Attachment 07-DD Form 1354 - AUG 2022.pdf

PDF 97 KB Posted

Attached to
B611 HVAC Repair
Solicitation number
FA480326B0001
Issued by

About this file

DD Form 1354 is a Department of Defense administrative form used for the transfer and acceptance of real property between DoD Components and installations. The form serves as an official record documenting the completion and handover of constructed facilities or real property assets, with sections for identifying the transferring organization, receiving installation, project details, and facility specifications. The document includes fields for capturing essential property information such as facility number, real property unique identifier (RPUID), category code indicating the facility's designed use, construction type (permanent or semi-permanent), sustainability code compliance, and unit of measure for both accountability and operational purposes. Additionally, the form requires documentation of project costs, funding sources, and the type of legal interest DoD holds in the property.

The form requires completion and signature by both the transferring agent (typically the DoD Construction Agent or Installation Management Organization) and the accepting official (the Installation Management Organization's Real Property Accountable Officer) with dated signatures in YYYYMMDD format. Supporting sections allow for documentation of construction deficiencies identified during contractor turnover inspections and project-level remarks, with space for continuation sheets as needed. A property voucher number is assigned by the receiving Real Property Accountable Officer to track the transfer. Detailed instructions reference the Unified Facilities Criteria 1-300-08 and the Real Property Information Model (RPIM) for specific data inputs, coding requirements, and pick lists used to complete the form accurately.

View the file

Other files

File Type Posted
Solicitation Amendment FA480326B00010001.pdf PDF
Attachment 14-Base Access Template (CAO Jul 24).pdf PDF
Attachment 11-Progress Schedule Blank-1 Jun 90.pdf PDF
Attachment 15-REAL ID Act -Shaw AFB Access Handout.pdf PDF
Attachment 16-CONTRACTOR MEMO (optional_informational).pdf PDF
Attachment 17-B611 HVAC Repair Sign In Sheet-3 Feb 26.pdf PDF
Attachment 03-2022_Appendices_Shaw AFB HM_SW_HW_Refrigerant Requirements-6 Jan 26.pdf PDF
Attachment 09-AF form 66 03.27.2025.pdf PDF
Attachment 18-B611 HVAC Repair-Contractor Questions-Answers-4 Mar 26.pdf PDF
Attachment 01-SOW Revised VLSB 24-0032 Repair HVAC B611 03.03.2026.pdf PDF
Attachment 02-Blank Pricing Sheet VLSB 24-0032 B611 HVAC Repair-6 Jan 26.pdf PDF
Attachment 04-2023_SOW Template_Contract Environmental Provisions_FINAL-7 Feb 23.pdf PDF
Attachment 10-Progress Report Blank-1 Apr 96.pdf PDF
Attachment 13-Wage Determination-SC20260030-2 Jan 26.pdf PDF
Attachment 03-2022_Appendices_Shaw AFB HM_SW_HW_Refrigerant Requirements-6 Jan 26.docx DOCX document
Attachment 05-Mechanical Layout-Sep 07.pdf PDF
Attachment 08-Shaw AFB Design Standards 21 Aug 18.pdf PDF
Attachment 15-REAL ID Act -Shaw AFB Access Handout.docx DOCX document
Attachment 06-Ltd Asb Survey Report 3-18-25.pdf PDF
Attachment 09-AF form 66 03.27.2025.xlsx XLSX spreadsheet
Solicitation - FA480326B0001.pdf PDF
Attachment 01-SOW VLSB-24-0032 B611 HVAC Repair- 11 Sep 25.pdf PDF
Attachment 02-Blank Pricing Sheet VLSB 24-0032 B611 HVAC Repair-6 Jan 26.xlsx XLSX spreadsheet
Attachment 04-2023_SOW Template_Contract Environmental Provisions_FINAL-7 Feb 23.docx DOCX document
Attachment 11-Progress Schedule Blank-1 Jun 90.xlsx XLSX spreadsheet
Attachment 12-SF 1413 Statement of Acknowledgment-01 Oct 23.pdf PDF
Attachment 14-Base Access Template (CAO Jul 24).docx DOCX document
Attachment 16-CONTRACTOR MEMO (optional_informational).docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PREVIOUS EDITION IS OBSOLETE. Page 1 of 2DD FORM 1354, AUG 2022

TRANSFER AND ACCEPTANCE OF DoD REAL PROPERTY

PAGE

OF

PAGES

1. FROM (Organization Name) 2. DATE PREPARED

(YYYYMMDD)

3. PROJECT/JOB

NUMBER

4. SERIAL NUMBER

5. TO (Organization - Installation Code and Name) 6. RPSUID/SITENAME/

INSTCODE/INSTNAME

7. CONTRACT

NUMBER(S)

7a. RPA PLACED-IN-

SERVICE DATE

(YYYYMMDD)

8. TRANSACTION DETAILS

a. TYPE (X only one box)

ACQUISITION

TRANSFER BETWEEN SERVICES

CAPITAL IMPROVEMENT

INVENTORY ADJUSTMENT

b. WHEN/EVENT (X one)

TOTAL ASSET

PLACED-IN-SERVICE

PARTIAL ASSET

PLACED-IN-SERVICE

c. VERSION (X one)

DRAFT INTERIM FINAL

9.

ITEM

NO.

10a.

FACILITY NO.

10b.

RPUID

11.

CATCODE

12.

CATCODE

DESCRIPTION

13.

CONS

TYPE CODE

14.

SUST

CODE

PRIMARY

15.

UMA

16.

QUANTITY

SECONDARY

17.

UMO

18.

QUANTITY

19.

COST

20.

FUND

SOURCE

21.

FUND

ORG

22.

RPA INT

TYPE

CODE

23.

ITEM

REMARKS

24. STATEMENT OF COMPLETION. The facilities listed hereon are in accordance with maps, drawings, and specifications and change orders approved by the authorized representative of the using agency except for the deficiencies listed on the reverse side.

a. TITLE (Construction Agent/Installation Management Organization Accountable Official/RPAO)

b. TRANSFERRED BY (Typed Name and Signature)

c. DATE

SIGNED

(YYYYMMDD)

25. ACCEPTED BY (Typed Name and Signature)

a. TITLE (Installation Management Organization Accountable Official/RPAO)

b. NAME AND SIGNATURE

c. DATE SIGNED

(YYYYMMDD)

26. PROPERTY

VOUCHER

NUMBER

PREVIOUS EDITION IS OBSOLETE. Page 2 of 2DD FORM 1354, AUG 2022

27. CONSTRUCTION DEFICIENCIES (Attach blank sheet for continuations) 28. PROJECT REMARKS (Attach blank sheet for continuations)

INSTRUCTIONS

GENERAL. This form has been designed and issued for acceptance of real property or transfer between the DoD Components.

For detailed instructions on how to fill out this form, please refer to Unified Facilities Criteria 1-300-08.

Existing instructions issued by the DoD Components relative to the preparation of DD Form 1354 are applicable to this revised form to the extent that the various items and columns on the superseded forms have been retained. The DOD Components may promulgate additional instructions, as appropriate.

For detailed information on data inputs and codes, please refer to the latest version of the Real Property Information Model (RPIM) Report and use the RPIM Pick Lists for Block responses:

https://extranet.acq.osd.mil/ie/

SPECIFIC DATA ITEMS.

1. From. Name of the DoD Component.

2. Date Prepared. Date of actual preparation. Enter all dates in YYYYMMDD format (Example:

March 31, 2010 = 20100331).

3. Project/Job Number. Project number on a DD Form 1391 or Individual Job Order Number.

4. Serial Number. Sequential serial number assigned by the preparing organization (e.g.,Item 17.

2010-0001).

5. To. Name and address of the receiving installation, activity, and Service of the Real Property

Accountable Officer (RPAO).

6. RPSUID/SITENAME/INSTCODE/INSTNAME. Site Unique Identifier and name or installation code and name where the constructed facility is located.

7. Contract Number(s). Contract number(s) for this project.

7a. RPA Placed-In-Service Date. The calendar date the asset is accepted for use by DoD.

8. Transaction Details.

a. Type of Transaction. X only one box.

For Acquisition Type, refer to the Acquisition Method Code pick list in RPIM.

b. When/Event. When or event causing preparation of DD Form 1354. X only one box.

c. Version. Draft, interim, or final DD Form 1354. X only one box.

9. Item Number. Use a separate item number for each facility, no item number for additional usages.

10a. Facility Number. An installation specific asset identification number.

10b. RPUID. A unique non-intelligent code to permanently identify an asset.

11. CATCODE. The real property Category Code (CATCODE) that classifies the designed use of the asset (original or current) and corresponds to the largest quantity of the asset that is utilized for a single purpose (RPA Predominant Design Use CATCODE).

12. CATCODE Description. The CATCODE name corresponding with Item 11.

13. Construction (CONS) Type Code. The code represents the Construction Type Code and valid values can be found in the RPIM pick list by the same name. Type of construction will be PERM for Permanent or SEMI for Semi-permanent.

14. Sustainability (SUST) Code. : This code is also known as the Facility Sustainability Code and valid values can be found in the RPIM pick list by the same name. It indicates whether a facility meets the Guiding Principles of Federal Leadership in High Performance and Sustainable Buildings for buildings greater than 10,000 sq. ft. The list of valid values is: 1, 2, 3, 4.

15. UMA. Enter the primary unit of measure accountability for each design use category code for each item of real property.

16.Quantity. Enter the total quantity in the unit of measure accountability specified for each item of real property.

17. UMO. Enter the appropriate unit of measure operational for capacity/configuration as applicable for the design use category code.

18. Quantity. Enter the total quantity of capacity/configuration in the unit of measure operational specified for each item of real property.

19. Cost. Enter the total project cost for each item of real property. UFC 1-300-08 contains additional guidance.

20. Fund Source. Identify the fund source in this column for each real property asset or item. UFC 1-300-08 contains additional guidance.

21. Funding Organization. Identify the organization(s) responsible for funding the acquisition of this real property asset.

22. RPA Interest Type Code. This code represents the RPA Interest Type Code and valid values can be found in the RPIM pick list by the same name. The code is used to identify the type of legal interest that DoD holds in a real property asset.

23. Item Remarks. Remarks pertaining only to the item number identified in Item 9; show cost sharing.

24. Statement of Completion. Typed name, signature, title, and date of signature by the responsible transferring individual or agent. In the case of a real property acceptance action this is signed by the DoD Construction Agent. In the case of a real property transfer this is signed by the Installation Management Organization.

25. Accepted By. Typed name, signature, title, and date of signature by the Installation Management Organization RPAO or accepting official.

26. Property Voucher Number. Next sequential number assigned by the RPAO in voucher register.

27. Construction Deficiencies. List construction deficiencies in project during contractor turnover inspection.

28. Project Remarks. Project level remarks and continuation of blocks.

https://extranet.acq.osd.mil/ie/

PREVIOUS EDITION IS OBSOLETE.

Page of

DD FORM 1354, AUG 2022

TRANSFER AND ACCEPTANCE OF DoD REAL PROPERTY TRANSFER AND ACCEPTANCE OF DoD REAL PROPERTY

OF

OF

8. TRANSACTION DETAILS

8. TRANSACTION DETALS

a. TYPE (X only one box)

b. WHEN/EVENT (X one) B. WHEN/EVENT (X one)

c. VERSION (X one)

9. ITEM NO.

9. ITEM NO.

10a. FACILITY NO.

10. A. FACILITY NO.

10b. RPUID

10. B. RPUID

11. CATCODE

11. CATEGORY CODE

12. CATCODE DESCRIPTION

12. CATCODE DESCRIPTION

13. CONS TYPE CODE

13. TYPE CODE

14. SUST CODE

14. SUST. CODE

PRIMARY

AREA

15. UMA

15. PRIMARY UM

16. QUANTITY

16. PRIMARY UM QUANTITY

SECONDARY

OTHER

17. UMO

17. SECONDARY UM

18. QUANTITY

18. SECONDARY QUANTITY

19. COST

19. COST

20. FUND SOURCE

20. FUND SOURCE

21. FUND ORG

22. INTEREST CODE

22. RPA INT TYPE CODE

22. INTEREST CODE

23. ITEM REMARKS

23. ITEM REMARKS

24. STATEMENT OF COMPLETION. The facilities listed hereon are in accordance with maps, drawings, and specifications and change orders approved by the authorized representative of the using agency except for the deficiencies listed on the reverse side.

24. STATEMENT OF COMPLETION. The facilities listed hereon are in accordance with maps, drawings, and specifications and change orders approved by the authorized representative of the using agency except for the deficiencies listed on the reverse side.

b. TRANSFERRED BY (Typed Name and Signature) A. TRANSFERRED BY (Typed Name and Signature)

25. ACCEPTED BY (Typed Name and Signature) A. TRANSFERRED BY (Typed Name and Signature) DD1354, "TRANSFER AND ACCEPTANCE OF DoD REAL PROPERTY" 6.2.0.20160331.1.924316.921890

INSTRUCTIONS

INSTRUCTIONS

GENERAL. This form has been designed and issued for acceptance of real property or transfer between the DoD Components.

For detailed instructions on how to fill out this form, please refer to Unified Facilities Criteria 1-300-08.

Existing instructions issued by the DoD Components relative to the preparation of DD Form 1354 are applicable to this revised form to the extent that the various items and columns on the superseded forms have been retained. The DOD Components may promulgate additional instructions, as appropriate.

For detailed information on data inputs and codes, please refer to the latest version of the Real Property Information Model (RPIM) Report and use the RPIM Pick Lists for Block responses: https://extranet.acq.osd.mil/ie/

SPECIFIC DATA ITEMS.

1. From. Name of the DoD Component.

2. Date Prepared. Date of actual preparation. Enter all dates in YYYYMMDD format (Example: March 31, 2010 = 20100331).

3. Project/Job Number. Project number on a DD Form 1391 or Individual Job Order Number.

4. Serial Number. Sequential serial number assigned by the preparing organization (e.g.,Item 17. 2010-0001).

5. To. Name and address of the receiving installation, activity, and Service of the Real Property Accountable Officer (RPAO).

6. RPSUID/SITENAME/INSTCODE/INSTNAME. Site Unique Identifier and name or installation code and name where the constructed facility is located.

7. Contract Number(s). Contract number(s) for this project.

7a. RPA Placed-In-Service Date. The calendar date the asset is accepted for use by DoD.

8. Transaction Details.

a. Type of Transaction. X only one box.

For Acquisition Type, refer to the Acquisition Method Code pick list in RPIM.

b. When/Event. When or event causing preparation of DD Form 1354. X only one box.

c. Version. Draft, interim, or final DD Form 1354. X only one box.

9. Item Number. Use a separate item number for each facility, no item number for additional usages.

10a. Facility Number. An installation specific asset identification number.

10b. RPUID. A unique non-intelligent code to permanently identify an asset.

11. CATCODE. The real property Category Code (CATCODE) that classifies the designed use of the asset (original or current) and corresponds to the largest quantity of the asset that is utilized for a single purpose (RPA Predominant Design Use CATCODE).

12. CATCODE Description. The CATCODE name corresponding with Item 11.

13. Construction (CONS) Type Code. The code represents the Construction Type Code and valid values can be found in the RPIM pick list by the same name. Type of construction will be PERM for Permanent or SEMI for Semi-permanent.

14. Sustainability (SUST) Code. : This code is also known as the Facility Sustainability Code and valid values can be found in the RPIM pick list by the same name. It indicates whether a facility meets the Guiding Principles of Federal Leadership in High Performance and Sustainable Buildings for buildings greater than 10,000 sq. ft. The list of valid values is: 1, 2, 3, 4.

15. UMA. Enter the primary unit of measure accountability for each design use category code for each item of real property.

16.Quantity. Enter the total quantity in the unit of measure accountability specified for each item of real property.

17. UMO. Enter the appropriate unit of measure operational for capacity/configuration as applicable for the design use category code.

18. Quantity. Enter the total quantity of capacity/configuration in the unit of measure operational specified for each item of real property.

19. Cost. Enter the total project cost for each item of real property. UFC 1-300-08 contains additional guidance.

20. Fund Source. Identify the fund source in this column for each real property asset or item. UFC 1-300-08 contains additional guidance.

21. Funding Organization. Identify the organization(s) responsible for funding the acquisition of this real property asset.

22. RPA Interest Type Code. This code represents the RPA Interest Type Code and valid values can be found in the RPIM pick list by the same name. The code is used to identify the type of legal interest that DoD holds in a real property asset.

23. Item Remarks. Remarks pertaining only to the item number identified in Item 9; show cost sharing.

24. Statement of Completion. Typed name, signature, title, and date of signature by the responsible transferring individual or agent. In the case of a real property acceptance action this is signed by the DoD Construction Agent. In the case of a real property transfer this is signed by the Installation Management Organization.

25. Accepted By. Typed name, signature, title, and date of signature by the Installation Management Organization RPAO or accepting official.

26. Property Voucher Number. Next sequential number assigned by the RPAO in voucher register.

27. Construction Deficiencies. List construction deficiencies in project during contractor turnover inspection.

28. Project Remarks. Project level remarks and continuation of blocks.

CurrentPage:
PageCount:
Enter current page number.: 1.00000000
Enter total number of pages.: 1.00000000
1. FROM (Organization Name):
2. DATE PREPARED (YYYYMMDD):
3. PROJECT/JOB NUMBER : VLSB 24-0032
serialNum: FY25
5. TO (Organization - Installation Code and Name): 20 Civil Engineer Squadron

428 Chapin Street Shaw AFB, SC 29152-5123

6. RPSUID/SITENAME/ INSTCODE/INSTNAME: 3269, Shaw Air Force Base Site 1,

7. CONTRACT NUMBER(S): FA
serviceDate:
Select for ACQUISITION BY CONSTRUCTION: 0
Enter Acquisition type.:
Select for TRANSFER BETWEEN SERVICES: 0
Select for CAPITAL IMPROVEMENT: 0
Select for INVENTORY ADJUSTMENT: 0
Select for TOTAL ASSET PLACED-IN-SERVICE: 0
Select for PARTIAL ASSET PLACED-IN-SERVICE: 0
Select for DRAFT: 0
Select for INTERIM: 0
Select for FINAL: 0
9. ITEM NUMBER:
10. A. FACILITY NUMBER:
10. B. RPUID - REAL PROPERTY UNIQUE IDENTIFIER:
11. CATEGORY CODE :
12. CATCODE DESCRIPTION- CODE NAME WHICH DESCRIBES FACILITY USAGE:
13. CONS TYPE CODE - TYPE OF CONSTRUCTION. PERM FOR PERMANENT, SEMI FOR SEMIPERMANENT:
14. SUSTAINABILITY CODE:
15. PRIMARY UMA:
16. PRIMARY QUANTITY:
17. SECONDARY UMO:
18. CONFIGURATION QUANTITY:
19. COST:
20. FUND SOURCE:
21. FUNDING ORGANIZATION:
22. RPA INTEREST CODE:
23. ITEM REMARKS:
A. TITLE (DPW/RPAO):
B. NAME:
B. SIGNATURE:
C. DATE SIGNED (YYYYMMDD):
26. PROPERTY VOUCHER NUMBER:
27. CONSTRUCTION DEFICIENCIES (Attach blank sheet for continuations):
28. PROJECT REMARKS (Attach blank sheet for continuations):