About this file

This document contains a sample construction bid breakdown form and information about an indefinite-delivery indefinite-quantity mechanical and electrical construction contract opportunity. The sample bid breakdown form outlines a template for contractors to provide pricing details for various line items such as general conditions, civil, structural, architectural, plumbing, mechanical, electrical, fire suppression alarm, and other work. It includes columns for materials, overhead, profit, bid bond, and grand total pricing.

The federal contract opportunity is for mechanical and electrical maintenance support at Robins Air Force Base, Georgia. The mechanical-electrical IDIQ contract provides maintenance, repair, alteration, and new construction services for facilities including HVAC, controls, underground piping systems, fuel distribution, boilers, airfield and exterior lighting, lightning protection, and fire suppression and alarm systems. Contractors must provide all material, equipment, labor, and general conditions for individual task orders issued against the IDIQ vehicle. The solicitation was issued by the Department of the Air Force Materiel Command Lifecycle Management Center located at Robins Air Force Base.

Attachment #8 - Blank AF Form 3052

View the file

Other files for this federal contract opportunity

Other files attached to Mechanical Electrical IDIQ, newest first.
File Type Posted
RFI__6_Answers.pdf PDF
Atch__8_-_AF_Form_3052.xlsx XLSX spreadsheet
Atch__10_-_AF_Form_3065.xlsx XLSX spreadsheet
Atch__9_-_AF_Form_3064.xlsx XLSX spreadsheet
Atch__33_-_Addendum__2_Mech_Elec.pdf PDF
RFI__5_Answer.pdf PDF
Atch__35_-_09_29_00_-_Gypsum_Board.pdf PDF
Atch__34_-_Revised_Project_Table_of_Contents_22_Mar_18.pdf PDF
FA8501-18-R-0003-0002.pdf PDF
Atch__14_-_Schedule_of_Values.xlsx XLSX spreadsheet
RFI__4_Answers.pdf PDF
RFI__3_Answers.pdf PDF
Atch__30_-_VPP_DART-TCIR_Chart.xlsx XLSX spreadsheet
Atch__32_-_CIP_Concrete_Specifications.pdf PDF
Atch__31_-_Addendum__1_Mech-Elec.pdf PDF
RFI__2_Answers.pdf PDF
FA8501-18-R-0003-0001.pdf PDF
RFI__1_Answers.pdf PDF
Site_Visit_Slides_&_Sign_In_Sheet.pdf PDF
Atch__15_-_BLANK_SAMPLE_Dig_Permit_Form_v3.0.pdf PDF
Atch__17_-_BLANK_SAMPLE_DD_Form_1354_Transfer_and_Acceptance_of_DoD_Real_Property.pdf PDF
Atch__2_-_App_C_UHHZ_170241.pdf PDF
Atch__1_-_Mech-Elec_SOW.pdf PDF
Atch__10_-_BLANK_SAMPLE_AF_Form_3065.pdf PDF
Atch__14_-_BLANK_SAMPLE_Schedule_of_Values_Template_UNLOCKED.pdf PDF
Atch__20_-_Best_Practices_for_Landscape_Guidelines_Robins_AFB_3-15-2011.pdf PDF
Atch__12_-_01560_Environmental_Requirements_2018.pdf PDF
Atch__29_-_UHHZ090516_Combined_Drawings.pdf PDF
Atch__4_-_Robins_AFB_Division_1_Specs_and_Forms_REVISED_24_April_2017.pdf PDF
Atch__28_-_UHHZ090516_Combined_Specifications.pdf PDF
Atch__9_-_BLANK_SAMPLE_AF_Form_3064.pdf PDF
Atch__23_-_AFI_31-204_RAFB_Sup_1_Motor_Vehicle_Traffic_Supervision.pdf PDF
Atch__30_-_VPP_DART-TCIR_Chart.xlsx XLSX spreadsheet
Atch__13_-_Wage_Determination.pdf PDF
Atch__5_-_UHHZ170241_BIDDING_SCHEDULE_(TEP).pdf PDF
Atch__11_-_BLANK_SAMPLE_AF_Form_3000_with_digital_signatures.pdf PDF
Atch__26_-_UFC_4_010_05_Sensitive_Compartmented_Information_Facilities_Planning,_Design,_and_Construction.pdf PDF
Atch__18_-_Technical_Spec_for_ICD705_version1.2_April_23_2012.pdf PDF
Atch__19_-_AFSC_Energy_Metering_Requirements_24_June_2016.pdf PDF
Atch__7_-_Robins_AFB_Asbestos_Management_Plan_-_January_2015.pdf PDF
FA8501-18-R-0003.pdf PDF
Atch__16_-_BLANK_SAMPLE_Master_Utility_Outage.pdf PDF
Atch__24_-_Air_Force_Manual_32_1084_Civil_Engineering_Facility_Requirements.pdf PDF
Atch__22_-_BLANK_SAMPLE_AF_Form_66_SUBMITTAL_REGISTER.pdf PDF
Atch__3_-_PROCEDURAL_GUIDE_FOR_DESIGNERS_INCLUDING_AE_FIRMS_29_May_15.pdf PDF
Atch__21_-_Form20SP.STANDARDSensitiveEquipmentPropertyRequest.Revised15July2016.pdf PDF
Atch__27_-_BFS-RAFB_16_FEB_17.pdf PDF
Atch__25_-_AF_Form_2586_Flightline_Driving_Request.pdf PDF
Atch__6_-_Robins_AFB_Architectural_Compatiblity_Standards_18_Aug_2015.pdf PDF
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR: ADDRESS

CONTRACT FOR:

PROJECT NUMBER:

Type Report WORK LOCATION

Material Tax: % or Burden: % *Overhead: % *Profit: % *Bid Bond %

(1) (2) (3) (9) (10)

(4) (5) (6) (7) (8)

LINE

NO. ITEM - CIVIL

1 Cover Sheet 2 General Conditions -

3 Civil

4 STRUCTURAL

5 ARCHITECTURAL

6 PLUMBING

7 MECHANICAL

8 ELECTRICAL

9 FIRE SUPPRESS ALARM

10 OTHER

18 #VALUE! Page 1 Mtls.

20 $0.00 $0.00 21 OverHead $0.00 22 SubTotal $0.00 23 Profit $0.00 24 Subtotal $0.00 25 Bid Bond $0.00

26 Grand Total $0.00

CONSTRUCTION BREAKDOWN OF WORK TO BE ACCOMPLISHED

XXXX XXXXXXXX *** Put Contractor's Address Here

UHHZ XXXXXX

Robins Air Force Base

Cover