPR
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- FA302226R0025
- Agency
-
Air Education and Training Command
Air Force, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Columbus, Mississippi 39710, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Air Force Education and Training Command seeks renovation and conversion of rooms 131, 135, 135A, and 140 in Building 730 at Columbus Air Force Base, Mississippi, into Sexual Assault Prevention and Response (SAPR) facilities (one storage area, one reception/waiting area, and six offices), with proposals due August 24 at 2:00 PM CDT. The procurement is a total small business set-aside under NAICS 236220, Commercial and Institutional Building Construction.
Place of performance is Columbus, Mississippi. The contractor must provide all plant, labor, equipment, transportation, and tools to complete interior construction including non-load-bearing partitions, flooring (20 mil LVT plank in common areas, 24" x 24" carpet tiles in offices), 2' x 2' acoustical ceiling grids, comprehensive mechanical and electrical upgrades, fire alarm and sprinkler system modifications, and installation of two duress alarm buttons wired to an existing Honeywell Vindicator system. Soundproofing materials must achieve Sound Transmission Class (STC) 50–55 for offices and 45–50 for corridors per UFC 3-450-01. The period of performance is 300 calendar days from notice to proceed; the contractor must begin work within 10 calendar days of award. Liquidated damages are $593.89 per calendar day of delay.
The estimated budget range is $250,000 to $500,000. Evaluation is on a Lowest Price Technically Acceptable (LPTA) basis, weighing price, technical approach, and past performance. The contractor must submit design deliverables at 35%, 65%, 95%, and 100% completion with government review at each phase. Performance and payment bonds are required within 10 calendar days of award. All contractor personnel must complete DoD Controlled Unclassified Information (CUI) training and sign the MFR Contractor CUI Training Acknowledgment to access drawings and associated CUI documentation via SAM.gov. A site visit is scheduled for August 5 at 1:00 PM CDT; registration closes July 30 at 7:30 AM CDT. Amendment 01 (August 13) extended the proposal deadline from 2:00 AM to 2:00 PM CDT and updated the Statement of Work to the August 11, 2026 version. Amendment 02 (August 20) added Appendix A Cost Breakdown. All RFIs are due no later than August 10 at 7:30 AM CDT.
Notice text
5 versions
Update #5 · Latest ·
Amendment 02: The purpose of this amendment is to: Add Appendix A Cost Breakdown.
Notice 02: Sign-in sheet from the Site Visit has been posted.
Amendment 01: The purpose of this amendment is to: 1. Change solicitation due time from 2:00 A.M CDT to 2:00 P.M CDT. 2. Update Statement of Work from SOW dated 07 July 2026 to SOW Dated 11 August 2026. 3. Attached "B730-1st Floor new vindicator" section J. Additionally, RFI answers have been posted.
Notice 01: Site Visit time has been changed from 9:00 AM (CDT) to 1:00 PM (CDT). The site visit date has NOT changed.
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
NOTE: Contractors/Offerors must complete CUI Training Slides; sign and return the "MFR Contractor CUI Training Acknowledgment for Solicitations" attachment to gain access to drawings and other associated CUI documentation. Once the POC has received your signed MFR, please request access to the locked documents through SAM.gov. Your MFR will be reviewed and access to the lock SAM.gov documents will be granted accordingly. Proposals will be submitted electronically.
Description: The Contractor must provide all plant, labor, equipment, transportation, and tools required to remodel and change the room layout of rooms 131, 135, 135A, and 140 in Building 730 at Columbus AFB Mississippi.
Site Visit, RSVP, and Base Entry: The Government invites you to a site visit on 05 Aug 2026 at 1:00 PM CDT. Attendance is highly encouraged but not mandatory. Please note that registration is required by 7:30 AM CDT on 30 Jul 2026. To register, please email the POC requesting a DoD Safe drop-off link to securely upload your completed Entry Authorization Listing (EAL) document (found in the list of SAM.gov attachments). If you do not contact the POC by 7:30 AM CDT on 30 Jul 2026, you will not be able to attend the site visit.
Identification: All attendees must bring a valid photo ID. All photo IDs must meet the requirements for "REAL ID."
Vehicle Requirements: If driving on base, please ensure the driver has driver's license, vehicle registration, and proof of insurance.
IMPORTANT: All contractors should arrive at Columbus AFB’s Visitors Center early and wait for a 14th Contracting Squadron representative to arrive and lead them to the site visit location. The representative will leave the visitors’ center at 1:00 PM CDT
Additional Info: All RFIs must be submitted NLT 7:30 AM CDT, on 10 Aug 2026.
The range of magnitude for this procurement is between $250,000 and $500,000.
52.232-18 Availability of Funds. Availability of Funds (Apr 1984)
Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.
Update #4 ·
Notice 02: Sign-in sheet from the Site Visit has been posted.
Amendment 01: The purpose of this amendment is to: 1. Change solicitation due time from 2:00 A.M CDT to 2:00 P.M CDT. 2. Update Statement of Work from SOW dated 07 July 2026 to SOW Dated 11 August 2026. 3. Attached "B730-1st Floor new vindicator" section J. Additionally, RFI answers have been posted.
Notice 01: Site Visit time has been changed from 9:00 AM (CDT) to 1:00 PM (CDT). The site visit date has NOT changed.
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
NOTE: Contractors/Offerors must complete CUI Training Slides; sign and return the "MFR Contractor CUI Training Acknowledgment for Solicitations" attachment to gain access to drawings and other associated CUI documentation. Once the POC has received your signed MFR, please request access to the locked documents through SAM.gov. Your MFR will be reviewed and access to the lock SAM.gov documents will be granted accordingly. Proposals will be submitted electronically.
Description: The Contractor must provide all plant, labor, equipment, transportation, and tools required to remodel and change the room layout of rooms 131, 135, 135A, and 140 in Building 730 at Columbus AFB Mississippi.
Site Visit, RSVP, and Base Entry: The Government invites you to a site visit on 05 Aug 2026 at 1:00 PM CDT. Attendance is highly encouraged but not mandatory. Please note that registration is required by 7:30 AM CDT on 30 Jul 2026. To register, please email the POC requesting a DoD Safe drop-off link to securely upload your completed Entry Authorization Listing (EAL) document (found in the list of SAM.gov attachments). If you do not contact the POC by 7:30 AM CDT on 30 Jul 2026, you will not be able to attend the site visit.
Identification: All attendees must bring a valid photo ID. All photo IDs must meet the requirements for "REAL ID."
Vehicle Requirements: If driving on base, please ensure the driver has driver's license, vehicle registration, and proof of insurance.
IMPORTANT: All contractors should arrive at Columbus AFB’s Visitors Center early and wait for a 14th Contracting Squadron representative to arrive and lead them to the site visit location. The representative will leave the visitors’ center at 1:00 PM CDT
Additional Info: All RFIs must be submitted NLT 7:30 AM CDT, on 10 Aug 2026.
The range of magnitude for this procurement is between $250,000 and $500,000.
52.232-18 Availability of Funds. Availability of Funds (Apr 1984)
Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.
Update #3 ·
Amendment 01: The purpose of this amendment is to: 1. Change solicitation due time from 2:00 A.M CDT to 2:00 P.M CDT. 2. Update Statement of Work from SOW dated 07 July 2026 to SOW Dated 11 August 2026. 3. Attached "B730-1st Floor new vindicator" section J. Additnaly, RFI answers have been posted.
Notice 1: Site Visit time has been changed from 9:00 AM (CDT) to 1:00 PM (CDT). The site visit date has NOT changed.
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
NOTE: Contractors/Offerors must complete CUI Training Slides; sign and return the "MFR Contractor CUI Training Acknowledgment for Solicitations" attachment to gain access to drawings and other associated CUI documentation. Once the POC has received your signed MFR, please request access to the locked documents through SAM.gov. Your MFR will be reviewed and access to the lock SAM.gov documents will be granted accordingly. Proposals will be submitted electronically.
Description: The Contractor must provide all plant, labor, equipment, transportation, and tools required to remodel and change the room layout of rooms 131, 135, 135A, and 140 in Building 730 at Columbus AFB Mississippi.
Site Visit, RSVP, and Base Entry: The Government invites you to a site visit on 05 Aug 2026 at 1:00 PM CDT. Attendance is highly encouraged but not mandatory. Please note that registration is required by 7:30 AM CDT on 30 Jul 2026. To register, please email the POC requesting a DoD Safe drop-off link to securely upload your completed Entry Authorization Listing (EAL) document (found in the list of SAM.gov attachments). If you do not contact the POC by 7:30 AM CDT on 30 Jul 2026, you will not be able to attend the site visit.
Identification: All attendees must bring a valid photo ID. All photo IDs must meet the requirements for "REAL ID."
Vehicle Requirements: If driving on base, please ensure the driver has driver's license, vehicle registration, and proof of insurance.
IMPORTANT: All contractors should arrive at Columbus AFB’s Visitors Center early and wait for a 14th Contracting Squadron representative to arrive and lead them to the site visit location. The representative will leave the visitors’ center at 1:00 PM CDT
Additional Info: All RFIs must be submitted NLT 7:30 AM CDT, on 10 Aug 2026.
The range of magnitude for this procurement is between $250,000 and $500,000.
52.232-18 Availability of Funds. Availability of Funds (Apr 1984)
Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.
Update #2 ·
Notice 1: Site Visit time has been changed from 9:00 AM (CDT) to 1:00 PM (CDT). The site visit date has NOT changed.
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
NOTE: Contractors/Offerors must complete CUI Training Slides; sign and return the "MFR Contractor CUI Training Acknowledgment for Solicitations" attachment to gain access to drawings and other associated CUI documentation. Once the POC has received your signed MFR, please request access to the locked documents through SAM.gov. Your MFR will be reviewed and access to the lock SAM.gov documents will be granted accordingly. Proposals will be submitted electronically.
Description: The Contractor must provide all plant, labor, equipment, transportation, and tools required to remodel and change the room layout of rooms 131, 135, 135A, and 140 in Building 730 at Columbus AFB Mississippi.
Site Visit, RSVP, and Base Entry: The Government invites you to a site visit on 05 Aug 2026 at 1:00 PM CDT. Attendance is highly encouraged but not mandatory. Please note that registration is required by 7:30 AM CDT on 30 Jul 2026. To register, please email the POC requesting a DoD Safe drop-off link to securely upload your completed Entry Authorization Listing (EAL) document (found in the list of SAM.gov attachments). If you do not contact the POC by 7:30 AM CDT on 30 Jul 2026, you will not be able to attend the site visit.
Identification: All attendees must bring a valid photo ID. All photo IDs must meet the requirements for "REAL ID."
Vehicle Requirements: If driving on base, please ensure the driver has driver's license, vehicle registration, and proof of insurance.
IMPORTANT: All contractors should arrive at Columbus AFB’s Visitors Center early and wait for a 14th Contracting Squadron representative to arrive and lead them to the site visit location. The representative will leave the visitors’ center at 1:00 PM CDT
Additional Info: All RFIs must be submitted NLT 7:30 AM CDT, on 10 Aug 2026.
The range of magnitude for this procurement is between $250,000 and $500,000.
52.232-18 Availability of Funds. Availability of Funds (Apr 1984)
Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.
Update #1 ·
NOTE: Contractors/Offerors must complete CUI Training Slides; sign and return the "MFR Contractor CUI Training Acknowledgment for Solicitations" attachment to gain access to drawings and other associated CUI documentation. Once the POC has received your signed MFR, please request access to the locked documents through SAM.gov. Your MFR will be reviewed and access to the lock SAM.gov documents will be granted accordingly. Proposals will be submitted electronically.
Description: The Contractor must provide all plant, labor, equipment, transportation, and tools required to remodel and change the room layout of rooms 131, 135, 135A, and 140 in Building 730 at Columbus AFB Mississippi.
Site Visit, RSVP, and Base Entry: The Government invites you to a site visit on 05 Aug 2026 at 9:00 AM CDT. Attendance is highly encouraged but not mandatory. Please note that registration is required by 7:30 AM CDT on 30 Jul 2026. To register, please email the POC requesting a DoD Safe drop-off link to securely upload your completed Entry Authorization Listing (EAL) document (found in the list of SAM.gov attachments). If you do not contact the POC by 7:30 AM CDT on 30 Jul 2026, you will not be able to attend the site visit.
Identification: All attendees must bring a valid photo ID. All photo IDs must meet the requirements for "REAL ID."
Vehicle Requirements: If driving on base, please ensure the driver has driver's license, vehicle registration, and proof of insurance.
IMPORTANT: All contractors should arrive at Columbus AFB’s Visitors Center early and wait for a 14th Contracting Squadron representative to arrive and lead them to the site visit location. The representative will leave the visitors’ center at 9:00 AM CST
Additional Info: All RFIs must be submitted NLT 7:30 AM CDT, on 10 Aug 2026.
The range of magnitude for this procurement is between $250,000 and $500,000.
52.232-18 Availability of Funds. Availability of Funds (Apr 1984)
Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.
Files
Show all 11
Notice history
| Notice | Type | Posted |
|---|---|---|
| B730 Renovate Convert Comm to SAPR | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Sources Sought - Construction Repair Building 6413 Secure Space (511669 & 519580) Barksdale AFB | ENDIST Fort Worth | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity