This document package comprises a Task Assignment (TA) and supporting proposal materials executed under an indefinite delivery vehicle contract between the State of Florida Department of Environmental Protection (FDEP) and Terracon Consultants, Inc. The Task Assignment (TA Number DC028G) is issued pursuant to underlying Contract Number HW687, executed January 5, 2022, and authorizes work at the Alpine Cleaners facility located at 5240 NW 24th Boulevard, Gainesville, Alachua County, Florida (ERIC_3987). The primary parties are FDEP, represented by Project Manager Gabriel Sostre, and contractor Terracon Consultants, Inc., represented by Project Manager Donna Cline. Key personnel include Senior Geologist Ralph F. Mongillo Jr. as field project manager and Senior Remediation Engineer Donna Cline as authorized project reviewer.

The Task Assignment authorizes Terracon to conduct Annual Groundwater Monitoring and Reporting at the Alpine Cleaners site on a fixed unit rate basis. The scope encompasses two subtasks: Subtask 1 (Project Management) and Subtask 2 (Groundwater Sampling and Report Preparation). Deliverables include field notes and groundwater sample documentation due May 8, 2026, and an Annual Groundwater Monitoring Report due by June 12, 2026, contingent upon FDEP approval. The work involves collecting groundwater samples from five shallow zone monitoring wells (MW001S, MW002S, MW004S, MW005S, and PZ003) for volatile organic halogen (VOH) analysis, depth-to-water measurements from eight wells, investigative derived waste management and disposal, and preparation of a comprehensive report with analytical results and conclusions. The Total TA Value is $8,249.86, representing 49.33 total labor hours. Invoice payment of the full amount is due upon FDEP approval of the Annual Groundwater Monitoring Report. Cost components include direct labor ($2,171.15), overhead at 116 percent ($2,518.53), fringe benefits at 56.263 percent ($1,221.55), vehicle costs ($240.00), subcontractor services for IDW disposal ($214.50), laboratory analytical costs ($475.00), and field equipment and expendables ($818.00). The TA is effective as of February 10, 2026, and shall be completed by June 12, 2026.

View the file

Other files

File Type Posted
CN-370000-HW687-BF01ACO1.pdf PDF
CN-370000-HW687-BF03ACO1.pdf PDF
CN-370000-HW687-BIL01A.pdf PDF
CN-370000-HW687-BIL2ACO1.pdf PDF
CN-370000-HW687-BIL2BCO1.pdf PDF
CN-370000-HW687-BIL2CCO1.pdf PDF
CN-370000-HW687-BIL3ACO2.pdf PDF
CN-370000-HW687-BIO1ACO1.pdf PDF
CN-370000-HW687-DC001A.pdf PDF
CN-370000-HW687-DC003A.pdf PDF
CN-370000-HW687-DC003D.pdf PDF
CN-370000-HW687-DC005D.pdf PDF
CN-370000-HW687-DC006A.pdf PDF
CN-370000-HW687-DC006B.pdf PDF
CN-370000-HW687-DC008C.pdf PDF
CN-370000-HW687-DC010A.pdf PDF
CN-370000-HW687-DC010B.pdf PDF
CN-370000-HW687-DC011F.pdf PDF
CN-370000-HW687-DC011H.pdf PDF
CN-370000-HW687-DC012D.pdf PDF
CN-370000-HW687-DC013C.pdf PDF
CN-370000-HW687-DC015A.pdf PDF
CN-370000-HW687-DC015C.pdf PDF
CN-370000-HW687-DC019A.pdf PDF
CN-370000-HW687-DC01ACO2.pdf PDF
CN-370000-HW687-DC020A.pdf PDF
CN-370000-HW687-DC020B.pdf PDF
CN-370000-HW687-DC020C.pdf PDF
CN-370000-HW687-DC020D.pdf PDF
CN-370000-HW687-DC023C.pdf PDF
CN-370000-HW687-DC025B.pdf PDF
CN-370000-HW687-DC025C.pdf PDF
CN-370000-HW687-DC025F.pdf PDF
CN-370000-HW687-DC027B.pdf PDF
CN-370000-HW687-DC027C.pdf PDF
CN-370000-HW687-DC02BCO1.pdf PDF
CN-370000-HW687-DC02CCO2.pdf PDF
CN-370000-HW687-DC02DCO1.pdf PDF
CN-370000-HW687-DC02HCO1.pdf PDF
CN-370000-HW687-DC032A.pdf PDF
CN-370000-HW687-DC034A.pdf PDF
CN-370000-HW687-DC034C.pdf PDF
CN-370000-HW687-DC034D.pdf PDF
CN-370000-HW687-DC035F.pdf PDF
CN-370000-HW687-DC036A.pdf PDF
CN-370000-HW687-DC03CCO1.pdf PDF
CN-370000-HW687-DC041C.pdf PDF
CN-370000-HW687-DC041D.pdf PDF
CN-370000-HW687-DC048A.pdf PDF
CN-370000-HW687-DC048B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW687

DC028G Completion June 12, 2026

This Task Assignment authorizes Terracon to conduct Annual Groundwater Monitoring and Reporting at the Alpine Cleaners site as part of contract HW687.

Gabriel Sostre 850-245-8749 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Terracon Consultants, Inc.

Terracon Consultants, Inc.

Donna Cline 904-479-7415

ERIC_3987

5240 NW 24th Boulevard, Gainesville, Alachua County

Alpine Cleaners

✔ $ 8,249.86

$ 8,249.86

Scope of Work

Donna Cline

Senior Associate / Remediation Engineer

02/10/2026

Digitally signed by Cline, Donna L DN: cn=Cline, Donna L, ou=Domain Users, email=Donna.Cline@terracon.com Date: 2026.02.10 05:50:23 -05'00'

Cline, Donna L

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2026.02.06 19:18:40 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

BWC TAFORM 01/18

HW687

DC028G

Subtasks 1 & 2: Project Management. Groundwater Monitoring of five shallow zone wells (MW001S, MW002S, MW004S, MW005S, and PZ003) for VOH analysis. Annual Groundwater Monitoring Report.

05/08/2026

Subtasks 1 & 2: FDEP approval of Annual Groundwater Monitoring Report including field notes and updated tables, charts, graphs, and exhibits. $ 8,249.86

$ 8,249.86

McGrane_P Rectangle

Memorandum

TO:

FROM:

SUBJECT:

DATE:

Negotiation File Alpine Cleaners 5240 NW 34th Boulevard Gainesville, Alachua County

ERIC_3987

Gabriel Sostre, Project Manager

Negotiation Summary Task Assignment DC028G (HW687)

January 29th, 2026

This Task Assignment authorizes Terracon Consultants Inc. (Terracon) to conduct Annual Groundwater Monitoring and Reporting at the Alpine Cleaners site as part of contract HW687. Below is a summary of each of the subtasks related to this TA:

Subtask 1: Reserved for Project Management.

Subtask 2: Terracon shall conduct VOH Groundwater Sampling of five shallow Monitoring Wells (MW001S, MW002S, MW004S, MW005S, and PZ003) and report their findings in the Annual Groundwater Monitoring Report. Terracon shall submit the report to the FDEP for review before receiving Approval to Invoice.

The total cost of this TA is $8,249.86. The total amount of labor hours dedicated to this TA is 49.33.

Terracon may invoice according to included schedule.

FDEP COST ESTIMATEContractor: Terracon Consultants, Inc

Date: 1/29/2026

Task #: DC028F SubTask 1 Project Management SubTask 6

Site: Alpine Cleaners SubTask 2 Groundwater Sampling & Report SubTask 7

Activity/Phase: Groundwaater Monitoring SubTask 3 SubTask 8

Project Manager: Gabriel Sostre SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$57.69 Project Manager Ralph Mongillo 4.33 4.33 $25.22 Administrative Tanja Proietto 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Brownfield Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $36.06 GIS Technician Chelsea Fulgate 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Data Analyst & Visualization Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $33.65 Field Scientist Nicole Kovach 11.00 11.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Project Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $33.49 Field Scientist Darryl Williams 13.00 13.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Staff Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$72.79 Senior Engineer Donna Cline 2.50 2.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $57.69 Senior Geologist Ralph Mongillo 13.50 13.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Senior GIS Analyst 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$31.01 Staff Scientist Cali May 5.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $26.00 Environmental Tech Tyler Cozart 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $22.00 Project Geologist Avery Bliss 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $25.00 Staff Scientist Frankie Gilday 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Staff Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Hours 49.33 4.33 45.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor 2171.15 249.78 1921.37 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 116.00% 2518.53 289.74 2228.79 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% 0.00 0.00 0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.263% 1221.55 140.53 1081.02 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor 5911.23 680.05 5231.18 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 09/25 CEF WSP Page 1

FDEP COST ESTIMATEContractor: Terracon Consultants, Inc

Date: 1/29/2026

Task #: DC028F SubTask 1 Project Management SubTask 6

Site: Alpine Cleaners SubTask 2 Groundwater Sampling & Report SubTask 7

Activity/Phase: Groundwaater Monitoring SubTask 3 SubTask 8

Project Manager: Gabriel Sostre SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle $240.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Meals $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $240.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 IDW - Erwin $195.00 195.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $195.00 $195.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $19.50 $19.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $214.50 $214.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $475.00 475.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 -$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $475.00 $475.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $93.00 93.00$ -$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $625.00 625.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 100.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $818.00 $818.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $7,658.73 $680.05 $6,978.68 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $591.13 $68.01 $523.12 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $8,249.86 $748.06 $7,501.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Cost from Prior CEF: $0.00 Manual Entry Cost from Delta CEF; $0.00 Manual Entry

Cost (Prior + Delta): $0.00 Auto-Calculated Rounding Error: $8,249.86 Auto-Calculated

Final Total Cost: $8,249.86 Auto-Calculated

REV: 09/25 CEF WSP Page 2

SITE : Alpine Cleaners SUBTASK 2: Groundwater Sampling & Report

DATE: 1/29/2026

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning Senior Geologist RFM 1.00

Senior Geologist RFM 2.00

Groundwater Sampling

Time Duration: 1 day Project Scientist DW Load/unload equipment (0.5 hour/day) 0.50 Project Scientist NK 1.50

Field Scientist DW 3.00

Project Scientist NK 4.50

Field Scientist NK 0.50 IDW Management Senior Geologist RFM 1.00 Project Scientist NK Containerize, manage, and sample IDW Drum (0.5 hrs./day) 0.50 Field Scientist DW 1.00 Report Preparation Senior Geologist RFM 5.00

Senior Geologist RFM 0.50 Senior Geologist RFM Evaluate data in report text, groundwater data, tables, and exhibits 4.00 Staff Scientist CM Preparation of draft Tables, Exhibits, and Appendices 2.00 Senior Engineer DC water quality parameters and groundwater analytical results and summary evaluation 1.50 Senior Engineer DC Conclusions/Recommendations 1.00 GIS Technician CM 3.00

Mobilization / Demobilizations Field Scientist DW 4.50

Field Scientist NK 4.00 Field Scientist DW 4.00

Personnel: RFM DW NK CM DC Hours: 13.50 13.00 11.00 5.00 2.50 OTAL LABOR 45.00

Meet with IDW Disposal subcontractor and sign Manifest

Collect water levels (5 wells sampled plus existing shallow zone wells MW003S, PZ001, and PZ002, total of 8 wells, 10 minutes/well)

Safety meeting, calibrate instruments, collect groundwater samples for VOHs, prepare samples for shipment (1.5 hours/well, 2 wells) Safety meeting, calibrate instruments, collect groundwater samples for VOHs, prepare samples for shipment (1.5 hours/well, 3 wells) Prepare GW sampling/calibration logs/field notes for PM evaluation (0.5 hr./day)

4 hours per mobe/demobe from Jacksonville (IDW Pickup)

Prepare draft report introduction, recent activities summary, and discussion of groundwater results QA/QC field and laboratory data (5 groundwater samples)

Prepare groundwater flow (shallow zone), groundwater VOH concentrations map for shallow zone monitoring wells

4 hours per mobe/demobe from Jacksonville (GW Sampling) and 30 minutes drop off samples 4 hours per mobe/demobe from Jacksonville (GW Sampling)

Prepare the manifest and provide waste profile data for Sub and coordinate/pickup drum

Request laboratory sample kit, verify property owner is the same as on the access agreement, notify property owner and FDEP of field activity schedule, revise HASP

Scope: Collect groundwater samples from five shallow zone wells (MW001S, MW002S, MW004S, MW005S, and PZ003).

Review field notes, laboratory report, and prepare IDW waste profile, manifest and schedule disposal of the drum

VEHICLE TYPE RATE UNIT USEAGE

Truck (DW/NK) GW Sampling 120 day 1 120.00$

Truck (DW) IDW Disposal 120 day 1 120.00$

TOTAL VEHICLE 240.00$

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin $ 195.00 Drum 1 195.00$

TOTAL 195.00$

LABORATORY COSTS

PARAMETER RATE # SAMPLES IDW

VOHs (GW) EPA 8260 73.00$ 5 365.00$ VOCs Full List (IDW GW) 110.00$ 1 110.00$

TOTAL LAB 475.00$

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 2 GW Samp/IDW 80.00$

Ice (Sample Preservation) 6.50$ each 2 13.00$ Analytical related Shallow Groundwater Sampling 290.00$ day 2 2 people 580.00$

Tubing, HDPE 0.30$ ft 100 30.00$ Tubing, silicon (3/16 x 3/8) 3.00$ ft 5 15.00$

IDW related Drum 100.00$ drum 1 100.00$

TOTAL EQUIPMENT 818.00$

VOC IDW Disposal (groundwater)

8001 Baymeadows Way, Suite 1 Jacksonville, FL 32256

P (904) 900-6494

F (904) 268-5255 Terracon.com

January 29, 2026

Florida Department of Environmental Protection Waste Cleanup Program Waste Site Cleanup Section Drycleaning Solvent Cleanup Program 2600 Blair Stone Road, MS4520 Tallahassee, Florida 32399-4520

Attn: Mr. Gabriel Sostre, Environmental Specialist II E: Gabrial.Sostre@FloridaDEP.gov

Re: Proposal for Annual Groundwater Monitoring and Report

Alpine Cleaners 5240 NW 34th Boulevard Gainesville, Alachua County, Florida

ERIC_3987

Contract No. HW687 Proposed Task Assignment No. DC028F Terracon Proposal No. PEQ257451/EQ237242D

Dear Mr. Sostre:

Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this proposal to the Florida Department of Environmental Program (FDEP) Waste Cleanup Program to conduct Annual Groundwater Monitoring (GWM) activities and prepare a report documenting the results for the former Alpine Cleaners facility (Site), located at the intersection of 5240 NW 34th Boulevard, Suite E, in Gainesville, Alachua County, Florida.

The purpose of this proposal is to collect groundwater samples from five shallow zone monitoring wells for analysis of volatile organic halogens (VOHs) constituents of concern as identified in the recommendations section of the Supplemental Site Assessment Report, dated February 14, 2025 and prior to system startup of the Soil Vapor Extraction system. In addition, no groundwater samples are proposed to be collected for analysis of per- and polyfluoroalkyl substances (PFAS) constituents of concern since the previous PFAS results at concentrations below the Practical Groundwater Cleanup Target Levels (PGCTL) during the last two sampling events.

mailto:Gabrial.Sostre@FloridaDEP.gov

Proposal for Annul Groundwater Monitoring and Report Alpine Cleaners, ERIC_3987 ■ Gainesville, FL January 29, 2026 ■ Terracon Proposal No. PEQ257451

Scope of Services

Project management Preparation of updated Health and Safety Plan (HASP) Verify property ownership (both source and offsite) and notify the property owners/tenants and offsite property owners of scheduled field activities Depth to water measurements from 8 monitoring/piezometer wells Annual groundwater sampling to include VOH constituents of concern from five shallow zone monitoring wells (Exhibit 5) Investigative derived waste (IDW) management and disposal Preparation of a GWM report documenting the findings with conclusions and recommendations

See attached LOE (Attachment A)

Schedule

Deliverable of field notes, groundwater sample logs, and chain-of-custody documentation, within 5 to 7 business days of completion of subtask field work Deliverable of GWM report within 30 business days following receipt of laboratory results.

Compensation See attached CEF for details. (Attachment A)

SCOPE OF SERVICES

Subtask 1 – Project Management

Ralph F. Mongillo Jr P.G. will serve as the Project Manager during the field investigation.

Donna Cline, P.E., will be involved throughout the project, serving as Authorized Project Reviewer.

Terracon obtained quotes from subcontractors for IDW management services. Exhibits of proposed sample locations are provided in Attachment B. A summary of subcontractor quotes and selected contractor is provided for each service in Attachment C and includes a copy of the quotes.

Subtask 2 – Groundwater Monitoring

Pre-Task Planning will be performed to prepare for field investigations. Terracon will update the existing site-specific health and safety plan. Terracon will also pick up the IDW drum, order the sample kits, and meet internally to discuss the scope of work, and the sampling equipment required.

Site Access Verifications and Notifications Verify that the source and off-site property owners that signed the FDEP Permission to Enter Property form still own the properties. Terracon will also notify the source property owner South Financial Services Inc. (Land Parcel No. 06083-025-000), and the tenant, and non-source offsite property owner J & Z Properties Inc. (Land Parcel Nos. 06083-026-002 and 06083-026-003) of the schedule for the field work.

Groundwater Well Sampling Groundwater samples will be collected from five (5) shallow zone wells (MW001S, MW002S, MW004S, MW005S, and PZ003) for VOH analysis (Exhibit 5). The monitoring wells will be sampled in accordance with the FDEP SOPs, dated January 2017 (effective April 16, 2018) for chlorinated solvents. Prior to monitoring well sampling activities, Terracon will collect depth-to-water measurements of the five shallow zone monitoring wells to be sampled and MW003S, PZ001, and PZ002.

Terracon will complete an email deliverable for Subtask 2 documenting the field event is completed by providing field notes, groundwater sampling forms, laboratory chain-of-custodies, and nonhazardous waste manifest.

Terracon will prepare an Annual Groundwater Monitoring (GWM) report that includes a summary of the sampling methodology and analytical results. The GWM report will include tables and figures summarizing the groundwater results in comparison to FDEP’s Cleanup Target Levels (groundwater). Exhibits will be provided to illustrate the site layout, sample locations, and results by matrix.

IDW Management and Disposal Liquid IDW derived from purge water during the Subtask 2 will be contained in one DOT approved 55-gallon drum and temporarily stored onsite until the waste characterization sample results for the full list VOCs can be evaluated. Assuming the waste is non-hazardous, the drum will be transported to an approved facility for disposal or treatment.

Estimate one (1) drum of liquid.

SCHEDULE

The goal of the report deliverable is to provide any data obtained by the end of May 2026.

CLOSING REMARKS

Terracon services will be conducted in accordance with the terms and conditions contained within DEP Waste Cleanup Program (WCP) Contract No. HW687, executed January 5, 2022.

It is understood that a Task Assignment will be issued to authorize us to perform this work.

We appreciate the opportunity to provide this proposal and look forward to collaborating with you on this project. If you should have any questions or comments regarding this proposal, please contact either of the undersigned at 904-900-9464.

Sincerely, Terracon Consultants, Inc.

Ralph F. Mongillo Jr., P.G. Donna Cline, P.E.

Senior Geologist Senior Remediation Engineer

(904) 479-7411 (904) 479-7415 Ralph.Mongillojr@Terracon.com Donna.Cline@Terracon.com

Attachment A. Cost Estimate Form/Level of Effort Attachment B. Exhibit 5: Groundwater Analytical Summary – VOHs Attachment C. Subcontractor Quotes and Summary of Quote Comparisons mailto:Ralph.Mongillojr@Terracon.com mailto:Donna.Cline@Terracon.com

IDW VOC Cost Estimate Summary

FAC ID#: ERIC_3987 Contractor Name: Terracon - Ralph Mongillo - 904 610-8761

Description Unit Unit Rate Number of Units Minimum Extended

Price Unit Rate Number of Units Minimum Extended

Price Unit Rate Number of Units Minimum Extended

Price Disposal only of non haz non reg VOC/PFAS 55 gal drum 55-gal $195.00 1 $195.00 Profiling fee (Once per site) $0.00

Disposal only of non haz non reg VOC/PFAS 55 gal drum $325.00 1 $325.00

Transportation only of Drums $60 per drum or $300 min $300.00 1 $300.00

Stop charge per trip $125 $125.00 1 $125.00

Fuel Surcharge per drum $15.50 1 $15.50

IDW Liquids – Non-Regulated VOCs/PFAS 55-gal $325.00 1 $325.00 Profile and Paperwork $375.00 1 $375.00 Admin and Insurance Fee Estimated Disposal Subtotal $700.00

Transportation Minimum Lump $0.00

$195.00 $765.50

TOTAL COST $700.00 TOTAL COST $195.00 TOTAL COST $765.50

Site Name: Alpine Cleaners - Gainesville FL

Common Ground EnvironmentalWhatever Waste Erwin Remediation

408 Ditmar Street

Pensacola, FL 32503

ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562

(850) 292-6511

To: Mr. Ralph Mongillo Terracon 8001 Baymeadows Way, Suite 1 Jacksonville, FL 32256

January 5, 2026

Re: Transport & Disposal Drums – 5240 NW 34th Boulevard - Gainesville, FL

Mr. Mongillo:

The price for transportation and disposal of non-hazardous PFAS/PFOS impacted water located at your jobsite in Gainesville, FL is itemized below.

Description Rate Unit Qty Total

Profiling Fee (Once per Site) $ 350.00 Per Site 0 $ 0.00 Non-Hazardous Drum Disposal – PFAS/PFOS impacted Water

$ 195.00 Per Drum 1 $ 195.00

Total

Est: $ 195.00

All drums should be staged in a central location. Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.).

A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc.

This quote is valid for 90 days.

Respectfully, Robert Donado Erwin Remediation, Inc.

Email: Robert@ErwinRemediation.com Phone: (850) 466-2358

Whatever Waste, LLC 3834 Mandarin Woods Dr. No.

Jacksonville, FL 32223 904.881.1957

Ralph F. Mongillo Jr., PG Senior Geologist Terracon 8001 Baymeadows Way - Suite 1 Jacksonville 32256

Estimate Number 010526.3

Notes Disposal facility acceptance of non-hazardous VOC/PFAS impacted drum is contingent on review of supplied analytical data along with submittal of completed and signed waste profile.

Drum must be in DOT shippable condition and staged on a visible, accessible hard level surface (not pallet).

Terms Payment terms as established between Whatever Waste and Terracon

Indemnification: Each party agrees to indemnify, defend and hold harmless each other for and from any loss or liability arising out of the party's breach of this agreement, scope of work, except for gross negligence, willful misconduct or bad faith.

Estimate Date 01/05/2026

Description Rate Qty Line Total

(1) NH VOC-impacted Low Level PFAS Liquid IDW 55-gallon Drum Manifest, Transport & Dispose at Permitted Facility Former Dry Cleaner Site - 5240 NW 34th Blvd., Gainesville, Alachua County, Florida

$325.00 1 $325.00

Waste Profile (1) $375.00 1 $375.00

Subtotal Tax

700.00 0.00

Estimate Total (USD) $700.00

Common Ground Environmental Inc.

(Common Sense Approach to Environmental Issues)

P.O. Box 1044, Lakeland, Florida 33802 Phone: (863) 647-3888

September 29, 2025

Ralph Mongillo Terracon 645 NW Enterprise Drive Suite 107 Port Saint Lucie, FL 34986

RE: Cleaners with One (1) Drum of Non-Hazardous (Non-Typical / PFAS) Waste for Disposal at 5240 NW 34th Boulevard Gainesville, Florida

Dear Ralph, Thank you for the opportunity to present Common Ground Environmental Inc. (CGE) to you.

CGE is committed to providing the best service in the waste management industry at competitive pricing. When you choose CGE, you choose to have a partner with the experience and the capabilities to handle all your environmental needs, from proper paperwork to site audits to remediation and analytical testing. CGE will be on site at time of pick up to correctly complete all paperwork and to tackle any unexpected problems. CGE makes it easy for you by handling all profiles, paperwork, and scheduling; all you do is sign the shipping documents!

Common Ground Environmental, Inc. is pleased to submit this quote for the following services.

Waste Stream Qty. Price per Unit Total Disposal Only of Non-Hazardous Non-Regulated (Non-Typical) Material in 55 Gallon Drums (Any amount of PFAS at all) (TCLP 8 Metals Testing will also be needed)

1 $325.00.00 per 55 Gallon Drum

$325.00

Transportation Only of Drums 1 $60.00 per Drum Minimum $300

$300.00

Stop Charge 1 $125.00 per Trip $125.00 Fuel Surcharge as of 9/29/25 1 $15.50 per Drum $15.50 Estimated Total $765.50

NOTES:

• The above pricing will be valid for 10 days from date of this quote. _____ Int.

• The first hour of loading is included in the above price. For each additional hour, customer will be billed $225.00 per hour. _____ Int.

• The above quote is only an estimated total. Final invoice can be higher, or it can be lower due to number of drums for disposal, number of surcharges and/or waste conditions. _____ Int.

• Quote is based on final profile approval from waste facility. _____ Int.

• A monthly fee of 1 ½ % interest will be charged on the balance of every past due invoice that is over 30 days past due and will incur every 30 days until invoice and late fees are paid in full. _____ Int.

• Our terms are 30 Days Net. _____ Int.

Terracon Page 2

The pricing above includes transportation and disposal to an EPA permitted facility. Pricing is based on approved waste profiles and non-conforming waste will be assessed surcharges that are billed separately. A $125.00 stop fee will be passed on to the customer. Please note, due to the high cost of Diesel, the fuel surcharge rate will now be managed separately on a month-to-month basis.

Thank you for considering Common Ground Environmental, Inc. as your waste management provider. Please review the above pricing and if it meets with your approval, please confirm your order by signing and returning this quote to my attention. Do not hesitate calling me at (863) 860- 0827 or (863) 647-3888 with questions or concerns.

Sincerely, Michael Propst Mike Propst Common Ground Environmental, Inc.

Acceptance of Proposal

The above prices, specifications and conditions are satisfactory to generator/client and are hereby accepted. Common Ground Environmental, Inc. is hereby granted to do the work as specified.

Payment terms are net 30 days unless specified otherwise. A 1.5% per month finance charge will be applied on all past due invoices. The generator/client will be responsible for all cost, expenses and reasonable counsel fees incurred by or on behalf of Common Ground Environmental, Inc. as a result of failure to remit payment as specified above.

Date of Acceptance _______________________________________________________

Signature: __________________________________________Title: ________________

Printed Name: ___________________________________________________________

COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_v2.pdf
Subtask 1 – Project Management
Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling
Subtask 3 –Monitoring Well Installation
Right-of-Way Permitting
Utility Locate and Drilling Subcontractors
Monitoring Well Installation
Subtask 4 – Monitoring Well Sampling and Surveying
Laboratory Analysis
Trip Report
Subtask 5 – Investigation Derived Waste
Trip Report
Subtask 6 – Supplemental Site Assessment Report
Invoice and Deliverable Schedule:
ATTACHMENT A
ATTACHMENT B
ATTACHMENT C
ATTACHMENT D
ATTACHMENT E
ATTACHMENT F
Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v1.pdf
Cost Estimate
Subtask 2
Subtask 3
Subtask 4
Subtask 5
Subtask 6
2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev1_12-12-22.pdf
Table 1 for SAWP
Monitoring Well Locations
Utility Locate Bids_Compiled.pdf
Geosyntec Utility-272_Geotek_1500
Geoview Utility Quote_2000_COT FTF SIS
Tallahassee Fire Training Division_V1_Bloodhound_3700
Drilling Bids_Compiled.pdf
PDS_Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (sonic)
Direct Push
City of Tallahassee Fire Training Site_GW Protection PFAS Free Water Estimate Email
Cascade_Geosyntec Consultants, Inc. - City of Tallahassee Fire Training Facility - PN221026-118844
GW Protection_Geosyntec (T) 1022060 S.pdf
Invoice
Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (MOT).xlsx.pdf
Sheet1
COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v1.pdf
Subtask 1 – Project Management
Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling
Subtask 3 –Monitoring Well Installation
Right-of-Way Permitting
Utility Locate and Drilling Subcontractors
Monitoring Well Installation
Subtask 4 – Monitoring Well Sampling and Surveying
Laboratory Analysis
Trip Report
Subtask 5 – Investigation Derived Waste
Trip Report
Subtask 6 – Supplemental Site Assessment Report
Invoice and Deliverable Schedule:
ATTACHMENT A
ATTACHMENT B
ATTACHMENT C
ATTACHMENT D
ATTACHMENT E
ATTACHMENT F
COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v2.pdf
Subtask 1 – Project Management
Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling
Subtask 3 –Monitoring Well Installation
Right-of-Way Permitting
Utility Locate and Drilling Subcontractors
Monitoring Well Installation
Subtask 4 – Monitoring Well Sampling and Surveying
Laboratory Analysis
Trip Report
Subtask 5 – Investigation Derived Waste
Trip Report
Subtask 6 – Supplemental Site Assessment Report
Invoice and Deliverable Schedule:
ATTACHMENT A
ATTACHMENT B
ATTACHMENT C
ATTACHMENT D
ATTACHMENT E
ATTACHMENT F
Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v2.pdf
Cost Estimate
Subtask 2
Subtask 3
Subtask 4
Subtask 5
Subtask 6
2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev2.pdf
Table 1 for SAWP
Monitoring Well Locations

File details come from the government source that posted it. Updated .