This document is a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (FDEP) to Terracon Consultants, Inc. for groundwater monitoring services at the Sun State Supply facility located at 118 W. Grant Street in Orlando, Florida (ERIC_5047). The TA is issued under Contract Number HW687 and is designated as Task Assignment DC004A, with an effective date of April 6, 2022, and a completion date of August 31, 2022. The contracting parties include the FDEP as the state agency, with Dean Cox serving as the Department Project Manager, and Terracon Consultants, Inc., with Donna Cline as the contractor's project manager.
The TA authorizes Terracon to conduct biennial groundwater sampling of four monitoring wells (MW005, MW011, MW013, and MW014) and prepare a comprehensive Groundwater Monitoring Report. Services include field task planning, groundwater sampling and analysis, preparation of historical data summary tables and graphical exhibits, and delivery of the report within 20 business days of receiving laboratory results. The total contract value is $5,210.88, utilizing 36.51 hours of labor across multiple staff categories including a Senior Scientist, Project Scientist, Environmental Technician, and GIS Technician. The compensation is structured as a fixed unit rate with invoicing contingent upon FDEP approval of the completed Groundwater Monitoring Report. Cost estimates include direct labor ($1,351.11), overhead (116% rate), fringe benefits (56.26%), travel ($180.00), laboratory analytical costs ($350.50), subcontractor IDW disposal services ($110.00 through Erwin Remediation), and field equipment and expendables ($524.00). The deliverable report is due by May 31, 2022.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW687
DC004A Completion August 31, 2022
This task assignment (TA) authorizes costs for groundwater sampling and associated reporting. The total cost for this TA is $5,210.88 with 36.51 hours of labor.
Dean Cox 850-245-8969 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Terracon Consultants, Inc.
Terracon Consultants, Inc.
Donna Cline 813-321-0340
ERIC_5047
118 W. Grant Street Orlando
Sun State Supply
✔ $ 5,210.88
$ 5,210.88
Scope of Work
William E. Burns, Jr.
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2022.04.06 15:21:19 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Groundwater Monitoring Report (Biennial) 05/31/2022
FDEP approval of Groundwater Monitoring Report (Subtask 1 Project Management and Subtask 2 Groundwater Monitoring & Reporting). $ 5,210.88
$ 5,210.88
HW687
DC004A
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Interim Secretary
Memorandum
TO: HW687 Contract File FROM: Dean Cox, Contract Manager SUBJECT: DC004A TA – Sun State Supply (ERIC_5047) Groundwater Sampling (Biennial)
DATE: 4/6/2022
This task assignment (TA) authorizes costs for groundwater sampling (4 wells) and associated reporting (Biennial Monitoring Report), based on the Terracon proposal received 4/5/2022. The total cost for this TA is $5,210.88 with 36.51 hours of labor. Invoicing will occur for the total TA amount and will include payment for Subtask 1 Project Management and Subtask 2 Groundwater Sampling & Groundwater Monitoring Report submittal. The deliverable report (Subtask 2) will be supplemented with GIS & ADaPT table update & upload, along with waste manifest submittal.
Draft TA labor hour decimal digit precision was standardized between the CEF and LOE per FDEP request, resulting in a cost reduction of $141.83 in the final proposal. Cost reductions included a 1-hour reduction in groundwater sampling & reporting labor, with an associated reduction in project management labor. Labor reductions resulted in commensurate reductions in overhead, fringe, and general & administrative costs.
FDEP COST ESTIMATE
Contractor: Terracon
Date: 4/5/2022 Task #: DC004A SubTask 1 Project Management SubTask 6
Site: Sun State Supply ERIC_5047 SubTask 2 Groundwater Monitoring and Reporting SubTask 7 Activity/Phase: GW Sampling and Biennial Monitoring Report SubTask 3 SubTask 8
Project Manager: Dean Cox SubTask 4 SubTask 9 SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$62.02 Project Manager Donna Cline 2.51 2.51 $26.63 Administrative Julie Brown 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Brownfield Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$21.25 CADD Specialist Andy Schifano 4.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Data Analyst & Visualization Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$24.00 Environmental Technician Pete Christianson 11.00 11.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 GIS Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$35.63 Project Scientist Igor Karimov 5.50 5.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior GIS Analyst 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$48.20 Senior Scientist Lydia Wing 13.50 13.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 36.51 2.51 34.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $1,351.11 $155.44 $1,195.67 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 116.00% $1,567.29 $180.31 $1,386.98 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.26% $760.13 $87.45 $672.68 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $3,678.53 $423.20 $3,255.33 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 1
FDEP COST ESTIMATEContractor: Terracon Date: 4/5/2022
Task #: DC004A SubTask 1 Project Management SubTask 6 Site: Sun State Supply ERIC_5047 SubTask 2 Groundwater Monitoring and Reporting SubTask 7
Activity/Phase: GW Sampling and Biennial Monitoring Report SubTask 3 SubTask 8 Project Manager: Dean Cox SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $180.00 180.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $180.00 $180.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $100.00 100.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $10.00 $10.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $292.00 292.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $58.50 58.50$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $350.50 $350.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 40.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $356.00 356.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 100.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $28.00 28.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $524.00 $524.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $4,843.03 $423.20 $4,419.83 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $367.85 $42.32 $325.53 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $5,210.88 $465.52 $4,745.36 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Sun State Supply ERIC_5047 SUBTASK 2: Groundwater Monitoring and Reporting
PROPOSAL NO. PH1227123
DATE: 4/5/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning and Groundwater Sampling
Senior Scientist/Geologist LW 0.50 Senior Scientist/Geologist LW 1.00 Senior Scientist/Geologist LW 1.00
Env Technician PC Load/unload 1.00 Env Technician PC Mobilization/Demobilization (from Winter Park) 1.50 Env Technician PC Access wells and replace locks (4 wells) 1.00 Env Technician PC Collect groundwater levels (4 wells,10 minutes per well) 0.50 Env Technician PC Collect groundwater samples (4 wells, 1.5 hours each) 6.00
IDW
Env Technician PC 1.00 Senior Scientist/Geologist LW 0.50 Project Scientist IK 1.50
Report Deliverable
Project Scientist IK Prepare report tables, trend graphs and draft maps 3.00 Senior Scientist/Geologist LW Prepare report 6.00 Senior Scientist/Geologist LW QA/QC field and laboratory data 1.00 Senior Scientist/Geologist LW Review and Summarize Water Quality Parameters and Tend Graphs 2.00 Senior Scientist/Geologist LW Review and Summarize Groundwater Analytical Results 1.50
Project Scientist IK Complete ADAPTand FDEP GIS tables 1.00
GIS Technician AS Prepare base figures and Exhibits (groundwater flow and concentrations maps) 4.00
TOTAL LABOR 34.00
VEHICLE TYPE RATE UNIT USEAGE
Truck (groundwater sampling) 120 day 1 120.00$ Truck (IDW) 120 day 0.5 60.00$
TOTAL VEHICLE 180.00$
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM -$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
Erwin Remediation IDW Disposal 100.00$ each 1 100.00$
Subcontractor Handling Fee 10% 0 10.00$
TOTAL 110.00$
Request sample kit Prepare Health and Safety Plan PreTask Planning, prepare field sampling SOW/coordinate site access
IDW handling & storage IDW manifest completion Meet hauler for pickup-disposal
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Sun State Supply ERIC_5047 SUBTASK 2: Groundwater Monitoring and Reporting
PROPOSAL NO. PH1227123
DATE: 4/5/2022
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC* #IDW TOTALS
Halocarbons EPA 8260 73.00$ 4 0 0 292.00$ Sample Shipping Small Cooler (2 day) 52.00$ 1 52.00$ Sample Shipping Ice 6.50$ 1 6.50$
TOTAL LAB 350.50$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Shallow groundwater sampling kit 290.00$ day 1 290.00$ Tubing, HDPE 0.30$ ft 180 54.00$ Tubing, silicon (3/16 x 3/8) 3.00$ ft 4 12.00$ Expendables 40.00$ day 1 40.00$ Lock, key operated 7.00$ ea 4 28.00$ 55-gallon drum, new 100.00$ drum 1 100.00$
TOTAL EQUIPMENT 524.00$
5463 West Waters Avenue, Suite 830
Tampa, FL 33584
P (813) 221-0050
F (813) 221-0051
Terracon.com
April 5, 2022
Florida Department of Environmental Protection
Waste Cleanup Program
Waste Management Division
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Attn: Mr. Dean Cox, Environmental Consultant
E: Dean.Cox@FloridaDep.gov
W: 850-245-8969
M: 727-686-6502
Re: Proposal for Biennial Groundwater Monitoring and Report
Sun State Supply
118 West Grant Street
Orlando, Orange County, Florida
ERIC_5047
Task Assignment HW687 DC004A
Terracon Proposal No. PH1227134
Dear Mr. Cox:
Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this proposal to the
Florida Department of Environmental Program (FDEP) Waste Cleanup Program to perform biennial groundwater monitoring and prepare a report.
Scope of Services
◼ Conduct groundwater sampling and laboratory analysis of four lower surficial monitoring wells (MW005, MW011, MW013 and
MW014); and
◼ Prepare a Biennial Groundwater Monitoring Report.
See attached LOE for details
Schedule Deliverable report within 20 business days following receipt of laboratory results.
Compensation
See attached CEF for details.
DELIVERABLES
The Biennial Groundwater Monitoring Report will detail and summarize the groundwater sample event, field observations, and results of monitoring well analysis to include historical data summary tables and exhibits (including a graphical depiction of the groundwater elevation data and analytical results).
Conclusions and recommendations will include a summary of results and recommendations for future
Ranking by fee
Sub Solids non-haz 55-gal drum
Liquids non-haz
55-gal drum Additional pricing conditions
Minority Y/N
Regions* Contact Name Contact # email
1 Erwin Remediation 100.00$ 100.00$ all inclusive No All Johnathan Erwin 850-292-6511 erwinremediation@gmail.com
2 Clean Earth $63+$45=$108 $65+$45 =$110 15% EEI on total disposal, stop fee $100, 55% FSC of total transportation
No All Ryan Penfield 843-562-7481 rpenfield@harsco.com
3A Whatever Waste 150.00$ 150.00$ all included No North and
Central Florida
John 904-881-1957 John@whateverwaste.com
3B Whatever Waste 200.00$ 200.00$ all included No South Florida
John 904-881-1957 John@whateverwaste.com
* Regions that are specified with "All" of Florida, are not inclusive of the Keys
Erwin Remediation is the selected IDW Contractor
IDW Contractors, All of Florida (Except the Keys)
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Mr. Sid O’Neal
Terracon
3559 Timberlane School Road
Tallahassee, FL 32312
March 4, 2022
Re: Non-Hazardous Drum Disposal – State of Florida
Mr. O’Neal:
The price for the transportation and disposal (T&D) of drums of non-hazardous soil, mud and water located in the State of Florida is listed below.
Non-Hazardous Chlorinated VOHs, Petroleum and Metals:
Description Rate Unit
T&D - Non-Haz Soil $ 100.00 Per Drum
T&D - Non-Haz Mud/Water $ 100.00 Per Drum
The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida
Keys. Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.
Respectfully, Jonathan Erwin
Erwin Remediation, Inc.
Email: ErwinRemediation@Gmail.com
Office: (850) 292-6511 mailto:Remediation@Gmail.com
Cline, Donna L
From: O'Neal, Sid L Sent: Wednesday, March 9, 2022 12:12 PM To: Cline, Donna L; Wing, Lydia; Lewis, Tom E Subject: FW: :EXTERNAL: RFQ - Non-Haz T&D
Here’s an email quote from Clean Earth. Should be the final one needed
Thanks, Sid O’Neal Senior Scientist I Environmental
3559 Timberlane School Road I Tallahassee, Florida 32312 D (850) 692-7189 I F (850) 692-7186 I M (229) 400-5108 sid.oneal@terracon.com I Terracon.com
From: Penfield, Ryan L <rpenfield@harsco.com> Sent: Wednesday, March 9, 2022 12:09 PM To: O'Neal, Sid L <Sid.O'neal@terracon.com> Subject: RE: :EXTERNAL: RFQ - Non-Haz T&D
Hello Sid, Non haz liquids (NH-L-20) $65 per drum Non haz solids (NH-S-10) $63 per drum 15% EEI on total disposal
Transportation (excluding the KEYS) Stop fee $100 Per Drum Trans $45 FSC based upon DOE currently 55% of total trans
This will be good for all of Florida except the keys.
Ryan Penfield
Environmental Specialist
M 843.562.7841 O 1.800.739.9156 rpenfield@harsco.com www.cleanearthinc.com
402 Webster Chapel Road, Glencoe , AL 35905
From: O'Neal, Sid L <Sid.O'neal@terracon.com> Sent: Wednesday, March 9, 2022 11:59 AM To: Penfield, Ryan L <rpenfield@harsco.com> Subject: :EXTERNAL: RFQ - Non-Haz T&D
Hi Larry, Was just following up from yesterday’s phone call in case you have my email wrong.
Need quote for Non-Haz Drum T&D – soil and gw waste for all Florida regions covering north, central, and south regions
Thanks, Sid O’Neal Senior Scientist I Environmental
3559 Timberlane School Road I Tallahassee, Florida 32312 D (850) 692-7189 I F (850) 692-7186 I M (229) 400-5108 sid.oneal@terracon.com I Terracon.com
Terracon provides environmental, facilities, geotechnical, and materials consulting engineering services delivered with responsiveness, resourcefulness, and reliability.
Private and confidential as detailed here (www.terracon.com/disclaimer). If you cannot access the hyperlink, please e-mail sender.
CAUTION : This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.
You don't often get email from sid.o'neal@terracon.com. Learn why this is important
Whatever Waste, LLC 904.881.1957
3834 Mandarin Woods Dr. No.
Jacksonville, Florida
32223 United States
Overview RE: Non-hazardous Waste Drum Transport & Disposal LOC: North Florida (Jacksonville >< Pensacola) Central Florida (Greater Orlando >< Greater Tampa)
Good day Sid and Tom:
Whatever Waste appreciates the opportunity to price non-hazardous waste drums at facilities or sites throughout the North and Central Florida regions.
Overview Manifest, transport and dispose of non-hazardous petroleum contaminated soil, solids or liquids (including but not limited to PCW, IDW, groundwater, well drilling, and tank cleaning) in 55-gallon DOT shippable drums
Pricing
Prepared For Sid O'Neal Sr. Scientist
Terracon 3559 Timberlane School Road
Tallahassee, FL 32312
Proposal Number 030822.1
Proposal Date 03/08/2022
Description Rate Qty Line Total
Solids or Liquids Drums (each)
$150.00 1 $150.00
$0.00 1 $0.00
Notes Pricing includes assisting with waste profiling and analytical testing advisement unless the waste stream falls under a blanket profile.
Pricing and non-hazardous disposal acceptance of the drums is based on the waste being on-specification and RCRA non-hazardous. Required analytical testing data TBD based on disposal facility requirements DOT shippable drums must be on a hard surface and accessible location.
Drum pickup time frame can range from one week to several weeks based on location Whatever Waste also quotes hazardous waste drum transport and disposal
Terms
Whatever Waste will invoice actual amounts or volumes unless minimum quantities apply Due to pricing volatility in national and international energy sectors the non-hazardous waste drum transport and disposal rate will increase by $15.00 per drum for every $0.50 per gallon over $5.00 per gallon No-load stop fee if called off in transit or on-site $125.00 Payment is due in 30 days from email receipt of invoice
Sid O'Neal Sr. Scientist, Terracon
Subtotal
Tax
150.00
0.00
Proposal Total (USD) $150.00
Whatever Waste, LLC 904.881.1957
3834 Mandarin Woods Dr. No.
Jacksonville, Florida
32223 United States
Overview RE: Non-hazardous Waste Drum Transport & Disposal LOC: South Florida (south of Lake Okeechobee north end) Florida Keys
Good day Sid and Tom:
Whatever Waste appreciates the opportunity to price non-hazardous waste drums at facilities or sites throughout South Florida and the Florida Keys.
Overview Manifest, transport and dispose of non-hazardous petroleum contaminated soil, solids or liquids (including but not limited to PCW, IDW, groundwater, well drilling, and tank cleaning) in 55-gallon DOT shippable drums
Pricing
Prepared For Sid O'Neal Sr. Scientist
Terracon 3559 Timberlane School Road
Tallahassee, FL 32312
Proposal Number 030822.2
Proposal Date 03/08/2022
Description Rate Qty Line Total
Solids or Liquids Drums (each) (South Florida)
$200.00 1 $200.00
Solids or Liquid Drums (each) (Florida Keys)
$275.00 1 $275.00
Notes Pricing includes assisting with waste profiling and analytical testing advisement unless the waste stream falls under a blanket profile.
Pricing and non-hazardous disposal acceptance of the drums is based on the waste being on-specification and RCRA non-hazardous. Required analytical testing data TBD based on disposal facility requirements DOT shippable drums must be on a hard surface and accessible location.
Drum pickup time frame can range from one week to several weeks based on location Whatever Waste also quotes hazardous waste drum transport and disposal
Terms
Whatever Waste will invoice actual amounts or volumes unless minimum quantities apply Due to pricing volatility in national and international energy sectors the non-hazardous waste drum transport and disposal rate will increase by $15.00 per drum for every $0.50 per gallon over $5.00 per gallon No-load stop fee if called off in transit or on-site $175.00 Payment is due in 30 days from email receipt of invoice
Sid O'Neal Sr. Scientist, Terracon
Subtotal
Tax
475.00
0.00
Proposal Total (USD) $475.00
| DC004A.pdf |
| memo DC004A.pdf |
| Pages from proposal DC004A 220405-2.pdf |
| Pages from proposal DC004A 220405.pdf |
| IDWbids.pdf |
| ErwinRemediation Quote - Terracon - Drum - All Regions - 03.04.2022 |
| Clean Earth |
| Whatever Waste - Drum Quote Proposal 030822.1 |
| Whatever Waste Proposal 030822.2 - South Region |
File details come from the government source that posted it. Updated .