This document is a Task Assignment (TA) BIL02C issued under Contract Number HW687 between the State of Florida Department of Environmental Protection (FDEP) and Terracon Consultants, Inc. The task assignment authorizes work at the Broward County School Board Property located at the southeast corner of Broward Boulevard and South Hiatus Road in Plantation, Florida (Project Number ERIC_18360). The services are being conducted using federal funds from the State & Tribal Response Program Bipartisan Infrastructure Law (BIL) funding cooperative agreement administered by FDEP on behalf of the U.S. Environmental Protection Agency (EPA).
The task assignment covers supplemental site assessment and remedial alternatives evaluation activities for the 13.06-acre property, which has documented soil and groundwater impacts from historical agricultural operations involving arsenic, toxaphene, and organochlorine pesticides. The work comprises four subtasks: Project Management ($1,632.22), Surface Water and Sediment Sampling ($2,591.85), Revised Supplemental Site Assessment Report ($2,896.09), and Remedial Alternatives Evaluation ($8,069.59), for a total contract value of $15,189.75 under a fixed unit rate payment structure. Key deliverables include field notes and sampling logs due October 24, 2025; a Revised Supplemental Site Assessment Report due October 24, 2025; and a Remedial Alternatives Evaluation with project management due December 1, 2025. Invoice payments are structured in three phases corresponding to departmental approval of each deliverable component.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
HW687
BIL02C January 12, 2026
The Department approves this Task Assignment (TA) based upon the Cost Proposal and Level of Effort
(CP/LOE) for supplemental site assessment (SSA) and remedial alternatives evaluation (RAE) submitted to the Department on September 5, 2025, by Terracon Consultants, Inc., for the below referenced site. The final deliverable will be a RAE received by the Department no later than December 1, 2025.
Megan Johnson 850.245.8994 Terracon Consultants, Inc.
Shawn Ouellette 561.689.4299
ERIC_18360
SE Corner of Broward Blvd. and South Hiatus Road, Broward County
Broward County School Board Property - Plantation
$ 15,189.75
$ 15,189.75
Scope of Work
Terracon Consultants, Inc.
Donna Cline, P.E.
Senior Remediation Engineer
2025.09.23
Digitally signed by Cline, Donna L DN: cn=Cline, Donna L, ou=Domain Users, email=Donna.Cline@terracon.com Date: 2025.09.23 15:02:27 -04'00'
Cline, Donna L
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2025.09.19 13:04:20 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jay Collins Lt. Governor
Alexis A. Lambert Secretary
Memorandum
TO: Terracon Consultants, Inc., HW687 Contract File
FROM: Megan Johnson, Contract Manager
DATE: September 16, 2025
SUBJECT: Negotiation Summary – BIL22 Task Assignment (TA) BIL02C Broward County School Board Property – Site ID # ERIC_18360 Supplemental Site Assessment and Remedial Alternatives Evaluation
This TA is intended for conducting Supplemental Site Assessment and Remedial Alternatives Evaluation activities at the Broward County School Board Property site, located at the southeast corner of Broward Boulevard and South Hiatus Road, Plantation, Broward County, Florida. The services under this task are being conducted using federal funds from the State & Tribal Response Program Bipartisan Infrastructure Law (BIL) funding cooperative agreement that is administered by the Department on behalf of the U.S. Environmental Protection Agency (EPA).
Subtask 1: Project Management This subtask is a percentage of the overall project fees and has been negotiated as a contract rate.
It includes project management, overhead, general and administrative, and fringe. The agreed upon cost of this subtask is $1,632.22.
Subtask 2: Surface Water and Sediment Sampling Under this subtask, Terracon will collect two surface water samples and two sediment samples from the Old Plantation Water Control District canal for laboratory analysis for arsenic and/or OCP. The agreed upon cost of this subtask is $2,591.85.
Subtask 3: Revised Supplemental Site Assessment Report (SAR) A revised Supplemental SAR will be prepared that incorporates the results of the new surface water and sediment samples, and revisions/response to comments requested by the Broward County Environmental Permitting Division. The agreed upon cost of this subtask is $2,896.09.
Subtask 4: Remedial Alternatives Evaluation (RAE) Under this subtask, Terracon will conduct a RAE for the soil and groundwater exceedances with respect to historical conditions at the site. The agreed upon cost of this subtask is $8,069.59.
Summary The Department’s BIL Contract Manager and Terracon’s Contract Manager have both agreed to the scope of work and associated costs. The final cost associated with this TA is $15,189.75.
Documentation of these costs is included in the Cost Proposal/Level of Effort (CP/LOE) Form and CP/LOE narrative provided by Terracon on September 5, 2025, and the Task Assignment Form for BIL02C prepared by the Department. The final deliverable must be received by the Department no later than December 1, 2025.
645 NW Enterprise Drive #107 Port St Lucie, FL 34986
P (772) 343-9787 Terracon.com
September 5, 2025
Florida Department of Environmental Protection Waste Cleanup Program-Waste Management Division 2600 Blair Stone Road Tallahassee, Florida 32399-2400
Attn: Ms. Megan R. Johnson, Environmental Consultant Brownfields and CERCLA Site Screening Section E: Megan.R.Johnson@floridadep.gov W: 850-245-8994
Re: Task Assignment Request: Supplemental Site Assessment Addendum School Board of Broward County Plantation Site S Hiatus Road and W Broward Blvd Plantation, Broward County, Florida Terracon Proposal No. PHB247047
Dear Ms. Johnson:
Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this Task Assignment request to the Florida Department of Environmental (FDEP) Waste Cleanup Section Program to conduct a Supplemental Site Assessment Addendum (SSAA) for the School Board of Broward County (SBOBC), Plantation Site, located at the SE corner of south Hiatus Road and West Broward Blvd in Plantation, Florida. These activities will be performed as approved by both FDEP and the U.S. Environmental Protection Agency (U.S. EPA) for utilizing Targeted Brownfield Assessment/Site Specific Activities (TBA/SSA) federal funding administered by FDEP. This TA is being submitted to address the comments and revisions to the SSAA requested by the Broward County Environmental Permitting Division (Division), in a review letter dated August 11, 2025.
Scope of Services (see Section 2.0 of attached Proposal Detail)
Subtask 1 – Project Management: The costs associated with this subtask are calculated automatically at 13% of the direct labor costs of the remaining subtasks.
Subtask 2 – Surface Water and Sediment Sampling: Terracon proposes to collect two surface water samples and two sediment samples from the Old Plantation Water Control District (OPWCD) canal and submit for laboratory analysis. Terracon proposes collecting the two surface water and two sediment samples as outlined in the scope of services section for subtask 2.
Subtask 3– Reporting: A Revised Supplemental Site Assessment Report will be prepared that incorporates the results of the new surface water and sediment samples, and Revisions/Response to Comments requested by the Division in the August 11, 2025, SARA Review Letter.
Subtask 4– Remedial Alternatives Evaluation: Conduct a Remedial Alternatives Evaluation for the soil and groundwater exceedances with respect to historical agrichemical mixing, storage and application.
Proposal for Supplemental Site Assessment and Preparation of Report SBOBC Plantation Site Plantation, FL September 5, 2025 Terracon Proposal No. PHB247047
See attached LOEs for details
Schedule Deliverable of Revised Supplemental Site Assessment Report by October 24, 2025, as stipulated in the August 11, 2025 SARA Review Letter.
1.0 PROJECT INFORMATION
The School Board of Broward County Plantation site is an approximate 13.06-acre parcel of land located at the SE Corner of south Hiatus Rd and west Broward Blvd, Plantation, Broward County, Florida (hereinafter, referred to as the site). The site is comprised of two land parcels identified as Broward County Property Appraiser’s office (BCPAO) parcel identification numbers 5041-07-15-0020 (11.87 acres southern portion) and 5041-10-70-0140, (1.19-acre northern portion) The site is located in Section 7, Township 50 South, and Range 41 East. The approximate latitude/longitude coordinates of the site are N: 26° 7' 10.68" / W: -80° 17' 43.61".
The site is currently vacant land and is present as a cleared maintained grassed field with 2-to-6-foot raised areas.
Historically, the site was part of a larger agricultural area that was utilized to cultivate row crops from approximately 1968 to 1999. The site also contained a maintenance/equipment storage/staging area in its northwestern portion and a drainage canal previously transected the entire northern parcel along its frontage with west Broward Blvd.
The review of historical reports and analytical data indicate the presence of arsenic and toxaphene at concentrations in soil above the SCTLs and arsenic concentrations in groundwater above the GCTL.
The extents of soil and groundwater impacts have yet to be satisfactorily delineated. The identified areas are believed to be related to the former row crop agricultural operations and an associated maintenance structure formerly located in the northwest portion of the site. Terracon submitted a Site Assessment Report Addendum, dated June 2, 2025 (received August 4, 2025, by the Division). This proposal is based on the comments received by the Division in SARA review letter dated August 11, 2025.
2.0 SCOPE OF SERVICES
Based on prior discussion and the review letter comments, the proposed scope of services consists of three subtasks involving Project Management, surface water sampling for laboratory analysis, and producing a Revised Supplemental Site Assessment Report:
Subtask Description
Subtask 1: Project Management This scope is provided for in the template worksheets
September 5, 2025 Terracon Proposal No. PHB247047
Subtask Description
Subtask 2. Surface Water Sampling
Collect 2 surface water samples from the OPWCD canal adjacent to W Broward Blvd and located on the OPWCD Property Parcel for laboratory analysis by EPA method 6020 for arsenic and EPA Method 8081 for OCPs. The analysis will be performed using a NELAP approved laboratory.
Collect 2 s samples from the OPWCD canal adjacent to W Broward Blvd and located on the OPWCD Property Parcel for laboratory analysis by EPA method 6020 for arsenic and EPA Method 8081 for OCPs. The analysis will be performed using a NELAP approved laboratory.
Subtask 3. Revised Supplemental Site Assessment Report
Prepare a Revised Supplemental Site Assessment Report incorporating the additional surface water and sediment sampling results, and address the comments and revisions requested by the Division as requested in August 12, 2025, Review Letter.
Subtask 4. Remedial Alternative Evaluation
Prepare a Remedial Alternatives Evaluation to address the documented soil and groundwater exceedances as presented in
SSAA.
3.0 SCHEDULE
It is estimated that the additional surface water samples can be collected within two weeks of the signed proposal and receipt of notice to proceed. A Revised Supplemental Site Assessment Report will be issued by October 24, 2025, as stipulated in the August 25, 2025, review letter.
CLOSING REMARKS
Terracon services will be conducted in accordance with the terms and conditions contained within DEP Waste Cleanup Program (WCP) Contract No. HW687, executed January 5, 2022. It is understood that a Task Assignment will be issued to authorize Terracon to perform this work.
We appreciate the opportunity to provide this proposal and look forward to working with you on this project. If you should have any questions or comments regarding this proposal, please contact either of the undersigned at 772-343-9787.
Sincerely, Terracon Consultants, Inc.
Jessica Endicott, P.G. Shawn Ouellette, P.G.
Project Geologist Senior Geologist
Attachments: Exhibit A
September 5, 2025 Terracon Proposal No. PHB247047
Division Review Letter (August 12, 2025) Cost Spreadsheet Level of Effort
Resilient Environment Department
ENVIRONMENTAL PERMITTING DIVISION
1 North University Drive, Mailbox 201, Plantation, Florida 33324 • 954-519-1483 • FAX 954-519-1412
Broward County Board of County Commissioners Mark D. Bogen • Lamar P. Fisher • Beam Furr • Steve Geller • Robert McKinzie • Nan H. Rich • Hazelle P. Rogers • Tim Ryan • Michael Udine www.broward.org
August 11, 2025
Mr. Chris Akagbosu Mr. Brett W. Butler, Superintendent Broward County Public Schools Old Plantation Water Control District 600 S.E. Third Avenue 8800 N New River Canal Road Fort Lauderdale, FL 33301 Plantation, FL 33324
RE: Site Assessment Report Addendum Broward County School Board Property (EAR No. 1414) & Plantation Canal Property (EAR No. 1417) SE Corner of Broward Blvd and S Hiatus Road, Plantation, FL
ERIC_18360
The Environmental Permitting Division (Division) has reviewed the Site Assessment Report Addendum (Report) dated June 2, 2025 (received August 4, 2025) for the above-referenced site, prepared and submitted by Terracon Consultants, Inc. (Terracon). The Division approves the Report, and requires additional information before Site Assessment is deemed complete pursuant to rule 62-780.600, Florida Administrative Code (FAC).
Summary
The Report documents impacts of agrichemicals related to historic agricultural use on both properties. The extent of historic agricultural use also appears to encompass nearby and adjacent parcels. In soil, the following contaminant concentrations exceed applicable cleanup target levels in vadose soil within the 0-to-4-foot interval below ground surface (bgs): arsenic, aldrin, alpha-BHC, beta-BHC, dieldrin, endrin, gamma-BHC, heptachlor epoxide, and toxaphene. Likewise, cleanup target level exceedances in groundwater include: arsenic, alpha- BHC, beta-BHC, endrin, and dieldrin. Groundwater contaminant exceedances were present in the shallow to deepest depth of approximately 32 feet bgs. During sampling events, water table elevation varied from 4 to 9 feet bgs with a groundwater flow direction towards the west/southwest in the shallow and intermediate zones, and variations in vertical flow directions within the intermediate zone. At this time, there are no definitive plans for future development, and so Terracon plans to evaluate remedial alternatives to make a more definitive recommendation pursuant to subsection 62-780.600(8)(b), FAC.
Division Review
Please note the following:
Any historic data being used for assessment should be included in the appropriate figures and tables.
Horizontal and vertical delineation of groundwater and soil impacts documented in the Report appear to be complete. For purposes of remediation, boundaries of impacted soil should end at the closest “clean” sample. Optionally, if source removal is conducted, sidewalls and pit bottoms can be sampled to confirm removal effectiveness.
August 11, 2025
Broward County Board of County Commissioners Mark D. Bogen • Lamar P. Fisher • Beam Furr • Steve Geller • Robert McKinzie • Nan H. Rich • Hazelle P. Rogers • Tim Ryan • Michael Udine www.broward.org
Please provide additional discussion regarding leaching potential to both groundwater and nearby surface water bodies. Please include a figure with all soil boring and groundwater monitoring well locations to show the proximity of their locations as part of the leachability assessment. Additionally, please keep in mind that subsection 62-780.680(1)(b)2.f., FAC, requires one year of monitoring to prove contaminants in soil are not contributing to groundwater exceedances.
The Report mentions SPLP testing for toxaphene conducted by Terracon and by the previous consultant, Kleinfelder Inc. Previous results indicated that SPLP had failed in some locations. Please include a discussion regarding these historic test results with respect to leaching potential.
Groundwater sampling logs are missing for samples collected on February 26, 2024, and MW-300D on July 29, 2024.
Please correct the applicable table and figure for dieldrin at SB-112(0.5-2). Additionally, the dieldrin concentration for SB-103E(0.5-2) is missing from the applicable figure.
The waste manifest from May 1, 2025, characterizes waste as petroleum-contaminated liquids and solids. Please confirm that the waste hauler is made aware of and documents the correct type of waste to ensure proper disposal.
The Site Assessment Report Addendum, including the information required herein, is due to the Division by October 24, 2025. Pursuant to the requirements of Section 27-356(d)(4)c., Broward County Code (B.C.C.), please provide written notification at least three working days prior to performing additional field activities at the referenced site.
Also, please note that pursuant to the requirements of Section 27-356(d)(4)b., B.C.C., a time extension request (email or facsimile is sufficient) must be submitted at least 20 calendar days prior to the due date for any report or required activity. Please contact me at (954) 519-1461 or rjayson@broward.org if you have any questions regarding this review.
Sincerely, ENVIRONMENTAL PERMITTING DIVISION
Rachel Jayson Brownfields Coordinator
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : SBOBC Plantation Site BFO3B SUBTASK 2: Surface Water and Sediment Sampling
PROPOSAL NO. PHB247047
DATE: 9/2/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning and Coordination Senior Geologist SO 2.00
SO Pretask planning, Field Event preperation 2.00 Surface Water / Additional GW Sampling Env Technician RS Load/Unload 1.50 Env Technician RS Mobilization/Demobilization (from PSL) @ 4 hours round trip 3.00 Env Technician RS Collect Surface water samples from the OPWCD canal, prepare COC for laboratory drop off 2.00 Env Technician RS Collect two additional sediment samples from OPWCD Canal, prepare for laboratory drop off 2.00
Personnel: SO RS JE Hours: 4.00 8.50 0.00
TOTAL LABOR 12.50
VEHICLE TYPE RATE UNIT USEAGE
RS Truck (Surface water/ Gwsampling and IDW pick up) $120.00 days 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC IDW
Surface Water Arsenic EPA 6020 14.00$ 2 1 0 $42.00 OCPs EPA 8081 105.00$ 2 0 0 $210.00
Sediment Arsenic EPA 6020 14.00$ 2 1 0 $42.00 OCPs EPA 8081 105.00$ 2 0 0 $210.00
Sample Shipping Large Cooler 150.00$ 1 $150.00
TOTAL $654.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables 40.00$ day 1 $40.00 Personal Protection 35.00$ day 0 $0.00 Shallow GW Sampling Kit 290.00$ day 0 $0.00 Core Sampler 25.00$ day 1 $25.00 Tubing, HDPE 0.30$ ft 0 $0.00 Tubing, silicon (3/16 x 3/8) 3.00$ ft 0 $0.00 Ice (for samples) 6.50$ EA 2 $13.00 55-gallon drum, new 110.00$ drum 0 $0.00
TOTAL EQUIPMENT $78.00
Site access verification, Kick-off meeting/planning
SUBTASK 3: Revised SSAR
PROPOSAL NO. PHB247047
DATE: 9/2/2025
LABOR CATEGORY
STAFF-TITLE WORK DESCRIPTION HOURS
Review of Field Data Senior Scientist JE 2.00
Preparation of Draft SSAR Report, Tables and Figures
Senior Geologist JE 6.00 and summarize in a SSAR.
Preparation of Report Senior Geologist SO 2.00 Senior Geologist SO Finalize tables and figures 4.00 Senior Geologist SO Finalize report to address all review comments 2.00
Figures and Drafting
Senior CADD Technician CF Finalize Figures/Exhibits (updated groundwater OCP int. wells, updated soil maps - remove ref. 5.00 to Kleinfelder data and include SPLP results, figures/exhibist for surface water
Personnel: SO JE CF DC Hours: 8.00 8.00 5.00 0.00
TOTAL LABOR 21.00
VEHICLE TYPE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNIT USEAGE
TOTAL $0.00
LABORATORY COSTS
PARAMETER # SAMPLES #QAQC IDW
TOTAL LAB $0.00
EQUIPMENT ITEM COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Review Surface water and Soil sample Field Data
Draft response to comments to Broward County review, include updated sample results, Finalize Surface Water and sediment results
SUBTASK 4: Remedial Alternatives Analysis
PROPOSAL NO. PHB247047
DATE: 9/2/2025
LABOR CATEGORY
STAFF-TITLE WORK DESCRIPTION HOURS
Preparation of Report
Senior Scientist MM 15.00 cleanup alternatives
Senior Scientist MM Evaluate cleanup alternative, the cost for each of the proposed cleanup alternative, 12.00 and evaluate the regulatory path to closure
Figures and Drafting Senior CADD Technician CF Prepare exhibits illustrating the area and volume calculations for proposed soil 8.00 remediation areas Senior Scientist MM Prepare associated area, volume and cost estimate tables associated with each 6.00 remedial alternative Senior Engineer DC QA/QC calculation, regulatory closure criteria, and cost estimate summary tables 8.00 and figures Senior Engineer DC Finalize Report 4.00
Personnel: SO CF DC MM Hours: 0.00 8.00 12.00 33.00
TOTAL LABOR 53.00
VEHICLE TYPE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNIT USEAGE
TOTAL $0.00
LABORATORY COSTS
PARAMETER # SAMPLES #QAQC IDW
TOTAL LAB $0.00
EQUIPMENT ITEM COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Prepare remedial alternatives analysis, remedial design / analysis of brownfield