CN-370000-HW687-DC016A.pdf
PDF 4 MB Posted
- Contract number
- HW687
- Issued by
- Florida
About this file
This is a Task Assignment (TA) document issued under Contract HW687 between the State of Florida Department of Environmental Protection (FDEP) and Terracon Consultants, Inc. The task assignment, numbered DC016A, was executed on June 23, 2022, and is effective through October 31, 2022. The project involves groundwater monitoring and reporting services at the Concord Custom Cleaners #715 facility (ERIC_4866) located at 1911 South Adams Street in Tallahassee, Leon County, Florida. The Department Project Manager is Dean Cox, and the Contractor's Project Manager is Donna Cline.
The task assignment authorizes costs for site reconnaissance, groundwater monitoring and reporting, and associated expenses including equipment, sample shipping and analysis, and waste disposal. The total contract value is $7,444.33 on a fixed unit rate basis, with 45.84 hours of labor allocated. Labor costs were negotiated downward by 3 hours from the original proposal, reducing the total cost by $375.23. The primary deliverable is a Groundwater Monitoring Report due by August 31, 2022, with invoice payment due upon FDEP approval. The scope includes sampling of five existing monitoring wells (MW003, MW004, MW006, MW008, MW009) and water level measurements at one additional well (MW002) to identify current drycleaning solvent compound concentrations, particularly following detection of perchloroethylene (PCE) above the ground closure target level in prior monitoring conducted in 2020.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW687
DC016A Completion October 31, 2022
This task assignment (TA) authorizes costs for site reconnaissance and groundwater monitoring & reporting, along with associated costs for equipment, sample shipping and analysis, and waste disposal. The total cost of this TA is $7,444.33 with 45.84 hours of labor. The entire cost of this TA is fixed unit rate.
Dean Cox 850-245-8969 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Terracon Consultants, Inc.
Terracon Consultants, Inc.
Donna Cline 813-321-0340
ERIC_4866
1911 South Adams, Tallahassee
Concord Custom Cleaners #715 (former)
✔ $ 7,444.33
$ 7,444.33
Scope of Work
William E. Burns, Jr.
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2022.06.23 11:30:53 -04'00'
N/A dlcline Typewriter Donna Cline
Senior Remediation Engineer
6/23/22
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Groundwater Monitoring Report 08/31/2022
FDEP approval of Groundwater Monitoring Report (Subtask 1 Project Management and Subtask 2 Groundwater Monitoring & Reporting) $ 7,444.33
$ 7,444.33
HW687
DC016A
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Interim Secretary
Memorandum
TO: HW687 Contract File FROM: Dean Cox, Contract Manager SUBJECT: DC016A GW Monitoring – Concord Custom Cleaners (former) ERIC_4866
DATE: 6/20/2022
This task assignment (TA) authorizes costs for site reconnaissance and groundwater monitoring & reporting, along with associated costs for equipment, sample shipping and analysis, and waste disposal. The total cost of this TA is $7,444,33 with 45.84 hours of labor. The entire cost of this TA is fixed unit rate.
The cost of this TA was negotiated. Labor costs were reduced by 3 hours from the original proposal. The total cost of this TA is $375.23 less than the original proposal.
This groundwater monitoring TA is designed to identify current drycleaning solvent compound concentrations. Only PCE was detected above the GCTL in the previous groundwater monitoring event, completed in 2020. One well, offsite, had PCE above the GCTL in that 2020 event at 7.57 ug/L. Site access has been verified.
FDEP COST ESTIMATE
Contractor: Terracon
Date: 6/20/2022 Task #: DC016A SubTask 1 Project Management SubTask 6
Site: Concord Custom Cleaners #715, ERIC_4866 SubTask 2 Groundwater Monitoring and Reporting SubTask 7 Activity/Phase: GW Monitoring and Reporting SubTask 3 SubTask 8
Project Manager: Dean Cox SubTask 4 SubTask 9 SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$70.19 Project Manager Tom Lewis 2.84 2.84 $19.00 Administrative Ashley Miller 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Brownfield Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$20.50 CADD Specialist Oscar Encalada 3.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Data Analyst & Visualization Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Environmental Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 GIS Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$29.81 Project Scientist Kyle Parson 22.00 22.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior GIS Analyst 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$45.19 Senior Scientist Sid O'Neal 18.00 18.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 45.84 2.84 43.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $1,729.74 $199.00 $1,530.74 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 116.00% $2,006.50 $230.84 $1,775.66 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.26% $973.15 $111.96 $861.19 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $4,709.39 $541.80 $4,167.59 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 1
FDEP COST ESTIMATEContractor: Terracon Date: 6/20/2022
Task #: DC016A SubTask 1 Project Management SubTask 6 Site: Concord Custom Cleaners #715, ERIC_4866 SubTask 2 Groundwater Monitoring and Reporting SubTask 7
Activity/Phase: GW Monitoring and Reporting SubTask 3 SubTask 8 Project Manager: Dean Cox SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $440.00 $440.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $440.00 $440.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 IDW - Erwin Remediation $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $10.00 $10.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $315.00 $315.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $65.00 $65.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $380.00 $380.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,010.00 $1,010.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $144.00 $144.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,334.00 $1,334.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $6,973.39 $541.80 $6,431.59 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $470.94 $54.18 $416.76 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $7,444.33 $595.98 $6,848.35 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Concord Custom Cleaners #715, ERIC_4866 SUBTASK 2: Groundwater Sampling
PROPOSAL NO. PHF227023
DATE: 6/20/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Initial Site Visit to Evaluate Site Conditions Senior Scientist SO 1.00 Senior Scientist SO Site walk-around, locate and evaluate monitoring wells, and general site conditions 1.50
Field Task Planning and Groundwater Sampling Senior Scientist SO 0.50 Senior Scientist SO 1.00 Senior Scientist SO 2.00
Project Scientist KP Load/unload 1.00 Project Scientist KP Mobilization/Demobilization (from Tallahassee) 1.00 Project Scientist KP Access wells and replace well caps and locks (6 wells) 1.50 Project Scientist KP Collect groundwater levels ( 6 wells,10 minutes per well) 1.00 Project Scientist KP Collect deep groundwater samples (5 wells, 2 hours each) 10.00 Project Scientist KP Containerize IDW 0.50
Coordinate IDW T&D Senior Scientist SO 1.00 Project Scientist KP 2.00
Report Deliverable Project Scientist KP Prepare report tables, trend graphs and draft maps 5.00
Senior Scientist SO Prepare report 5.50 Senior Scientist SO QA/QC field and laboratory data 1.00 Senior Scientist SO Summarize Water Quality Parameters and Trend Graphs 1.00 Senior Scientist SO Summarize Groundwater Analytical Results 1.50 Senior Scientist SO Conclusions/Recommendations 2.00
CADD Specialist OE Prepare base figures and Exhibits (groundwater flow and concentrations maps) 3.00
TOTAL LABOR 43
VEHICLE TYPE RATE UNIT USEAGE
Truck (groundwater sampling) 120 day 2 $240.00
Automobile (Initial site visit) 80 day 1 $80.00 Truck (IDW pickup) 120 day 1 $120.00
TOTAL VEHICLE $440.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DI $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
Erwin Remediation IDW Disposal 100.00$ each 1 $100.00
Subcontractor Handling Fee 10% sum $10.00
TOTAL SUBCONTRACTOR $110.00
Coordinate IDW T&D: Meet transporter to unlock secure area for pickup
Mobilization/Demobilization (from Tallahassee)
Request sample kit Prepare Health and Safety Plan PreTask Planning, prepare field sampling SOW/coordinate site access
Prepare waste characterization/Generator Profile and schedule pickup
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Concord Custom Cleaners #715, ERIC_4866 SUBTASK 2: Groundwater Sampling
PROPOSAL NO. PHF227023
DATE: 6/20/2022
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOCs (short list) EPA 8260D 63.00$ 5 $315.00 Sample Shipping Small Cooler (2 day) 52.00$ 1 $52.00 Sample Shipping Ice 6.50$ 2 $13.00
TOTAL LAB $380.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Deep groundwater sampling k 415.00$ day 2 $830.00 Tubing, HDPE 1/5" to 5/8" 0.40$ ft 450 $180.00 Expendables 40.00$ day 2 $80.00 Lock, key operated 7.00$ ea 6 $42.00 Well Cap, 2" 17.00$ ea 6 $102.00 55-gallon drum, new 100.00$ drum 1 $100.00
TOTAL EQUIPMENT $1,334.00
Ranking by fee
Sub Solids non-haz 55-gal drum
Liquids non-haz
55-gal drum Additional pricing conditions
Minority Y/N
Regions* Contact Name Contact # email
1 Erwin Remediation 100.00$ 100.00$ all inclusive No All Johnathan Erwin 850-292-6511 erwinremediation@gmail.com
2 Clean Earth $63+$45=$108 $65+$45 =$110 15% EEI on total disposal, stop fee $100, 55% FSC of total transportation
No All Ryan Penfield 843-562-7481 rpenfield@harsco.com
3A Whatever Waste 150.00$ 150.00$ all included No North and
Central Florida
John 904-881-1957 John@whateverwaste.com
3B Whatever Waste 200.00$ 200.00$ all included No South Florida
John 904-881-1957 John@whateverwaste.com
* Regions that are specified with "All" of Florida, are not inclusive of the Keys
Erwin Remediation is the selected IDW Contractor
IDW Contractors, All of Florida (Except the Keys)
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Mr. Sid O’Neal
Terracon
3559 Timberlane School Road
Tallahassee, FL 32312
March 4, 2022
Re: Non-Hazardous Drum Disposal – State of Florida
Mr. O’Neal:
The price for the transportation and disposal (T&D) of drums of non-hazardous soil, mud and water located in the State of Florida is listed below.
Non-Hazardous Chlorinated VOHs, Petroleum and Metals:
Description Rate Unit
T&D - Non-Haz Soil $ 100.00 Per Drum
T&D - Non-Haz Mud/Water $ 100.00 Per Drum
The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida
Keys. Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.
Respectfully, Jonathan Erwin
Erwin Remediation, Inc.
Email: ErwinRemediation@Gmail.com
Office: (850) 292-6511 mailto:Remediation@Gmail.com
Cline, Donna L
From: O'Neal, Sid L Sent: Wednesday, March 9, 2022 12:12 PM To: Cline, Donna L; Wing, Lydia; Lewis, Tom E Subject: FW: :EXTERNAL: RFQ - Non-Haz T&D
Here’s an email quote from Clean Earth. Should be the final one needed
Thanks, Sid O’Neal Senior Scientist I Environmental
3559 Timberlane School Road I Tallahassee, Florida 32312 D (850) 692-7189 I F (850) 692-7186 I M (229) 400-5108 sid.oneal@terracon.com I Terracon.com
From: Penfield, Ryan L <rpenfield@harsco.com> Sent: Wednesday, March 9, 2022 12:09 PM To: O'Neal, Sid L <Sid.O'neal@terracon.com> Subject: RE: :EXTERNAL: RFQ - Non-Haz T&D
Hello Sid, Non haz liquids (NH-L-20) $65 per drum Non haz solids (NH-S-10) $63 per drum 15% EEI on total disposal
Transportation (excluding the KEYS) Stop fee $100 Per Drum Trans $45 FSC based upon DOE currently 55% of total trans
This will be good for all of Florida except the keys.
Ryan Penfield
Environmental Specialist
M 843.562.7841 O 1.800.739.9156 rpenfield@harsco.com www.cleanearthinc.com
402 Webster Chapel Road, Glencoe , AL 35905
From: O'Neal, Sid L <Sid.O'neal@terracon.com> Sent: Wednesday, March 9, 2022 11:59 AM To: Penfield, Ryan L <rpenfield@harsco.com> Subject: :EXTERNAL: RFQ - Non-Haz T&D
Hi Larry, Was just following up from yesterday’s phone call in case you have my email wrong.
Need quote for Non-Haz Drum T&D – soil and gw waste for all Florida regions covering north, central, and south regions
Thanks, Sid O’Neal Senior Scientist I Environmental
3559 Timberlane School Road I Tallahassee, Florida 32312 D (850) 692-7189 I F (850) 692-7186 I M (229) 400-5108 sid.oneal@terracon.com I Terracon.com
Terracon provides environmental, facilities, geotechnical, and materials consulting engineering services delivered with responsiveness, resourcefulness, and reliability.
Private and confidential as detailed here (www.terracon.com/disclaimer). If you cannot access the hyperlink, please e-mail sender.
CAUTION : This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.
You don't often get email from sid.o'neal@terracon.com. Learn why this is important
Whatever Waste, LLC 904.881.1957
3834 Mandarin Woods Dr. No.
Jacksonville, Florida
32223 United States
Overview RE: Non-hazardous Waste Drum Transport & Disposal LOC: North Florida (Jacksonville >< Pensacola) Central Florida (Greater Orlando >< Greater Tampa)
Good day Sid and Tom:
Whatever Waste appreciates the opportunity to price non-hazardous waste drums at facilities or sites throughout the North and Central Florida regions.
Overview Manifest, transport and dispose of non-hazardous petroleum contaminated soil, solids or liquids (including but not limited to PCW, IDW, groundwater, well drilling, and tank cleaning) in 55-gallon DOT shippable drums
Pricing
Prepared For Sid O'Neal Sr. Scientist
Terracon 3559 Timberlane School Road
Tallahassee, FL 32312
Proposal Number 030822.1
Proposal Date 03/08/2022
Description Rate Qty Line Total
Solids or Liquids Drums (each)
$150.00 1 $150.00
$0.00 1 $0.00
Notes Pricing includes assisting with waste profiling and analytical testing advisement unless the waste stream falls under a blanket profile.
Pricing and non-hazardous disposal acceptance of the drums is based on the waste being on-specification and RCRA non-hazardous. Required analytical testing data TBD based on disposal facility requirements DOT shippable drums must be on a hard surface and accessible location.
Drum pickup time frame can range from one week to several weeks based on location Whatever Waste also quotes hazardous waste drum transport and disposal
Terms
Whatever Waste will invoice actual amounts or volumes unless minimum quantities apply Due to pricing volatility in national and international energy sectors the non-hazardous waste drum transport and disposal rate will increase by $15.00 per drum for every $0.50 per gallon over $5.00 per gallon No-load stop fee if called off in transit or on-site $125.00 Payment is due in 30 days from email receipt of invoice
Sid O'Neal Sr. Scientist, Terracon
Subtotal
Tax
150.00
0.00
Proposal Total (USD) $150.00
Whatever Waste, LLC 904.881.1957
3834 Mandarin Woods Dr. No.
Jacksonville, Florida
32223 United States
Overview RE: Non-hazardous Waste Drum Transport & Disposal LOC: South Florida (south of Lake Okeechobee north end) Florida Keys
Good day Sid and Tom:
Whatever Waste appreciates the opportunity to price non-hazardous waste drums at facilities or sites throughout South Florida and the Florida Keys.
Overview Manifest, transport and dispose of non-hazardous petroleum contaminated soil, solids or liquids (including but not limited to PCW, IDW, groundwater, well drilling, and tank cleaning) in 55-gallon DOT shippable drums
Pricing
Prepared For Sid O'Neal Sr. Scientist
Terracon 3559 Timberlane School Road
Tallahassee, FL 32312
Proposal Number 030822.2
Proposal Date 03/08/2022
Description Rate Qty Line Total
Solids or Liquids Drums (each) (South Florida)
$200.00 1 $200.00
Solids or Liquid Drums (each) (Florida Keys)
$275.00 1 $275.00
Notes Pricing includes assisting with waste profiling and analytical testing advisement unless the waste stream falls under a blanket profile.
Pricing and non-hazardous disposal acceptance of the drums is based on the waste being on-specification and RCRA non-hazardous. Required analytical testing data TBD based on disposal facility requirements DOT shippable drums must be on a hard surface and accessible location.
Drum pickup time frame can range from one week to several weeks based on location Whatever Waste also quotes hazardous waste drum transport and disposal
Terms
Whatever Waste will invoice actual amounts or volumes unless minimum quantities apply Due to pricing volatility in national and international energy sectors the non-hazardous waste drum transport and disposal rate will increase by $15.00 per drum for every $0.50 per gallon over $5.00 per gallon No-load stop fee if called off in transit or on-site $175.00 Payment is due in 30 days from email receipt of invoice
Sid O'Neal Sr. Scientist, Terracon
Subtotal
Tax
475.00
0.00
Proposal Total (USD) $475.00
| DC016A.pdf |
| DC016A memo.pdf |
| DC016A CEF-LOE FDEPedits220620.pdf |
| Cost Estimate |
| LOE Subtask 2 |
| DC0016Aproposal220613_Page_5.pdf |
| DC0016Aproposal220613_Page_6.pdf |
| IDWbids.pdf |
| ErwinRemediation Quote - Terracon - Drum - All Regions - 03.04.2022 |
| Clean Earth |
| Whatever Waste - Drum Quote Proposal 030822.1 |
| Whatever Waste Proposal 030822.2 - South Region |