CN-370000-HW687-DC025E.pdf

PDF 4 MB Posted

Attached to
Master Agreement FL|HW687|519929c0c8a00e44396dc1d8f5fa086b
Contract number
HW687
Issued by
Florida

About this file

Task Assignment Summary

This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) under the FDEP Waste Cleanup Program Contract No. HW687. The assignment authorizes Terracon Consultants, Inc., to conduct annual groundwater monitoring at the Majik Touch Cleaners and Laundry facility located at 3312 Lithia Pinecrest Road, Valrico, Hillsborough County, Florida (ERIC_4714). The TA is numbered DC025E with a completion date of February 27, 2026. Gabriel Sostre of FDEP serves as the Department Project Manager, while Donna Cline of Terracon is the Contractor's Project Manager.

The scope of work comprises two subtasks: Project Management and Annual Groundwater Monitoring. Terracon will collect depth-to-groundwater measurements from eight monitoring wells, perform groundwater sampling of eight monitoring wells for volatile organic halogenated (VOH) analysis, prepare an Annual Groundwater Monitoring Report with updated tables, charts, graphs, and lab results, and coordinate IDW (investigative-derived waste) disposal. The total contract value is $10,374.87, representing 61.44 labor hours. The deliverable—the Annual Groundwater Monitoring Report including FDEP approval of submitted report, updated tables, charts, graphs, and signed waste manifests—is due January 30, 2026. Invoice payment of $10,374.87 is contingent upon FDEP approval of the submitted report and associated documentation.

View the file

Other files

File Type Posted
CN-370000-HW687-BF01A.pdf PDF
CN-370000-HW687-BF01B.pdf PDF
CN-370000-HW687-BF02A.pdf PDF
CN-370000-HW687-BF04A.pdf PDF
CN-370000-HW687-BF04ACO3.pdf PDF
CN-370000-HW687-BIL01B.pdf PDF
CN-370000-HW687-BIL02B.pdf PDF
CN-370000-HW687-BIL03B.pdf PDF
CN-370000-HW687-BIL1BCO2.pdf PDF
CN-370000-HW687-BIL2CCO2.pdf PDF
CN-370000-HW687-CSS02.pdf PDF
CN-370000-HW687-CSS03.pdf PDF
CN-370000-HW687-DC002A.pdf PDF
CN-370000-HW687-DC002G.pdf PDF
CN-370000-HW687-DC006C.pdf PDF
CN-370000-HW687-DC008B.pdf PDF
CN-370000-HW687-DC008D.pdf PDF
CN-370000-HW687-DC009B.pdf PDF
CN-370000-HW687-DC010C.pdf PDF
CN-370000-HW687-DC012A.pdf PDF
CN-370000-HW687-DC014B.pdf PDF
CN-370000-HW687-DC014D.pdf PDF
CN-370000-HW687-DC014H.pdf PDF
CN-370000-HW687-DC015D.pdf PDF
CN-370000-HW687-DC016C.pdf PDF
CN-370000-HW687-DC01ACO9.pdf PDF
CN-370000-HW687-DC021A.pdf PDF
CN-370000-HW687-DC021C.pdf PDF
CN-370000-HW687-DC022A.pdf PDF
CN-370000-HW687-DC023B.pdf PDF
CN-370000-HW687-DC023D.pdf PDF
CN-370000-HW687-DC024B.pdf PDF
CN-370000-HW687-DC024E.pdf PDF
CN-370000-HW687-DC024F.pdf PDF
CN-370000-HW687-DC027A.pdf PDF
CN-370000-HW687-DC028A.pdf PDF
CN-370000-HW687-DC028D.pdf PDF
CN-370000-HW687-DC029C.pdf PDF
CN-370000-HW687-DC02ACO1.pdf PDF
CN-370000-HW687-DC02HCO2.pdf PDF
CN-370000-HW687-DC030A.pdf PDF
CN-370000-HW687-DC031A.pdf PDF
CN-370000-HW687-DC035A.pdf PDF
CN-370000-HW687-DC037A.pdf PDF
CN-370000-HW687-DC03CCO2.pdf PDF
CN-370000-HW687-DC044A.pdf PDF
CN-370000-HW687-DC045B.pdf PDF
CN-370000-HW687-DC049A.pdf PDF
CN-370000-HW687-DC054A.pdf PDF
CN-370000-HW687-DC056A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

HW687

DC025E February 27, 2026

This Task Assignment authorizes Terracon to conduct Annual Groundwater

Monitoring at the Majik Touch Cleaners and Laundry site.

Gabriel Sostre 850-245-8749 Terracon Consultants, Inc.

Donna Cline 904-479-7415

ERIC_4714

3312 Lithia Pinecrest Road, Valrico, Hillsborough County

Majik Touch Cleaners and Laundry

$ 10,374.87

$ 10,374.87

Scope of Work

Terracon Consultants, Inc.

Donna Cline

Senior Associate

11/18/2025

Digitally signed by Cline, Donna L DN: cn=Cline, Donna L, ou=Domain Users, email=Donna.Cline@terracon.com Date: 2025.11.18 07:04:56 -05'00'

Cline, Donna L

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2025.11.07 18:40:51 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

BWC TAFORM 01/18

Memorandum

FDEP COST ESTIMATE

Contractor: Terracon

Date: 10/24/2025

Task #: HW687 SubTask 1 Project Management

Site: Majik Touch Cleaners and Laundry SubTask 2 Annual Groundwater Monitoring

Activity/Phase: Annual GW Sampling SubTask 3

Project Manager: Gabriel Sostre SubTask 4

SubTask 5

Totals 1 2 3 4 5

Labor Rate Category

$56.73 Project Manager Fabio Fortes 5.44 5.44

$36.06 CADD Specialist Chelsea Fugate 3.00 3.00 0.00 0.00 0.00

$56.73 Senior Engineer Fabio Fortes 9.00 9.00 0.00 0.00 0.00

$39.90 Senior Scientist Eric Clementelli 44.00 44.00 0.00 0.00 0.00

Total Hours 61.44 5.44 56.00 0.00 0.00 0.00

Direct Labor $2,683.02 $308.67 $2,374.35 $0.00 $0.00 $0.00

Overhead 116.00% $3,112.31 $358.06 $2,754.25 $0.00 $0.00 $0.00

Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 56.263% $1,509.55 $173.67 $1,335.88 $0.00 $0.00 $0.00

Total Labor $7,304.88 $840.40 $6,464.48 $0.00 $0.00 $0.00

Travel

Vehicle Rental $360.00 360.00$ -$ $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $360.00 360.00$ $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00

Initiation Fee $0.00 $0.00 $0.00 $0.00 $0.00

Petrotech $375.00 375.00$ -$ $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $375.00 $375.00 $0.00 $0.00 $0.00

Handling Fee $37.50 $37.50 $0.00 $0.00 $0.00

Total Subcontractor Cost $412.50 $412.50 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $657.00 657.00$ $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $0.00 -$ $0.00 $0.00 $0.00

Total Laboratory $657.00 $657.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $106.00 106.00$ -$ $0.00 $0.00

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $664.00 664.00$ $0.00 $0.00 $0.00

Equipment (IDW related) $100.00 100.00$ -$ $0.00 $0.00

Equipment (Other) $40.00 40.00$ $0.00 $0.00 $0.00

Total Field Expenses $910.00 $910.00 $0.00 $0.00 $0.00

Subtotal $9,644.38 $840.40 $8,803.98 $0.00 $0.00 $0.00

Completion Fee $730.49 $84.04 $646.45 $0.00 $0.00 $0.00

Total Estimated Cost $10,374.87 $924.44 $9,450.43 $0.00 $0.00 $0.00

REV: 02/03 CEF TERRACON Page 1

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Majik Touch Cleaners and Laundry SUBTASK 2: Annual Groundwater Monitoring Proposal No PH4257302

DATE: 10/24/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning Groundwater Sampling Senior Scientist EC 3.00 Senior Engineer FF 2.00

Offsite Property Access Senior Scientist EC 3.00 Senior Engineer FF 1.00

Groundwater Sampling

Senior Scientist EC Load/unload, calibrate equipment beginning and end of day 2.00

Senior Scientist EC Pickup drum for IDW from drum wholesale 1.50

Senior Scientist EC Mobilization/Demobilization (from Tampa) (2 days, 2 hours/day) 4.00

Senior Scientist EC Collect water levels from 8 monitoring/piezometer wells @ 10 minutes per well 1.50

Senior Scientist EC Collect 8 VOH Groundwater Samples @ 1.5 hrs per well 12.00

Senior Scientist EC Containerize IDW, secure drum 1.00

IDW Coordination

Senior Engineer FF Prepare IDW Waste Characterization/Generator Profile 2.00

Senior Scientist EC Mobilization and Coordinate IDW T&D Meet Transporter Onsite 3.00

Report Deliverable

Senior Scientist EC Prepare Report Tables, Draft Groundwater Elevation and Analytical Isoconcentration Figures 4.00

Senior Scientist EC Prepare Report 8.00

Senior Engineer FF Senior QA/QC of Field Operations and Laboratory Data 2.00

Senior Scientist EC Summarize Groundwater Analytical Results 1.00

Senior Engineer FF Conclusions and Recomendations 2.00

CADD Specialist CF Prepare Figures and Exhibits (concentration and flow map) 3.00

EC FF CF

Hours: 44.00 9.00 3.00 TOTAL LABOR 56.00

VEHICLE TYPE RATE UNIT USEAGE

Truck Sampling 120.00$ day 2 240.00$ Truck IDW Pick up 120.00$ day 1 120.00$

TOTAL VEHICLE 360.00$

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Petrotech IDW Disposal 150.00$ each 1 150.00$

Stop fee 225.00$ each 1 225.00$

TOTAL 375.00$

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC* #IDW TOTALS

Halocarbons (short list) EPA 8260 73.00$ 8 0 1 657.00$

TOTAL 657.00$

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 2 80.00$ Ice (Sample preservation 2 bag/day) 6.50$ Bag 4 26.00$

Analytical Related Shallow Groundwater Sampling Kit 290.00$ day 2 580.00$ Tubing, HDPE 0.30$ ft 200 60.00$ Tubing, silicon (3/16 x 3/8) 3.00$ ft 8 24.00$

IDW 55-gallon drum, new 100.00$ drum 1 100.00$ Other Metal Detector 40.00$ day 1 40.00$

TOTAL EQUIPMENT 910.00$

Request Sample Kit, Pre-Task Planning, Project Kick-Off, Prepare Field Sampling and Field Work Request Project Kick-Off, Contact with Onsite Property Owner and FDEP for Field Activities Schedule

Property Owner Contact for offsite agreement Property Onwer Contact Support

File details come from the government source that posted it. Updated .