This document contains a schedule of values and federal contract opportunity solicitation. The schedule of values outlines the line items, descriptions, values, percentages, and totals for a construction project with a total bid of $43.72 million. It includes line items for general requirements, existing conditions, concrete, masonry, metals, wood and composites, thermal and moisture protection, openings, finishes, specialties, special construction, fire suppression, plumbing, HVAC, electrical, communications, electronic safety and security, earthwork, exterior improvements, utilities, and closeout documents.

The federal contract opportunity solicitation is for the Mechanical-Electrical Indefinite-Delivery Indefinite-Quantity construction contract to provide mechanical and electrical maintenance support at Robins Air Force Base, Georgia. The work includes a broad range of maintenance, repair, alteration, and new construction for HVAC, controls, underground utilities, boilers, airfield and exterior lighting, fire suppression and alarm systems. The contractor is to provide all material, equipment, labor, and general conditions to accomplish the work required for each individual task order. The solicitation number is FA8501-18-R-0003 and was issued by the Department of the Air Force Materiel Command Lifecycle Management Center.

Attachment #14 - Schedule of Values

View the file

Other files for this federal contract opportunity

Other files attached to Mechanical Electrical IDIQ, newest first.
File Type Posted
RFI__6_Answers.pdf PDF
Atch__8_-_AF_Form_3052.xlsx XLSX spreadsheet
Atch__10_-_AF_Form_3065.xlsx XLSX spreadsheet
Atch__9_-_AF_Form_3064.xlsx XLSX spreadsheet
Atch__33_-_Addendum__2_Mech_Elec.pdf PDF
RFI__5_Answer.pdf PDF
Atch__35_-_09_29_00_-_Gypsum_Board.pdf PDF
Atch__34_-_Revised_Project_Table_of_Contents_22_Mar_18.pdf PDF
FA8501-18-R-0003-0002.pdf PDF
RFI__4_Answers.pdf PDF
RFI__3_Answers.pdf PDF
Atch__30_-_VPP_DART-TCIR_Chart.xlsx XLSX spreadsheet
Atch__32_-_CIP_Concrete_Specifications.pdf PDF
Atch__31_-_Addendum__1_Mech-Elec.pdf PDF
RFI__2_Answers.pdf PDF
FA8501-18-R-0003-0001.pdf PDF
RFI__1_Answers.pdf PDF
Site_Visit_Slides_&_Sign_In_Sheet.pdf PDF
Atch__15_-_BLANK_SAMPLE_Dig_Permit_Form_v3.0.pdf PDF
Atch__17_-_BLANK_SAMPLE_DD_Form_1354_Transfer_and_Acceptance_of_DoD_Real_Property.pdf PDF
Atch__2_-_App_C_UHHZ_170241.pdf PDF
Atch__1_-_Mech-Elec_SOW.pdf PDF
Atch__10_-_BLANK_SAMPLE_AF_Form_3065.pdf PDF
Atch__14_-_BLANK_SAMPLE_Schedule_of_Values_Template_UNLOCKED.pdf PDF
Atch__20_-_Best_Practices_for_Landscape_Guidelines_Robins_AFB_3-15-2011.pdf PDF
Atch__12_-_01560_Environmental_Requirements_2018.pdf PDF
Atch__29_-_UHHZ090516_Combined_Drawings.pdf PDF
Atch__4_-_Robins_AFB_Division_1_Specs_and_Forms_REVISED_24_April_2017.pdf PDF
Atch__28_-_UHHZ090516_Combined_Specifications.pdf PDF
Atch__9_-_BLANK_SAMPLE_AF_Form_3064.pdf PDF
Atch__23_-_AFI_31-204_RAFB_Sup_1_Motor_Vehicle_Traffic_Supervision.pdf PDF
Atch__30_-_VPP_DART-TCIR_Chart.xlsx XLSX spreadsheet
Atch__8_-_BLANK_SAMPLE_AF_Form_3052.pdf PDF
Atch__13_-_Wage_Determination.pdf PDF
Atch__5_-_UHHZ170241_BIDDING_SCHEDULE_(TEP).pdf PDF
Atch__11_-_BLANK_SAMPLE_AF_Form_3000_with_digital_signatures.pdf PDF
Atch__26_-_UFC_4_010_05_Sensitive_Compartmented_Information_Facilities_Planning,_Design,_and_Construction.pdf PDF
Atch__18_-_Technical_Spec_for_ICD705_version1.2_April_23_2012.pdf PDF
Atch__19_-_AFSC_Energy_Metering_Requirements_24_June_2016.pdf PDF
Atch__7_-_Robins_AFB_Asbestos_Management_Plan_-_January_2015.pdf PDF
FA8501-18-R-0003.pdf PDF
Atch__16_-_BLANK_SAMPLE_Master_Utility_Outage.pdf PDF
Atch__24_-_Air_Force_Manual_32_1084_Civil_Engineering_Facility_Requirements.pdf PDF
Atch__22_-_BLANK_SAMPLE_AF_Form_66_SUBMITTAL_REGISTER.pdf PDF
Atch__3_-_PROCEDURAL_GUIDE_FOR_DESIGNERS_INCLUDING_AE_FIRMS_29_May_15.pdf PDF
Atch__21_-_Form20SP.STANDARDSensitiveEquipmentPropertyRequest.Revised15July2016.pdf PDF
Atch__27_-_BFS-RAFB_16_FEB_17.pdf PDF
Atch__25_-_AF_Form_2586_Flightline_Driving_Request.pdf PDF
Atch__6_-_Robins_AFB_Architectural_Compatiblity_Standards_18_Aug_2015.pdf PDF
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

BLANK SAMPLE SCHEDULE OF VALUES
Contract No: FA8501-XX-X-XXXX
Project No & Title: UHHZ XXXXXX Construct XXXXXXXXXXXXXXXXXXXXXXX
DIVISION 01 - GENERAL REQUIREMENTS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
1.1Project Management$0.731.67%
1.2Supervision$0.972.22%
1.3Project Trailer (including deliver & return)$0.050.11%
1.4Roll-Off Dumpster$0.531.21%
1.5Temporary Fence$0.531.21%
1.6Bond$0.130.30%
1.7Rental Equipment (Lull, Manlift, Boom Truck)$0.190.43%
1.8Tools$0.190.43%
Division 01 Total$3.137.16%7.16%
DIVISION 02 - EXISTING CONDITIONS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
2.1Demolition Interior (Electrical)$0.882.01%
2.2Demolition Interior (Mechanical)$0.320.73%
2.3Demolition (Plumbing)$0.150.34%
2.4Demolition (Flooring)$0.150.34%
2.5Demolition (Openings)$0.882.01%
2.6Demolition (Concrete)$0.882.01%
2.7Demolition (Ceilings)$0.882.01%
2.8Demolition (Walls)$0.551.26%
2.9Demolition (Fire Suppression)$0.882.01%
2.10Demolition (Fire Alarm System)$0.681.56%
2.11Demolition (Communications)$0.250.57%
Division 02 Total$6.5014.87%14.87%
DIVISION 03 - CONCRETE
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
3.1Concrete Pad (Generator)$0.320.73%
3.2Concrete Ceiling {Vault)$0.681.56%
3.3Concrete Pad (Mechanical Yard}$0.871.99%
3.4Concrete Pad (HVAC Units)$0.962.20%
3.5Concrete Reinforcements$0.140.32%
3.6Expansion Joints, Contraction Joinls$0.180.41%
3.7Concrete Design Mix/Rebar Shop Drawings$0.100.23%
3.8Concrete Testing and Reports$0.080.18%
Division 03 Total$3.157.20%7.20%
DIVISION 04 - MASONRY
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
4.1Mechanical Yard Masonrv Wall$0.310.71%
4.2Generator Pad Masonry Wall$0.651.49%
4.3Infill (Front Entry Area)$0.962.20%
4.4Masonry Patch Work (Roll-up Door)$0.962.20%
4.5Infill (Mechanical Louver Area)$0.200.46%
4.6Vault$0.932.13%
Division 04 Total$4.019.17%9.17%
DIVISION 05 - METALS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
5.1Metal Stud Framing (Interior)$0.781.78%
5.2Metal Stud Framing Accessories$0.120.27%
5.30.00%
Division 05 Total$0.902.06%2.06%
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
6.1Casework (Women's Restroom)$0.340.78%
6.2Casework (Men's Restroom)$0.340.78%
6.3Casework (Break Room)0.00%
Division 06 Total$0.681.56%1.56%
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
7.1Mineral Fiber Blanket lnsulation (Interior)$0.541.24%
7.2Sound Attenuation Fire Blanket in rated walls$0.140.32%
7.3Rigid (Polyisocyanurate) Insulation$0.040.09%
Division 07 Total$0.721.65%1.65%
DIVISION 08 - OPENINGS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
8.1Steel Doors and Frames$0.030.07%
8.2Prefinished Electric Insulated Overhead Coiling Door$0.350.80%
8.3Windows$0.390.89%
8.4Door Hsrdware including door cylinders$0.210.48%
Division 08 Total$0.771.76%1.76%
DIVISION 09 - FINISHES
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
9.1Gypsum Board and mud, tape, corner beads$0.300.69%
9.2Paints and Coatings$0.110.25%
9.3Epoxy Flooring$0.060.14%
9.4Acoustlcal Ceiling Tile and Grid$0.160.37%
9.5Porcelain Tile$0.420.96%
9.6Carpet Tiles$0.731.67%
9.7Vinyl Composition Tile$0.240.55%
9.8Rubber Base$0.110.25%
Division 09 Total$1.784.07%4.07%
DIVISION 10 - SPECIALTIES
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
10.1Toilet Accessories$0.150.34%
10.2Interior Signage$0.861.97%
10.30.00%
Division 10 Total$1.012.31%2.31%
DIVISION 13 - SPECIAL CONSTRUCTION
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
13.1Steel Deck Vault$0.551.26%
13.2Steel I-beam (Openings)$0.902.06%
13.3Steel louvers (Mech Yard)$0.781.78%
13.4Steel Gate (Generator)$0.581.33%
13.5Steel Gate (Generator)$0.581.33%
13.6Pre-engineered Metal Building$0.751.72%
13.7Pre-engineered Metal Building Wall Roof panels$0.120.27%
13.8Pre-engineered Metal Building Accessories$0.070.16%
Division 13 Total$4.149.47%9.47%
DIVISION 21 - FIRE SUPPRESSION
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
21.1Riser, Dbl Check Valves, Tamper & Flow Switches$0.020.05%
21.2Wet Pipe Fire Sprinkler Piping$0.140.32%
21.3Testing$0.781.78%
Division 21 Total$0.942.15%2.15%
DIVISION 22 - PLUMBING
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
22.1Plumbing (Fixtures)$0.090.21%
22.2Plumbing Piping& Materials$0.731.67%
22.30.00%
Division 22 Total$0.821.88%1.88%
DIVISION 23 - HEATING, VENTILATION AND AIR CONDITIONING
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
23.1HVAC Air Handlers$0.110.25%
23.2Acoustics Duct Silencers$0.180.41%
23.3Exhaust & Supply Fans$0.350.80%
23.4Boiler & Computer Room Units (CRAC)$0.581.33%
23.5Variable Air Volume 0JAV) Boxes$0.741.69%
23.6Fire Smoke Dampers & Louvers$0.350.80%
23.7Testing, Adjusting & Balancing of HVAC Sys$0.110.25%
23.8Thermal lnsulation for Mechanical Sys$0.350.80%
23.9Duct Insulation$0.230.53%
23.10Duct Work & Duct Work Accessories$0.501.14%
23.11Diffusers, Registers & Grills$0.220.50%
23.12HVAC Controls$0.701.60%
Division 23 Total$4.4210.11%10.11%
DIVISION 26 - ELECTRICAL
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
26.1Electrical Conduit, Fillings, Boxes$0.240.55%
26.2Electrical Wire & Cable$0.932.13%
26.3Interior Distribution Systems$0.912.08%
26.4Low Voltage SwitchQear$0.230.53%
26.5Switchboards & Panel Boards$0.511.17%
26.6Interior lighting$0.110.25%
26.7Electrical Exterior Underground$0.751.72%
26.8Electric Meter$0.070.16%
Division 26 Total$3.688.42%8.42%
DIVISION 27 - COMMUNICATIONS (IF REQUIRED AS A PART OF CONTRACT)
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
27.1Comm Piping, Fittings and Boxes$0.882.01%
27.2Communications Wire$0.441.01%
27.3Communications Cable Tray$0.801.83%
27.4Testing$0.060.14%
Division 27 Total$2.184.99%4.99%
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
28.1Fire Alarm System Conduit & Fittings$0.170.39%
28.2Fire Alarm Panel and Power Boosters$0.962.20%
28.3Fire Alarm Programming & Testing$0.050.11%
28.4MNS Conduit and Fittings$0.471.08%
28.5MNS Panels$0.400.91%
28.6FA/MNS Programming & Testing$0.290.66%
Division 28 Total$2.345.35%5.35%
DIVISION 31 - EARTHWORK
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
31.1Landscaping (Demo)$0.060.14%
31.2Landscaping (Sod and Watering)$0.060.14%
31.3Soii Compaction Test$0.150.34%
Division 31 Total$0.270.62%0.62%
DIVISION 32 - EXTERIOR IMPROVEMENTS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
32.1Bollards$0.581.33%
32.2Concrete Sidewalks$0.050.11%
32.3Fog Seal (Parking Lot)$0.631.44%
32.4Curb Stops (Parking Lot)$0.050.11%
32.5Restnping (Parking Lot)$0.290.66%
Division 32 Total$1.603.66%3.66%
DIVISION 33 - UTILITIES
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
33.1Natural Gas$0.631.44%
33.2Gas Meter$0.050.11%
33.30.00%
Division 33 Total$0.681.56%1.56%
CLOSE-OUT DOCUMENTS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
AAs-Built Drawings0.00%
BWarranties
CO&M Manuals (Paper Copy and CD/DVD's)0.00%
DRoof Inspection Reports0.00%
Close-out Total$0.000.00%0.00%
BID TOTAL$43.72100.00%100.00%