Atch__27_-_BFS-RAFB_16_FEB_17.pdf
PDF 7 MB Posted
- Attached to
- Mechanical Electrical IDIQ Federal contract opportunity
- Solicitation number
- FA8501-18-R-0003
About this file
This solicitation seeks proposals for an indefinite-delivery indefinite-quantity construction contract to provide mechanical and electrical maintenance services at Robins Air Force Base in Georgia. Work will include a wide range of HVAC, electrical, plumbing and controls services for various facilities, such as repairs, renovations and upgrades of HVAC, lighting, fire suppression and alarm systems. The contractor will be responsible for supplying all necessary labor, materials, equipment and general conditions to complete individual task orders issued under the IDIQ contract. The Air Force Materiel Command Lifecycle Management Center at Robins AFB will administer the contract. Proposals are due by the date specified in the solicitation for an award to be made.
Attachment #27 - BFS RAFB
View the file
Other files for this federal contract opportunity
Show all 49
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROBINS AIR FORCE BASE (RAFB)
BASE FACILITY STANDARDS
February 2017 ROBINS AFB BASE FACILITY STANDARD
ROBINS AIR FORCE BASE (RAFB)
BASE FACILITY STANDARDS
1 1
Change No. Date Location
This Base Facility Standard supersedes all previous versions.
FOREWORD
AUTHORIZED BY:
GARY SCHNEIDER, P.E. MARSHALL WALL P.E.
Director Chief, Engineering Division 78 Civil Engineer Group 78 Civil Engineer Group
SUZANNE O’NEAL
Chief Editor
STE ANIE DAWSON
Chief, Project Execution Section
78 CEG/CENMP 78 CEG/CENPL
ACKNOWLEDGEMENTS
Special thanks to Electrical Review Team that spent many hours reviewing, updating and re-developing the Electrical Elements
Chairman
Thanks also to the many Subject Matter Experts that assisted with review of this document:
Architectural Compatibility Standards
(Retired)
Communications
Environmental Requirements
Mechanical Elements
(Retired) (Retired)
All About Roofing
Stormwater Management
Structural
TABLE OF CONTENTS
PART 1 SPECIAL PROGRAMS 8
1A GEOBASE PROGRAM
1B FALL PROTECTION
1C PRE-ENGINEEERED METAL BUILDINGS
PART 2 ENVIRONMENTAL REQUIREMENTS 1
2A GENERAL GUIDANCE
2A-1 GENERAL REFERENCE DOCUMENTS - ENVIRONMENTAL COMPILED
2B EXECUTION
BFS FORM 2B-1
BFS FORM 2B-2
BFS FORM 2B-3
2C SPECIAL WASTES AND HAZARDOUS MATERIALS
2D AIR QUALITY
2E PESTICIDES
2F STORAGE TANKS
2G WETLANDS
2H GREEN PROCUREMENT PLAN (GPP)
2I PRESERVING HISTORICAL AND ARHAELOGICAL RESOURCES
2J PROTECTION OF WATER AND LAND RESOURCES
FIGURE 2J5-1
TABLE 2J-5-1
TABLE 2J-5-2
TABLE 2J-10-1
2K BACKFLOW PREVENTION DEVICES (BPDs)
PART 3 STRUCTURAL AND CIVIL ENGINEERING ELEMENTS
3A STRUCTURAL REQUIREMENTS
3B CIVIL AND SITE PLANNING
3C WATER SUPPLY
3D WASTE WATER TREATMENT
3E SUB-SOIL INVESTIGATION
3F TERMITE PRE-TREATMENT
3G STORMWATER MANAGEMENT.(See PART 2J)
3H LANDSCAPE MANAGEMENT AND SITE RESTORATION
3I LAWN SPRINKLER SYSTEMS
PART 4 ARCHITECTURAL COMPATIBILITY STANDARDS 9
TABLE OF CONTENT
CHAPTER 1 INTRODUCTION
CHAPTER 2 SPECIFICATIONS, REGULATIONS AND STANDARDS
CHAPTER 3 EXTERIOR FACILITY DESIGN STANDARDS
3.2 RAFB EXTERIOR COLOR PLAN
CHAPTER 4 EXTERIOR EXTERIOR ELEMENTS
CHAPTER 5 INTERIOR FACILITY GUIDELINES
5.1 FLOORS - CARPET AND COVEBASE OPTIONS……………………
5.2 RAFB INTERIOR PAINT COLOR OPTIONS
APPENDIX A -
PART 5 MECHANICAL ENGINEERING ELEMENTS
5A MECHANICAL STANDARDS
5B HEATING, VENTILATION AND AIR CONDITIONING (HVAC) STANDARDS
5C PLUMBING STANDARDS
5D COMPRESSED AIR STANDARDS
5E FIRE SUPPRESSION
5F UTILITY MONITORING AND CONTROL SYSTEMS
5G CATHODIC PROTECTION ( )
PART 6 ELECTRICAL ELEMENTS 167
6A MEDIUM VOLTAGE ELECTRICAL DISTRIBUTION
APPENDIX 6A-A
APPENDIX 6A-B
6B MEDIUM TO LOW VOLTAGE ELECTRICAL DISTRIBUTION
6C LOW VOLTAGE ELECTRICAL DISTRIBUTION
6D LOW VOLTAGE ELECTRICAL DISTRIBUTION EQUIPMENT
6E GROUNDING AND BONDING
6F LIGHTNING PROTECTION SYSTEM (LPS)
APPENDIX 6F-A
APPENDIX 6F-B
6G COMMUNICATIONS
February 2017 ROBINS AFB BASE FACILITY STANDARD
6H FIRE ALARM AND MASS NOTIFICATION SYSTEMS
APPENDIX 6H-A ……
APPENDIX 6H-B ……………………
APPENDIX 6H-C ……………………
6I FIRE PUMPS
6J INTRUSION DETECTION SYSTEMS (IDS)
APPENDIX 6J-A ……
APPENDIX 6J-B ……………………
6K AUXILIARY POWER
APPENDIX 6K-A ……
6L HARZARDOUS AREAS
6M WHOLE FACILITY METERING
6N CATHODIC PROTECTION SYSTEMS
6O INTERIOR LIGHTING
6P EMERGENCY LIGHTING SYSTEMS
6Q EQUIPMENT POWER, MOTORS AND RECEPTACLES
6R AIRFIELD NAVAIDS
6S EXTERIOR LIGHTING
6T TRAFFIC SIGNAL CONTROL SYSTEMS
6U DESIGN ANALYSIS
APPENDIX 6U-A ……
APPENDIX 6U-B ……………………
6V DESIGN ANALYSIS
6W INSPECTIONS AND START-UP TESTING
6X ELECTRICAL SAFETY
APPENDIX 6X-A ……
APPENDIX 6X-B ……………………
PART 1
SPECIAL PROGRAMS
ROBINS AFB BASE FACILITY STANDARDS
PART 1A
GEOBASE PROGRAM
1A-1 CRITERIA REFERENCE DOCUMENTS
AIR FORCE INSTRUCTIONS (AFI)
NATIONAL INSTITUTE OF BUILDING SCIENCES
US ARMY CORPS OF ENGINEERS® (USACE)
1A-2 GENERAL REQUIREMENTS
1A-2.1
1A-2.2
1A-2.2.1
1A-2.2.2
1A-2.2.3
PART 1B
FALL PROTECTION
1B-1 CRITERIA REFERENCE DOCUMENTS
AIR FORCE INSTRUCTIONS (AFI)
The Air Force Mishap Prevention Program
Air Force Consolidated Occupational Safety Instruction
AIR FORCE PAMPHLETS (AFPAM)
Contract Safety Risk Management (RM) Guidelines and Tools
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION
UNITED FACILITIES CRITERIA (UFC)
1B-2 HISTORICAL REFERENCES
Operation Risk Management Guidelines and Tools
The US Air Force Mishap Prevention Program, The US Air Force Consolidated Occupational Safety Instruction, 1B-3 GENERAL REQUIREMENTS
1B-4 SAFETY PLAN REQUIRMENTS
1B-4.1
1B-4.1
1B-4.1.1
1B-4.1.2
1B-4.1.3
1B-4.2
1B-4.3
1B-4.3.1
1B-4.3.2
1B-4.3.3
PART 1C
PRE-ENGINEERED METAL BUILDINGS
1C-1 CRITERIA REFERENCE DOCUMENTS
ASTM INTERNATIONAL
INTERNATIONAL ACCREDITATION SERVICE®
UNITED FACILITIES CRITERIA (UFC)
OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION
1C-2 HISTORICAL REFERENCE
1C-3 SYSTEM COMPONENTS AND DESIGN REQUIREMENTS
1C-3.1
1C-3.2
1C-3.3
1C-3.
1C-3.5
1C-3.5.1
1C-3.5.2
1C-3.6
1C-3.6.1
1C-3.6.2
1C-3.6.3
1C-3.7
1C-3.7.1
1C-3.5.
1C-3.7.3
1C-4 FALL PROTECTION
1C-5 WARRANTIES
1C-5.1
1C-5.2
1C-3.7.2
PART 2
ENVIRONMENTAL REQUIREMENTS
ROBINS AFB BASE FACILITY STANDARDS
PART 2A
GENERAL GUIDANCE
2A-1 CRITERIA REFERENCE DOCUMENTS – ENVIRONMENTAL COMPILED
AIR FORCE INSTRUCTIONS (AFI)
AIR FORCE FEDERAL ACQUISITION REGULATIONS SUPPLEMENT (AFFARS)
FEDERAL ACQUISITION REGULATIONS (FAR)
FEDERAL POLICY
GEORGIA SOIL AND WATER CONSERVATION COMMISSION (GSWCC)
HOUSTON COUNTY, GEORGIA
OCCUPATIONAL SAFETY AND HEALTH STANDARDS (OSHA)
ROBINS AIR FORCE BASE (AFB)
STATE OF GEORGIA ENVIRONMENTAL PROTECTION DIVISION (EPD)
TRANSPORTATION
UNITED STATES CODE (USC)
U.S. DEPARTMENT OF DEFENSE (DOD)
UNITED STATES (US) ENVIRONMENTAL PROTECTION AGENCY (EPA)
2A-2 HISTORICAL REFERENCE DOCUMENTS
Exposure to Asbestos
EPA Guideline Items in Construction and Other Engineering Specifications dated 2000, 2A-3 GENERAL ENVIRONMENTAL REQUIREMENTS
2A-3.1
2A-3.2
2A-3.3
2A-4 CONTRACTOR RESPONSIBILITY
2A-4.1
2A-4.1.1
2A-4.1.2
2A-4.1.3
2A-4.1.4
Course List Miscellaneous
2A-5 NO NOTICE INSPECTIONS
2A-5.1
2A-5.2
2A-5.3
2A-5.4
2A-6 SUBMITTALS
2A-6.1
2A-6.2
2A-6.3
2A-6.4
PART 2B
EXECUTION
2B-1 DISPOSAL OF WASTE AND EXCESS MATERIAL
2B-1.1
2B-1.2
2B-1.3
2B-1.4
2B-2 SOLID WASTE HANDLING
2B-2.1
2B-2.2
2B-2.3
2B-3 SOLID WASTE DISPOSAL
2B-3.1
2B-3.1.1
2B-3.1.2
2B-3.1.3
2B-3.1.4
2B-3.2
2B-3.2.1
2B-3.2.2
2B-3.2.3
2B-3.2.4
2B-3.3
2B-3.3.1
2B-3.3.2
2B-3.3.3
2B-3.3.4
2B-3.4
2B-3.4.1
2B-3.4.2
2B-3.4.3
2B-3.4.4
2B-3.5
2B-3.5.1
2B-3.5.2
2B-3.5.3
2B-3.5.4
2B-3.5.5
2B-3.5.6
2B-3.5.7
2B-3.6
2B-3.6.1
2B-3.6.2
2B-4 REPORTING OF DISPOSAL AND RECYCLING
2B-4.1
2B-4.2
2B-4.2.1
2B-4.2.2
2B-4.2.3
2B-4.2.4
2B-4.2.5
2B-4.2.6
2B-4.2.7
2B-4.2.8
2B-5 SUBMITTALS, NOTIFICATIONS AND APPROVALS
2B-5.1
2B-5.1.1
2B-5.1.2
2B-5.1.3
2B-5.2
2B-5.3
2B-5.4
Houston County MSW Landfill Profile No:
2018 Kings Chapel Road (Assigned by Houston County) Perry, Georgia 31069 Telephone: (478) 987-0089 Fax: (478) 987-0102
SPECIAL WASTE ACCEPTANCE APPLICATION (SWAA)
Generator Name: Contact:
Address:
Telephone: Fax:
Description of Waste:
Source / Location of Waste:
Waste Quantity: Cubic Yards Tons Frequency of Disposal: Daily Weekly Monthly One Time Other
LABORATORY DATA (Please attach a hard copy of laboratory test data)
Physical Properties: Physical State: Solid Semisolid Liquid Color:
Halogenated Organics: mg/kg Flash Point: F Odor: Yes No Water Content: % by Weight Paint Filter Test Passed Failed Reactive: No Yes With H2S mg/kg HCN mg/kg Others mg/kg pH Value: (S.U.) Infectious: Yes No:
Chemical Properties (TCLP): (Concentrations in mg/l) Arsenic m-Cresol Hexachlorobenzene Pyridine Barium p-Cresol Hexacholorobutadiene Selenium Benzene Total Cresol Hexachloroethane Silver Cadmium 2,4-D Lead Tetrachloroethene Carbon Tetrachloride 1,4 Dichlorobenzene Lindane Toxaphene Chlordane 1,2 Dichloroethane Mercury Trichloroethene Chlorobenzene 1,1 Dichloroethylene Methoxychlor 2,4,5 Trichlorophenol Chloroform 2,4 Dinitrotoluene Methyl Ethyl Ketone 2,4,6 Trichlorophenol Chromium Endrin Nitrobenzene 2,4,5TP (Silvex) o-Cresol Heptachlor (a hydroxide) Pentachlorophenol Vinyl Chloride
None of the above constituents exceed TCLP disposal limits Others (List) Other Information: Delivery method: Bulk Other Regulatory Agency Approval Received: Yes No Permit Number Material Safety Data Sheet Provided: Yes No
Generator's Certification Statement "I certify under penalty of law that this document and all attachments were prepared under my direction and supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. To the best of my knowledge, the material described above is not classified as hazardous waste under current regulations, and I agree to notify Houston County MSW Landfill if such classification changes. The attached information provided is true and accurate to the best of my knowledge."
Signature of Authorizing Agent Date
Name of Agent (Typed or Printed) Title
Houston County MSW Landfill Profile No:
2018 Kings Chapel Road (Assigned to SWAA) Perry, Georgia 31069 Telephone: (478) 987-0089
WASTE SHIPMENT TRACKING DOCUMENT
Generator Name: Contact:
Address:
Telephone: Fax:
Description of Waste:
Location of Waste:
Date Shipped: Quantity Shipped:
Certification: I certify the waste described above is the waste represented by the Special Waste Acceptance Application (SWAA) of the same Profile Number and no regulated hazardous waste has been introduced into the waste.
Generator's Signature: Date:
Transporter: Contact:
Address:
Telephone:
Certification: I certify no regulated hazardous waste was introduced into the waste while in my custody:
Hauler's Signature: Date:
Waste Disposal Site: Houston County MSW Landfill
Quantity Received:
Certification: I certify receipt and proper disposal of the Special Waste Profiled materials covered by this manifest.
Operator’s Printed Name:
Operator’s Signature: Date:
WASTE MANAGEMENT REPORT (MONTHLY)
Contract Number Government Inspector:
Contractor Project # Title:
Contractor POC: Date:
Phone No:
I. MSW Landfill Disposal II. C&D Landfill Disposal III. Inert Landfill Disposal
Quantity (tons): Quantity (tons): Quantity (tons):
Landfill Site: Landfill Site: Landfill Site:
Tip fee/ton ($/ton): Tip fee/ton ($/ton): Tip fee/ton ($/ton):
*Total cost of disposal ($): *Total cost of disposal ($): *Total cost of disposal ($):
*Total cost/ton ($/ton): *Total cost/ton ($/ton): *Total cost/ton ($/ton):
IV. Alternatives to Landfilling (Recycling Strongly Encouraged)
Type of Material
Quantity (pounds or tons) Destination
* Handling & Transportation
Cost ($)
*Expected Revenue & Tip Fee Earnings ($) * Net Cost ($)
*Cost if Landfilled ($)
* Comparison Cost
(+)/Savings (-) Cardboard Dimensional wood Beverage containers Land debris Concrete
CMU
Asphalt Metals - all types Gypsum board Paint Carpet Insulation Glass Cast stone Wood materials Electric cable PVC piping Rubber flooring Raised flooring
IV. Total net cost (+) or savings (-) from all alternatives to landfilling all project waste
V. Means of keeping recyclables free of contamination All similar materials will be grouped together based on the requirements of the recycling center.
All dissimilar materials will be kept in separate containers/bins in order to avoid contamination.
VI. Meetings to be held to address waste management At regularly scheduled job site coordination/progress meetings and at job safety meetings, waste discussed to clarify any confusion with craftspeople.
* Optional
PART 2C
SPECIAL WASTES AND HAZARDOUS MATERIALS
2C-1 GENERAL
2C-1.1
2C-1.1.1
2C-1.1.2
2C-2 HAZARDOUS WASTE
2C-2.1
2C-2.2
2C-2.3
2C-2.4
2C-2.5
2C-2.6
2C-2.6.1
2C-2.6.2
2C-2.6.3
2C-2.7
2C-2.7.1
2C-2.7.2
2C-2.7.3
2C-2.7.4
2C-2.7.5
2C-2.7.6
2C-3 ASBESTOS CONTAINING MATERIALS
2C-3.1
2C-3.1.1
2C-3.1.2
2C-3.2
2C-3.2.1
2C-3.2.2
2C-3.2.3
2C-3.3
2C-3.3.1
2C-3.3.2
2C-3.3.3
2C-4 LEAD PAINT
2C-4.1
2C-4.1
2C-4.1
2C-5 POLYCHLORINATED BIPHENYLS (PCBs)
2C-5.1
2C-5.2
2C-5.2.1
2C-5.2.2
2C-5.2.3
2C-5.2.4
2C-5.5
2C-5.5.1
2C-5.5.2
2C-5.5.3
2C-6 OZONE DEPLETING SUBSTANCES (ODS) AND CONTROLLED SUBSTANCES
2C-6.1
2C-6.1.1
2C-6.1.2
2C-6.1.3
2C-6.1.4
2C-6.2
2C-6.2.1
2C-6.2.2
2C-6.3
2C-6.4
Warning
The Contractor shall insert the name of the substance(s).
2C-7 HAZARDOUS MATERIALS (HAZMAT):
2C-7.1
2C-7.1.1
2C-7.1.2
2C-7.2 Any consumer product or hazardous substance, as those terms are defined in the Consumer Product Safety Act (15 U.S.C. 2051 et seq.) and Federal Hazardous Substances Act (15 U.S.C. 1261 et seq.) respectively, where the employer can show that it is used in the workplace for the purpose intended by the chemical manufacturer or importer of the product, and the use results in a duration and frequency of exposure which is not greater than the range of exposures that could reasonably be experienced by consumers when used for the purpose intended.
2C-7.3
2C-7.3.1
2C-7.3.2
2C-8 SUBMITTALS, NOTIFICATIONS AND APPROVALS
2C-8.1
2C-8.2
2C-8.2.1
2C-8.2.2
2C-8.2.3
2C-8.2.4
2C-8.3
2C-8.3.1
2C-8.3.2
2C-8.3.3
2C-8.3.4
2C-8.3.5
2C-8.3.6
PART 2D
AIR QUALITY
2D-1 GENERAL
2D-1.1
2D-1.2
2D-1.3
2D-1.4
2D-2 SUBMITTALS, NOTIFICATIONS AND APPROVALS
2D-2.1
2D-2.2
PART 2E
PESTICIDES
2E-1 GENERAL
2E-2 LICENSES
2E-3 HANDLING
2E-3.1
2E-3.2
2E-4 SUBMITTALS, NOTIFICATIONS AND APPROVALS
2E-4.1
2E-4.2
PART 2F
STORAGE TANKS
2F-1 GENERAL
2F-1.1
2F-1.2
2F-1.3
2F-2 TANK REMOVAL OR CLOSURE
2F-2.1
2F-2.2
2F-3 TANK ADDITION OR REPLACEMENT
2F-4 SEPTIC TANKS
PART 2G
WETLANDS
2G-1 GENERAL
PART 2H
GREEN PROCUREMENT PLAN (GPP)
2H-1 GENERAL
Green Procurement Program (GPP) Plan
PART 2I
PRESERVING HISTORICAL AND ARCHAEOLOGICAL RESOURCES
2I-1 GENERAL
2I-1.1
2I-1.2
2I-1.2 ARCHAEOLOGICAL FINDS
PART 2J
PROTECTION OF WATER AND LAND RESOURCES
2J-1 CRITERIA REFERENCE DOCUMENTS
AIR FORCE GUIDANCE
AIR FORCE ENGINEERING TECHNICAL LETTERS (ETL)
FEDERAL AVIATION ADMINISTRATION (FAA) ADVISORY CIRCULAR (AC)
GEORGIA DEPARTMENT OF NATURAL RESOURCES (GA DNR)
ENVIRONMENTAL PROTECTION DIVISION (EPD)
GEORGIA SOIL AND WATER CONSERVATION COMMISSION (GSWCC)
HOUSTON COUNTY, GEORGIA
UNITED STATES GREEN BUILDING COUNCIL (USGBC)
starting 1 Nov 2016 must use this version; other versions have been superseded.)
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
U.S.DEPARTMENT OF DEFENSE (DOD)
2J-2 HISTORICAL REFERENCES
Surface Drainage Design
LEED Manual for New Construction & Major Renovations
LEED 2009 Leadership in Energy and Environmental Design (LEED) 2009
Sustainable Development
Stormwater Construction Standards
2J-3 GENERAL
2J-4 STORMWATER MANAGEMENT DURING CONSTRUCTION
Construction and Operation and Maintenance Guidance for Storm Water Systems.
As requirements from each of these guidance documents are incorporated into this standard, a reference to the specific location with the guidance document in included for the Contractor’s benefit to obtain more information. The reference is presented in [brackets].
2J-4.1 Construction Requirements for Sites Disturbing Less Than One Acre
Part 2J-4.2.2
2J-4.2 Construction Requirements for Projects Disturbing Greater Than (or Equal to) One Acre
2J-4.2.1
Construction and Operation and Maintenance Guidance for Storm Water Systems
2J-4.2.2
Part 2J-10.1 o o
2J-5 POST CONSTRUCTION STORMWATER MANAGEMENT
Figure 2J-5-1
As requirements from each of these guidance documents are incorporated into this standard, a reference to the specific location with the guidance document in included for the Contractor’s benefit to obtain more information. The reference is presented in [brackets].
Part 2J-10.2
Figure 2J5-1
POST CONSTRUCTION STORMWATER FLOW CHART
2J-5.1 WATER QUALITY REQUIREMENTS
2J-5.1.1
Part 2J-5.1.2
2J-5.1.2
Part 2J-5.1.1
2J-5.1.2 for non-airfield projects for airfield projects
2J-5.2 WATER QUANTITY REQUIREMENTS
Part 2J-5.2.1
OR
Part 2J-5.2.2 o Part 2J-5.2.3
2J-5.2.1
2J-5.2.1.1
2J-5.2.1.2
2J-5.2.2
2J-5.2.2.1 o
2J-5.2.2.2
The “10% point” is defined as the point in the watershed downstream of the site or the stormwater management system where the area of the site comprises 10% of the total drainage area.
2J-5.2.2.3
Projects may be part of the NPDES Industrial Stormwater Permit Program if they are commercial or industrial new development or redevelopment, regardless of size, with a Standard Industrial Classification (SIC) code that is listed in Appendix D of the NPDES Industrial Stormwater General Permits. [GSMM 2.2.2.1(3)]
“Hot spots” are defined as “land use or activity on a site that produces higher concentrations of trace metals, hydrocarbons or other priority pollutants than are normally found in stormwater runoff. Examples include gas stations, vehicle service and maintenance areas, industrial facilities such as salvage yards…, material storage sites, garbage transfer facilities, and commercial parking lots with high-intensity use”. [GSMM 2.2.2.1 Definitions] o o o
2J-5.2.2.4 o o
Table 2J-5-1
TABLE 2J-5-1 CULVERT AND PIPE DESIGN
Roadway Classification or Use Design Storm o o the height of water above the culvert invert at the entrance end of the culvert) o o Table 2J-5-2
TABLE 2J-5-2 FLOODING DEPTHS FOR INLETS IN A CLOSED PIPE SYSTEM
Roadway Classification or Use Flooding Depth
Note that the flooding depth for parking lots has been adjusted by Robins AFB to be more stringent that the LDM criterion.
o o maximum allowable elevation of the water surface o o 2J-5.2.2.5
Table 2J-5-1 o
2J-5.2.2.6
2J-5.2.2.7
2J-5.2.3 Building Projects with New Impervious Surfaces Greater than 5,000 Square Feet
Building is defined as a roofed and floored facility enclosed by exterior walls and consisting of one or more levels that is suitable for single or multiple functions.
The impervious footprint does not include existing buildings area to be renovated, existing pavement area to be resurfaced, or new pavement area other than supporting facilities associated with the building.
The 95th percentile storm event is based on the 24-hour (daily) rainfall depth averaged over a minimum of 10 years, ideally 30 years where 30 or more years of rainfall records are available. Rainfall records can be obtained from the National Oceanic and
Atmospheric Administration (NOAA). [LID 2-1.2] The Microsoft Excel tool, “EISA 2007 Section 438 Compliance Documentation” includes the appropriate 95th percentile storm event for Robins AFB. Maximum extent technically feasible requires full employment of accepted and reasonable stormwater retention and reuse technologies subject to in-situ site conditions and applicable regulatory constraints [LID 2-1.3]
OR
2J-5.3 SUSTAINABILITY
Part 2J-5.2.3
Major renovation projects include changes to a building that provide significant opportunity for substantial improvement in the sustainable design elements of the building, including energy efficiency.
Minor renovation projects include repair, maintenance, and equipment installations.
Part 2J-10.2
2J-6 PROHIBITION OF ILLEGAL DISCHARGES
2J-6.1
2J-6.2
2J-6.3
2J-6.4
2J-7 PROHIBITION OF ILLICIT CONNECTIONS
2J-7.1
2J-7.2
2J-7.3
2J-8 SPILLS
2J-8.1
2J-8.2
2J-9 TREE PROTECTION AND NEW LANDSCAPING
SECTION 3H LANDSCAPE MANAGEMENT AND SITE RESTORATION
2J-9.1
2J-9.2
2J-9.3
2J-9.4
Seeding between March and August shall consist of hulled Bermuda or Centipede; seeding between September and February shall consist of a mixture of Winter Rye and un-hulled Bermuda or a Tall Fescue variety. Sod shall consist of Bermuda or Centipede and shall not be installed between September and February. Brown Top Millet is not authorized for use at Robins AFB.
2J-10 RESTORATION OF LANDSCAPE DAMAGE
Part 2J
2J-10.1
2J-10.1.1
2J-10.1.2
Notice to Proceed (NTP) from Robins AFB to occur no sooner than fourteen (14) days after NOI postage mark. ESPCP (approved by Robins AFB) and post-marked return receipt from GA EPD for NOI must be submitted to Robins AFB to obtain NTP.
2J-10.1.3
2J-10.1.4
2J-10.1.5
Part 2J-10.1.4
2J-10.1.6
Final payment shall not be performed until the site achieves final stabilization as defined above.
2J-10.1.7
2J-10.2 POST-CONSTRUCTION STORMWATER MANAGEMENT
Table 2J-10-1
TABLE 2J-10-1 STORMWATER MANAGEMENT PLAN CHECKLIST
OR
Detailed guidance on acceptable and non-acceptable plant materials and landscape management practices is available in “Best Practices for Landscaping at Robins Air Force Base”, available from 78 CEG/CEIE.
Operations and Maintenance Plan can be prepared as a stand-alone package and referenced/included accordingly.
PART 2K
BACKFLOW PREVENTION DEVICES (BPDS)
2K-1 GENERAL
2K-1.1
2K-1.2
2K-1.3
2K-2 SUBMITTALS, NOTIFICATIONS AND APPROVALS
2K-2.1
2K-2.2
2K-2.3
PART 3
STRUCTURAL & CIVIL ENGINEERING
ELEMENTS
ROBINS AFB BASE FACILITY STANDARDS
PART 3A
STRUCTURAL AND CIVIL ENGINEERING ELEMENTS
STRUCTURAL REQUIREMENTS
3A-1 CRITERIA REFERENCE DOCUMENTS
AMERICAN CONCRETE INSTITUTE INTERNATIONAL (ACI)
AMERICAN WOOD COUNCIL
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
AMERICAN IRON AND STEEL ASSOCIATION (AISI)
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
STRUCTURAL ENGINEERING INSTITUTE (SEI)
AMERICAN WELDING SOCIETY (AWS)
INTERNATIONAL CODE COUNCIL (ICC))
METAL BUILDING MANUFACTURERS ASSOCIATION (MBMA)
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
STEEL DECK INSTITUTE (SDI)
U.S. DEPARTMENT OF DEFENSE (DOD)
3A-2 HISTORICAL REFERENCE DOCUMENTS
3A-3 GENERAL STRUCTURAL REQUIREMENTS
3A-3.1
3A-3.2
3A-4 SPECIAL STRUCTURAL REQUIRMENTS
3A-4.1
3A-4.2
3A-4.3
3A-4.4
3A-5 FOUNDATIONS
3A-5.1
3A-5.2
3A-6 ANTENNAS AND OTHER EXTERIOR USER EQUIPMENT
3A-6.1
3A-6.2
PART 3B
CIVIL ENGINEERING AND SITE PLANNING
3B-1 CRITERIA REFERENCE DOCUMENTS
AIR FORCE ENGINEERING TECHNICAL LETTER (AFETL)
AIR FORCE INSTRUCTIONS (AFI)
AIR FORCE MANUALS (AFM)
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO)
GEORGIA SOIL AND WATER CONSERVATION COMMISSION (GSWCC)
STATE OF GEORGIA ENVIRONMENTAL PROTECTION DIVISION (EPD)
INTERNATIONAL CODE COUNCIL (ICC))
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
U.S. DEPARTMENT OF DEFENSE (DOD)
UNITED STATES (US) ENVIRONMENTAL PROTECTION AGENCY (EPA)
3B-2 HISTORICAL REFERENCE DOCUMENTS
3B-3 GENERAL CIVIL ENGINEERING AND SITE PLANNING.
3B-3.1
3B-3.2 o o o o o o o o o o o o o o o o o o o o o
3B-4 SITE VISIT
3B-5 SPECIAL STRUCTURAL REQUIRMENTS
3B-5.1
3B-5.2
3B-5.3
3B-6 FOUNDATIONS
3B-6.1
3B-6.2
3B-7 ANTENNAS AND OTHER EXTERIOR USER EQUIPMENT.
3B-7.1
3B-7.2
PART 3C
WATER SUPPLY
3C-1 CRITERIA REFERENCE DOCUMENTS
AIR FORCE INSTRUCTIONS (AFI)
AIR FORCE MANUAL
ENGINEERING TECHNICAL LETTERS (ETL)
GEORGIA DEPARTMENT OF NATURAL RESOURCES
ENVIRONMENTAL PROTECTION DIVISION (EPD)
U.S. DEPARTMENT OF DEFENSE (D0D)
3C-2 HISTORICAL REFERENCES
3C-3 GENERAL INFORMATION
3C-3.1
3C-3.2
3C-3 WATER SUPPLY.
3C-3.1 See Fire
3C-3.2
3C-3.3
3C-3.4
3C-3.5
See 6N Cathodic Protection Systems
3C-3.5
3C-4 WATER SUPPLY PROTECTION.
3C-4.1
3C-4.1.1
3C-4.1.2
3C-4.1.3
3C-4.2
3C-4.2.1
3C-4.2.2 Examples of facilities where these conditions exist include sewage treatment plants, boiler/steam plants, production or manufacturing processes using chemicals and rinse systems, aircraft/equipment de-painting, plating/anodizing operations and hospitals.
3C-4.2.3
3C-4.2.4
3C-4.3
3C-4.4
PVC is resistant to some chemicals but is not resistant to petroleum products.
3C-4.5
3C-4.6
PART 3D
WASTE WATER TREATMENT
3D-1 CRITERIA REFERENCE DOCUMENTS
AIR FORCE INSTRUCTIONS ENGINEERING TECHNICAL LETTERS (ETL)
AIR FORCE INSTRUCTIONS (AFI)
U.S.DEPARTMENT OF DEFENSE (DOD)
3D-2 HISTORICAL REFERENCES
3D-3 GENERAL INFORMATION.
3D-3.1
3D-3.2
3D-3.3
3D-3 WASTEWATER TREAMENT SYSTEM
3D-3.1
3D-3.2
3D-3.3
3D-3.4
3D-3.5
3D-3.6
3D-4 WASTEWATER SYSTEM CONSTRUCTION
3D-4.1
3D-4.2
3D-4.3
3D-4.4
PART 3E
SUB-SURFACE INVESTIGATION
3E-1 CRITERIA REFERENCE DOCUMENTS
U.S.DEPARTMENT OF DEFENSE (DOD)
3E-2 GENERAL REQUIREMENTS.
3E-2.1
3E-2.2
3E-2.3
3E-3 DIGGING AND EXCAVATION REQUIREMENTS.
3E-3.1
3E-3.1.1
3E-3.1.2
3E-3.1.3
3E-3.1.4
3E-3.1.5
3E-3.1.6
3E-3.1.7
3E-3.2
3E-3.2.1
3E-3.2.2
3E-3.2.3
3E-3.2.4
3E-4 PRESERVING HISTORICAL AND ARCHAEOLOGICAL RESOURCES
PART 3F
TERMITE PRE-TREATMENT
3F-1 CRITERIA REFERENCE DOCUMENTS
UNITED STATES CODE (USC)
3F-2 GENERAL REQUIREMENTS
3F-3 SAFETY REQUIRMENTS FOR USE AND HANDLING
3F-3.1
3F-3.2
3F-3.3
3F-3.4
3F-3.5
3F-3.6
3F-3.7
PART 3G
STORMWATER MANAGEMENT
SECTION 2J PROTECTION OF WATER AND LAND RESOURCES
Part 2J-4
Part 2J-5
Part 2J-10
PART 3H
LANDSCAPE DESIGN AND SITE RESTORATION
3H-1 CRITERIA REFERENCE DOCUMENTS
AIR FORCE INSTRUCTIONS (AFI)
ROBINS AFB STANDARDS
U.S. DEPARTMENT OF DEFENSE (DOD)
3H-2 GENERAL REQUIREMENTS
3H-3 SITE RESTORATION
3H-3.1
3H-3.1.1
3H-3.1.2
3H-3.2
3H-3.2.1
3H-3.2.2
3H-3.2.3
3H-3.3
3H-3.3.1
3H-3.3.2
3H-3.3.3
3H-3.3.4
3H-3.4 SODDING
3H-3.5 HYDRO-SEEDING
3H-3.6 TURF ESTABLISHMENT PERIOD
3H-3.7 WATERING
3H-3.8 IRRIGATION
3H-3.8.1
3H-3.8.2
See Part 3I Lawn Sprinkler Systems
3H-3.9 MOWING
PART 3I
LAWN SPRINKLER SYSTEMS
3I-1 CRITERIA REFERENCE DOCUMENTS
U.S.DEPARTMENT OF DEFENSE (DOD)
3I-2 HISTORICAL REFERENCES
Irrigation of Installation Turfgrass and Landscaping
Site Planning and Design ater Supply: Water Distribution
3I-3 GENERAL REQUIREMENTS.
3I-3.1
3I-3.2
3I-3.3
3I-4 DESIGN REQUIR MENTS
3I-4.1
3I-4.2
3I-4.3
3I-4.3.1
3I-4.3.2
3I-4.4
3I-4.5
3I-4.6
3I-4.6.1
3I-4.6.2
3I-4.6.3
3I-4.6.4
3I-4.6.5
3I-4.6.6
3I-4.6.7
3I-4.7
3I-4.7.1
3I-4.7.2
3I-4.7.3
3I-4.7.4
3I-4.8
3I-4.8.1
3I-4.8.2
3I-4.8.3
3I-4.8.4
3I-4.9
3I-4.9.1
3I-4.9.2
3I-4.10
3I-5 INSTALLATION
3I-5.1
3I-5.2
3I-6 POST CONSTRUCTION REQUIREMENTS
3I-6.1
3I-6.1.1
3I-6.1.2
3I-6.2
3I-6.3
3I-6.3.1
3I-6.3.2
3I-6.3.3
3I-6.3.4
ARCHITECTURAL
COMPATIBILITY
STANDARDS
ROBINS AIR FORCE BASE
a component of
Robins Air Force Base Facility Standards
18 AUGUST 2015
PART 4A
ARCHITECTURAL ELEMENTS
ARCHITECTURE
4A-1 GENERAL REQUIREMENTS.
Architectural Compatibility Standards
4A-2 CRITERIA REFERENCE DOCUMENTS
AIR FORCE GUIDANCE
AIR FORCE INSTRUCTIONS (AFI)
ARCHITECTURAL BARRIERS ACT / ACCESS BOARD
AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
DRYWALL FINISHING COUNCIL INCORPORATED (DWFC)
ENGINEERING TECHNICAL LETTERS (ETL)
GYPSUM ASSOCIATION (GA)
INTERNATIONAL CODES
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
U.S. DEPARTMENT OF DEFENSE (DOD)
United States Gypsum Company (USG)
4A-11 HISTORICAL REFERENCES
2ARCHITECTURAL COMPATIBILITY STANDARD
TABLE OF CONTENTS
INTRODUCTION
SPECIFICATIONS, REGULATIONS & STANDARDS
EXTERIOR FACILITY STANDARDS
EXTERIOR ELEMENTS (SITE CONSIDERATIONS)
INTERIOR FACILITY GUIDELINES
1.1 1.2
2.1 2.2 2.3 2.4
3.1 3.2 3.3 3.4 3.5
4.1 4.2 4.3 4.4
5.1 5.2
Chapter 1
Chapter 3
Chapter 2
Chapter 4
Chapter 5
Appendix A
3ARCHITECTURAL COMPATIBILITY STANDARD
Chapter 1 INTRODUCTION
Robins Air Force Base (AFB), Life-Cycle-Cost
Architectural Compatibility Standard (ACS)
Air Force Corporate
AFCFS
AFCFS
See
Building 189 complies with the Robins AFB Exterior COLOR PLAN and Roofing Program.
4ARCHITECTURAL COMPATIBILITY STANDARD
Chapter 1.1 GOALS Architectural Compatibility Standard (ACS)
FUNCTIONALITY
SUSTAINABILITY
ENVIRONMENTAL PROTECTION
SAFETY / SECURITY
COST EFFECTIVENESS
AESTHETICS
ACCESSIBILITY
5ARCHITECTURAL COMPATIBILITY STANDARD
Chapter 1.2 INSTALLATION DEVELOPMENT PLANNING
Development Plan IDP
IDP
Architectural Compatibility Standard ACS
Robins AFB Planning Districts from Installation Development Plan 2015
Planning Districts from IDP 2015 overlayed on Robins AFB Future Land Use Map (General Plan 2002)
AIRFIELD EAST
AIRFIELD
AIRFIELD WEST
COMMUNITY SUPPORT
ADMINISTRATIVE
AND INDUSTRIAL
INDUSTRIAL
AND TRAINING
6ARCHITECTURAL COMPATIBILITY STANDARD
Chapter 2 SPECIFICATIONS, REGULATIONS & STANDARDS
HIERARCHY OF REQUIREMENTS
Base Facility Standards Architectural Compatibility Standards
NFPA) 101- Life Safety except
UFC
A list of the core UFC criteria is provided in this document.
UFGS
Updates are posted quarterly in February, May, August and November.
UFGS
UFGS
Auto-CAD 2010
WHOLE BUILDING DESIGN GUIDE
(WBDG)
The WBDG is a comprehensive resource for federal construction and development projects. It includes data, guidance, mandates, specifications and much more.
See http://www.wbdg.org/
7ARCHITECTURAL COMPATIBILITY STANDARD
Chapter 2.1 SPECIFICATIONS & STANDARDS
CORE UFCs
Comply with the Core UFCs listed here, and other UFCs identified as applicable.
General Building Requirements use of
Follow all provisions of UFC 1-200-02 High Performance and Sustainable Building Requirements to
8ARCHITECTURAL COMPATIBILITY STANDARD
Chapter 2.2 SUSTAINABILITY
For the U.S. Air Force (USAF), the term “sustainable” means the
It is the ability to operate into the
We must create sustainable
LEED or Energy & Environmental Design to recognize best-in-class
CURRENT GUIDANCE
was not compliance The LEED Scoresheet is tool
Air Force Sustainable Design and Development (SDD) Implementing Guidance Memorandum
• AF MILCON Sustainability Requirements
• LEED 2009
BACKGROUND
9ARCHITECTURAL COMPATIBILITY STANDARD
GUIDING PRINCIPLES
FOR FEDERAL LEADERSHIP
IN
HIGH PERFORMANCE AND
SUSTAINABLE BUILDINGS
Outline I. E Principles
II.
III.
IV.
Quality
V. R of Materials
2.2 SUSTAINABILITY continued
VVVVVVVVVV
CURRENT SUSTAINABILITY POLICY MEMORANDUM
10ARCHITECTURAL COMPATIBILITY STANDARD
ROBINS AFB
GREEN PROCUREMENT
2.2 SUSTAINABILITY continued
GUIDANCE
Building 937 was sited to take advantage the cooling impact of existing trees.
11ARCHITECTURAL COMPATIBILITY STANDARD
Chapter 2.3 FORCE PROTECTION
ANTITERRORISM FORCE PROTECTION AT/FP
• all new
• only
What are the AT/FP TRIGGERS?
50%
The cost to meet these standards is not part of the 50%.
Occupancy Levels
• Low Occupancy
Note
What is NOT an AT/FP TRIGGER?
alone
DoD Minimum Antiterrorism Standards for Buildings
DoD Minimum Antiterrorism Standoff Distances for Buildings"
General Building Requirements"
EXEMPT from
EXEMPT from the most personnel and assets inside
12ARCHITECTURAL COMPATIBILITY STANDARD
2.3 FORCE PROTECTION continued
DESIGN STRATEGIES
Ways to Minimize the Impact and Cost of AT/FP Compliance
STANDOFF DISTANCES
asset threat typically depending on Occupancy Level
Explosive Weight
- Table B-1
Table B-2 UFC 4-010-01 Note Standoff Distances shown in Table B-2 do not include design calculations for glazed windows and doors. These must be designed for the Applicable Explosive Weight and factored into the Standoff Distance.
DESIGN SUBMITTAL
Required Design Basis for Explosive Weight and Level of
13ARCHITECTURAL COMPATIBILITY STANDARD
Chapter 2.4 ACCESSIBILITY
(ABA DoD has also
Act (ADA
The enforcement for accessibility
(ADAAG).
The is available at
A
MILITARY EXCEPTIONS
PARKING
Building 301 - Handicap ramp located adjacent to handicap parking space.
14ARCHITECTURAL COMPATIBILITY STANDARD
Chapter 3 EXTERIOR FACILITY DESIGN STANDARDS
SUBMITTAL REQUIREMENTS
Architectural Compatibility Standards height, configuration, ACS
Statement of Sustainability
Architectural Compatibility Standards
At Robins AFB a southerly building exposure will maximize heat from the sun in the winter and minimize heat from the sun in the summer.
15ARCHITECTURAL COMPATIBILITY STANDARD
Chapter 3.1 ARCHITECTURAL CHARACTER
HISTORICAL EXEMPTIONS
No buildings or structures are automatically exempt from the provisions of the ACS.
1. When renovating or modifying buildings that have been historically exempt, follow the provisions of the ACS as much as practicable.
2. If the provisions of the ACS seem impractical, request a variance as early as possible.
DESIGN GUIDELINES
1.
2.
4.
5.
6.
7.
Building 222 Addition - The size, mass and character of this addition is compatible with adjacent architecture
The use of color creates the feeling of cohesive architectural character, even though the buildings in the Avionics Complex vary significantly in size.
16ARCHITECTURAL COMPATIBILITY STANDARD
Chapter 3.2 ROBINS AFB EXTERIOR COLOR PLAN
1. Exterior COLOR PLAN 2.
4.
5.
EXTERIOR PAINT COLORS
BRICK COLORS
as closely as possible
17ARCHITECTURAL COMPATIBILITY STANDARD
1.
2.
4.
5.
MATERIAL SELECTION GUIDELINES
BRICK
CONCRETE MASONRY UNITS (CMU)/CAST STONE MASONRY UNITS
Exterior COLOR PLAN
CONCRETE/PRECAST CONCRETE/CONCRETE AGGREGATE PANELS
Exterior COLOR PLAN.
EXTERIOR INSULATION FINISH SYSTEM (EIFS)
Exterior COLOR PLAN
Chapter 3.3 OUTSIDE WALLS & FINISHES
Building 700 - Brick + concrete accent;
R62 trim
Building 365 - EIFS; R63 trim
Building 196 - CMU; R62 trim
Building 189 - Metal + CMU; R62 trim
18ARCHITECTURAL COMPATIBILITY STANDARD
Building 282
3.3 OUTSIDE WALLS & FINISHES continued
Building 2078
19ARCHITECTURAL COMPATIBILITY STANDARD
METAL
Exterior COLOR PLAN
Exterior COLOR PLAN
Exterior
COLOR PLAN
Exterior COLOR
PLAN.
Building 128 - Metal; Gutters match
Building 148 - Metal + concrete with compatible addition
WOOD FRAMING, SHEATHING AND DECKING
Exterior
COLOR PLAN.
3.3 OUTSIDE WALLS & FINISHES continued
Building 229 - Brick with R62 accents;
R48 handrails and utility boxes
Building 2061 - One structure with multiple integrated exterior finishes. Metal in the back; EIFS, brick cladding and matching trim in front.
Note: A white-colored area is used to identify (highlight) the location of the primary building entrance.
20ARCHITECTURAL COMPATIBILITY STANDARD
Chapter 3.4 ROOFING
ALLOWABLE ROOF TYPES
WARRANTY REQUIRED
ROOF COLOR OPTIONS
February 2017 ROBINS AFB BASE FACILITY STANDARD
OPTIMAL SLOPE 3:12
21ARCHITECTURAL COMPATIBILITY STANDARD
STANDING SEAM METAL ROOF
See
3.4 ROOFING continued
Building 549T - Modular building with EIFS cladding and standing seam metal roof
CONFIGURATION OPTIONS
SIMPLE
ARCHITECTURAL
TRIM AND ACCESSORIES
SINGLE-PLY MEMBRANE ROOFS
See
Building 210 - A new PVC roof is being installed. Note the rolls of PVC lying on the ground.
22ARCHITECTURAL COMPATIBILITY STANDARD
3.4 ROOFING continued
FASCIAS, GUTTERS AND DOWNSPOUTS
ROOF VENTS AND ELEMENTS
Building 701 - Gutters match metal panels;
Doors and fascia are R62; Roof is off-white.
78 CEG/CEN ROOFING MANAGERS
POINTS OF CONTACT
Primary: Terry R. Stinson (478) 327-2942 Alternate: David A. Trescott (478) 926-8838
WARRANTY EXPIRATION DATE
xx MONTH 20xx
ROOF SECTION - XX
Building 44 gets a new roof. Building 46 is located in the foreground.
23ARCHITECTURAL COMPATIBILITY STANDARD
GLAZING
inhabited
Chapter 3.5 DOORS & WINDOWS
ANNEALED GLASS
Breaks easily into long, sharp splinters.
Broken annealed glass is very dangerous.
LAMINATED GLASS
Cracks under pressure but remains integral by adhering to the inner layer .
Broken laminated glass resembles a "spider-web"
TEMPERED GLASS
Shatters completely with high impact and breaks into small granular pieces or "jewels"
Low-E windows with thermal-break frames take advantage of passive heat gain from the sun while keeping interior heat from escaping.
Laminated glass minimizes injuries if the glass is broken.
L E i dd i hh hh ll bb kk
This window design meets minimum AT/FP and sustainability standards.
24ARCHITECTURAL COMPATIBILITY STANDARD
3.5 DOORS & WINDOWS continued
COLOR OPTIONS
Exterior COLOR PLAN
Exterior COLOR PLAN
EXTERIOR HARDWARE
LOCKS
Building 228 uses mirrored, spandrel glass that is no longer allowed.
Building 215 has R42 exterior walls; R62 doors and awning with Stainless Steel hardware; R48 trim.
Building 220 - Windows and frames were successfully replaced to comply with AT/FP standards. Note that legacy plant materials were retained.
25ARCHITECTURAL COMPATIBILITY STANDARD
Chapter 4 EXTERIOR ELEMENTS
EFFICIENT HEALTHY COMFORTABLE SAFE
View towards Buildings 83 and 125
Building 280 - Picnic tables and bench.
Building 85
26ARCHITECTURAL COMPATIBILITY STANDARD
Chapter 4.1 VEHICULAR CIRCULATION & PARKING
AT/FP REQUIREMENTS FOR ROADS AND PARKING
UFC 4-010-01
but except
PARKING DESIGN GUIDELINES
MILITARY S
U
R
FA
C E
D E P L O Y M E N T A N D D I S T R I B U T I O
N
COM
MAND
E T A
TRANSPORTATION
ENGINEERING
AGENCY
Military Surface Deployment and Distribution Command Transportation Engineering Agency
Better Military Traffic Engineering
SDDCTEA Pamphlet 55-17
27ARCHITECTURAL COMPATIBILITY STANDARD
Chapter 4.2 PEDESTRIAN CIRCULATION
SIDEWALKS
HANDRAILS
Sidewalks interconnect buildings in the dense area between Buildings 300 and 228
Crosswalk to Building 229 provides handicap access to sidewalks.
Building 365 - Handrails at a service entrance
28ARCHITECTURAL COMPATIBILITY STANDARD
Chapter 4.3 LANDSCAPING
GRASSING
TREES
SHRUBS AND GROUNDCOVERS
"BEST PRACTICES FOR LANDSCAPING AT ROBINS AIR FORCE BASE,"
29ARCHITECTURAL COMPATIBILITY STANDARD
Chapter 4.4 SITE APPURTENANCES
WALLS AND FENCES
WALLS
Exterior
COLOR PLAN
FENCES
Building 365 - Wall is incorporated into facility design.
Building 365 - These elements are hidden behind the wall.
Building 321 - Metal shadowbox fence used for screening.
Building 287 - Chain link fence used for security. Vinyl-coating would prevent rust.
New brown vinyl-coated chain link fence with concrete mow strip at Robins AFB Dog Park.
Black ornamental metal fence with concrete mow strip along Hwy 247 perimeter.
30ARCHITECTURAL COMPATIBILITY STANDARD
4.4 SITE APPURTENANCES continued
Dumpsters at Building 660.
Dumpsters for Building 2067 are located across roadway
Dumpsters for Day Care Center are partially screened.Dark Brown
DUMPSTER LOCATIONS - AT/FP REQUIREMENTS
UFC 4-010-01
Buildings.
Where the applicable standoff distance is not available or an alternate dumpster location cannot be found, building hardening shall be required.
DUMPSTER SAFETY
31ARCHITECTURAL COMPATIBILITY STANDARD
4.5 SITE APPURTENANCES continued
OUTDOOR EQUIPMENT CABINETS
xterior COLOR PLAN
Utility / equipment boxes near the NE corner of First Street are less noticeable when painted Robins 48.
SITE FURNISHINGS
PAVILIONS AND SHADE STRUCTURES
The use of wooden residential gazebos is discouraged.
w
Utility / equipment boxes outside Building 208. Boxes painted Robins 48 are preferred;
Factory-finished gray-green is acceptable.
Building 301 - Outdoor seating and recycling bin provide a neat and unified appearance.
32ARCHITECTURAL COMPATIBILITY STANDARD
4.5 SITE APPURTENANCES continued
OUTDOOR LIGHTING
Pedestrian lighting is typically 10 to 15 feet in height. In the Dorms Area, fully shielded downlight fixtures provide direct illumination for the sidewalks and blend with the aesthetics of the surrounding area.
Security lighting for defined spaces like this Dorm Area parking lot should be a maximum of 20 feet in height. This Cobra-Head fixture is partially shielded to reduce upward glare. Note the fenced dumpster and concrete pad.
High mast light-emitting diode (LED) lighting up to 40 feet in height provides broad area illumination.
OUTDOOR SIGNAGE
Standard identification sign at Building 301.
Signage at the primary entrance to Building 229 is acceptable. Identification at Building 385 that includes the group emblem is acceptable.
33ARCHITECTURAL COMPATIBILITY STANDARD
INTERIOR DESIGN
INTERIOR FINISHES AND COLORS
CEILING TILES
RESTROOMS
Chapter 5 INTERIOR FACILITY GUIDELINES
New "Familiar" carpet with freshly painted "Lambskin" walls.
New "Correlate" carpet with freshly painted "Site White" walls.
34ARCHITECTURAL COMPATIBILITY STANDARD
5.0 INTERIOR FACILITY GUIDELINES continued
LIGHTING
COMMISSIONING
35ARCHITECTURAL COMPATIBILITY STANDARD
5.1 FLOORS - CARPET AND COVEBASE OPTIONS
CARPET COLORS VINYL COVEBASE COLORS
BROWNS
BLUES
GREENS
36ARCHITECTURAL COMPATIBILITY STANDARD
5.2 ROBINS AFB INTERIOR PAINT COLOR OPTIONS
for walls for trim
INTERIOR PAINT COLORS
37ARCHITECTURAL COMPATIBILITY STANDARD
Appendix A
PART 5
MECHANICAL ENGINEERING
ELEMENTS
ROBINS AFB BASE FACILITY STANDARDS
PART 5A
MECHANICAL ENGINEERING ELEMENTS
MECHANICAL STANDARDS
5A-1 CRITERIA REFERENCE DOCUMENTS
AIR FORCE ENGINEERING TECHNICAL LETTERS
AIR FORCE INSTRUCTION (AFI)
U.S.DEPARTMENT OF DEFENSE (DOD)
5A-2 HISTORICAL REFERENCES
Heat Distribution System Outside of Buildings s
DoD Handbook: Petroleum Fuel Facilities
Energy Conservation
Utility Monitoring and Control Systems
5A-3 GENERAL MECHANICAL REQUIREMENTS.
5A-3.1
5A-3.2
5A-3.3
5A-3.4
5A-3.4.1
5A-3.4.2
5A-3.4.3
5A-3.5
5A-3.5.1
5A-3.5.2
5A-4 MECHANICAL DESIGN REQUIREMENTS
5A-4.1
5A-4.1.1
5A-4.1.2
5A-4.1.3
5A-4.1.4
5A-4.1.5
5A-4.2
5A-4.2.1
5A-4.2.2
5A-4.2.3
5A-4.2.4
5A-4.3
5A-4.4
5A-4.4.1
5A-4.4.2
5A-4.4.3
5A-4.4.4
5A-4.4.5
5A-4.4.6
5A-4.4.7
5A-4.4.8
5A-4.4.9
5A-4.4.10
5A-4.4.11
5A-4.4.12
5A-4.4.13
5A-5 MECHANICAL MAINTENANCE REQUIREMENTS
5A-5.1
5A-5.1.1
5A-5.1.2
5A-5.2
5A-5.2.1
5A-5.2.2
5A-5.2.3
5A-5.2.4
5A-5.2.5
5A-5.2.6
5A-5.3
5A-5.4
5A-5.5 no
PART 5B
HEATING, VENTILATION AND AIR CONDITIONING STANDARDS
5B-1 CRITERIA REFERENCE DOCUMENTS
AIR FORCE ENGINEERING TECHNICAL LETTERS
AIR FORCE INSTRUCTION (AFI)
AMERICAN SOCIETY OF HEATING, REFRIGERATING
AND AIR-CONDITIONING ENGINEERS (ASHRAE)
U.S.DEPARTMENT OF DEFENSE (DOD)
5B-2 HISTORICAL REFERENCES
Design of Control Systems for HVAC
Direct Digital Control of Heating, Ventilation and Air Conditioning Systems
Heat Distribution System Outside of Buildings has been s
Commissioning of Heating, Ventilating and Air Conditioning Systems Guide Specification
DoD Handbook: Petroleum Fuel Facilities
Energy Conservation
5B-3 HEATING, VENTILATION AND AIR CONDITIONING (HVAC) GENERAL
REQUIREMENTS.
5B-3.1
5B-3.1.1
5B-3.1.2
5B-3.1.3
5B-3.1.4
5B-3.1.5
5B-3.1.6
5B-3.2
5B-3.3
5B-3.3.1
5B-3.3.2
5B-3.3.3
5B-3.4
5B-3.5
5B-3.6 R410a or R134a
5B-3.6.1
Refer to Part 2C SPECIAL WASTES AND HAZARDS (Section 01560) for the list of products which are Class I and Class II
ODS:
5B-3.6.2
5B-3.6.3
5B-3.6.4
5B-3.7
5B-3.7.1
5B-3.7.2
5B-3.7.3
5B-3.7.4
5B-3.7.5
5B-3.7.6
5B-3.7.7
5B-3.8
5B-3.8.1
5B-3.8.2
5B-3.8.3
5B-3.8.4
5B-3.9
5B-3.9.1
5B-3.9.2
5B-3.10 latest edition
5B-3.10.1
5B-3.10.2
5B-3.10.3
5B-3.10.4
5B-3.10.5
5B-3.10.6
5B-3.10.7
5B-3.11
5B-4 HVAC WATER TREATMENT
5B-4.1
5B-4.2 National
Association of Corrosion Engineers)
5B-4.3
5B-4.3.1 Closed
5B-4.3.2 Open
5B-4.3.3 Closed
5B-4.3.4 o o o
5B-4.3.5 o o
5B-5 SYSTEM COMMISSIONING OF HVAC
5B-5.1
5B-5.1.1
5B-5.1.2
5B-5.2
5B-5.2.1
5B-5.2.2
5B-5.2.3
5B-5.2.4
5B-6 SYSTEM MAINTAINABILITY
5B-6.1
5B-6.2
5B-6.3
5B-6.3.1
5B-6.3.2
5B-6.3.3
5B-6.4
5B-6.5
5B-6.6
5B-6.6.1
5B-6.6.2
5B-6.7
PART 5C
5C-1
PLUMBING
CRITERIA REFERENCE DOCUMENTS
AIR FORCE ENGINEERING TECHNICAL LETTERS (ETL)
AIR FORCE INSTRUCTIONS (AFI)
GEORGIA DEPARTMENT OF COMMUNITY AFFAIRS
GEORGIA DEPARTMENT OF NATURAL RESOURCES
ENVIRONMENTAL PROTECTION DIVISION (EPD)
INTERNATIONAL CODE COUNCIL (ICC)
INTERNATIONAL ASSOC. OF PLUMBING AND MECHANICAL OFFICIALS (IAMPO)
U.S.DEPARTMENT OF DEFENSE (DOD)
5C-2 HISTORICAL REFERENCES
5C-3 GENERAL REQUIREMENTS
5C-3.1
5C-3.2
5C-3.2.1
5C-3.2.2
5C-3.2.3
5C-3.2.4
5C-3.3
5C-3.4
5C-3.4.1
5C-3.4.2 o Design basis: FlowGuard Gold® CPVC for pipe two inches (2”) diameter or smaller.
5C-3.4.3 o o o
5C-3.5
5C-3.5.1
5C-3.5.2
5C-3.5.3
5C-3.6
5C-3.6.1
5C-3.6.2
5C-3.6.3
PART 5D
COMPRESSED AIR
5D-1 CRITERIA REFERENCE DOCUMENTS
AIR FORCE ENGINEERING TECHNICAL LETTERS (ETL)
AIR FORCE INSTRUCTIONS (AFI)
COMPRESSED AIR AND GAS INSTITUTE (CAGI)
GEORGIA DEPARTMENT OF COMMUNITY AFFAIRS
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) /
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
INTERNATIONAL CODE COUNCIL (ICC)
INTERNATIONAL ASSOC. OF PLUMBING AND MECHANICAL OFFICIALS (IAMPO)
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA)
U.S.DEPARTMENT OF DEFENSE (DOD)
5D-2 HISTORICAL REFERENCES
5D-3 GENERAL REQUIREMENTS
5D-3.1
5D-3.2
5D-4 ENERGY CONSERVATION
5D-4.1
5D-4.1.1
5D-4.1.2
5D-4.1.3
5D-4.1.4
5D-4.1.5
5D-4.1.6
5D-4.1.7
5D-4.1.8
5D-4.1.9
5D-4.1.10
5D-4.1.11
5D-4.2
5D-4.2.1
5D-4.2.2
5D-4.3
5D-4.3.1
5D-4.3.2
5D-4.3.3
5D-4.3.4
5D-4.4
5D-5 AIR COMPRESSORS
5D-5.1
5D-5.2
5D-5.3
5D-5.4
5D-5.5
5D-5.6
5D-5.7
5D-5.8
5D-5.9
5D-5.10
5D-5.11
5D-5.12
5D-5.13
5D-6 AIR DRYERS
5D-6.1
5D-6.2
5D-6.3
5D-6.4
5D-6.5
5D-6.6
5D-7 RECEIVER TANKS
5D-7.1
5D-7.2
5D-7.3
5D-7.4
5D-7.4.1
5D-7.4.2
5D-7.4.3
5D-7.5
5D-8 PIPING
5D-8.1
5D-8.2
5D-8.3
5D-8.4
5D-8.5
5D-8.6
5D-8.7
5D-8.8
5D-9 AIR DROPS AND CONNECTORS
5D-9.1
5D-9.2
5D-10 AUTOMATIC DRAIN VALVES
5D-11 DESIGN ANALYSIS
5D-12 EQUIPMENT SCHEDULES
5D-12.1
5D-12.2
5D-12.3
5D-12.4
5D-12.5
PART 5E
FIRE SUPPRESSION
5E-1 CRITERIA REFERENCE DOCUMENTS
AIR FORCE ENGINEERING TECHNICAL LETTERS (ETL)
AIR FORCE INSTRUCTIONS (AFI)
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
U.S.DEPARTMENT OF DEFENSE (DOD)
5E-2 HISTORICAL REFERENCES
5E-3 GENERAL REQUIREMENTS
5E-3.1
5E-3.2
5E-3.3
5E-3.4
5E-3.4.1
5E-3.4.2
5E-4 SUPPRESSION SYSTEM DESIGN REQUIREMENTS
5E-4.1
5E-4.2
5E-4.3
5E-4.4
5E-4.5
5E-4.5.1
5E-4.5.2
5E-4.5.3
5E-4.6
5E-4.7
5E-4.8
5E-4.9
PART 5F
UTILITY MONITORING AND CONTROL SYSTEMS
6M WHOLE FACILITY METERING.
PART 5G
CATHODIC PROTECTION
6N CATHODIC PROTECTION SYSTEMS.
PART 6
ELECTRICAL ELEMENTS
ROBINS AFB BASE FACILITY STANDARDS
PART 6A
MEDIUM VOLTAGE DISTRIBUTION
SECTION I GENERAL
6A-1 QUICK REFERENCE
SECTION I GENERAL
SECTION II UNDERGROUND CIRCUITS
SECTION III DISTRIBUTION EQUIPMENT
SECTION IV RENOVATION/DEMOLITION
SECTION V DESIGN GUIDANCE
SECTION VI DESIGN ANALYSIS
SECTION VII INSPECTIONS AND TESTING
6A-2 CRITERIA REFERENCE DOCUMENTS
AIR FORCE INSTRUCTION (AFI)
NATIONAL ELECTRICAL SAFETY CODE (NESC)
NATIONAL FIRE PROTECTION AGENCY (NFPA)
UNIFIED FACILITY CRITERIA (UFC)
6A-3 GOVERNANCE
6A-3.1
6A-3.2
6A-3.3
6A-3.4
6A-4 NO OVERHEAD
6A-5 GROUNDING
SECTION II UNDERGROUND CIRCUITS
6A-6 SUBSTATIONS
6A-6.1
6A-6.2
6A-6.3
6A-6.4
6A-6.5
6A-6.6
6A-6.7
6A-7 DUCT BANK
6A-7.1
6A-7.4
6A-7.5
6A-7.6
6A-8 MANHOLES AND HANDHOLES
6A-8.1 o o o o o o
6A-8.2
6A-8.3 o
6A-9 DIRECT BURIED:
6A-10 NOT CONCRETE ENCASED
6A-10.1
6A-10.2
6A-10.3
6A-11 CABLE
6A-11.1
6A-11.2
6A-11.3
6A-11.4
6A-11.5
6A-11.6
6A-11.7
6A-11.8
6A-11.9
6A-11.10
6A-12 SPLICES
6A-12.1
6A-12.2
6A-12.3
6A-12.4
6A-12.5
6A-13 TERMINATIONS
6A-13.1
6A-13.2
6A-13.3
6A-13.4
6A-13.5
SECTION III DISTRIBUTION EQUIPMENT
6A-14 AIR SWITCHES
6A-14.1
6A-14.2
6A-14.3
6A-14.4
6A-14.5
6A-14.6
6A-14.7 o o o
6A-14.8
6A-14.9
6A-14.10
6A-14.11 o o o o
6A-14.12
6A-14.13
6A-14.14
6A-14.15
6A-15 EQUIPMENT PADS
6A-15.1
6A-15.2
6A-15.3
6A-15.4
6A-15.5
6A-15.6
6A-16 RISER POLES
6A-16.1
6A-16.2
6A-16.3
6A-16.4
SECTION IV RENOVATION/DEMOLITION
6A-17 RENOVATION
6A-17.1
6A-17.2 o o
6A-17.3
6A-17.4
6A-17.5
6A-17.6 o o o
6A-17.7
6A-18 DEMOLITION
6A-18.1
6A-18.2
6A-18.3
6A-18.4
6A-18.5
6A-18.6
6A-18.7
If to be removed, remove the pad and conduits down to the top of the duct bank. Fill hole with soil and seed.
If to remain in place, remove the wiring and cap the conduits on both ends. If the conduit protrudes more than two (2) inches above the pad, they shall be sawed off at one (1) inch height and capped.
6A-18.8 Recycling: All metal demolished as a part of the project shall remain property of the Government. Turn items into 78 CEG to be recycled. If there is a lot of metal such as would be the case a re-cabling project, a dumpster will be provided on the jobsite.
Section V DESIGN GUIDANCE
6A-19 DRAWINGS AND SPECIFICATIONS
See Part 6U – Design Guidance.
6A-20 DESIGN
6A-20.1 Voltage of distribution system is 12,470/7200 volts, wye, with most transformers in a delta-wye configuration
6A-20.2 A few installations of 4160 volt service are used to feed specific equipment, not for distribution of power from facility to facility.
6A-20.3 A neutral shall be routed in all circuits. Neutral acts as neutral and grounding conductor.
6A-20.4 If there is an existing service to an existing building and greater load is being added to the building, designer shall:
Replace the existing service with a larger service to provide the existing and new load.
If space, aesthetics or price is a limiting factor, obtain approval from 78 CEG to investigate an alternate method. This method, when determined, shall also be approved by 78 CEG. Approval of investigating an alternate method, does not guarantee approval of that method.
In the event a second service must be installed in an existing facility, consider what areas of the building each service will serve. Break the building into parts (preferably by fire areas.) Feed items in an area from one service. In no case, shall a room in the facility be serviced from more than one service (for this purpose double-ended service entrance gear shall be considered as one service.) For existing facilities, this may require rewiring some of the existing items in room(s).
SECTION VI DESIGN ANALYSIS
6A-21 DESIGN ANALYSIS
6A-21.1
6A-21.2
6A-21.3
6A-21.3
6A-21.4
6A-21.5
6A-21.6
6A-22 CALCULATIONS
6A-22.1
6A-22.2
6A-22.3
6A-22.4
6A-23 SHORT CIRCUIT STUDY
6A-24 ARC FLASH
SECTION VII INSPECTIONS AND TESTING
6A-25 DUCT BANK
6A-26 MANHOLES AND HANDHOLES
6A-26.1
6A-26.2
6A-26.3
6A-26.4
6A-27 CABLE
6A-27.1
6A-27.2
6A-28 SPLICES AND TERMINATIONS
6A-29 AIR SWITCHES
6A-29.1
6A-29.2
6A-30 EQUIPMENT PADS
6A-31 PRIMARY TRANSFORMERS
6A-31.1 o o
6A-31.2
6A-31.3
APPENDIX 6A-A
SHORT CIRCUIT VALUES
CKT/Switch ID Sym Amps Asy Amps
APPENDIX 6A-B
PICTURES OF VARIOUS DEVICES
Air Switch
Three-Phase Transformer
Single-Phase Padmount Transformer with Switchgear on Rack and Generator
Padmount Transformer with Exterior Switchgear
Interrupter Switch and Substation-Type Transformer
Double-Ended Unit Substation
PART 6B
MEDIUM TO LOW VOLTAGE
SECTION I GENERAL
6B-1 QUICK REFERENCE
SECTION I GENERAL
SECTION II TRANSFORMER/SERVICE ENTRANCE
COMBINATIONS
SECTION III TRANSFORMER / SERVICE ENTRANCES
SECTION IV SERVICE ENTRANCES
SECTION V RENOVATION / DEMOLITION
6B-2 CRITERIA REFERENCE DOCUMENTS
AIR FORCE INSTRUCTION (AFI)
NATIONAL ELECTRICAL SAFETY CODE (NESC)
NATIONAL FIRE PROTECTION AGENCY (NFPA)
UNIFIED FACILITY CRITERIA (UFC)
6B-3 GENERAL
6B-3.1
6B-3.2
6B-3.3
SECTION II TRANSFORMER/SERVICE ENTRANCE COMBINATIONS
6B-4 NEW FACILITIES
6B-4.1
6B-4.2
6B-4.3
6B-4.4
6B-4.5
6B-4.6
6B-4.7
6B-5 EXISTING FACILITIES
6B-5.1
6B-5.2
6B-5.3
6B-5.4
6B-6 OTHER COMBINATIONS
SECTION III TRANSFORMER / SERVICE ENTRANCES (SE)
6B-7 NUMBER OF SERVICES
6B-7.1
6B-7.2
6B-7.3
6B-7.4
6B-7.5
6B-8 TRANSFORMERS (GENERAL)
6B-8.1
6B-8.2
6B-8.3
6B-8.4
6B-8.5
6B-8.6
6B-8.7
6B-8.8
6B-8.9
6B-8.10
6B-8.11 o o o
6B-8.12
6B-8.13
6B-8.14
6B-8.15
6B-8.16
6B-9 GROUNDING
6B-10 PADMOUNT TRANSFORMERS
6B-10.1
6B-10.2
6B-10.3
6B-10.4
6B-10.5
6B-10.6
6B-11 INTERRUPTER SWITCH AND SUBSTATION-TYPE TRANSFORMER
6B-11.1
6B-11.2
6B-11.3 o o o o o o o o
6B-12 EXTER OR WALK-IN ENCLOSURES
6B-12.1
6B-12.2
6B-12.3
6B-12.4
6B-12.5
6B-12.6
6B-12.7
6B-13 FACILITY METERING
6B-13.1
6B-13.2
SECTION IV SERVICE ENTRANCES (SE)
6B-14 TRANSFORMER / SERVICE ENTRANCE (SE) COMBINATIONS
6B-14.1
6B-14.2
6B-15 SERVICE ENTRANCE FEEDERS
6B-15.1
6B-15.2
6B-15.3
6B-15.4
6B-15.5
6B-16 SERVICE ENTRANCE EQUIPMENT
6B-16.1
6B-16.2
6B-16.3
6B-17 SERVICE ENTRANCE (SE) GROUNDING
SECTION V RENOVATION/DEMOLITION
6B-18 RENOVATION
6B-18.1
6B-18.2
6B-18.3 o o
6B-18.4
6B-18.5
6B-19 DEMOLITION
6B-19.1
6B-19.2
6B-19.3
6B-19.4
PART 6C
LOW VOLTAGE ELECTRICAL DISTRIBUTION
SECTION I GENERAL
6C-1 QUICK REFERENCE
SECTION I GENERAL
SECTION II CONNECTIONS TO SERVICE ENTRANCE EQUIPMENT
(SE) GEAR
SECTION III INTERIOR DISTRIBUTION SYSTEM
SECTION IV BRANCH WIRING
SECTION V CONDUCTORS AND RACEWAYS
SECTION VI BRANCH WIRING - EXTERIOR
SECTION VII RENOVATION / DEMOLITION
6C-2 CRITERIA REFERENCE DOCUMENTS
AIR FORCE INSTRUCTION (AFI)
NATIONAL FIRE PROTECTION AGENCY (NFPA)
UNIFIED FACILITY CRITERIA (UFC)
6C-3 GOVERNANCE
6C-3.1
6C-3.2
6C-3.3
6C-3.4
6C-4 OMITTED
SECTION II CONNECTIONS TO SERVICE ENTRANCE EQUIPMENT (SE) GEAR
6C-5 GENERATOR CONNECTIONS
6C-6 RISER DIAGRAM
6C-7 MAIN ELECTRICAL ROOM(S)
6C-7.1
6C-7.2
6C-7.3
6C-7.4
6C-7.5
6C-7.6
SECTION III INTERIOR DISTRIBUTION SYSTEM
6C-8 FEEDERS
6C-8.1
6C-8.2
6C-8.3
6C-8.4
6C-8.5
6C-8.6
6C-8.7
6C-9 DISTRIBUTION EQUIPMENT
6C-10 ROUTING OF RACEWAYS INTO DISTRIBUTION EQUIPMENT
6C-10.1
6C-10.2
6C-10.3
6C-10.4
6C-10.5
6C-11 NO LOADS CONNECTED AHEAD OF MAIN
6C-11.1
6C-11.2
6C-11.3
6C-11.4
6C-12 HOUSEKEEPING PADS
6C-12.1
6C-12.2
6C-12.3
6C-12.4
6C-13 DIRECTORIES AND LABELING
6C-13.1
6C-13.2 o
6C-14 ELECTRICAL CLOSETS (Administrative Spaces)
6C-14.1
6C-14.2
6C-14.3
6C-15 INDUSTRIAL/SHOP AREAS
6C-15.1
6C-15.2
6C-15.3
6C-15.4
SECTION IV BRANCH WIRING
6C-16 DEFINITION
6C-17 WIRING METHODS
6C-17.1 Individual copper conductors in raceway:
6C-17.2 Splices:
Wiring shall not contain any splices in switchboards, distribution panelboards or panelboards to extend the length.
Splices to divert the branch wiring in various directions or to feed down to a fixture shall be made in a junction box. Use wire nuts for #10 or smaller wire.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .