CN-370000-HW687-DC007B.pdf

PDF 3 MB Posted

Attached to
Master Agreement FL|HW687|519929c0c8a00e44396dc1d8f5fa086b
Contract number
HW687
Issued by
Florida

About this file

Task Assignment Summary

This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) to Terracon Consultants, Inc. for environmental remediation services at the Jay Lee Cleaners facility located at 119 Railroad Avenue, Chipley, Washington County, Florida. The Task Assignment is authorized under Contract Number HW687, dated January 5, 2022, and is designated as TA Number DC007B with an effective completion date of December 20, 2024. The State project manager is Patrick McGrane, while Terracon's project manager is Donna Cline.

Terracon is authorized to conduct annual groundwater monitoring and reporting at the site in accordance with the June 6, 2024 Scope of Work, Cost Estimate, and Bid Documentation. The work includes project management and groundwater monitoring of 13 wells (nine shallow wells and four deep wells) with analysis for chlorinated volatile organic compounds via EPA Method 8260D, surveying of two monitoring well elevations, contact with local health authorities regarding nearby potable wells, and preparation of a comprehensive Annual Groundwater Monitoring Report with updated data tables and exhibits. The total Task Assignment value is fixed at $17,101.04, comprising 7 hours of project management labor and 94 hours of technical labor across two subtasks. The deliverable due date is October 25, 2024 for completion of field work and groundwater monitoring, with final invoice and FDEP approval of the Annual Groundwater Monitoring Report required for payment of the full amount. All costs including labor, travel, laboratory analysis, equipment, subcontractor services, and field expenses are included in the fixed price.

View the file

Other files

File Type Posted
CN-370000-HW687-BF01ACO1.pdf PDF
CN-370000-HW687-BF03ACO1.pdf PDF
CN-370000-HW687-BIL01A.pdf PDF
CN-370000-HW687-BIL2ACO1.pdf PDF
CN-370000-HW687-BIL2BCO1.pdf PDF
CN-370000-HW687-BIL2CCO1.pdf PDF
CN-370000-HW687-BIL3ACO2.pdf PDF
CN-370000-HW687-BIO1ACO1.pdf PDF
CN-370000-HW687-DC001A.pdf PDF
CN-370000-HW687-DC003A.pdf PDF
CN-370000-HW687-DC003D.pdf PDF
CN-370000-HW687-DC005D.pdf PDF
CN-370000-HW687-DC006A.pdf PDF
CN-370000-HW687-DC006B.pdf PDF
CN-370000-HW687-DC008C.pdf PDF
CN-370000-HW687-DC010A.pdf PDF
CN-370000-HW687-DC010B.pdf PDF
CN-370000-HW687-DC011F.pdf PDF
CN-370000-HW687-DC011H.pdf PDF
CN-370000-HW687-DC012D.pdf PDF
CN-370000-HW687-DC013C.pdf PDF
CN-370000-HW687-DC015A.pdf PDF
CN-370000-HW687-DC015C.pdf PDF
CN-370000-HW687-DC019A.pdf PDF
CN-370000-HW687-DC01ACO2.pdf PDF
CN-370000-HW687-DC020A.pdf PDF
CN-370000-HW687-DC020B.pdf PDF
CN-370000-HW687-DC020C.pdf PDF
CN-370000-HW687-DC020D.pdf PDF
CN-370000-HW687-DC023C.pdf PDF
CN-370000-HW687-DC025B.pdf PDF
CN-370000-HW687-DC025C.pdf PDF
CN-370000-HW687-DC025F.pdf PDF
CN-370000-HW687-DC027B.pdf PDF
CN-370000-HW687-DC027C.pdf PDF
CN-370000-HW687-DC02BCO1.pdf PDF
CN-370000-HW687-DC02CCO2.pdf PDF
CN-370000-HW687-DC02DCO1.pdf PDF
CN-370000-HW687-DC02HCO1.pdf PDF
CN-370000-HW687-DC032A.pdf PDF
CN-370000-HW687-DC034A.pdf PDF
CN-370000-HW687-DC034C.pdf PDF
CN-370000-HW687-DC034D.pdf PDF
CN-370000-HW687-DC035F.pdf PDF
CN-370000-HW687-DC036A.pdf PDF
CN-370000-HW687-DC03CCO1.pdf PDF
CN-370000-HW687-DC041C.pdf PDF
CN-370000-HW687-DC041D.pdf PDF
CN-370000-HW687-DC048A.pdf PDF
CN-370000-HW687-DC048B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW687

DC007B Completion December 20, 2024

This Task Assignment authorizes Terracon Consultants, Inc. (Terracon) to conduct Annual Groundwater Monitoring at Jay Lee Cleaners in accordance with the June 6, 2024 Scope of Work, Cost Estimate, and Bid Documentation.

Patrick McGrane 850-245-8899 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Terracon Consultants, Inc.

Terracon Consultants, Inc.

Donna Cline 904-479-7415

ERIC_5542

119 Railroad Avenue, Chipley, Washington County

Jay Lee Cleaners

✔ $ 17,101.04

$ 17,101.04

Scope of Work

Donna Cline

Senior Associate / Remediation Engineer Digitally signed by Cline, Donna L DN: cn=Cline, Donna L, ou=General Users, email=Donna.Cline@terracon.com Date: 2024.06.26 16:09:33 -04'00'

Cline, Donna L

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2024.06.26 13:06:11 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW687

DC007B

Subtasks 1 & 2 - Project Management; Groundwater Monitoring 10/25/2024

Subtasks 1 & 2 - Project Management; Submittal and FDEP approval of the Annual Groundwater Monitoring Report $ 17,101.04

$ 17,101.04

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

Memorandum TO: Negotiation File

Jay Lee Cleaners Chipley, Washington County

ERIC_5542

FROM: Patrick McGrane, Project Manager

SUBJECT: Negotiation Summary Task Assignment DC007B (HW687)

DATE: June 26, 2024

This Task Assignment authorizes Terracon Consultants, Inc. (Terracon) to conduct Groundwater Monitoring at the Jay Lee Cleaners site.

The total cost for this project is $17,101.04 with 101 total labor hours. All work is to be completed in accordance with the June 6, 2024, Scope of Work, Cost Estimate, and Bid Documentation.

Terracon may invoice according to the included schedule.

Subtask 1:

Project Management is automatically calculated as a percentage of total labor in accordance with Contract HW687.

Subtask 2:

Following verification of an accurate access agreement with the current real property owner, Terracon will collect groundwater samples from 13 monitoring wells. All 13 wells will be analyzed for chlorinated volatile organic compounds via EPA Method 8260D. See attached Scope of Services for sample well IDs and the corresponding analysis. Following the groundwater sampling event, Terracon will submit a Groundwater Monitoring Report summarizing their findings with updated analytical results and tables as well as conclusions and recommendations based on the most recent data.

FDEP COST ESTIMATE

Contractor: Terracon

Date: 6/6/2024 Task #: SubTask 1 Project Management SubTask 6

Site: Jay Lee Cleaners, ERIC_5542 SubTask 2 Annual Groundwater Monitoring and Reporting SubTask 7 Activity/Phase: GW Sampling and Reporting SubTask 3 SubTask 8

Project Manager: Dean Cox SubTask 4 SubTask 9 SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$75.48 Project Manager Tom Lewis 7 6.9 $0.00 Administrative 0 0 0 0 0 0 0 0 0 $0.00 Brownfield Consultant 0 0 0 0 0 0 0 0 0 0

$33.31 CADD Specialist Chelsea Fugate 6 6 0 0 0 0 0 0 0 0 $0.00 Data Analyst & Visualization Specialist 0 0 0 0 0 0 0 0 0 0 $0.00 Environmental Technician 0 0 0 0 0 0 0 0 0 0 $0.00 Field Geologist 0 0 0 0 0 0 0 0 0 0 $0.00 Field Scientist 0 0 0 0 0 0 0 0 0 0 $0.00 GIS Technician 0 0 0 0 0 0 0 0 0 0 $0.00 Principal Consultant 0 0 0 0 0 0 0 0 0 0 $0.00 Project Geologist 0 0 0 0 0 0 0 0 0 0 $0.00 Project Industrial Hygienist 0 0 0 0 0 0 0 0 0 0

$35.58 Project Scientist Kyle Parson 55 55 0 0 0 0 0 0 0 0 $0.00 Senior Engineer 0 0 0 0 0 0 0 0 0 0

$75.48 Senior Geologist Tom Lewis 8 8 0 0 0 0 0 0 0 0 $0.00 Senior GIS Analyst 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Industrial Hygienist 0 0 0 0 0 0 0 0 0 0

$49.52 Senior Scientist Sid O'Neal 25 25 0 0 0 0 0 0 0 0 $0.00 Staff Engineer 0 0 0 0 0 0 0 0 0 0 $0.00 Staff Scientist 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 101 7 94 0 0 0 0 0 0 0 0

Direct Labor $4,518.42 $519.82 $3,998.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 116.00% $5,241.37 $602.99 $4,638.38 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.26% $2,542.06 $292.45 $2,249.61 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $12,301.85 $1,415.26 $10,886.59 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF TERRACON Page 1

FDEP COST ESTIMATEContractor: Terracon Date: 6/6/2024

Task #: SubTask 1 Project Management SubTask 6 Site: Jay Lee Cleaners, ERIC_5542 SubTask 2 Annual Groundwater Monitoring and Reporting SubTask 7

Activity/Phase: GW Sampling and Reporting SubTask 3 SubTask 8 Project Manager: Dean Cox SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $560.00 $560.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $560.00 $560.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 IDW - Erwin Remediation $250.00 $250.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $250.00 $250.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $25.00 $25.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $275.00 $275.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $882.00 $882.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $104.00 $104.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $986.00 $986.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $159.00 $159.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,339.00 $1,339.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $250.00 $250.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,748.00 $1,748.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $15,870.85 $1,415.26 $14,455.59 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,230.19 $141.53 $1,088.66 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $17,101.04 $1,556.79 $15,544.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF TERRACON Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Jay Lee Cleaners, ERIC_5542 SUBTASK 2: Groundwater Monitoring and Reporting

PROPOSAL NO. PHF237065

DATE: 6/4/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning and Groundwater Sampling/TOC Well Surveying Senior Scientist SO 1.00 Senior Scientist SO 1.00 Senior Scientist SO 2.00 Project Scientist KP Load/unload (0.5 hrs/day, 3 days) 2.00 Project Scientist KP Mobilization/Demobilization (from Pensacola), 3 events 9.00 Project Scientist KP Collect groundwater levels ( 13 wells,10 minutes per well) 3.00 Project Scientist KP Collect shallow groundwater samples (9 wells, 2 hours each) 18.00 Project Scientist KP Collect deep groundwater samples (4 wells, 2 hours each) 8.00 Project Scientist KP Containerize IDW (0.5/hrs/day, 3 days) 2.00 Senior Scientist KP 2.00 Senior Scientist SO 2.00 Senior Scientist SO Mobilization/Demobilization (from Tallahassee), 1 event to survey TOC 6.00 Senior Scientist SO Contact City of Chipley/Department of Health to find out latest results from the two 3.00 nearby potable wells/locate latest sample results Coordinate IDW T&D Senior Scientist SO 1.00 Project Scientist KP 4.00 Report Deliverable Project Scientist KP Prepare report tables, trend graphs and draft maps 7.00 Senior Scientist/Geologi SO Prepare report 9.00 Senior Geologist TL QA/QC field and laboratory data 2.00 Senior Geologist TL Review and Summarize Water Quality Parameters 2.00 Senior Geologist TL Review and Summarize Groundwater Analytical Results and Trend Graphs 2.00 Senior Geologist TL Conclusions/Recommendations 2.00 GIS Technician CF Prepare Exhibits (groundwater flow (3 each) and concentrations maps) 6.00

Staff Total hours

TL 8

SO 25

CF 6

KP 55 TOTAL LABOR 94

VEHICLE TYPE RATE UNIT USEAGE

Truck (groundwater sampling) 120 day 3 $360.00

Auto (Assist with surveying) 80 day 1 $80.00 Truck (IDW pickup) 120 day 1 $120.00

TOTAL VEHICLE $560.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Erwin Remediation IDW Disposal 125.00$ each 2 $250.00

TOTAL $250.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES IDW Duplicate VOCs EPA 8260D (short list) 63.00$ 13 1 $882.00 Sample Shipping Small Cooler (2 day) 52.00$ 2 $104.00

TOTAL LAB $986.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 3 $120.00

Ice 6.50$ 6 $39.00 Analytical Related Shallow groundwater sampling k 290.00$ day 1 $290.00

Deep groundwater sampling kit 415.00$ day 2 $830.00 Tubing, HDPE 0.30$ ft 300 $90.00 Tubing, silicon (3/16 x 3/8) 3.00$ ft 3 $9.00 Tubing, HDPE 1/2" x 5/8" 0.40$ ft 300 $120.00

Other 55-gallon drum, new 100.00$ drum 2 $200.00 Total Survey Station 50.00$ day 1 $50.00

TOTAL EQUIPMEN $1,748.00

Request sample kit, coordinate Prepare Health and Safety Plan PreTask Planning, prepare field sampling SOW/coordinate site access

Prepare waste characterization/Generator Profile Coordinate IDW T&D: Meet transporter to unlock secure area for pickup

Survey TOC for wells MW013 and MW017 Survey TOC for wells MW013 and MW017

3559 Timberlane School Rd

Tallahassee, FL 32312

P (850) 692-7185

F (813) 692-7186

Terracon.com

June 6, 2024

Florida Department of Environmental Protection

Waste Cleanup Program

Waste Management Division

2600 Blair Stone Road

Tallahassee, Florida 32399-2400

Attn: Ms. Mubeen Darji

E: Mubeen.Darji@FloridaDep.gov

W: 850-245-8965

Re: Proposal for Annual Groundwater Monitoring and Reporting

Jay Lee Cleaners

119 Railroad Avenue

Chipley, Washington County, Florida

ERIC_5542

Task Assignment HW687 HW003B

Terracon Proposal No. PHF237065

Dear Ms. Mubeen:

Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this proposal to the

Florida Department of Environmental Program (FDEP) Waste Cleanup Section to conduct Annual

Groundwater Monitoring and Reporting for the Jay Lee Cleaners (ERIC_5542) facility located at 119

Railroad Avenue in Chipley, Washington County, Florida.

Scope of Services

◼ Field preparation, mobilize to site, measure depth to groundwater of 13 shallow and deep monitoring wells, perform groundwater sampling and laboratory analysis of nine (9) shallow monitoring wells (MW002, MW003, MW004, MW005, MW006, MW009, MW014, MW015, and MW017) and four (4) deep monitoring wells (MW012, MW013, MW016, and MW024)

◼ Resurvey TOC elevations for monitoring wells MW013 and

MW017.

◼ Contact City of Chipley / Department of Health to find out latest sampling results from nearby potable wells

◼ Review data and prepare an Annual Groundwater Monitoring

Report including updated tables and groundwater flow and concentration exhibits sealed by a Professional Geologist.

See attached LOE for details

Schedule

Deliverable Annual Sampling Report within 20 business days following receipt of laboratory results.

mailto:Mubeen.Darji@FloridaDep.gov

Proposal for Annual Groundwater Monitoring and Preparation of Report

Jay Lee Cleaners, ERIC_5542 ■ Chipley, FL

June 6, 2024 ■ Terracon Proposal No. PHF237065

Compensation

See attached CEF for details.

DELIVERABLES

The Annual Groundwater Monitoring Report will detail and summarize the sampling activities, field observations, and results of monitoring well analysis and will include updates to the site’s historical data tables and updated exhibits of groundwater flow and well concentrations. Additionally, Terracon will contact City of Chipley / Department of Health and identify latest groundwater results and communicate status and proximity of JayLee Cleaners. Conclusions and recommendations will include a summary of results and recommendations for future sampling or remedial activities should the results indicate the onsite plume is nearing eligibility for Risk Management Option (RMO) I or RMO III closure.

SCHEDULE

It is estimated that the wells could be sampled within two weeks from TA authorization and report issued within 20 business days of receipt of analytical data.

CLOSING REMARKS

Terracon services will be conducted in accordance with the terms and conditions, contained within DEP

Waste Cleanup Program (WCP) Contract No. HW687, dated January 5, 2022. It is understood that a

Task Assignment will be issued to authorize us to perform this work.

We appreciate the opportunity to provide this proposal and look forward to working with you on this project. If you should have any questions or comments regarding this proposal, please contact either of the undersigned at 813-221-0050.

Sincerely, Terracon Consultants, Inc.

Sid O’Neal Tom Lewis, P.G.

Senior Scientist Principal

Attachments: Cost Spreadsheet

Level of Effort

IDW Quotes

Drawn By:

Checked By:

Approved By:

Project Mngr:

File No.

Date:

Scale:

Project No. EXHIBITSHALLOW GROUNDWATER CONTAMINANT CONCENTRATION MAP

AS SHOWN

5463 W. Waters Ave., Ste 830 Tampa, Florida

FAX. (813) 221-0051PH. (813) 221-0050

MUNICIPAL WELL #002

MW015/MW016

Church

MW011

NORTH RAILROAD AVE

SOUTH RAILROAD AVE

VARIOUS SHOPS

VARIOUS SHOPS

AND OFFICES

MW003

MW006

MW019

CSX RAILROAD

MW024

MW004

MW002

MW021

CHURCH PROPERTY

HWY 90

BP-MW 7

MUNICIPAL WELL # 003

(M

AI

N

S

TR

EE

T)

MW008

VA

R

IO

U

S

SH

O

PS

SHALLOW MONITORING WELL

DEEP MONITORING WELL

CLUSTERED WELLS

MUNICIPAL WATER WELL

ABANDONED/DESTROYED MONITORING WELL

CSX RAILROAD

MOST RECENT SAMPLE DATE

LEGEND

BA

N

K

FORMER BP

N

ANALYTE EXCEEDS GCTL

ANALYTE DETECTED BETWEEN THE LAB METHOD

NOTE: SITE MAP PROVIDED BY TETRA TECH INC.

MW001

(9.65'-29.65')

11/5/2007 6/17/2008

PCE BDL BDL

TCE BDL BDL

MW017

(22.21'-32.21')

3/26/2019 5/7/2020 6/2/2022

PCE 102 95.3 51

TCE 1.1 0.73 I 0.46 U

MW003

(9.62'-29.62')

3/26/2019 5/7/2020 6/2/2022

PCE 77.4 45.1 28

TCE 1.72 0.66 I 0.46 U

MW020

(19.08'-29.08')

11/5/2007 6/17/2008

PCE BDL BDL

TCE BDL BDL

MW006

(9.78'-29.78')

2/7/2007 11/6/2007 6/2/2022

PCE 43 84 4.4

TCE 0.6 I 1.0 0.46 U

MW007

(9.57'-29.57')

11/6/2007 5/7/2020

PCE BDL 0.4 U

TCE BDL 0.4 U

MW023

(7.15'-27.15')

3/18/09

PCE BDL

TCE BDL

MW002

(9.23'-29.23')

2/8/2007 11/6/2007 6/2/2022

PCE 186 D 200 D 33

TCE 0.4 I 0.4 I 0.46 U

MW008

(9.44'-29.44')

11/6/2007 6/8/2018 6/2/2022

PCE 150 D 0.58 U 0.48 U

TCE 0.8 I 0.5 U 0.46 U

GCTL NADC

3 300 3 300

PCE EXCEEDANCE LEVELS (µg/L)

SUBJECT SITE LOCATION

YELLOW

TCE EXCEEDANCE LEVELS (µg/L)

RED BOLD

ANALYTE EXCEEDS NADCBLUE BOLD

I =

DETECTION LIMIT & THE PRACTICAL QUANTITATION

LIMIT

ANALYTE NOT DETECTED ABOVE LAB METHODU =

DETECTION LIMIT

RESULTS REPORTED IN MICROGRAMS PERµg/L =

LITER

PCE ISOCONTOUR (DASHED WHERE INFERRED)

CF

TL

SO

SO

HF227013

6/28/22

GROUNDWATER MONITORING REPORT

1359 SOUTH RAILROAD AVENUE

CHIPLEY, WASHINGTON COUNTY, FLORIDA

JAY LEE CLEANERS (FORMER)

ERIC_5542

HF227013

(CNL)

COULD NOT LOCATE(CNL) -

MW004

(9.62'-29.62')

3/26/2019 5/7/2020 6/3/2022

PCE 2.19 23.9 14

TCE 0.4 U 0.4 U 0.46 U

MW005

(9.78'-29.78')

11/6/2007 6/17/2008 6/3/2022

PCE BDL 0.5 I 0.48 U

TCE BDL BDL 0.46 U

MW009

(9.99'-29.99')

3/26/2019 5/7/2020 6/3/2022

PCE 45 102 53

TCE 1.73 0.4 U 0.46 U

MW015

(24.26'-34.26')

3/26/2019 5/7/2020 6/2/2022

PCE 4.8 2.19 0.48 U

TCE 0.4 U 0.4 U 0.46 U

MW014

(10.21'-30.21')

2/7/2007 11/6/2007 6/2/2022

PCE 40 18 0.48 U

TCE BDL BDL 0.46 U

MW018/MW022

(CNL)

< 3.0

3.0

MW023

MW005

MW020 MW012

MW007

MW013/MW014

MW017

MW001

MW009

MW010

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

APPROXIMATE

AutoCAD SHX Text

1INCH = 120 FEET

AutoCAD SHX Text

SIDEWALK

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

SIDEWALK

AutoCAD SHX Text

ALLEY

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

GRASS

Drawn By:

Checked By:

Approved By:

Project Mngr:

File No.

Date:

Scale:

Project No. EXHIBITDEEP GROUNDWATER CONTAMINANT CONCENTRATION MAP

AS SHOWN

5463 W. Waters Ave., Ste 830 Tampa, Florida

FAX. (813) 221-0051PH. (813) 221-0050

MUNICIPAL WELL #002

MW015/MW016

Church

MW011

NORTH RAILROAD AVE

SOUTH RAILROAD AVE

MW005

VARIOUS SHOPS

VARIOUS SHOPS

AND OFFICES

MW020 MW012

MW019

MW007

MW013/MW014 CSX RAILROAD

MW024

MW004

MW002

MW021CHURCH PROPERTY

HWY 90

BP-MW 7

MUNICIPAL WELL # 003

(M

AI

N

S

TR

EE

T)

MW008

VA

R

IO

U

S

SH

O

PS

SHALLOW MONITORING WELL

DEEP MONITORING WELL

CLUSTERED WELLS

MUNICIPAL WATER WELL

ABANDONED/DESTROYED MONITORING WELL

CSX RAILROAD

MOST RECENT SAMPLE DATE

LEGEND

BA

N

K

FORMER BP

N

MW009

MW010

ANALYTE EXCEEDS GCTL

ANALYTE DETECTED BETWEEN THE LAB METHOD

NOTE: SITE MAP PROVIDED BY TETRA TECH INC.

GCTL NADC

3 300 3 300

PCE EXCEEDANCE LEVELS (µg/L)

SUBJECT SITE LOCATION

YELLOW

TCE EXCEEDANCE LEVELS (µg/L)

RED BOLD

ANALYTE EXCEEDS NADCBLUE BOLD

I =

DETECTION LIMIT & THE PRACTICAL QUANTITATION

LIMIT

ANALYTE NOT DETECTED ABOVE LAB METHODU =

DETECTION LIMIT

RESULTS REPORTED IN MICROGRAMS PERµg/L =

LITER

PCE ISOCONTOUR (DASHED WHERE INFERRED)

CF

TL

SO

SO

MW016

(61.74'-71.74')

3/26/19 5/7/20 6/3/2022

PCE 0.4 U 0.4 U 0.48 U

TCE 0.4 U 0.4 U 0.46 UMW013

(51.36'-71.36') 11/8/07 3/18/09 6/3/2022

PCE 14 4.6 3.1

TCE BDL BDL 0.46 U

MW011

(50.41'-70.41')

6/16/08 3/18/09

PCE 1.0 1.0

TCE BDL BDL

MW024

(7.15'-27.15')

3/26/19 5/6/2020 6/3/2022

PCE 17.1 21.4 18

TCE 0.4 U 0.76 I 0.46 U

MW012

(50.31'-70.31')

3/26/19 5/6/20 6/3/2022

PCE 11 10.8 8.4

TCE 0.4 U 0.4 U 0.46 U

HF227013

6/28/22

GROUNDWATER MONITORING REPORT

1359 SOUTH RAILROAD AVENUE

CHIPLEY, WASHINGTON COUNTY, FLORIDA

JAY LEE CLEANERS (FORMER)

ERIC_5542

HF227013

(CNL)

COULD NOT LOCATE(CNL) -

MW018/MW022

(CNL)

3.0

< 3.0

MW023

MW003

MW006

MW017

MW001

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

APPROXIMATE

AutoCAD SHX Text

1INCH = 120 FEET

AutoCAD SHX Text

SIDEWALK

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

SIDEWALK

AutoCAD SHX Text

ALLEY

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

GRASS

IDW Quotes

FDEP Waste Cleanup Program

COMPETITIVE BID WORKSHEET

Project Name/Address: Jay Lee Cleaners ERIC_5542, Chipley, FL Date: 6/6/24

Detailed description of goods or services required (including total quantity, size, delivery requirements, and all other specifications):

Transport and dispose of IDW Drum for groundwater generated during purging

Vendor Name: Quantity / Description Erwin Remediation Whatever Waste, LLC CES Contact Name: Robert Donado John Russell Mike Anderson Contact Number: 850-292-6511 407-295-3532 813-613-0452

Written Quote (yes/no): Yes Yes Yes Telephone Quote (yes/no): No No No

DOT 55-gallon drum per drum 125.00$ 140.00$ 140.00$

Service/Good Cost:

Taxes (7.5%):

Shipping:

Handling/Drop Fees:

TOTAL COST: 125.00$ 140.00$ 140.00$

VENDOR SELECTED: Erwin Remediation Basis of Selection: Lowest bid

Note: All items costing $1,000 or more will be 3-bid. More than three bids will be necessary if any vendor no-bids a request.

If adequate bids cannot be obtained, a full explanation must be included with this bid form.

408 Ditmar Street

Pensacola, FL 32503

ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562

(850) 292-6511

To: Mr. Sid O’Neal Terracon 3559 Timberlane School Road Tallahassee, Florida 32312

May 22, 2024

Re: Drum Disposal – Chlorinated Solvents

Mr. O’Neal:

The price for the transportation and disposal (T&D) of 55-gallon drums of non-hazardous soil and water impacted with chlorinated solvents is listed below:

Description Rate Unit

T&D – Non-Hazardous Soil Impacted with Chlorinated Solvents $110.00 Per Drum T&D – Non-Hazardous Water Impacted with Chlorinated Solvents $125.00 Per Drum

Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.). A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc. This quote is valid for 90 days.

Please contact me if you have any additional questions.

Respectfully, Robert Donado Erwin Remediation, Inc.

Email: Robert@erwinremediation.com

Whatever Waste, LLC 3834 Mandarin Woods Dr. No.

Jacksonville, FL 32223 United States 904.881.1957

Rachael Greller Staff Scientist Terracon 1675 Lee Road Winter Park 32789 United States

Proposal Number 033023.1

Overview RE: Drycleaner Waste Drum Cleanup Program Non-haz IDW Drum Transport & Disposal LOC: Statewide including Florida Keys

Good day Ms. Greller, Whatever Waste is pleased to provide non-haz IDW soil and water drum transport & disposal services to you and Terracon in regions throughout Florida including the Keys

Pricing

Notes

Proposal Date 03/30/2023

Description Rate Qty Line Total

North Region: NH IDW Soil & Water 55-gallon drums - each (No Stop Fee)

$140.00 1 $140.00

Central Region:NH IDW Soil & Water 55-gallon drums - each (South of Ocala; North of Sarasota/Port St. Lucie) (Stop fee $150; 2 drums or less)

$140.00 1 $140.00

South Region: NH IDW Soil & Water 55-gal drums - each (South of Sarasota/Port St. Lucie) (Stop fee $200; 2 drums or less)

$225.00 1 $225.00

Florida Keys: NH IDW Soil & Water 55-gal drums - each (Stop Fee - $250)

$275.00 1 $275.00

Subtotal

Tax

780.00

0.00

Proposal Total (USD) $780.00

Whatever Waste will assist with IDW profiling and require VOCs, and RCRA 4 metals for IDW drycleaner site soils; and VOCs only for IDW drycleaner site water.

DOT shippable drums at each location must be accessible in one area and on a hard surface.

No-load run charges to locations if called off in transit or upon arrival would be the stop fee in Central, South Regions and the Keys. In the North Region the no-load charge would be $100.

Terms

Actual amounts will be invoiced unless minimum quantities and associated fees apply Rates under contract are valid for 6 months Payment terms are 30 days after receiving emailed invoice with associated documents

Indemnification: Each party agrees to indemnify, defend and hold harmless each other for and from any loss or liability arising out of the party's breach of this agreement except for gross negligence, willful misconduct or bad faith.

Capitol 200 Biddle Ave, Suite 205 Environmental Newark, DE 19702 Services, Inc. 302-380-3737 www.capitolenv.com

EXPERTISE SUSTAINABILITY SOLUTIONS

Rachael Greller Terracon 3-28-2023 1675 Lee RD Winter Park FL 32789

Scope of Work: Provide transportation and disposal of Non Hazardous drill cuttings, and Purged waters. Drums to be located on a hard surface for loading, or additional charges could apply. Quote good for sites in Central FL North areas. With approved profile and analytical.

DESCRIPTION

Estimated Quantity

UM Price $ Total $

Drill cuttings from drilling operation solids 30 drums Per Drum $140.00

Drums Purge waters ( 55 GL drum ) 30 drums Per Drum $135.00

Additional loading time after 1-hour site. Per Hour $155.00

Actual time

Rachael, I appreciate the opportunity to submit this proposal and hope that Capitol Environmental Services, Inc. can be of service to Terracon. Should you require additional information, or have any questions at all, please do not hesitate to contact me at 813-613-0452 Manderson@capitolenv.com

Sincerely Yours, Mike Anderson www.capitolenv.com mailto:Manderson@capitolenv.com file://CESIFP01/Users/TSRedirections/bfrenchman/AppData/Roaming/Microsoft/Word/www.capitolenv.com

COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_v2.pdf
Subtask 1 – Project Management
Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling
Subtask 3 –Monitoring Well Installation
Right-of-Way Permitting
Utility Locate and Drilling Subcontractors
Monitoring Well Installation
Subtask 4 – Monitoring Well Sampling and Surveying
Laboratory Analysis
Trip Report
Subtask 5 – Investigation Derived Waste
Trip Report
Subtask 6 – Supplemental Site Assessment Report
Invoice and Deliverable Schedule:
ATTACHMENT A
ATTACHMENT B
ATTACHMENT C
ATTACHMENT D
ATTACHMENT E
ATTACHMENT F
Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v1.pdf
Cost Estimate
Subtask 2
Subtask 3
Subtask 4
Subtask 5
Subtask 6
2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev1_12-12-22.pdf
Table 1 for SAWP
Monitoring Well Locations
Utility Locate Bids_Compiled.pdf
Geosyntec Utility-272_Geotek_1500
Geoview Utility Quote_2000_COT FTF SIS
Tallahassee Fire Training Division_V1_Bloodhound_3700
Drilling Bids_Compiled.pdf
PDS_Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (sonic)
Direct Push
City of Tallahassee Fire Training Site_GW Protection PFAS Free Water Estimate Email
Cascade_Geosyntec Consultants, Inc. - City of Tallahassee Fire Training Facility - PN221026-118844
GW Protection_Geosyntec (T) 1022060 S.pdf
Invoice
Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (MOT).xlsx.pdf
Sheet1
COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v1.pdf
Subtask 1 – Project Management
Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling
Subtask 3 –Monitoring Well Installation
Right-of-Way Permitting
Utility Locate and Drilling Subcontractors
Monitoring Well Installation
Subtask 4 – Monitoring Well Sampling and Surveying
Laboratory Analysis
Trip Report
Subtask 5 – Investigation Derived Waste
Trip Report
Subtask 6 – Supplemental Site Assessment Report
Invoice and Deliverable Schedule:
ATTACHMENT A
ATTACHMENT B
ATTACHMENT C
ATTACHMENT D
ATTACHMENT E
ATTACHMENT F
COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v2.pdf
Subtask 1 – Project Management
Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling
Subtask 3 –Monitoring Well Installation
Right-of-Way Permitting
Utility Locate and Drilling Subcontractors
Monitoring Well Installation
Subtask 4 – Monitoring Well Sampling and Surveying
Laboratory Analysis
Trip Report
Subtask 5 – Investigation Derived Waste
Trip Report
Subtask 6 – Supplemental Site Assessment Report
Invoice and Deliverable Schedule:
ATTACHMENT A
ATTACHMENT B
ATTACHMENT C
ATTACHMENT D
ATTACHMENT E
ATTACHMENT F
Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v2.pdf
Cost Estimate
Subtask 2
Subtask 3
Subtask 4
Subtask 5
Subtask 6
2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev2.pdf
Table 1 for SAWP
Monitoring Well Locations

File details come from the government source that posted it. Updated .