This document is a Task Assignment (TA) under Contract HW687 between the State of Florida Department of Environmental Protection (FDEP) and Terracon Consultants, Inc. The task assignment authorizes work at Corman's Cleaners, a dry cleaning facility located at 3464 SE Dixie Highway in Stuart, Martin County, Florida. The project is identified as ERIC_4924 and falls under the FDEP's Waste Cleanup Program. The Department Project Manager is Dean Cox (850-245-8969), and the contractor's project manager is Donna Cline (813-321-0340). The task assignment is effective November 10, 2022, with a completion date of May 31, 2023.

The task assignment authorizes costs for groundwater volatile organic compounds (VOHs) sampling, including sample shipping, laboratory analysis, expendables, and sample results reporting, with a total fixed unit rate value of $2,855.96. The primary deliverable is a Groundwater Monitoring Report including field notes and forms, updated data tables and figures, certified laboratory reports, sampling data summary, and site recommendations, due January 31, 2023. The cost breakdown includes direct labor ($817.22), overhead ($947.97), fringe benefits ($459.77), laboratory analytical costs ($252.00), sample shipping ($110.00), field expendables ($46.50), and a completion fee ($222.50). Payment is contingent upon FDEP approval of the Groundwater Monitoring Report covering both project management and groundwater monitoring and reporting subtasks. The field work is coordinated with a separate PFAS sampling task assignment, and the sampling focuses on determining whether groundwater contaminant of concern concentrations have dropped below applicable groundwater cleanup target levels.

View the file

Other files

File Type Posted
CN-370000-HW687-BF01A.pdf PDF
CN-370000-HW687-BF01B.pdf PDF
CN-370000-HW687-BF02A.pdf PDF
CN-370000-HW687-BF04A.pdf PDF
CN-370000-HW687-BF04ACO3.pdf PDF
CN-370000-HW687-BIL01B.pdf PDF
CN-370000-HW687-BIL02B.pdf PDF
CN-370000-HW687-BIL03B.pdf PDF
CN-370000-HW687-BIL1BCO2.pdf PDF
CN-370000-HW687-BIL2CCO2.pdf PDF
CN-370000-HW687-CSS02.pdf PDF
CN-370000-HW687-CSS03.pdf PDF
CN-370000-HW687-DC002A.pdf PDF
CN-370000-HW687-DC002G.pdf PDF
CN-370000-HW687-DC006C.pdf PDF
CN-370000-HW687-DC008B.pdf PDF
CN-370000-HW687-DC008D.pdf PDF
CN-370000-HW687-DC009B.pdf PDF
CN-370000-HW687-DC010C.pdf PDF
CN-370000-HW687-DC012A.pdf PDF
CN-370000-HW687-DC014B.pdf PDF
CN-370000-HW687-DC014D.pdf PDF
CN-370000-HW687-DC014H.pdf PDF
CN-370000-HW687-DC015D.pdf PDF
CN-370000-HW687-DC016C.pdf PDF
CN-370000-HW687-DC01ACO9.pdf PDF
CN-370000-HW687-DC021A.pdf PDF
CN-370000-HW687-DC021C.pdf PDF
CN-370000-HW687-DC022A.pdf PDF
CN-370000-HW687-DC023B.pdf PDF
CN-370000-HW687-DC023D.pdf PDF
CN-370000-HW687-DC024B.pdf PDF
CN-370000-HW687-DC024E.pdf PDF
CN-370000-HW687-DC024F.pdf PDF
CN-370000-HW687-DC027A.pdf PDF
CN-370000-HW687-DC028A.pdf PDF
CN-370000-HW687-DC028D.pdf PDF
CN-370000-HW687-DC029C.pdf PDF
CN-370000-HW687-DC02ACO1.pdf PDF
CN-370000-HW687-DC02HCO2.pdf PDF
CN-370000-HW687-DC030A.pdf PDF
CN-370000-HW687-DC031A.pdf PDF
CN-370000-HW687-DC035A.pdf PDF
CN-370000-HW687-DC037A.pdf PDF
CN-370000-HW687-DC03CCO2.pdf PDF
CN-370000-HW687-DC044A.pdf PDF
CN-370000-HW687-DC045B.pdf PDF
CN-370000-HW687-DC049A.pdf PDF
CN-370000-HW687-DC054A.pdf PDF
CN-370000-HW687-DC056A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW687

DC024A Completion May 31, 2023

This TA authorizes costs for groundwater VOHs sampling, along with associated costs for sample shipping & analysis, expendables, and sample results reporting. The total cost of this TA is $2,855.96 and this entire amount is fixed unit rate.

Dean Cox 850-245-8969 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Terracon Consultants, Inc.

Terracon Consultants, Inc.

Donna Cline 813-321-0340

ERIC_4924

3464 SE Dixie Highway, Stuart (Martin County)

Corman's Cleaners

✔ $ 2,855.96

$ 2,855.96

Scope of Work

David Phillips Digitally signed by David Phillips Date: 2022.11.09 14:28:11 -05'00'

N/A

Cline, Donna L Typewriter Donna Cline

Sr. Remediation Engineer

11/10/22

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Groundwater Monitoring Report, including field notes/forms, updated data tables & figures, certified laboratory report, sampling data summary, and site recommendations; Project Mgmt.

01/31/2023

FDEP approval of Groundwater Monitoring Report (Subtask 1 Project Management and Subtask 2 Groundwater Monitoring & Reporting) $ 2,855.96

$ 2,855.96

HW687

DC024A

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Interim Secretary

Memorandum

TO: HW687 Contract File FROM: Dean Cox, Contract Manager SUBJECT: DC024A Groundwater VOHs Sampling – Corman’s Cleaners (ERIC_4924)

DATE: 11/9/2022

This TA authorizes costs for groundwater VOHs sampling, along with associated costs for sample shipping & analysis, expendables, and sample results reporting. The total cost of this TA is $2,855.96 and this entire amount is fixed unit rate. The costs for this TA were negotiated. The original TA proposal costs are reduced in this TA by $107.04 or 4%.

The field work in this VOHs sampling TA will be coordinated with PFAS sampling tasked in a separate TA. The last VOHs sampling at this site in 2020 indicated PCE as the only COC above a GCTL, at 3.69 ug/L in MW001 (onsite/interior). Vinyl chloride and 1,1,-DCE were also detected above their GCTLs but these contaminants are considered to be from an offsite source, per WSCS discussions between the PM and PG.

This VOHs sampling event is being done to determine if groundwater COC concentrations have dropped below applicable GCTLs and indicate an additional sampling event(s) will demonstrate groundwater cleanup completion. Additional soil sampling to confirm soil concentrations below SCTLs is being completed in a separate TA that also includes a repeat of the site MAGS test. Site access has been confirmed as accurate & current.

FDEP COST ESTIMATE

Contractor: Terracon

Date: 11/9/2022 Task #: SubTask 1 Project Management SubTask 6

Site: Corman Cleaners SubTask 2 Groundwater Monitoring & Reporting SubTask 7 Activity/Phase: GW Monitoring & Reporting SubTask 3 SubTask 8

Project Manager: Dean Cox SubTask 4 SubTask 9 SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$64.50 Project Manager Donna Cline 1.46 1.46 Administrative Susan Delgado 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Brownfield Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $31.25 CADD Specialist Chelsea Fugate 5.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Data Analyst & Visualization Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Environmental Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 GIS Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$32.00 Project Geologist Joshua Feltner 10.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$26.06 Project Scientist Farina Mackliff 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior GIS Analyst 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$44.90 Senior Scientist Paul Thornbury 5.50 5.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Hours 21.96 1.46 20.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $817.22 $94.02 $723.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 116.00% $947.97 $109.06 $838.91 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.26% $459.77 $52.90 $406.87 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $2,224.96 $255.98 $1,968.98 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF TERRACON Page 1

FDEP COST ESTIMATEContractor: Terracon Date: 11/9/2022

Task #: SubTask 1 Project Management SubTask 6 Site: Corman Cleaners SubTask 2 Groundwater Monitoring & Reporting SubTask 7

Activity/Phase: GW Monitoring & Reporting SubTask 3 SubTask 8 Project Manager: Dean Cox SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 IDW - Erwin Remediation $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $252.00 $252.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $362.00 $362.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $46.50 $46.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $46.50 $46.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $2,633.46 $255.98 $2,377.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $222.50 $25.60 $196.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $2,855.96 $281.58 $2,574.38 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF TERRACON Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Corman ERIC_4924 SUBTASK 2: Groundwater Sampling & Reporting (Coordinated w separate PFAS sampling TA)

PROPOSAL NO. PHF227024

DATE: 11/9/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning and Groundwater Sampling Senior Scientist PT 0.50 Senior Scientist PT 0.50 Project Scientist FM Load/unload 0.50 Project Scientist FM Access wells and install locks (6 wells) 1.00 Project Scientist FM Collect groundwater levels (6 wells,10 minutes per well) 1.00 Project Scientist FM Containerize IDW 0.50 Report Deliverable Project Scientist FM Prepare report tables, trend graphs and draft maps 3.00 Senior Scientist FM Prepare report 4.00 Senior Scientist PT QA/QC field and laboratory data 1.00 Senior Scientist PT Evaluate and Summarize Water Quality Parameters 1.00 Senior Scientist PT Evaluate and Summarize Groundwater Analytical Results 1.00 Senior Scientist PT Conclusions/Recommendations 1.50 CADD Specialist CF Prepare initial base figures (convert TetraTechs) 2.00 CADD Specialist CF Prepare Exhibits (groundwater flow and concentrations) 3.00

Summary of hours: PT JF CF Total

5.50 10.00 5.00 20.50 TOTAL LABOR 20.50

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOHs (Short List) EPA 8260 63.00$ 4 $252.00 Sample Shipping Small Cooler (1 day) 110.00$ 1 $110.00

TOTAL LAB $362.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 1 $40.00

Ice (Sample shipping) 6.50$ 1 $6.50

TOTAL EQUIPMENT $46.50

Request sample kit PreTask Planning, prepare field sampling SOW/coordinate site access

3559 Timberlane School Rd

Tallahassee, FL 32312

P (850) 692-7185

F (813) 692-7186

Terracon.com

October 5, 2022

Florida Department of Environmental Protection

Waste Cleanup Program

Waste Management Division

2600 Blair Stone Road

Tallahassee, Florida 32399-2400

Attn: Mr. Dean Cox, Environmental Consultant

E: Dean.Cox@FloridaDep.gov

W: 850-245-8969

M: 727-686-6502

Re: Proposal for Annual Groundwater Monitoring and Reporting – Revised Combined with a Separate PFAS Sampling Event (TA HW003A)

Corman’s Cleaners

3464 SE Dixie Highway

Stuart, Florida

ERIC_4924

Task Assignment HW687

Terracon Proposal No. PHD227093

Dear Mr. Cox:

Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this proposal to the

Florida Department of Environmental Program (FDEP) Waste Cleanup Program to conduct Annual

Groundwater Monitoring and Reporting for the Corman’s Cleaners, Inc. (ERIC_4924) facility located at

3464 SE Dixie Highway in Stuart, Florida.

Scope of Services

◼Field task planning, mobilize to site, and perform groundwater sampling and laboratory analysis of the same 4 monitoring wells proposed for PFAS sampling (MW001, MW010, MW012, and PZ-3).

These select monitoring wells changed per email from Breck

Dalton and Dean Cox dated 9/23/22.

◼ Collect depth to water level measurements from 3 shallow and 3 deep monitoring wells, to include MW006 and PZ002

◼ Review data and prepare an Annual Groundwater Monitoring

Report including updated tables and groundwater flow and concentration exhibits. See attached LOE for details

Schedule

Deliverable Annual Groundwater Monitoring Report within 20 business days following receipt of laboratory results.

Compensation

See attached CEF for details.

mailto:Dean.Cox@FloridaDep.gov

Proposal for Annual Groundwater Monitoring and Preparation of Report, Revised to include a PFAS event

Corman’s Cleaners, ERIC_4924 ■ Stuart, FL

October 5, 2022 ■ Terracon Proposal No. PHD227093

SITE RECOMMENDATIONS

Recent site assessment activities were reported in a Site Assessment Report, Revision 1 in June 2021, prepared by Tetra Tech. A summary of the findings is provided below:

▪ The site is an operating drycleaner that recently converted to using a petroleum-based drycleaning solvent.

▪ As stated in the July 17, 2016, SAR review memorandum, the 1, 1-DCE/vinyl chloride plume is unrelated to drycleaning operations conducted at the Corman’s Cleaners site, funds from the

Florida Drycleaning Solvent Cleanup Program cannot be used to assess and clean up the 1,1-

DCE, vinyl chloride plume.

▪ A Natural Attenuation Monitoring (NAM) Presumptive Remedy Approval was issued on

December 28, 2018 and confirmed that the groundwater contamination is primarily 1,1-DCE and vinyl chloride and is believed to originate offsite. However, since a source has not been located, “continue to perform NAM.”

▪ In an April 21, 2020 report prepared by TetraTech, the confirmation of 1,1-DCE in monitoring well MW002, confirmed that DCE contamination has an offsite, upgradient source and is suggestive that vinyl chloride is present from the degradation of 1,1-DCE.

▪ PCE is present at a concentration slightly exceeding the GCTL in MW001, screened from 4 to

90 feet bgs, located inside the building.

▪ This proposal has been revised to be performed with a separate PFAS groundwater sampling event (HW687 Task Assignment HW003A). Thus, the CEF/LOE reflects reductions in staff time for mobilizations, groundwater sampling, IDW coordination, and the vehicle usage, IDW disposal, expendables, analytical related equipment and IDW related equipment.

CLOSING REMARKS

Terracon services will be conducted in accordance with the terms and conditions, contained within DEP

Waste Cleanup Program (WCP) Contract No. HW687, executed January 5, 2022. It is understood that a Task Assignment will be issued to authorize us to perform this work.

We appreciate the opportunity to provide this proposal and look forward to working with you on this project. If you should have any questions or comments regarding this proposal, please contact either of the undersigned at 813-221-0050.

Sincerely, Terracon Consultants, Inc.

Donna Cline, P.E. Tom Lewis, P.G.

Senior Remediation Engineer Principal

Attachments: Cost Spreadsheet

Level of Effort

DC024A.pdf
DC024A memo.pdf
DC024A LOE-CEF_VOHs DEPcomments221109.pdf
Cost Estimate
LOE Subtask 2

DC024Aproposal221005.pdf

File details come from the government source that posted it. Updated .