AF Form 66.xlsx

XLSX spreadsheet 80 KB Posted

Attached to
T-6 Flightline Shacks
Solicitation number
FA302226R0005
Issued by

About this file

This file is an AF Form 66 Schedule of Material Submittals for the repair and renovation of T-6 Flightline Shacks (Buildings 247, 628, 629, and 633) under Air Force project EEPZ 23 0749. The form establishes the contractor's required submissions and approval workflow across multiple disciplines, with tracking columns for submission dates, approvals, disapprovals, resubmittals, and final notifications.

The General section requires submission of Work/Construction/Phasing Plans, As-Built Drawings, Progress Schedules, Guarantees and Warranties, and Superintendent's Qualifications, each requiring three copies and basic specification reference approval. The Environmental section mandates Safety Data Sheets, hazardous waste reports, AF Form 3000 Hazardous Material Reports, recycled material/construction debris reports, Storm Water Pollution Prevention Plans, weekly inspection reports, state asbestos licenses for workers and supervisors, firm asbestos licenses, 10-day demolition/asbestos notifications, and work plans. The Architectural section requires submittals for VCT flooring, ceiling and grid tiles, cove base, paint, doors, and window blinds with specified approval documentation. The Mechanical section covers heat pumps, piping, ductwork, diffusers/returns, and bathroom exhaust fans, while the Electrical section addresses lights, receptacles, wiring, conduit, switches, boxes, and panelboards. Special Systems and Other/Miscellaneous sections include water fountains, toilets, airfield waivers (requiring site plans, equipment types, maximum heights, and work hours), and equipment height documentation. A separate HAZMAT Tracking Sheet requires contractors to document all hazardous materials usage, including product names, processes, part numbers, manufacturers, container types, sizes, and anticipated quantities, with final submission required prior to construction start and updated reports due upon project completion.

View the file

Other files

File Type Posted
T6 site visit sign in sheet.pdf PDF
Solicitation - FA302226R0005.pdf PDF
EAL Form.pdf PDF
SOW T-6 Shacks.pdf PDF
Contractors CUI Training Slides.pptx PPTX presentation
MFR CUI Contractor Training Acknowledgment July 2024.pdf PDF
Wage Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General

Project No:Project Title:Date:
EEPZ 23 0749Repair T6 Flightline Shacks, B247, B628, B629, B633
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
1Work/Construction/phasing PlanBASICX
3As-Built DrawingsBASICX
4Progress ScheduleBASICX
5Guarantees and WarrantiesBASICX
6Superintendent's Qualifications and ExperienceBASICX

AF Form 66 (Substitute) GENERAL Page&Pof&N

SCHEDULE OF MATERIAL SUBMITTALS

Environmental

Project No:Project Title:Date:
EEPZ 23 0749Repair T6 Flightline Shacks, B247, B628, B629, B63331-Dec-99
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
7Appropriate SDSBASIC
8Hazardous waste reportBASICXX
9Hazardous Material Report (AF Form 3000)BASICXX
10Recycled Material Report/Construction Debris reportBASICXX
11Storm Water Pollution Prevention Plan with Best Management Practices IdentifiedBASIC
12Weekly Inspection Reports for ProjectsBASICXX
13State Licenses for workers and supervisors (Asbestos)BASICXXX
14State license for the firm (Asbestos)BASICX
1510 Day Notification (Demolition and Asbestos)BASICX
16Work PlanBASICX

AF Form 66 (Substitute) Environmental Page&Pof &N

SCHEDULE OF MATERIAL SUBMITTALS

Architectural

Project No:Project Title:Date:
EEPZ 23 0749Repair T6 Flightline Shacks, B247, B628, B629, B63331-Dec-99
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
17VCT FLOORINGxxx
18Ceiling and grid tilesxx
19Cove basexx
20Paintxx
21Doorsxx
22Window blindsxxx

AF Form 66 (Substitute) Architectural Page&Pof&N

Civil

Project No:Project Title:Date:
EEPZ 23 0749Repair T6 Flightline Shacks, B247, B628, B629, B63331-Dec-99
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
Na

AF Form 66 (Substitute) CIVIL Page&Pof &N

Mechanical

Project No:Project Title:Date:
EEPZ 23 0749Repair T6 Flightline Shacks, B247, B628, B629, B63331-Dec-99
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
23Heat Pumpxxxx
24Pipingxxx
25Ductworkxxx
26Diffusers/Returnsxxx
27BR Exhaust Fanxxx

AF Form 66 (Substitute) Mechanical Page&Pof&N

Electrical

Project No:Project Title:Date:
EEPZ 23 0749Repair T6 Flightline Shacks, B247, B628, B629, B63331-Dec-99
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
28Lightsxx
29Receptaclesx
30Wiringx
31Conduitx
32Switches and cover platesx
33Boxesx
34Panelboardx

AF Form 66 (Substitute) Electrical Page&Pof &N

Special Systems

Project No:Project Title:Date:
EEPZ 23 0749Repair T6 Flightline Shacks, B247, B628, B629, B63331-Dec-99
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
35Water Fountainxx
36Toiletsx

AF Form 66 (Substitute) Special Systems Page&Pof &N

Other&Misc

Project No:Project Title:Date:
EEPZ 23 0749Repair T6 Flightline Shacks, B247, B628, B629, B63331-Dec-99
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
37Airfield Waiverxx
Prepared by CE but contractor must supply:
1. Site Plan/Area of Work
2. Type of Equipment to be used
3. Maximum height of equipment
4. Work Hours (24/7, nights, non-flying, etc).
5. Work Schedule

38 Height of equipment on the airfield x x

AF Form 66 (Substitute) Other and Misc Page&Pof &N

HAZMAT Tracking Sheet

Contractor Hazardous Materials Usage Tracking Form
Return this form to Contracting/Project Manager with Manufacturers original SDS
EEPZ 23 0749Repair T6 Flightline Shacks, B247, B628, B629, B633Contract #
Start Date:End Date:Cotractor:
Product Name as seen on SDS
Process (How is material used)Part #ManufacturerType of
ContainerSize of ContainerTotal

Quantity

UsedEESOH MSN
1
Process:
2
Process:
3
Process:
4
Process:
5
Process:
6
Process:
7
Process:
8
Process:
9
Process:
10
Process:
11
Process:
12
Process:
13
Process:
14
Process:
15
Process:
16
Process:
17
Process:
18
Process:
19
Process:
20
Process:
21
Process:
22
Process:
23
Process:
24
Process:
25
Process:
26
Process:
27
Process:
28
Process:

Example and Instructions

WORKSHEET INSTRUCTIONS
BLOCKDESCRIPTIONINFORMATION REQUIRED
AProject NumberProject number or Opportunity number assigned to the project by Civil Engineering.
BProject TitleThe title of the project.
CContract NumberThe contract number or delivery order assigned by contracting.
DProduct NameThe name of the product as listed on the SDS.
EProcessA Brief description of the work performed with each material.
FPart #The part number as listed on the SDS.
GManufacturerThe name of the Manufacturer of the product (not the distributor)
HType of ContainerThe type of container that the product comes in. Example: can, barrel, bottle, container, cylinder, drum, etc…
ISize of ContainerSize as listed on container. Example: oz, lbs, Liter, Quart, Gallon, etc…
JTotal Quantity UsedThis will be the amount that you anticipate using for the first submission. At the conclusion of the project you will need to provide a final list with updated quantities.
KEESOH MSNThis is the Material Stock Number assigned for EESOH-MIS tracking. (The Air Force Hazardous Materials Manager will provide this number)

NOTE: Complete the HAZMAT Tracking Sheet located on the first TAB of this Excel spreadsheet with all hazardous materials to be used during the duration of the construction project. Once completed, save the sheet as a .pdf file and submit to the contracting officer with an AF Form 3000 Submittal form. This data will need to be submitted prior to construction start. When construction is complete, you will submit a final revised report with updated quanties.

image1.emf

File details come from the government source that posted it. Updated .