This is a Task Assignment Change Order (TACO #1) issued by the Florida Department of Environmental Protection (FDEP) to Terracon Consultants, Inc. under Contract HW687. The change order amends Task Assignment BIL03A for supplemental site assessment activities at the Former 3D Oil Distribution Facility (Site ID ERIC_5549) located at 1744 Seagrave Street, South Daytona, Volusia County, Florida. The document was executed on February 19, 2024, with Megan Johnson serving as the FDEP Project Manager and Chad Northington, P.E., representing Terracon Consultants, Inc.

The change order extends the task assignment completion date from June 28, 2024, to August 2, 2024, a 35-day extension requested by the contractor due to delays in scheduling the drilling subcontractor. The total contract value remains unchanged at $71,080.66 on a fixed unit rate basis. The deliverable due dates were extended as follows: soil delineation and baseline groundwater sampling deliverables from March 29, 2024, to April 29, 2024; and the Supplemental Site Assessment Report from May 17, 2024, to June 28, 2024. Invoice payments are structured in three phases: $33,075.59 upon department approval of soil delineation field notes and sampling logs; $23,009.78 for baseline groundwater sampling documentation; and $14,995.29 upon approval of project management and the final assessment report, with no change to compensation terms.

View the file

Other files

File Type Posted
CN-370000-HW687-BF01A.pdf PDF
CN-370000-HW687-BF01B.pdf PDF
CN-370000-HW687-BF02A.pdf PDF
CN-370000-HW687-BF04A.pdf PDF
CN-370000-HW687-BF04ACO3.pdf PDF
CN-370000-HW687-BIL01B.pdf PDF
CN-370000-HW687-BIL02B.pdf PDF
CN-370000-HW687-BIL03B.pdf PDF
CN-370000-HW687-BIL1BCO2.pdf PDF
CN-370000-HW687-BIL2CCO2.pdf PDF
CN-370000-HW687-CSS02.pdf PDF
CN-370000-HW687-CSS03.pdf PDF
CN-370000-HW687-DC002A.pdf PDF
CN-370000-HW687-DC002G.pdf PDF
CN-370000-HW687-DC006C.pdf PDF
CN-370000-HW687-DC008B.pdf PDF
CN-370000-HW687-DC008D.pdf PDF
CN-370000-HW687-DC009B.pdf PDF
CN-370000-HW687-DC010C.pdf PDF
CN-370000-HW687-DC012A.pdf PDF
CN-370000-HW687-DC014B.pdf PDF
CN-370000-HW687-DC014D.pdf PDF
CN-370000-HW687-DC014H.pdf PDF
CN-370000-HW687-DC015D.pdf PDF
CN-370000-HW687-DC016C.pdf PDF
CN-370000-HW687-DC01ACO9.pdf PDF
CN-370000-HW687-DC021A.pdf PDF
CN-370000-HW687-DC021C.pdf PDF
CN-370000-HW687-DC022A.pdf PDF
CN-370000-HW687-DC023B.pdf PDF
CN-370000-HW687-DC023D.pdf PDF
CN-370000-HW687-DC024B.pdf PDF
CN-370000-HW687-DC024E.pdf PDF
CN-370000-HW687-DC024F.pdf PDF
CN-370000-HW687-DC027A.pdf PDF
CN-370000-HW687-DC028A.pdf PDF
CN-370000-HW687-DC028D.pdf PDF
CN-370000-HW687-DC029C.pdf PDF
CN-370000-HW687-DC02ACO1.pdf PDF
CN-370000-HW687-DC02HCO2.pdf PDF
CN-370000-HW687-DC030A.pdf PDF
CN-370000-HW687-DC031A.pdf PDF
CN-370000-HW687-DC035A.pdf PDF
CN-370000-HW687-DC037A.pdf PDF
CN-370000-HW687-DC03CCO2.pdf PDF
CN-370000-HW687-DC044A.pdf PDF
CN-370000-HW687-DC045B.pdf PDF
CN-370000-HW687-DC049A.pdf PDF
CN-370000-HW687-DC054A.pdf PDF
CN-370000-HW687-DC056A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

BIL03A 1 HW687

Megan Johnson 850.245.899 Terracon Consultants, Inc.

Chad Northington, P.E. 850.692.7185

ERIC_5549

Former 3D Oil Distribution Facility

$ 0.00 $ 0.00

06/28/2024 08/02/2024 35

1 1 1

Terracon Consultants, Inc.

Donna Cline, P.E.

Senior Remediation Engineer

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2024.02.19 13:14:48 -05'00'

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO: Terracon Consultants, Inc., HW687 Contract File

FROM: Megan Johnson, Contract Manager

DATE: February 15, 2024

SUBJECT: Negotiation Summary – BIL22 Task Assignment (TA) Change Order #1 – TA BIL03AC1 Former 3D Oil Distribution Facility – Site ID # ERIC_5549 Supplemental Site Assessment Activities

This Task Assignment Change Order (TACO) extends the Task Assignment completion date and the interim and final deliverable due dates. Specific changes are detailed below:

The contractor requested a time extension for the interim and final deliverables due to a delay in scheduling the subcontractor (drillers).

There is no change to the original cost of $71,080.66.

From: Wing, Lydia To: Johnson, Megan R Cc: Northington, Chad; Cline, Donna L Subject: Former 3D Oil ERIC_5549 - Drilling Schedule and Request for Extension of Deliverables Task Assignment BIL03A Date: Tuesday, February 13, 2024 4:36:35 PM Attachments: image001.png image003.png

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Good afternoon Megan, On behalf of Mr. Northington, who is out in the field today, I wanted to update you on the scheduling for this project.

We are on the drillers schedule!

Drillers are scheduled for March 18 through 20, 2024.

Based on that we would like to adjust the deliverable dates and are boldly (LOL) making some suggestions, but flexible.

Currently the deliverables based on the TA is as follows:

Subtask 2 (Soil Delineation/SOD Evaluation/In-Situ DVT): Current TA Deliverable 3/29/2924; Suggested extension to :

4/29/2024 Subtask 3 (Baseline GW Sampling/Plume Mass Profiling/Microbial Analysis): Current TA Deliverable 3/29/2924; Suggested extension to : 4/29/2024 Subtask 4 (SSAR): Current TA Deliverable 5/17/2924; Suggested extension to : 6/28/2024

Let us know if you have questions.

Have a great week, Lydia

From: Johnson, Megan R <Megan.R.Johnson@FloridaDEP.gov> Sent: Monday, January 22, 2024 2:40 PM To: Northington, Chad <Chad.Northington@terracon.com> Cc: Cline, Donna L <Donna.Cline@terracon.com>; Lewis, Tom E <Tom.Lewis@terracon.com>; Wing, Lydia <Lydia.Wing@terracon.com>; Fetter, Ryan <Ryan.Fetter@terracon.com>; Sweeney, Scott L <Scott.L.Sweeney@dep.state.fl.us>; Cross, Justin L. <Justin.L.Cross@dep.state.fl.us> Subject: RE: Task Assignment BIL03A - 3D Oil Site

Hey Chad, Attached is the FDEP signed Task Assignment BIL03A for the 3D Oil site. It is ready for review and Donna’s signature. Please copy us on the final executed document and let us know if you have any questions or concerns.

Thanks!

Megan

Megan R. Johnson Environmental Consultant Brownfields and CERCLA Site Screening Section Florida Department of Environmental Protection 2600 Blair Stone Road, MS 4535 Tallahassee, FL 32399