This is an AF Form 66 Schedule of Material Submittals for the repair of Buildings 17903 and 17904 at Holloman Air Force Base, New Mexico, under contract WT #17518529. The form establishes submittal requirements and deadlines for various materials, components, and documentation required throughout the project execution and closeout phases.
The submittal schedule specifies delivery timelines relative to Notice to Proceed (NTP) and design completion milestones. General submittals include the Project Specific Form 66 (NTP + 3 days), construction schedule (NTP + 5 days), and design drawings with a 95% design submission at NTP + 60 days followed by 100% design approval within 5 days of 95% acceptance. Architectural and component submittals due at Design + 30 days include doors, window shutters, liner panels, plumbing fittings, paint specifications, ladders, and hatch covers. Technical submittals include an anchor pull test certification (Test + 10 days), pyrometer, thermocouple, and engineer qualifications documentation. Closeout requirements consist of the final DD Form 1354 and warranty documentation, both due within 7 days of final project completion. All submittals require three copies in hard format with electronic copies provided; the government retains all submitted materials. The form serves as the project engineer and contract administrator's tool for tracking approval status across required submissions.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submittal 1
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | PROJECT NAME | SOLICITATION /CONTRACT NUMBER | ||||||||||||||||||
| WT #17518529 | Repair Bldgs 17903 & 17904 | ||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||||||||||||||||||||
| LINE NUMBER | Note: 3 copies required per submittal. Government will retain all submittals.Provide an electronic copy for each submittal. | CERTIF. OF COMPLIANCE | SHOP DRAWINGS | COLOR SELECTION | MANUFATURUR'S RECOMMENDATION | CATALOG DATA | O&M RECOMMENDATIONS | CALCULATIONS | WARRANTY | DRAWINGS | REPORT | TEST RESULTS | REQUIRED SUBMISSION DATE | DATE TO CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | APPROVED | DISAPPROVED | CONTRACTOR SUBMITTAL | FINAL APPROVAL |
| GENERAL | |||||||||||||||||||||
| Project Specific Form 66 | X | NTP + 3 | |||||||||||||||||||
| Construction Schedule | X | NTP + 5 | |||||||||||||||||||
| DESIGN | |||||||||||||||||||||
| PDF Drawings. | X | 95% Design: NTP + 60 days. 100% Design: Acceptance of 95% + 5 days. | |||||||||||||||||||
| ARCHITECTURAL | |||||||||||||||||||||
| Doors | X | Design + 30 | |||||||||||||||||||
| Window Shutters | X | Design + 30 | |||||||||||||||||||
| Liner Panels | X | Design + 30 | |||||||||||||||||||
| Plumbing Fittings | X | Design + 30 | |||||||||||||||||||
| Paint | X | Design + 30 | |||||||||||||||||||
| Ladder | X | Design + 30 | |||||||||||||||||||
| Hatch Cover | X | Design + 30 | |||||||||||||||||||
| Anchor Pull Test Certification | X | Test + 10 | |||||||||||||||||||
| Pyrometer | X | Design + 30 | |||||||||||||||||||
| Engineer Qualifications | X | Design + 30 | |||||||||||||||||||
| Thermocouple | X | Design + 30 | |||||||||||||||||||
| CLOSEOUT | |||||||||||||||||||||
| Final DD - 1354 | X | Final + 7 | |||||||||||||||||||
| Provide Warranty | X | Final + 7 |