This is a Task Assignment (TA) document issued under Contract HW687 between the State of Florida Department of Environmental Protection (FDEP) and Terracon Consultants, Inc. The Task Assignment, numbered DC056A, authorizes quarterly groundwater monitoring and annual reporting activities at the Classic French Dry Cleaners site located at 5539 West Oakland Park Boulevard, Lauderhill, Broward County, Florida (ERIC_4050). The project is managed by Gabriel Sostre for FDEP and Donna Cline for Terracon, with an effective date of March 16, 2026, and a completion date of July 30, 2027.
The Task Assignment authorizes Terracon to conduct four quarterly groundwater monitoring events and provide an annual groundwater monitoring report documenting groundwater quality observations. The scope includes sampling from multiple monitoring wells (MW001, MW016, and MW034) for volatile organic compounds via EPA Method 8260, with the fourth quarter event also including PFAS analysis via EPA Method 1633. Deliverables consist of quarterly trip reports due within 20 business days of sampling completion and an annual groundwater monitoring report including updated analytical tables, exhibits, and recommendations. Additional responsibilities include investigative-derived waste (IDW) management and disposal coordination. The total Task Assignment value is $16,942.90 on a fixed unit rate basis, with invoicing contingent upon FDEP approval of deliverables. The cost breakdown includes labor ($11,716.73), travel ($600.00), laboratory analysis ($694.00), field expenses ($1,980.50), subcontractor costs for IDW disposal ($780.00), and a completion fee ($1,171.67).
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW687
DC056A Completion July 30, 2027
This Task Assignment authorizes Quarterly Groundwater Monitoring and Annual Reporting at the Classic French Cleaners site as part of contract HW687.
Gabriel Sostre 850-245-8749 Contractor Terracon Consultants, Inc. Contractor
Contractor Donna Cline Contractor 904-479-7415
ERIC_4050
5539 West Oakland Park Boulevard, Lauderhill, Broward County
Classic French Dry Cleaners
Contractor Contractor
✔ $ 16,942.90
$ 16,942.90
Scope of Work
Terracon Consultants, Inc.
Contractor Donna Cline
Senior Associate / Remediation Engineer
03/16/2026
Digitally signed by Cline, Donna L DN: cn=Cline, Donna L, ou=Domain Users, email=Donna.Cline@terracon.com Date: 2026.03.16 01:03:10 -04'00'
Cline, Donna L
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2026.03.13 12:11:50 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
BWC TAFORM 01/18
HW687
DC056A
Subtask 3: Quarter 2 Groundwater Monitoring event for VOHs only.
Subtask 4: Quarter 3 Groundwater Monitoring event for VOHs only.
Subtask 5: Quarter 4 Groundwater Monitoring event/Annual Groundwater Monitoring event for VOHs and PFAS.
Subtasks 1 & 6: Project Management. IDW Management.
Subtask 2: Quarter 1 Groundwater Monitoring event for VOHs only.
04/24/2026
08/28/2026
01/15/2027
05/21/2027
06/25/2027
Subtask 2: FDEP approval of email deliverable containing Quarter 1 Groundwater Monitoring Results.
Subtask 3: FDEP approval of email deliverable containing Quarter 2 Groundwater Monitoring Results.
Subtask 4: FDEP approval of email deliverable containing Quarter 3 Groundwater Monitoring Results.
Subtask 5: FDEP approval of Annual Groundwater Monitoring Report including updated tables, charts, and graphs. Must include VOH sampling data and PFAS sampling data.
Subtasks 1 & 6: FDEP approval of signed waste manifest.
$ 3,077.53
$ 2,663.94
$ 2,663.94
$ 4,232.14
$ 4,305.35
$ 16,942.90
Memorandum
FDEP COST ESTIMATE
Contractor: Terracon SubTask 1 Date: 3/10/2026 SubTask 2 Quarter 1 Groundwater Monitoring
Task #: SubTask 3 Quarter 2 Groundwater Monitoring Site: Classic French Dry Cleaner (ERIC_4050) SubTask 4 Quarter 3 Groundwater Monitoring
Activity/Phase: Quarterly Groundwater Monitoring SubTask 5 Quarter 4 Annual Groundwater Sampling Project Manager: Gabriel Sostre SubTask 6
Subtask 7
Totals 1 2 3 4 5 6 Labor Rate Category
$47.84 Project Manager Derek Barry 8.49 8.49 $36.06 CADD Specialist Chelsea Fugate 8.00 2.00 2.00 2.00 2.00 0.00 $56.01 Senior Geologist Shawn Ouellette 5.00 1.00 1.00 1.00 2.00 0.00 $47.84 Senior Geologist Derek Barry 25.50 5.00 2.50 2.50 9.50 6.00 $37.00 Environmental Technicia Rob Siegel 57.00 11.00 10.50 10.50 13.00 12.00
Total Hours 103.99 8.49 19.00 16.00 16.00 26.50 18.00
Direct Labor 4,303.46$ 406.01$ 774.33$ 636.23$ 636.23$ 1,119.62$ 731.04$
Overhead 116% 4,992.02$ 470.97$ 898.22$ 738.03$ 738.03$ 1,298.76$ 848.01$ Gen & Admin 0.00% -$ -$ -$ -$ -$ -$ -$ Fringe 56.263% 2,421.25$ 228.43$ 435.66$ 357.96$ 357.96$ 629.93$ 411.31$ Total Labor 11,716.73$ 1,105.41$ 2,108.21$ 1,732.22$ 1,732.22$ 3,048.31$ 1,990.36$
Travel Vehicle charge $600.00 120.00$ 120.00$ 120.00$ 120.00$ 120.00$ Total Travel $600.00 120.00$ 120.00$ 120.00$ 120.00$ 120.00$
Subcontractor IDW (Erwin) $780.00 -$ -$ -$ -$ 780.00$ Subcontractor Subtotal $780.00 -$ -$ -$ -$ 780.00$ Total Subcontractor Cost $0.00 -$ -$ -$ -$ 780.00$
Laboratory Analytical Costs $584.00 146.00$ 146.00$ 146.00$ 146.00$ -$ Fast Turnaround Charges -$ -$ -$ -$ -$ -$ Sample Shipping $110.00 -$ -$ -$ 110.00$ -$ Total Laboratory $694.00 146.00$ 146.00$ 146.00$ 256.00$ -$
Field Expenses Personal Protection $0.00 -$ -$ -$ -$ -$ Expendables $186.00 46.50$ 46.50$ 46.50$ 46.50$ -$ Equipment (Analytical related) $1,394.50 346.00$ 346.00$ 346.00$ 356.50$ -$ Equipment (IDW related) $400.00 100.00$ 100.00$ 100.00$ 100.00$ -$ Equipment (Other) $0.00 -$ -$ -$ -$ -$ Total Field Expenses $1,980.50 492.50$ 492.50$ 492.50$ 503.00$ -$
Subtotal $15,771.23 $1,105.41 2,866.71$ 2,490.72$ 2,490.72$ 3,927.31$ 2,890.36$ Completion Fee $1,171.67 $110.54 210.82$ 173.22$ 173.22$ 304.83$ 199.04$
Total Estimated Cost $16,942.90 $1,215.95 3,077.53$ 2,663.94$ 2,663.94$ 4,232.14$ 3,089.40$
Project Management
IDW Disposal
REV: 02/03 CEF TERRACON
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Classic French Dry Cleaner (ERIC_4050) SUBTASK 2: Quarter 1 Groundwater Monitoring
PROPOSAL NO. PH1257J04
DATE: 3/4/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning Senior Geologist DB 3.00
Quarter 1 Groundwater Sampling (one person crew) Environmental Technician RS 1.00 Environmental Technician RS 1.00 Environmental Technician RS 1.50 Environmental Technician RS 3.00 Environmental Technician RS 0.50 Environmental Technician RS 0.50
Deliverable - Quarterly Trip Report Senior Geologist DB 2.00 Senior Geologist SO QA/QC lab report, prepare recommendations 1.00
CAD CF 2.00
Mobilization / Demobilization Environmental Technician RS 3.50
Personnel: DB RS CF SO Hours: 5.00 11.00 2.00 1.00 TOTAL LABOR 19.00
VEHICLE TYPE RATE UNIT USEAGE
Truck (RS) GW Sampling 120.00$ day 1 120.00$
TOTAL VEHICLE 120.00$
LABORATORY COSTS
PARAMETER RATE # SAMPLES IDW
Halocarbons (short list) EPA 8260 73.00$ 2 146.00$
TOTAL LAB 146.00$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables Expendables 40.00$ day 1 40.00$
Ice (Sample preservation, 2 bags/day) 6.50$ bag 1 6.50$ Analytical Related Shallow Groundwater Sampling Kit 325.00$ day 1 325.00$
Tubing, HDPE 0.30$ ft 60 18.00$ Tubing, silicon (3/16 x 3/8) 3.00$ ft 1 3.00$
IDW Related 55-gallon drum, new 100.00$ each 1 100.00$
TOTAL EQUIPMENT 492.50$
Load/unload equipment and check equipment calibration Collect Water Levels from 11 monitoring wells at approximately 10 minutes per well ( Initial visit) Collect 2 Groundwater Samples @ 1.5hr per well
Request laboratory sample kit, verify property owner is the same as on the access agreement, notify property owner and FDEP of field activity schedule, prepare HASP (new site)
Pickup drum for IDW from drum wholesale.
Mobilization/Demobilize ( 3hr roundtrip + 0.5 hour to drop off lab samples)
Containerize IDW, collect IDW sample, stage drum Prepare GW sampling/calibration logs/field notes for PM evaluation (0.5 hr./day)
Prepare updated tables, exhibits, and prepare Email Trip Report with recommendations
Prepare groundwater flow (shallow zone), groundwater VOH concentrations map for monitoring wells
SUBTASK 3: Quarter 2 Groundwater Monitoring
PROPOSAL NO. PH1257J04
DATE: 3/4/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning Senior Geologist DB 0.50
Quarter 1 Groundwater Sampling (one person crew) Environmental Technician RS 1.00 Environmental Technician RS 1.00 Environmental Technician RS 1.00 Environmental Technician RS 3.00 Environmental Technician RS 0.50 Environmental Technician RS 0.50
Deliverable - Quarterly Trip Report Senior Geologist DB 2.00 Senior Geologist SO QA/QC lab report, prepare recommendations 1.00
CAD CF 2.00
Mobilization / Demobilization Environmental Technician RS 3.50
Personnel: DB RS SO CF Hours: 2.50 10.50 1.00 2.00 TOTAL LABOR 16.00
VEHICLE TYPE RATE UNIT USEAGE
Truck (RS) GW Sampling 120.00$ day 1 120.00$
TOTAL VEHICLE 120.00$
LABORATORY COSTS
PARAMETER RATE # SAMPLES IDW QA
Halocarbons (short list) EPA 8260 73.00$ 2 146.00$
TOTAL LAB 146.00$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables Expendables 40.00$ day 1 40.00$
Ice (Sample preservation, 2 bags/day) 6.50$ Bag 1 6.50$ Analytical Related Shallow Groundwater Sampling Kit 325.00$ day 1 325.00$
Tubing, HDPE 0.30$ ft 60 18.00$ Tubing, silicon (3/16 x 3/8) 3.00$ ft 1 3.00$
IDW Related 55-gallon drum, new 100.00$ each 1 100.00$
TOTAL EQUIPMENT 492.50$
Prepare groundwater flow (shallow zone), groundwater VOH concentrations map for monitoring
Containerize IDW, collect IDW sample, stage drum
Mobilization/Demobilize ( 3hr roundtrip + 0.5 hour to drop off lab samples)
Request laboratory sample kit, notify property owner and FDEP of field activity schedule
Pickup drum for IDW from drum wholesale.
Load/unload equipment and check equipment calibration Collect Water Levels from 6 monitoring wells at approximately 10 minutes per well Collect 2 Groundwater Samples @ 1.5hr per well
Prepare GW sampling/calibration logs/field notes for PM evaluation (0.5 hr./day)
Prepare updated tables, exhibits, and prepare Email Trip Report with recommendations
SUBTASK 4: Quarter 3 Groundwater Monitoring
PROPOSAL NO. PH1257J04
DATE: 3/4/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning Senior Geologist DB 0.50
Quarter 1 Groundwater Sampling (one person crew) Environmental Technician RS 1.00 Environmental Technician RS 1.00 Environmental Technician RS 1.00 Environmental Technician RS 3.00 Environmental Technician RS 0.50 Environmental Technician RS 0.50
Deliverable - Quarterly Trip Report Senior Geologist DB 2.00 Senior Geologist SO QA/QC lab report, prepare recommendations 1.00
CAD CF 2.00
Mobilization / Demobilization Environmental Technician RS 3.50
Personnel: DB RS SO CF Hours: 2.50 10.50 1.00 2.00 TOTAL LABOR 16.00
VEHICLE TYPE RATE UNIT USEAGE
Truck (RS) GW Sampling 120.00$ day 1 120.00$
TOTAL VEHICLE 120.00$
LABORATORY COSTS
PARAMETER RATE # SAMPLES IDW QA
Halocarbons (short list) EPA 8260 73.00$ 2 146.00$
TOTAL LAB 146.00$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables Expendables 40.00$ day 1 40.00$
Ice (Sample preservation, 2 bags/day) 6.50$ Bag 1 6.50$ Analytical Related Shallow Groundwater Sampling Kit 325.00$ day 1 325.00$
Tubing, HDPE 0.30$ ft 60 18.00$ Tubing, silicon (3/16 x 3/8) 3.00$ ft 1 3.00$
IDW Related 55-gallon drum, new 100.00$ each 1 100.00$
TOTAL EQUIPMENT 492.50$
Mobilization/Demobilize ( 3hr roundtrip + 0.5 hour to drop off lab samples)
Prepare updated tables, exhibits, and prepare Email Trip Report with recommendations
Prepare groundwater flow (shallow zone), groundwater VOH concentrations map for monitoring wells
Containerize IDW, collect IDW sample, stage drum Prepare GW sampling/calibration logs/field notes for PM evaluation (0.5 hr./day)
Request laboratory sample kit, notify property owner and FDEP of field activity schedule
Pickup drum for IDW from drum wholesale.
Load/unload equipment and check equipment calibration Collect Water Levels from 6 monitoring wells at approximately 10 minutes per well Collect 2 Groundwater Samples @ 1.5hr per well
SUBTASK 5: Quarter 4 Annual Groundwater Sampling
PROPOSAL NO. PH1257J04
DATE: 3/4/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning Senior Geologist DB 0.50
Quarter 4 Groundwater Monitoring (one person crew) Environmental Technician RS 1.00 Environmental Technician RS 1.00 Environmental Technician RS 2.00 Environmental Technician RS 4.50 Environmental Technician RS 0.50 Environmental Technician RS 0.50
Annual Groundwater Monitoring Report Senior Geologist DB 2.00 Senior Geologist DB 4.00 Senior Geologist DB 1.00 Senior Geologist DB 2.00 Senior Scientist SO 2.00 CADD Specialist CF 2.00
Mobilization / Demobilization Environmental Technician RS 3.50
Personnel: SO DB RS CF Hours: 2.00 9.50 13.00 2.00 TOTAL LABOR 26.50$
VEHICLE TYPE RATE UNIT USEAGE
Truck (RS) 120.00$ day 1 120.00$
TOTAL VEHICLE 120.00$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
Erwin Remediation, Inc 195.00$ each 0 -$
TOTAL SUBCONTRACTOR -$
LABORATORY COSTS
PARAMETER RATE # SAMPLES IDW QA
Halocarbons (short list) EPA 8260 73.00$ 2 146.00$
Overnight Shipping 110.00$ 1 110.00$
PFAS Analysis FDEP Lab -$ 2 1 1 -
Sample Shipping (FDEP) -$ 2 -
TOTAL LAB 256.00$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables Expendables 40.00$ day 1 40.00$
Ice (Sample preservation, 2 bags/day) 6.50$ bag 1 6.50$
Analytical Related Shallow Groundwater Sampling Kit 325.00$ day 1 325.00$
Tubing, HDPE 0.30$ ft 90 27.00$
Tubing, silicon (3/16 x 3/8) 3.00$ ft 1.5 4.50$
IDW Related 55-gallon drum, new 100.00$ each 1 100.00$
TOTAL EQUIPMENT 503.00$
Containerize IDW, collect IDW sample, stage drum Prepare GW sampling/calibration logs/field notes for PM evaluation (0.5 hr./day)
Prepare report tables, draft groundwater elevation and analytical isoconcentration figures Prepare Annual Groundwater Monitoring Report QA/QC field and laboratory data Summarize groundwater analytical results Conclusions and reccomendations
IDW Pickup and Disposal
Prepare Figures and Exhibits
Request laboratory sample kit, notify property owner and FDEP of field activity schedule
Load/unload equipment and check equipment calibration
Mobilization/Demobilize ( 3hr roundtrip + 0.5 hour to drop off lab samples)
Pickup drum for IDW from drum wholesale.
Collect Water Levels from 11 monitoring wells at approximately 10 minutes per well Collect 3 Groundwater Samples @ 1.5hr per well
SUBTASK 6: IDW Disposal
PROPOSAL NO. PH1257J04
DATE: 3/4/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
IDW Coordination - Quarter 1 Senior Geologist DB 1.00 Environmental Technician RS 3.00 Senior Geologist DB 0.50
IDW Coordination - Quarter 2 Senior Geologist DB 1.00 Environmental Technician RS 3.00 Senior Geologist DB 0.50
IDW Coordination - Quarter 3 Senior Geologist DB 1.00 Environmental Technician RS 3.00 Senior Geologist DB 0.50
IDW Coordination - Quarter 4 (Annual) Senior Geologist DB 1.00 Environmental Technician RS 3.00 Senior Geologist DB 0.50
Personnel: DB RS Hours: 6.00 12.00 TOTAL LABOR 18.00$
VEHICLE TYPE RATE UNIT USEAGE
Truck (RS) IDW Manifesting (quarterly) 120.00$ Day 1 120.00$
TOTAL VEHICLE 120.00$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
Erwin Remediation, Inc 195.00$ each 4 780.00$
TOTAL SUBCONTRACTOR 780.00$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables Expendables 40.00$ day -$
Ice (Sample preservation, 2 bags/day) 6.50$ Bag -$
Analytical Related Shallow Groundwater Sampling Kit 325.00$ day -$
Tubing, HDPE 0.30$ ft -$
Tubing, silicon (3/16 x 3/8) 3.00$ ft -$
TOTAL EQUIPMENT -$
Compile IDW disposal documentation
Prepare IDW Waste Characterization/Generator Profile, schedule and coordinate pickup Mobilize to meet transporter onsite and sign manifest (3 hr roundtrip)
Mobilize to meet transporter onsite and sign manifest (3 hr roundtrip)
Prepare IDW Waste Characterization/Generator Profile, schedule and coordinate pickup Mobilize to meet transporter onsite and sign manifest (3 hr roundtrip) Compile IDW disposal documentation
Prepare IDW Waste Characterization/Generator Profile, schedule and coordinate pickup
Compile IDW disposal documentation
IDW Pickup and Disposal
Prepare IDW Waste Characterization/Generator Profile, schedule and coordinate pickup Mobilize to meet transporter onsite and sign manifest (3 hr roundtrip) Compile IDW disposal documentation
01/02/2025 08:11 AM PAGE 1 OF 6
Scope of Work
D (407) 618-8389 I M (571) 271-1874
Derek.Barry@terracon.com I Terracon.com
755 PRARIE INDUSTRIAL PKWY,
MULBERRY, FLORIDA, 33860
QUOTE #: 0046853
DATE: 12/31/2024 PROJECT PROPOSAL
CLIENT
DEREK BARRY
TERRACON
5463 W WATERS AVE. SUITE 830, TAMPA, FLORIDA, 33634
P: (571) 271-1874
E-MAIL:DEREK.BARRY@TERRACON.COM
PROJECT DESCRIPTION
T&D DRUMS
THE FOLLOWING DESCRIBES OUR UNDERSTANDING OF THE SCOPE OF SERVICES TO BE PERFORMED BY ENVIROSERVE, FOR THE
CLIENT, AT THE ABOVE REFERENCED LOCATION KNOWN AS THE JOB SITE.
FEE STRUCTURE
TRANSPORTATION
ITEM EST.QTY. UNIT PRICE UNIT TOTAL
TRANS & DISPOSAL PER DRUM
NOTES:SUBJECT TO FUEL SURCHARGE, - $400.00 55 GAL DRUM -
EIC SURCHARGE TO TOTAL INVOICE - $11.00 % -
TOTAL JOB ESTIMATE: $0.00
Job Estimate is for budgetary purposes only. Job will be billed according to time and materials used.
Time and Material Rates shall be charged portal to portal.
Please note that surcharges shall apply for off specification materials.
Applicable taxes and Environmental Fees are not included in our quotation, but shall be charged as applicable to the work.
Durations and Quantities are estimated only, actual fees shall be charged as incurred.
Minimum disposal amounts may apply to bulk disposal.
Tolls are not included in transportation rates
E-manifest fees will apply to hazardous waste manifests
Demurrage charged after one hour loading & unloading
Pricing assumes that drums/pallets are staged on a hard surface, accessible via van truck with liftgate & one driver with drum dolly or pallet jack.
Inaccessible areas (mud, heavy gravel), excessively heavy, deformed, unwieldy drums may require additional labor and equipment to assist. Fees for additional labor and equipment will be charged per EnviroServe's standard T&M rates.
The following materials are not eligible for LTL pricing and require direct or dedicated shipment to the TSDF: Cyanides, DOT Class 4.3 materials, DOT Class 1.4, 1.5 & 1.6 materials, Temperature Controlled/Self Reactive Materials, Odorant Materials (Mercaptans/Thiols), and other reactive/incompatible materials on a case by case basis. High hazardous containers (pails, drums, boxes, cylinders, etc.) will need to be assessed on a case by case basis to determine ability to be transported by EnviroServe.
Pricing for supplies (drums, pails, absorbent pads, etc.) is variable and may be adjusted without notice to account for market increases.
A 11% Environmental Fee will be applied to entire bill.
File details come from the government source that posted it. Updated .