Attachment 09-AF form 66 03.27.2025.pdf
PDF 111 KB Posted
- Attached to
- B611 HVAC Repair
- Solicitation number
- FA480326B0001
About this file
This is a Schedule of Material Submittals form (AF Form 66) for a federal construction contract related to HVAC repair work at a facility identified as HVAC 611. The project is referenced under Solicitation No. F38604-99-1480, Project Number VLSB 24-0032.
The form establishes the required material and documentation submissions from the contractor, organized into ten line items with specified submittal types and deadlines. Required submittals include: Construction Schedule (due within 1 week of Notice to Proceed), HVAC Materials (requiring shop drawings, samples, and color selection), Operations and Maintenance Manuals, design drawings at 35%, 65%, and 95% completion stages, As-Built Drawings, DDC Controls documentation (with color selection), Test and Balance Report, and Electrical Components. The form is divided into two sections: one for completion by the Project Engineer (documenting certification of compliance, shop drawings, samples, color selection, material specifications, manufacturer's warranty, catalog data, and operating instructions) and one for completion by the Contract Administrator (documenting receipt dates, civil engineering review dates, return suspense dates, submittal numbers, contractor notification dates, resubmittal tracking, and final approval status). The form provides space for remarks and approval/disapproval notation for each line item, with additional blank lines (11-16) available for supplementary submittals as needed.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. F38604-99-1480 Attachment 6
PROJECT NUMBER : PROJECT TITLE: SOLICITATION/CONTRACT NO.:
SCHEDULE OF MATERIAL SUBMITTALS
LI
N E
N U
M
BE
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
CE
RT
IF
IC
AT
IO
N O
F
CO
M
PL
IA
N
CE
SH
O P
DR
AW
IN
G
S
SA
M
PL
ES
CO
LO
R
SE
LE
CT
IO
N M at er ia l C ut sh ee t/
M at er ia l S pe ci fic at io ns M
AN
U
FA
CT
U
RE
R' S
W
AR
RA
N
TY
CA
TA
LO
G D
AT
A
O
PE
RA
TI
N G
IN
ST
RU
CT
IO
N
S O
TH
ER
RE
Q
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
DA
TE
R
EC
EI
VE
D
IN
C O
N
TR
AC
TI
N G
DA
TE
T O
C
IV
IL
E
N G
IN
EE
RI
N
G
RE
TU
RN
S
U
SP
EN
SE
D
AT
E
SU
BM
IT
TA
L N
U M
BE
RS
DATE CONTRACTOR
NOTIFIED
CO
N
TR
AC
TO
R
RE
SU
BM
IT
TA
L
FI
N
AL
A
PP
RO
VA
L
REMARKS
APPROVED
DIS-
APPROVED
1 Construction Schedule x Within 1 week of
NTP
2 HVAC Materials X x x
3 O&M Manuals x
4 35% Drawings x
5 65% Drawings x
6 95% Drawings x
7 As-Built Drawings x
8 DDC Controls x
9 Test and Balance Report x
10 Electrical Components x
Repair HVAC 611
TO BE COMPLETED BY CONTRACT ADMINISTRATORTO BE COMPLETED BY PROJECT ENGINEER
VLSB 24-0032
AF FORM 66 (Computer Generated) PAGE 1 of 2
Solicitation No. F38604-99-1480 Attachment 6
PROJECT NUMBER : PROJECT TITLE: SOLICITATION/CONTRACT NO.:
SCHEDULE OF MATERIAL SUBMITTALS
LI
N E
N U
M
BE
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
CE
RT
IF
IC
AT
IO
N O
F
CO
M
PL
IA
N
CE
SH
O P
DR
AW
IN
G
S
SA
M
PL
ES
CO
LO
R
SE
LE
CT
IO
N M at er ia l C ut sh ee t/
M at er ia l S pe ci fic at io ns M
AN
U
FA
CT
U
RE
R' S
W
AR
RA
N
TY
CA
TA
LO
G D
AT
A
O
PE
RA
TI
N G
IN
ST
RU
CT
IO
N
S O
TH
ER
RE
Q
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
DA
TE
R
EC
EI
VE
D
IN
C O
N
TR
AC
TI
N G
DA
TE
T O
C
IV
IL
E
N G
IN
EE
RI
N
G
RE
TU
RN
S
U
SP
EN
SE
D
AT
E
SU
BM
IT
TA
L N
U M
BE
RS
DATE CONTRACTOR
NOTIFIED
CO
N
TR
AC
TO
R
RE
SU
BM
IT
TA
L
FI
N
AL
A
PP
RO
VA
L
REMARKS
APPROVED
DIS-
APPROVED
Repair HVAC 611
TO BE COMPLETED BY CONTRACT ADMINISTRATORTO BE COMPLETED BY PROJECT ENGINEER
VLSB 24-0032
AF FORM 66 (Computer Generated) PAGE 2 of 2
NCOC-A
File details come from the government source that posted it. Updated .