CN-370000-HW687-DC056A.pdf

PDF 3 MB Posted

Attached to
Master Agreement FL|HW687|519929c0c8a00e44396dc1d8f5fa086b
Contract number
HW687
Issued by
Florida

About this file

This is a Task Assignment (TA) document issued under Contract HW687 between the State of Florida Department of Environmental Protection (FDEP) and Terracon Consultants, Inc. The Task Assignment, numbered DC056A, authorizes quarterly groundwater monitoring and annual reporting activities at the Classic French Dry Cleaners site located at 5539 West Oakland Park Boulevard, Lauderhill, Broward County, Florida (ERIC_4050). The project is managed by Gabriel Sostre for FDEP and Donna Cline for Terracon, with an effective date of March 16, 2026, and a completion date of July 30, 2027.

The Task Assignment authorizes Terracon to conduct four quarterly groundwater monitoring events and provide an annual groundwater monitoring report documenting groundwater quality observations. The scope includes sampling from multiple monitoring wells (MW001, MW016, and MW034) for volatile organic compounds via EPA Method 8260, with the fourth quarter event also including PFAS analysis via EPA Method 1633. Deliverables consist of quarterly trip reports due within 20 business days of sampling completion and an annual groundwater monitoring report including updated analytical tables, exhibits, and recommendations. Additional responsibilities include investigative-derived waste (IDW) management and disposal coordination. The total Task Assignment value is $16,942.90 on a fixed unit rate basis, with invoicing contingent upon FDEP approval of deliverables. The cost breakdown includes labor ($11,716.73), travel ($600.00), laboratory analysis ($694.00), field expenses ($1,980.50), subcontractor costs for IDW disposal ($780.00), and a completion fee ($1,171.67).

View the file

Other files

File Type Posted
CN-370000-HW687-BF01BCO1.pdf PDF
CN-370000-HW687-BF02B.pdf PDF
CN-370000-HW687-BF04ACO4.pdf PDF
CN-370000-HW687-BF05A.pdf PDF
CN-370000-HW687-BF1BCO2.pdf PDF
CN-370000-HW687-BIL02A.pdf PDF
CN-370000-HW687-BIL02C.pdf PDF
CN-370000-HW687-BIL03A.pdf PDF
CN-370000-HW687-BIL1BCO1.pdf PDF
CN-370000-HW687-BIL3ACO1.pdf PDF
CN-370000-HW687-CS04A.pdf PDF
CN-370000-HW687-CSS3BCO1.pdf PDF
CN-370000-HW687-DC002B.pdf PDF
CN-370000-HW687-DC002C.pdf PDF
CN-370000-HW687-DC002E.pdf PDF
CN-370000-HW687-DC002i.pdf PDF
CN-370000-HW687-DC003C.pdf PDF
CN-370000-HW687-DC004A.pdf PDF
CN-370000-HW687-DC005B.pdf PDF
CN-370000-HW687-DC006D.pdf PDF
CN-370000-HW687-DC007B.pdf PDF
CN-370000-HW687-DC007C.pdf PDF
CN-370000-HW687-DC008A.pdf PDF
CN-370000-HW687-DC008E.pdf PDF
CN-370000-HW687-DC010D.pdf PDF
CN-370000-HW687-DC011A.pdf PDF
CN-370000-HW687-DC011C.pdf PDF
CN-370000-HW687-DC011E.pdf PDF
CN-370000-HW687-DC011G.pdf PDF
CN-370000-HW687-DC013A.pdf PDF
CN-370000-HW687-DC014A.pdf PDF
CN-370000-HW687-DC014C.pdf PDF
CN-370000-HW687-DC016A.pdf PDF
CN-370000-HW687-DC018A.pdf PDF
CN-370000-HW687-DC01ACO4.pdf PDF
CN-370000-HW687-DC01ACO5.pdf PDF
CN-370000-HW687-DC01ACO6.pdf PDF
CN-370000-HW687-DC01ACO8.pdf PDF
CN-370000-HW687-DC021B.pdf PDF
CN-370000-HW687-DC023E.pdf PDF
CN-370000-HW687-DC024A.pdf PDF
CN-370000-HW687-DC024D.pdf PDF
CN-370000-HW687-DC025A.pdf PDF
CN-370000-HW687-DC025D.pdf PDF
CN-370000-HW687-DC025E.pdf PDF
CN-370000-HW687-DC027D.pdf PDF
CN-370000-HW687-DC028C.pdf PDF
CN-370000-HW687-DC028F.pdf PDF
CN-370000-HW687-DC028G.pdf PDF
CN-370000-HW687-DC031B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW687

DC056A Completion July 30, 2027

This Task Assignment authorizes Quarterly Groundwater Monitoring and Annual Reporting at the Classic French Cleaners site as part of contract HW687.

Gabriel Sostre 850-245-8749 Contractor Terracon Consultants, Inc. Contractor

Contractor Donna Cline Contractor 904-479-7415

ERIC_4050

5539 West Oakland Park Boulevard, Lauderhill, Broward County

Classic French Dry Cleaners

Contractor Contractor

✔ $ 16,942.90

$ 16,942.90

Scope of Work

Terracon Consultants, Inc.

Contractor Donna Cline

Senior Associate / Remediation Engineer

03/16/2026

Digitally signed by Cline, Donna L DN: cn=Cline, Donna L, ou=Domain Users, email=Donna.Cline@terracon.com Date: 2026.03.16 01:03:10 -04'00'

Cline, Donna L

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2026.03.13 12:11:50 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

BWC TAFORM 01/18

HW687

DC056A

Subtask 3: Quarter 2 Groundwater Monitoring event for VOHs only.

Subtask 4: Quarter 3 Groundwater Monitoring event for VOHs only.

Subtask 5: Quarter 4 Groundwater Monitoring event/Annual Groundwater Monitoring event for VOHs and PFAS.

Subtasks 1 & 6: Project Management. IDW Management.

Subtask 2: Quarter 1 Groundwater Monitoring event for VOHs only.

04/24/2026

08/28/2026

01/15/2027

05/21/2027

06/25/2027

Subtask 2: FDEP approval of email deliverable containing Quarter 1 Groundwater Monitoring Results.

Subtask 3: FDEP approval of email deliverable containing Quarter 2 Groundwater Monitoring Results.

Subtask 4: FDEP approval of email deliverable containing Quarter 3 Groundwater Monitoring Results.

Subtask 5: FDEP approval of Annual Groundwater Monitoring Report including updated tables, charts, and graphs. Must include VOH sampling data and PFAS sampling data.

Subtasks 1 & 6: FDEP approval of signed waste manifest.

$ 3,077.53

$ 2,663.94

$ 2,663.94

$ 4,232.14

$ 4,305.35

$ 16,942.90

Memorandum

FDEP COST ESTIMATE

Contractor: Terracon SubTask 1 Date: 3/10/2026 SubTask 2 Quarter 1 Groundwater Monitoring

Task #: SubTask 3 Quarter 2 Groundwater Monitoring Site: Classic French Dry Cleaner (ERIC_4050) SubTask 4 Quarter 3 Groundwater Monitoring

Activity/Phase: Quarterly Groundwater Monitoring SubTask 5 Quarter 4 Annual Groundwater Sampling Project Manager: Gabriel Sostre SubTask 6

Subtask 7

Totals 1 2 3 4 5 6 Labor Rate Category

$47.84 Project Manager Derek Barry 8.49 8.49 $36.06 CADD Specialist Chelsea Fugate 8.00 2.00 2.00 2.00 2.00 0.00 $56.01 Senior Geologist Shawn Ouellette 5.00 1.00 1.00 1.00 2.00 0.00 $47.84 Senior Geologist Derek Barry 25.50 5.00 2.50 2.50 9.50 6.00 $37.00 Environmental Technicia Rob Siegel 57.00 11.00 10.50 10.50 13.00 12.00

Total Hours 103.99 8.49 19.00 16.00 16.00 26.50 18.00

Direct Labor 4,303.46$ 406.01$ 774.33$ 636.23$ 636.23$ 1,119.62$ 731.04$

Overhead 116% 4,992.02$ 470.97$ 898.22$ 738.03$ 738.03$ 1,298.76$ 848.01$ Gen & Admin 0.00% -$ -$ -$ -$ -$ -$ -$ Fringe 56.263% 2,421.25$ 228.43$ 435.66$ 357.96$ 357.96$ 629.93$ 411.31$ Total Labor 11,716.73$ 1,105.41$ 2,108.21$ 1,732.22$ 1,732.22$ 3,048.31$ 1,990.36$

Travel Vehicle charge $600.00 120.00$ 120.00$ 120.00$ 120.00$ 120.00$ Total Travel $600.00 120.00$ 120.00$ 120.00$ 120.00$ 120.00$

Subcontractor IDW (Erwin) $780.00 -$ -$ -$ -$ 780.00$ Subcontractor Subtotal $780.00 -$ -$ -$ -$ 780.00$ Total Subcontractor Cost $0.00 -$ -$ -$ -$ 780.00$

Laboratory Analytical Costs $584.00 146.00$ 146.00$ 146.00$ 146.00$ -$ Fast Turnaround Charges -$ -$ -$ -$ -$ -$ Sample Shipping $110.00 -$ -$ -$ 110.00$ -$ Total Laboratory $694.00 146.00$ 146.00$ 146.00$ 256.00$ -$

Field Expenses Personal Protection $0.00 -$ -$ -$ -$ -$ Expendables $186.00 46.50$ 46.50$ 46.50$ 46.50$ -$ Equipment (Analytical related) $1,394.50 346.00$ 346.00$ 346.00$ 356.50$ -$ Equipment (IDW related) $400.00 100.00$ 100.00$ 100.00$ 100.00$ -$ Equipment (Other) $0.00 -$ -$ -$ -$ -$ Total Field Expenses $1,980.50 492.50$ 492.50$ 492.50$ 503.00$ -$

Subtotal $15,771.23 $1,105.41 2,866.71$ 2,490.72$ 2,490.72$ 3,927.31$ 2,890.36$ Completion Fee $1,171.67 $110.54 210.82$ 173.22$ 173.22$ 304.83$ 199.04$

Total Estimated Cost $16,942.90 $1,215.95 3,077.53$ 2,663.94$ 2,663.94$ 4,232.14$ 3,089.40$

Project Management

IDW Disposal

REV: 02/03 CEF TERRACON

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Classic French Dry Cleaner (ERIC_4050) SUBTASK 2: Quarter 1 Groundwater Monitoring

PROPOSAL NO. PH1257J04

DATE: 3/4/2026

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning Senior Geologist DB 3.00

Quarter 1 Groundwater Sampling (one person crew) Environmental Technician RS 1.00 Environmental Technician RS 1.00 Environmental Technician RS 1.50 Environmental Technician RS 3.00 Environmental Technician RS 0.50 Environmental Technician RS 0.50

Deliverable - Quarterly Trip Report Senior Geologist DB 2.00 Senior Geologist SO QA/QC lab report, prepare recommendations 1.00

CAD CF 2.00

Mobilization / Demobilization Environmental Technician RS 3.50

Personnel: DB RS CF SO Hours: 5.00 11.00 2.00 1.00 TOTAL LABOR 19.00

VEHICLE TYPE RATE UNIT USEAGE

Truck (RS) GW Sampling 120.00$ day 1 120.00$

TOTAL VEHICLE 120.00$

LABORATORY COSTS

PARAMETER RATE # SAMPLES IDW

Halocarbons (short list) EPA 8260 73.00$ 2 146.00$

TOTAL LAB 146.00$

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 1 40.00$

Ice (Sample preservation, 2 bags/day) 6.50$ bag 1 6.50$ Analytical Related Shallow Groundwater Sampling Kit 325.00$ day 1 325.00$

Tubing, HDPE 0.30$ ft 60 18.00$ Tubing, silicon (3/16 x 3/8) 3.00$ ft 1 3.00$

IDW Related 55-gallon drum, new 100.00$ each 1 100.00$

TOTAL EQUIPMENT 492.50$

Load/unload equipment and check equipment calibration Collect Water Levels from 11 monitoring wells at approximately 10 minutes per well ( Initial visit) Collect 2 Groundwater Samples @ 1.5hr per well

Request laboratory sample kit, verify property owner is the same as on the access agreement, notify property owner and FDEP of field activity schedule, prepare HASP (new site)

Pickup drum for IDW from drum wholesale.

Mobilization/Demobilize ( 3hr roundtrip + 0.5 hour to drop off lab samples)

Containerize IDW, collect IDW sample, stage drum Prepare GW sampling/calibration logs/field notes for PM evaluation (0.5 hr./day)

Prepare updated tables, exhibits, and prepare Email Trip Report with recommendations

Prepare groundwater flow (shallow zone), groundwater VOH concentrations map for monitoring wells

SUBTASK 3: Quarter 2 Groundwater Monitoring

PROPOSAL NO. PH1257J04

DATE: 3/4/2026

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning Senior Geologist DB 0.50

Quarter 1 Groundwater Sampling (one person crew) Environmental Technician RS 1.00 Environmental Technician RS 1.00 Environmental Technician RS 1.00 Environmental Technician RS 3.00 Environmental Technician RS 0.50 Environmental Technician RS 0.50

Deliverable - Quarterly Trip Report Senior Geologist DB 2.00 Senior Geologist SO QA/QC lab report, prepare recommendations 1.00

CAD CF 2.00

Mobilization / Demobilization Environmental Technician RS 3.50

Personnel: DB RS SO CF Hours: 2.50 10.50 1.00 2.00 TOTAL LABOR 16.00

VEHICLE TYPE RATE UNIT USEAGE

Truck (RS) GW Sampling 120.00$ day 1 120.00$

TOTAL VEHICLE 120.00$

LABORATORY COSTS

PARAMETER RATE # SAMPLES IDW QA

Halocarbons (short list) EPA 8260 73.00$ 2 146.00$

TOTAL LAB 146.00$

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 1 40.00$

Ice (Sample preservation, 2 bags/day) 6.50$ Bag 1 6.50$ Analytical Related Shallow Groundwater Sampling Kit 325.00$ day 1 325.00$

Tubing, HDPE 0.30$ ft 60 18.00$ Tubing, silicon (3/16 x 3/8) 3.00$ ft 1 3.00$

IDW Related 55-gallon drum, new 100.00$ each 1 100.00$

TOTAL EQUIPMENT 492.50$

Prepare groundwater flow (shallow zone), groundwater VOH concentrations map for monitoring

Containerize IDW, collect IDW sample, stage drum

Mobilization/Demobilize ( 3hr roundtrip + 0.5 hour to drop off lab samples)

Request laboratory sample kit, notify property owner and FDEP of field activity schedule

Pickup drum for IDW from drum wholesale.

Load/unload equipment and check equipment calibration Collect Water Levels from 6 monitoring wells at approximately 10 minutes per well Collect 2 Groundwater Samples @ 1.5hr per well

Prepare GW sampling/calibration logs/field notes for PM evaluation (0.5 hr./day)

Prepare updated tables, exhibits, and prepare Email Trip Report with recommendations

SUBTASK 4: Quarter 3 Groundwater Monitoring

PROPOSAL NO. PH1257J04

DATE: 3/4/2026

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning Senior Geologist DB 0.50

Quarter 1 Groundwater Sampling (one person crew) Environmental Technician RS 1.00 Environmental Technician RS 1.00 Environmental Technician RS 1.00 Environmental Technician RS 3.00 Environmental Technician RS 0.50 Environmental Technician RS 0.50

Deliverable - Quarterly Trip Report Senior Geologist DB 2.00 Senior Geologist SO QA/QC lab report, prepare recommendations 1.00

CAD CF 2.00

Mobilization / Demobilization Environmental Technician RS 3.50

Personnel: DB RS SO CF Hours: 2.50 10.50 1.00 2.00 TOTAL LABOR 16.00

VEHICLE TYPE RATE UNIT USEAGE

Truck (RS) GW Sampling 120.00$ day 1 120.00$

TOTAL VEHICLE 120.00$

LABORATORY COSTS

PARAMETER RATE # SAMPLES IDW QA

Halocarbons (short list) EPA 8260 73.00$ 2 146.00$

TOTAL LAB 146.00$

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 1 40.00$

Ice (Sample preservation, 2 bags/day) 6.50$ Bag 1 6.50$ Analytical Related Shallow Groundwater Sampling Kit 325.00$ day 1 325.00$

Tubing, HDPE 0.30$ ft 60 18.00$ Tubing, silicon (3/16 x 3/8) 3.00$ ft 1 3.00$

IDW Related 55-gallon drum, new 100.00$ each 1 100.00$

TOTAL EQUIPMENT 492.50$

Mobilization/Demobilize ( 3hr roundtrip + 0.5 hour to drop off lab samples)

Prepare updated tables, exhibits, and prepare Email Trip Report with recommendations

Prepare groundwater flow (shallow zone), groundwater VOH concentrations map for monitoring wells

Containerize IDW, collect IDW sample, stage drum Prepare GW sampling/calibration logs/field notes for PM evaluation (0.5 hr./day)

Request laboratory sample kit, notify property owner and FDEP of field activity schedule

Pickup drum for IDW from drum wholesale.

Load/unload equipment and check equipment calibration Collect Water Levels from 6 monitoring wells at approximately 10 minutes per well Collect 2 Groundwater Samples @ 1.5hr per well

SUBTASK 5: Quarter 4 Annual Groundwater Sampling

PROPOSAL NO. PH1257J04

DATE: 3/4/2026

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning Senior Geologist DB 0.50

Quarter 4 Groundwater Monitoring (one person crew) Environmental Technician RS 1.00 Environmental Technician RS 1.00 Environmental Technician RS 2.00 Environmental Technician RS 4.50 Environmental Technician RS 0.50 Environmental Technician RS 0.50

Annual Groundwater Monitoring Report Senior Geologist DB 2.00 Senior Geologist DB 4.00 Senior Geologist DB 1.00 Senior Geologist DB 2.00 Senior Scientist SO 2.00 CADD Specialist CF 2.00

Mobilization / Demobilization Environmental Technician RS 3.50

Personnel: SO DB RS CF Hours: 2.00 9.50 13.00 2.00 TOTAL LABOR 26.50$

VEHICLE TYPE RATE UNIT USEAGE

Truck (RS) 120.00$ day 1 120.00$

TOTAL VEHICLE 120.00$

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Erwin Remediation, Inc 195.00$ each 0 -$

TOTAL SUBCONTRACTOR -$

LABORATORY COSTS

PARAMETER RATE # SAMPLES IDW QA

Halocarbons (short list) EPA 8260 73.00$ 2 146.00$

Overnight Shipping 110.00$ 1 110.00$

PFAS Analysis FDEP Lab -$ 2 1 1 -

Sample Shipping (FDEP) -$ 2 -

TOTAL LAB 256.00$

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 1 40.00$

Ice (Sample preservation, 2 bags/day) 6.50$ bag 1 6.50$

Analytical Related Shallow Groundwater Sampling Kit 325.00$ day 1 325.00$

Tubing, HDPE 0.30$ ft 90 27.00$

Tubing, silicon (3/16 x 3/8) 3.00$ ft 1.5 4.50$

IDW Related 55-gallon drum, new 100.00$ each 1 100.00$

TOTAL EQUIPMENT 503.00$

Containerize IDW, collect IDW sample, stage drum Prepare GW sampling/calibration logs/field notes for PM evaluation (0.5 hr./day)

Prepare report tables, draft groundwater elevation and analytical isoconcentration figures Prepare Annual Groundwater Monitoring Report QA/QC field and laboratory data Summarize groundwater analytical results Conclusions and reccomendations

IDW Pickup and Disposal

Prepare Figures and Exhibits

Request laboratory sample kit, notify property owner and FDEP of field activity schedule

Load/unload equipment and check equipment calibration

Mobilization/Demobilize ( 3hr roundtrip + 0.5 hour to drop off lab samples)

Pickup drum for IDW from drum wholesale.

Collect Water Levels from 11 monitoring wells at approximately 10 minutes per well Collect 3 Groundwater Samples @ 1.5hr per well

SUBTASK 6: IDW Disposal

PROPOSAL NO. PH1257J04

DATE: 3/4/2026

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

IDW Coordination - Quarter 1 Senior Geologist DB 1.00 Environmental Technician RS 3.00 Senior Geologist DB 0.50

IDW Coordination - Quarter 2 Senior Geologist DB 1.00 Environmental Technician RS 3.00 Senior Geologist DB 0.50

IDW Coordination - Quarter 3 Senior Geologist DB 1.00 Environmental Technician RS 3.00 Senior Geologist DB 0.50

IDW Coordination - Quarter 4 (Annual) Senior Geologist DB 1.00 Environmental Technician RS 3.00 Senior Geologist DB 0.50

Personnel: DB RS Hours: 6.00 12.00 TOTAL LABOR 18.00$

VEHICLE TYPE RATE UNIT USEAGE

Truck (RS) IDW Manifesting (quarterly) 120.00$ Day 1 120.00$

TOTAL VEHICLE 120.00$

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Erwin Remediation, Inc 195.00$ each 4 780.00$

TOTAL SUBCONTRACTOR 780.00$

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day -$

Ice (Sample preservation, 2 bags/day) 6.50$ Bag -$

Analytical Related Shallow Groundwater Sampling Kit 325.00$ day -$

Tubing, HDPE 0.30$ ft -$

Tubing, silicon (3/16 x 3/8) 3.00$ ft -$

TOTAL EQUIPMENT -$

Compile IDW disposal documentation

Prepare IDW Waste Characterization/Generator Profile, schedule and coordinate pickup Mobilize to meet transporter onsite and sign manifest (3 hr roundtrip)

Mobilize to meet transporter onsite and sign manifest (3 hr roundtrip)

Prepare IDW Waste Characterization/Generator Profile, schedule and coordinate pickup Mobilize to meet transporter onsite and sign manifest (3 hr roundtrip) Compile IDW disposal documentation

Prepare IDW Waste Characterization/Generator Profile, schedule and coordinate pickup

Compile IDW disposal documentation

IDW Pickup and Disposal

Prepare IDW Waste Characterization/Generator Profile, schedule and coordinate pickup Mobilize to meet transporter onsite and sign manifest (3 hr roundtrip) Compile IDW disposal documentation

01/02/2025 08:11 AM PAGE 1 OF 6

Scope of Work

D (407) 618-8389 I M (571) 271-1874

Derek.Barry@terracon.com I Terracon.com

755 PRARIE INDUSTRIAL PKWY,

MULBERRY, FLORIDA, 33860

QUOTE #: 0046853

DATE: 12/31/2024 PROJECT PROPOSAL

CLIENT

DEREK BARRY

TERRACON

5463 W WATERS AVE. SUITE 830, TAMPA, FLORIDA, 33634

P: (571) 271-1874

E-MAIL:DEREK.BARRY@TERRACON.COM

PROJECT DESCRIPTION

T&D DRUMS

THE FOLLOWING DESCRIBES OUR UNDERSTANDING OF THE SCOPE OF SERVICES TO BE PERFORMED BY ENVIROSERVE, FOR THE

CLIENT, AT THE ABOVE REFERENCED LOCATION KNOWN AS THE JOB SITE.

FEE STRUCTURE

TRANSPORTATION

ITEM EST.QTY. UNIT PRICE UNIT TOTAL

TRANS & DISPOSAL PER DRUM

NOTES:SUBJECT TO FUEL SURCHARGE, - $400.00 55 GAL DRUM -

EIC SURCHARGE TO TOTAL INVOICE - $11.00 % -

TOTAL JOB ESTIMATE: $0.00

Job Estimate is for budgetary purposes only. Job will be billed according to time and materials used.

Time and Material Rates shall be charged portal to portal.

Please note that surcharges shall apply for off specification materials.

Applicable taxes and Environmental Fees are not included in our quotation, but shall be charged as applicable to the work.

Durations and Quantities are estimated only, actual fees shall be charged as incurred.

Minimum disposal amounts may apply to bulk disposal.

Tolls are not included in transportation rates

E-manifest fees will apply to hazardous waste manifests

Demurrage charged after one hour loading & unloading

Pricing assumes that drums/pallets are staged on a hard surface, accessible via van truck with liftgate & one driver with drum dolly or pallet jack.

Inaccessible areas (mud, heavy gravel), excessively heavy, deformed, unwieldy drums may require additional labor and equipment to assist. Fees for additional labor and equipment will be charged per EnviroServe's standard T&M rates.

The following materials are not eligible for LTL pricing and require direct or dedicated shipment to the TSDF: Cyanides, DOT Class 4.3 materials, DOT Class 1.4, 1.5 & 1.6 materials, Temperature Controlled/Self Reactive Materials, Odorant Materials (Mercaptans/Thiols), and other reactive/incompatible materials on a case by case basis. High hazardous containers (pails, drums, boxes, cylinders, etc.) will need to be assessed on a case by case basis to determine ability to be transported by EnviroServe.

Pricing for supplies (drums, pails, absorbent pads, etc.) is variable and may be adjusted without notice to account for market increases.

A 11% Environmental Fee will be applied to entire bill.