This document package contains a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (FDEP) under Contract No. HW687 to Terracon Consultants, Inc. for groundwater monitoring services at the Fabricare Cleaners and Laundry site (ERIC_4741) located at 13541 North Florida Avenue, Tampa, Hillsborough County, Florida. The TA is numbered DC008E with a completion date of September 11, 2026. The assignment is executed between the FDEP's Waste Cleanup Program and Terracon, with Gabriel Sostre serving as the FDEP project manager and Donna Cline as Terracon's project manager. The package includes the executed task assignment, cost estimates, detailed level of effort worksheets, a negotiation summary memorandum, the original proposal, competitive bid worksheets for subcontracted services, and a groundwater sampling summary table.
Terracon will conduct annual groundwater monitoring for volatile organic halides (VOHs) and per- and polyfluorinated substances (PFAS) across 17 monitoring wells, with VOH sampling from 8 wells and PFAS sampling from 14 wells, as well as prepare a comprehensive Groundwater Monitoring Report. The total task assignment value is $11,968.38 on a fixed unit rate basis, representing a negotiated decrease of $1,736.57 (12.67%) from the initial proposal of $13,704.95. The scope consists of three subtasks: Subtask 1 (Project Management—$1,038.09), Subtask 2 (VOH Groundwater Sampling and Annual Monitoring Report—$8,733.20), and Subtask 3 (PFAS Groundwater Sampling—$2,197.09). Deliverables are due by August 7, 2026, with invoicing contingent upon FDEP approval. The cost estimate encompasses 84.61 total labor hours distributed across six staff categories, travel costs of $360.00, laboratory analytical costs of $657.00, subcontractor costs for investigative-derived waste disposal of $341.00, and field equipment and expendables totaling $1,587.00. Additional vendors quoted for disposal services include Petrotech Southeast, Inc. (selected for IDW disposal at $310.00), Clean Earth Environmental Solutions, and Republic Services.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW687
DC008E Completion September 11, 2026
This Task Assignment authorizes Terracon Consultants Inc. to conduct Annual Groundwater Monitoring for VOHs and PFAS at the Fabricare Cleaners and Laundry site as part of contract HW687.
Gabriel Sostre 850-245-8749 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Terracon Consultants, Inc.
Terracon Consultants, Inc.
Donna Cline 904-479-7415
ERIC_4741
13541 North Florida Avenue, Tampa, Hillsborough County
Fabricare Cleaners and Laundry
✔ $ 11,968.38
$ 11,968.38
Scope of Work
Donna Cline
Senior Associate
5/13/26
Digitally signed by Cline, Donna L DN: cn=Cline, Donna L, ou=Domain Users, email=Donna.Cline@terracon.com Date: 2026.05.13 14:36:19 -04'00'
Cline, Donna L
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2026.05.13 12:35:25 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
BWC TAFORM 01/18
HW687
DC008E
Subtask 3: PFAS Groundwater Sampling Deliverable
Subtasks 1 & 2: Project Management; Annual Groundwater Monitoring Report.
08/07/2026
08/07/2026
Subtasks 1 & 2: FDEP approval of Project Management; Annual Groundwater Monitoring Report.
Subtask 3: FDEP approval of PFAS Groundwater Sampling Deliverable
$ 9,771.29
$ 2,197.09
$ 11,968.38
McGrane_P Rectangle
Memorandum
TO:
FROM:
SUBJECT:
DATE:
Negotiation File Fabricare Cleaners and Laundry 13541 North Florida Avenue Tampa, Hillsborough County
ERIC_4741
Gabriel Sostre, Project Manager
Negotiation Summary Task Assignment DC008E (HW687)
May 1st, 2026
This Task Assignment authorizes Terracon Consultants Inc. (Terracon) to conduct Annual Groundwater Monitoring for VOHs and PFAS at the Fabricare Cleaners and Laundry site as part of contract HW687.
Below is a summary of each of the subtasks related to this TA:
Subtask 1: Reserved for Project Management.
Subtask 2: Terracon shall collect Groundwater Samples for VOHs from eight Monitoring Wells.
Additionally, Terracon shall also prepare an Annual Groundwater Monitoring Report that details and summarizes the findings obtained from the Annual Groundwater Monitoring Event.
Subtask 3: Terracon shall collect Groundwater Samples for PFAS from nine Monitoring Wells. Terracon will conduct PFAS sampling during the same mobilization as VOH sampling and will include the results obtained from the Annual PFAS event in the Annual Groundwater Monitoring Report.
The previous total cost of this TA was $13,704.95. After negotiations with the FDEP, the new total is $11,968.38. This represents a decrease of $1,736.57 or 12.67%. The total amount of labor hours dedicated to this TA is 84.61. Terracon may invoice according to included schedule.
FDEP COST ESTIMATE
Contractor: Terracon
Date: 5/1/2026
Task #: SubTask 1 Project Management
Site: Fabricare Cleaners and Laundry ERIC_4741 SubTask 2 VOH Groundwater Sampling
Activity/Phase: Groundwater Sampling and Reporting SubTask 3 PFAS Groundwater Sampling
Project Manager: Gabriel Sostre SubTask 4
Totals 1 2 3 4 5 6
Labor Rate Category
$56.73 Project Manager Fabio Fortes 6.11 6.11
$36.06 CADD Specialist Chelsea Fugate 10.00 8.00 2.00 0.00 0.00 0.00
$21.75 Field Scientist William Rodriguez 17.50 13.00 4.50 0.00 0.00 0.00
$39.90 Senior Scientist Eric Clementelli 41.50 30.50 11.00 0.00 0.00 0.00
$72.79 Senior Engineer Donna Cline 3.00 3.00 0.00 0.00 0.00 0.00
$56.73 Senior Engineer Fabio Fortes 6.50 2.00 4.50 0.00 0.00 0.00
Total Hours 84.61 6.11 56.50 22.00 0.00 0.00 0.00
Direct Labor $3,012.92 $346.62 $2,120.01 $546.29 $0.00 $0.00 $0.00
Overhead 116.00% $3,494.99 $402.08 $2,459.21 $633.70 $0.00 $0.00 $0.00
Fringe 56.263% $1,695.16 $195.02 $1,192.78 $307.36 $0.00 $0.00 $0.00
Total Labor $8,203.07 $943.72 $5,772.00 $1,487.35 $0.00 $0.00 $0.00
Travel
Vehicle charge $360.00 240.00$ 120.00$ $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $360.00 $240.00 $120.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW - Petrotech $310.00 $0.00 310.00$ $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $310.00 $0.00 $310.00 $0.00 $0.00 $0.00
Handling Fee $31.00 $0.00 $31.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $341.00 $0.00 $341.00 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $657.00 657.00$ $0.00 $0.00 $0.00 $0.00
Encore Sampler $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $70.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Laboratory $657.00 $657.00 $0.00 $0.00 $0.00 $0.00
Field Expenses
Expendables $93.00 93.00$ $0.00 $0.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (IDW related) $100.00 $0.00 100.00$ $0.00 $0.00 $0.00
Equipment (Other) $1,394.00 1,394.00$ $0.00 $0.00 $0.00 $0.00
Total Field Expenses $1,587.00 $1,487.00 $100.00 $0.00 $0.00 $0.00
Subtotal $11,148.07 $943.72 $8,156.00 $2,048.35 $0.00 $0.00 $0.00
Completion Fee $820.31 $94.37 $577.20 $148.74 $0.00 $0.00 $0.00
Total Estimated Cost $11,968.38 $1,038.09 $8,733.20 $2,197.09 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 1
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Fabricare Cleaners and Laundry ERIC_4741 SUBTASK 2: VOH Groundwater Sampling
PROPOSAL NO. PH4267086
DATE: 4/22/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning Senior Scientist EC 2.00
Groundwater Sampling from 17 monitoring wells (2 days of field work, including PFAS sampling)
Senior Scientist EC 2.00
Field Scientist WR 2.00
Senior Scientist EC 2.00
Field Scientist WR 2.00
Senior Scientist EC 1.50
Field Scientist WR 1.50
Senior Scientist EC 6.00
Field Scientist WR 6.00
Field Scientist WR 1.50
Senior Scientist EC 1.00
Senior Engineer FF 1.00
GWM Report Deliverable
Senior Scientist EC 5.00
Senior Scientist EC 8.00
Senior Engineer FF 1.00
Senior Scientist EC 3.00
Senior Engineer DC 3.00
CADD Specialist CF 8.00
Personnel: WR EC FF CF DC Hours: 13.00 30.50 2.00 8.00 3.00 TOTAL LABOR 56.50
VEHICLE TYPE RATE UNIT USEAGE
Truck (EC, WR) GW Sampling 120.00$ day 2 240.00$
TOTAL VEHICLE 240.00$
LABORATORY COSTS
PARAMETER RATE # SAMPLES IDW TOTALS
Halocarbons (short list) EPA 8260 73.00$ 8 657.00$
TOTAL LAB 657.00$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables Expendables 40.00$ day 2 80.00$ 6.50$ day 2 13.00$
Equipment (others) Shallow Groundwater Sampling Kit 290.00$ day 4 (2 people x 2 days) 1,160.00$ Tubing, HDPE 0.30$ ft 700 210.00$ Tubing, silicon (3/16 x 3/8) 3.00$ ft 8 24.00$
TOTAL EQUIPMENT 1,487.00$
Collect water levels from 17 monitoring wells @ 10 minutes per well
Trip report including field notes and field logs
VOH Lab Kit Request, Site Access with Property Owner, Project Kick-Off, Pre-Task Planning, and Prepare Field
Mobilization/Demobilization (from Tampa) (1 hour/day)
Containerize IDW, coordinate with tenant on drum staging, collect IDW sample for characterization
Complete field logs, organize field documents
Load/unload equipment and check equipment calibration (1 hour/day)
Mobilization/Demobilization (from Tampa) (1 hour/day)
Collect water levels from 17 monitoring wells @ 10 minutes per well
Collect 4 VOH Groundwater Samples @ 1.5 hrs per well
Collect 4 VOH Groundwater Samples @ 1.5 hrs per well
Load/unload equipment and check equipment calibration (1 hour/day)
Ice (Sample preservation, 2 bags/day
Conclusions and Recomendations
Prepare Figures and Exhibits (2 Groundwater Elevation, 2 VOHs Results, 2 PFAS Results)
Prepare Report VOH Tables, Draft GW Analytical and Elevation Isoconcentration Figures
Prepare Report
QA/QC Field and laboratory data
Summarize Groundwater Analytical Results
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Fabricare Cleaners and Laundry ERIC_4741 SUBTASK 3: PFAS Groundwater Sampling
PROPOSAL NO. PH4267086
DATE: 5/1/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning Senior Engineer FF 1.00
Groundwater Sampling Activities not Included in LOE 2 Senior Scientist EC 6.00
Field Scientist WR 4.50
IDW Coordination
Senior Engineer FF 1.50
Senior Scientist EC Mobilization and Coordinate IDW T&D Meet Transporter Onsite 2.00
Email Deliverable for PFAS Sampling Senior Engineer FF QA/QC PFAS Field and Laboratory Data 1.00
Senior Scientist EC Tabulate PFAS Results and Prepare Data For Exhibits 3.00
Senior Engineer FF Evaluate and Summarize Groundwater Analytical Results 1.00
CADD Specialist CF Prepare PFAS exhibit (showing PFOA, PFOS and PFOA+PFAS for each well) 2.00
Personnel: EC WR FF DC CF Hours: 11.00 4.50 4.50 0.00 2.00 TOTAL LABOR 22.00
VEHICLE TYPE RATE UNIT USEAGE
Truck (EC) IDW Pickup 120.00$ day 1 120.00$
TOTAL VEHICLE 120.00$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
Petrotech IDW Disposal 225.00$ each 1 225.00$ Petrotech Stop Fee 85.00$ each 1 85.00$
TOTAL SUBCONTRACTOR 310.00$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
IDW Related 55-gallon drum, new 100.00$ each 1 100.00$
TOTAL EQUIPMENT 100.00$
Request PFAS Sample Kit, Coordinate Lab Availability
Collect 4 PFAS Groundwater Samples @ 1.5 hrs per well
Collect 3 PFAS Groundwater Samples @ 1.5 hrs per well
Prepare IDW Waste Characterization/ Generator Profile, Schedule and Coordinate Pickup
5463 W. Waters. Ave. Suite 830 Tampa, FL 33634
P (813) 221-0050 F (813) 221-0051
Terracon.com
April 17, 2026
Florida Department of Environmental Protection Waste Cleanup Program Waste Management Division 2600 Blair Stone Road Tallahassee, Florida 32399-2400
Attn: Mr. Gabriel Sostre, Environmental Specialist II E: Gabriel.Sostre@floridadep.gov W: 850-245-8749
Re: Proposal for Groundwater Sampling and Reporting Fabricare Cleaners and Laundry 13541 North Florida Avenue Tampa, Hillsborough County, Florida 33613
ERIC_4741
Waste Cleanup Contract No. HW687 Terracon Proposal No. PH4267086
Dear Mr. Sostre:
Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this proposal to the Florida Department of Environmental Program (FDEP) Waste Cleanup Program (WCP) to conduct groundwater monitoring for volatile organic halogenated (VOHs) and per-and polyfluorinated substances (PFAS) analysis, and prepare a Groundwater Monitoring Report for the Fabricare Cleaners and Laundry (ERIC_4741) site located in Tampa, Florida.
Scope of Services
Field preparation, mobilization to the site, collection of water levels from 17 existing monitoring wells, groundwater sampling and VOHs laboratory analysis from 8 selected monitoring wells (see attached Table 1).
Include PFAS analysis for 14 groundwater monitoring wells to evaluate horizontal and vertical PFAS groundwater impacts (see attached Table 1).
Properly manifest the groundwater drum of investigative-derived waste (IDW).
Submit PFAS samples in cooler preserved on ice by overnight courier to FDEP’s laboratory for sample analysis;
Review data and prepare a Groundwater Monitoring Report including updated tables, groundwater flow, and concentration exhibits;
Proposal for Groundwater Sampling and Reporting Fabricare Cleaners and Laundry, Inc. ERIC_4741 Tampa, FL April 17, 2026 Terracon Proposal No. PH4267086
See attached Groundwater Sampling Summary Table and LOE for details.
Schedule Deliverable Annual Groundwater Monitoring Report submitted within 30 business days following receipt of laboratory results.
Compensation See attached CEF for details.
SITE RECOMMENDATIONS
Terracon collected groundwater samples from 9 groundwater monitoring wells for VOHs analysis during the August 2025 sampling event. The prior scope of work also included an additional 7 monitoring wells sampling as part of the expanded PFAS assessment. The VOH contaminant plume has been vertically defined pursuant to Chapter 62-780, Florida Administrative Code (FAC). Horizontal delineation of the VOH contaminant plume remains undefined to the east in the intermediate-deep aquifer interval (monitoring wells screened between 36 and 46 feet below the ground surface);
however, the horizontal delineation has been established onsite to the north, offsite to the west, and offsite to the south.
Based on assessment data, PFAS concentrations have been reported above the FDEP Provisional Groundwater Cleanup Target Level of 70 nanograms per liter (ng/L) for Perfluorooctanoic acid (PFOA), Perfluorooctane sulfonic acid (PFOS), and their sum (PFOA + PFOS) in the shallow, intermediate, and intermediate-deep monitoring wells. PFAS groundwater plume remains undefined to the south of the former drycleaning site.
Based on the historical assessment data, Terracon recommends sampling 8 monitoring wells to evaluate VOH concentrations and trends. Terracon also recommends PFAS sampling from 14 monitoring wells to evaluate PFAS levels in groundwater. See Table 1 for the proposed groundwater sampling summary.
DELIVERABLES
The Groundwater Monitoring Report will detail and summarize the groundwater sampling activities, field observations, and results of monitoring well analysis, IDW disposal documentation updates to the site’s historical data tables, and updated exhibits of groundwater flow and well concentrations. Conclusions and recommendations will include a summary of results and recommendations for future sampling, closure, or remedial activities. The PFAS evaluation will be provided in an additional section within this report.
SCHEDULE
It is estimated that the wells could be sampled within two weeks from TA authorization and report issued within 30 business days of receipt of analytical data.
Proposal for Groundwater Sampling and Reporting Fabricare Cleaners and Laundry, Inc. ERIC_4741 Tampa, FL April 17, 2026 Terracon Proposal No. PH4267086
CLOSING REMARKS
Terracon services will be conducted in accordance with the terms and conditions contained within DEP Waste Cleanup Program (WCP) Contract No. HW687, executed January 5, 2022. It is understood that a Task Assignment will be issued to authorize us to perform this work.
We appreciate the opportunity to provide this proposal and look forward to working with you on this project. If you should have any questions or comments regarding this proposal, please contact either of the undersigned at 703-606-8530.
Sincerely, Terracon Consultants, Inc.
Ryan Fetter Donna Cline, P.E.
Senior Staff Geologist Senior Associate / Environmental
Attachments: Cost Spreadsheet Level of Effort Investigation Derived Waste (IDW) bid evaluation and quotes Table 1 – Proposed Groundwater Sampling 2026
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_v2.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v1.pdf |
| Cost Estimate |
| Subtask 2 |
| Subtask 3 |
| Subtask 4 |
| Subtask 5 |
| Subtask 6 |
| 2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev1_12-12-22.pdf |
| Table 1 for SAWP |
| Monitoring Well Locations |
| Utility Locate Bids_Compiled.pdf |
| Geosyntec Utility-272_Geotek_1500 |
| Geoview Utility Quote_2000_COT FTF SIS |
| Tallahassee Fire Training Division_V1_Bloodhound_3700 |
| Drilling Bids_Compiled.pdf |
| PDS_Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (sonic) |
| Direct Push |
| City of Tallahassee Fire Training Site_GW Protection PFAS Free Water Estimate Email |
| Cascade_Geosyntec Consultants, Inc. - City of Tallahassee Fire Training Facility - PN221026-118844 |
| GW Protection_Geosyntec (T) 1022060 S.pdf |
| Invoice |
| Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (MOT).xlsx.pdf |
| Sheet1 |
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v1.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v2.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v2.pdf |
| Cost Estimate |
| Subtask 2 |
| Subtask 3 |
| Subtask 4 |
| Subtask 5 |
| Subtask 6 |
| 2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev2.pdf |
| Table 1 for SAWP |
| Monitoring Well Locations |
File details come from the government source that posted it. Updated .