CN-370000-HW687-DC021B.pdf
PDF 5 MB Posted
- Contract number
- HW687
- Issued by
- Florida
About this file
This is a Task Assignment (TA) under Contract Number HW687 between the State of Florida Department of Environmental Protection (FDEP) and Terracon Consultants, Inc. The TA, numbered DC021B, was executed on December 1, 2023, with an effective completion date of April 30, 2024. The work is located at Village Laundry & Dry Cleaners (ERIC_4743) in Tampa, Hillsborough County, Florida. The parties to this contract are the FDEP, represented by Department Project Manager Dean Cox, and Terracon Consultants, Inc., represented by Project Manager Donna Cline.
The TA authorizes costs for groundwater monitor well installation, sampling, and reporting based on the Terracon proposal dated August 30, 2023. The total TA value is $43,169.28, structured as a fixed unit rate. Deliverables include a Supplementary Site Assessment (SSA) Phase 2 Report with activities summary, well construction logs, lithologic logs, updated tables and figures, laboratory reports, field notes and forms, evaluation and recommendations, and investigation derived waste (IDW) manifests, due January 31, 2024. The scope of work encompasses six subtasks: project management ($1,897.57), well installation including one 100-foot on-site deep well and one 70-foot off-site right-of-way well ($25,326.02), groundwater sampling of 23 wells ($7,211.24), IDW soil and groundwater management ($2,793.97), SSA Phase 2 Report preparation ($5,462.50), and drilling water meter sampling for PFAS analysis ($477.98). The cost represents a 16 percent reduction from Terracon's original proposal due to scope negotiation, including removal of seven wells from the sampling event.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW687
DC021B Completion April 30, 2024
This TA authorizes costs for groundwater monitor well installation, sampling, and reporting based on the Terracon proposal dated August 30, 2023. The total cost of this TA is $43,169.28 and this entire amount is fixed unit rate.
Dean Cox 850-245-8969 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Terracon Consultants, Inc.
Terracon Consultants, Inc.
Donna Cline 813-321-0340
ERIC_4743
10235 Lake Carroll Way, Tampa (Hillsborough County)
Village Laundry & Dry Cleaners
✔ $ 43,169.28
$ 43,169.28
Scope of Work
Kelly Crain
Digitally signed by Jennifer Farrell Date: 2023.12.01 08:38:49 -05'00'
N/A
Cline, Donna L Typewriter Donna Cline
Senior Associate
12/1/2023
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Supplementary Site Assessment (SSA) Phase 2 Report, including activities summary, well construction logs, lithologic log for deep well, updated tables & figures, lab reports, field notes & forms, evaluation & recommendations, and IDW manifests.
01/31/2024
DEP approval of SSA Phase 2 Report (Subtask 1 Proj. Mgmt., Subtask 2 Well Installation, Subtask 3 Groundwater Sampling, Subtask 4 IDW Soil & Groundwater Management, Subtask 5 SSA Phase 2 Report, Subtask 6 Drill H2O Sampling PFAS).
$ 43,169.28
$ 43,169.28
HW687
DC021B
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Interim Secretary
Negotiation Summary
TO: HW687 Contract File FROM: Dean Cox, Contract Manager SUBJECT: DC021B Village Laundry ERIC_4743 SSA Phase 2
DATE: 11/20/23
This TA authorizes costs for groundwater monitor well installation, sampling, and reporting based on the Terracon proposal dated August 30, 2023. The total cost of this TA is $43,169.28 and this entire amount is fixed unit rate. This TA was negotiated - the total cost is $8,084.43 or 16% less than originally proposed. Site access was confirmed.
The WSCS PG and PE approved the scope of this TA after meeting with Terracon and providing input. A deep well and an intermediate depth well will be installed to complete plume delineation, and most site wells will be sampled to update the status of plume COCs. COC groundwater concentrations are moderate. An SVE system is running as an ISR. No groundwater remediation has been done.
The monitor well sampling list in the Terracon proposal has been changed – the following wells were removed from this sampling event: 4S, 9S, 8I, 9I, 9D, 12D, and 13D. Twenty-three wells will be sampled. This figure includes the two newly installed wells.
FDEP COST ESTIMATE
Contractor: Terracon
Date: 11/28/2023 Task #: SubTask 1 Project Management SubTask 6 Drillling Water (Meter) Sampling for PFAS
Site: Village Laundry and Dry Cleaners ERIC_4743 SubTask 2 Well Installation SubTask 7 Activity/Phase: Supplemental Site Assessment SubTask 3 Groundwater Sampling SubTask 8
Project Manager: Dean Cox SubTask 4 IDW Soil and GW Management SubTask 9 SubTask 5 Supplemental Site Assessment Report SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$67.74 Project Manager Donna Cline 9.35 9.35 $32.50 CADD Specialist Chelsea Fugate 15.00 0.00 0.00 15.00 $20.00 Environmental Technician Corey Olson 0.00 $22.45 Field Geologist Jared Duncan 78.50 28.50 48.00 2.00 $39.90 Senior Scientist/ Geologis Ryan Fetter 43.50 18.50 4.00 1.00 16.00 4.00 $67.74 Senior Engineer Donna Cline 0.00 0.00 0.00 $63.46 Senior Geologist Dan Nedvidek 14.00 3.00 11.00 $43.27 Senior Scientist/Engineer Michael Mui 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00
Total Hours 160.35 9.35 50.00 52.00 3.00 42.00 4.00 0.00 0.00 0.00 0.00
Direct Labor $5,507.53 $633.61 $1,568.36 $1,237.20 $84.80 $1,823.96 $159.60 $0.00 $0.00 $0.00 $0.00
Overhead 116.00% $6,388.74 $734.99 $1,819.30 $1,435.15 $98.37 $2,115.79 $185.14 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.26% $3,098.54 $356.47 $882.36 $696.05 $47.71 $1,026.16 $89.79 $0.00 $0.00 $0.00 $0.00 Total Labor $14,994.81 $1,725.07 $4,270.02 $3,368.40 $230.88 $4,965.91 $434.53 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 1
FDEP COST ESTIMATEContractor: Terracon Date: 11/28/2023
Task #: SubTask 1 Project Management SubTask 6 Drillling Water (Meter) Sampling for PFAS Site: Village Laundry and Dry Cleaners ERIC_4743 SubTask 2 Well Installation SubTask 7
Activity/Phase: Supplemental Site Assessment SubTask 3 Groundwater Sampling SubTask 8 Project Manager: Dean Cox SubTask 4 IDW Soil and GW Management SubTask 9
SubTask 5 Supplemental Site Assessment Report SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle charge $1,120.00 520.00$ 480.00$ 120.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 -$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $1,120.00 $520.00 $480.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) - EDS $17,250.00 17,250.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying - SurvTech Solutions, Inc. $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 IDW - Erwin Remediation $2,200.00 $0.00 $0.00 2,200.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utilities - GPRS $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ROW Signage $475.00 475.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $19,925.00 $17,725.00 $0.00 $2,200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $1,945.00 $1,725.00 $0.00 $220.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $21,870.00 $19,450.00 $0.00 $2,420.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $1,589.00 140.00$ 1,449.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Encore Sampler $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $156.00 52.00$ 104.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,745.00 $192.00 $1,553.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $385.00 120.00$ 265.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,208.00 $0.00 1,208.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $22.00 22.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $325.00 325.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,940.00 $467.00 $1,473.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $41,669.81 $1,725.07 $24,899.02 $6,874.40 $2,770.88 $4,965.91 $434.53 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,499.47 $172.50 $427.00 $336.84 $23.09 $496.59 $43.45 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $43,169.28 $1,897.57 $25,326.02 $7,211.24 $2,793.97 $5,462.50 $477.98 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Village Laundry and Dry Cleaners ERIC_4743 SUBTASK 2: Monitoring Well Installation
PROPOSAL NO. PH4237303
DATE: 11/28/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning Senior Scientist/ Geologist RF 2.00 Senior Scientist/ Geologist RF 0.50 Senior Scientist/ Geologist RF 2.50 Senior Scientist/ Geologist RF 0.50 Senior Scientist/ Geologist RF 0.50
Well Installation Oversight - Sonic
Time Duration: 3 days Field Geologist JD Load/unload equipment (1 hr/day) 1.00 Senior Scientist/ Geologist RF Project oversite, direct work, safety debrief, oversight of installation, lithology of deep well 10.00 Field Geologist JD Assist in oversight of monitor well installations, site access, and safety (10 hr/day) 25.00 Senior Geologist DN Kickoff meeting and project oversight 3.00 Senior Scientist/ Geologist RF Finalize field notes at end of day for PM evaluation (1 hour/day) 1.50 Field Geologist JD Collect IDW samples from the drums (up to 2 samples total) 1.00 CADD Specialist CF 0.00 Mobilization / Demobilizations Senior Scientist/ Geologist RF Preconstruction meeting, 1 Days Well Installation Oversight (2 total days, 0.5 hour/day) 1.00 Field Geologist JD 3 Days Well Install Oversight (3 days, 0.5 hour/day) 1.50
Personnel: RF JD DN CF DC Hours: 18.50 28.50 3.00 0.00 0.00 TOTAL LABOR 50.00
VEHICLE TYPE RATE UNIT USEAGE
Auto (Senior Staff Geologist) 80.00$ day 2 160.00$ Truck (Field Geologist) 120.00$ day 3 360.00$
TOTAL VEHICLE 520.00$
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM -$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
Groundwater Protection Sonic Drilling 17,250.00$ each 1 17,250.00$ MOT Plans ROW Signage 475.00$ each 1 475.00$
TOTAL SUBCONTRACTOR 17,725.00$
LABORATORY COSTS
PARAMETER RATE # SAMPLES IDW
IDW VOCs - Halocarbons EPA 8260 (short list) 63.00$ 0 126.00$ 5035 Halocarbon Prep Lab Prep 7.00$ 0 2 14.00$ Sample shipment Small, 2-day 52.00$ 1 52.00$
TOTAL LAB 192.00$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables Expendables 40.00$ day 3 120.00$ Drilling Related Monitoring Well Installation Kit 325.00$ day 1 325.00$ IDW Related Terracore 11.00$ each 2 22.00$
TOTAL EQUIPMENT 467.00$
Update Compass profile for project and provide daily project updates to Terracon's Compass
Pre-task planning, develop subcontractor scopes of work, coordinate with well contractor for well permits Update Health and Safety Plan and contact Sunshine 811
Prepare soil logging materials and finalize logistics for investigation ROW Access Coordination with FDOT and MOT
Pre-Construction Meeting with site owner and driller
Scope: 1 intermediate monitoring well to 70 feet in the ROW, 1 deep monitoring well to 100 feet with lithology from 60'-100'.
Duration: 3 days
SUBTASK 3: Groundwater Sampling
PROPOSAL NO. PH4237303
DATE: 11/28/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning Senior Staff Geologist RF 2.00 Senior Staff Geologist RF 2.00
Groundwater Sampling
Time Duration: 5 days Field Geologist JD Load/unload equipment (1 hour/day) 2.00 Field Geologist JD Collect static water levels daily (32 wells, 10 min/well) 5.00 Field Geologist JD Containerize IDW (0.5 hrs/day) 2.00 Field Geologist JD Collect groundwater samples for VOHs (23 wells, 1.5 hours each) 34.50 Field Geologist JD Prepare gw sampling and calibration logs and field notes for PM evaluation (1 hr/day) 2.00 Mobilization / Demobilizations Field Geologist JD 5 Days (0.5 hours/day) 2.50
Personnel: RF JD DN CF Hours: 4.00 48.00 0.00 0.00 TOTAL LABOR 52.00
VEHICLE TYPE RATE UNIT USEAGE
Truck (Field Geologist) 480 week 1 480.00$
TOTAL VEHICLE 480.00$
LABORATORY COSTS
PARAMETER RATE # SAMPLES IDW
Halocarbons EPA 8260 (short list) 63.00$ 23 1,449.00$ Sample Shipment/PreparatioSmall - 2 Day 52.00$ 2 104.00$
TOTAL LAB 1,553.00$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables Expendables 40.00$ day 5 200.00$
Ice (Sample Preservation 2 bags/day) 6.50$ each 10 65.00$ Analytical related Groundwater Sampling Kit 290.00$ day 4 1,160.00$
Tubing, HDPE 0.30$ ft 0 -$ Tubing, silicon (3/16 x 3/8) 3.00$ ft 16 48.00$
IDW related (Drums provided by Driller)
TOTAL EQUIPMENT 1,473.00$
PreTask planning, prepare monitoring well groundwater sampling logs
Scope: 32 Total Wells: 2 New Monitoring Wells (includes one (1) 100 ft on-site well, and one (1) 70 ft off-site ROW well), and 30 existing monitoring wells
Daily oversite and communication, review of safety
SUBTASK 4: IDW Soil and GW Management
PROPOSAL NO. PH4237303
DATE: 11/28/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Coordinate IDW T&D Senior Staff Geologist RF 1.00 Field Geologist JD 2.00
TOTAL LABOR 3.00
VEHICLE TYPE RATE UNIT USEAGE
Truck (IDW management) 120 day 1 120.00$
TOTAL VEHICLE 120.00$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
Erwin Remediation 110.00$ drum 20 2,200.00$
TOTAL SUBCONTRACTOR 2,200.00$
IDW Disposal (soil / groundwater excluding haz mat)
Coordinate IDW T&D: Mobilize to site, meet transporter to sign manifests Prepare waste characterization/Generator Profile (potential for hazardous waste)
SUBTASK 5: Supplemental Site Assessment Report
PROPOSAL NO. PH4237303
DATE: 11/28/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Report Deliverable Senior Staff Geologist RF 10.00 Senior Geologist DN QA/QC field and laboratory data 3.00 Senior Staff Geologist RF 6.00 Senior Engineer DN Water Quality Parameters Summary Evaluation 2.00 Senior Engineer DN Groundwater Analytical Results and Summary Evaluation 3.00 Senior Engineer DN Conclusions/Recommendations 2.00 Senior Geologist DN Final report sign, and seal 1.00
CADD Specialist CF Prepare Exhibits (site setting, groundwater flow, cross sections, and concentrations maps) 15.00
Personnel: RF JD DN CF Hours: 16.00 0.00 11.00 15.00 TOTAL LABOR 42.00
Prepare draft report introduction, recent activities summary, and discussion of results
Input data into tables, evaluate raw data, and provide data for map development
SUBTASK 4: Drillling Water (Meter) Sampling for PFAS
PROPOSAL NO. PH4237303
DATE: 11/28/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Scientist/ Geologist RF 4.00
TOTAL LABOR 4.00
VEHICLE TYPE RATE UNIT USEAGE
Truck 120 day 0 -$
TOTAL VEHICLE -$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
0 -$
TOTAL SUBCONTRACTOR -$
Pre-collect sample from COT water meter for PFAS analysis, coordinate with driller for meter permit
Project Name/Address: Village Laundry and Dry Cleaning, Tampa
Detailed description of goods or services required (including total quantity, size, delivery requirements, and all other specifications):
See attached individual quotes from ROW Signage companies for pricing.
Vendor Name: RoadSafe Traffic Systems ACME Barricades MOT Plans Contact Name: Crystal McGowan Jaime Gonzales Jon Curry Contact Number: 813-740-0468 813-623-2263 813-600-7884
Written Quote (yes/no): No Response/ No Bid Yes Yes Telephone Quote (yes/no): No No No
Service/Good Cost: No Response/ No Bid 1,200.00$ $475.00 Taxes (7.5%):
Shipping:
Handling/Drop Fees:
TOTAL COST: No Response/ No Bid 1,200.00$ $475.00
VENDOR SELECTED: MOT Plans Basis of Selection: Lowest bid
FDEP Waste Cleanup Program
COMPETITIVE BID WORKSHEET
From: Jon Curry To: Fetter, Ryan Subject: Re: ROW Signage Along Dale Mabry Date: Monday, August 21, 2023 11:45:02 AM Attachments: image001.png image002.png image003.png image004.png image005.png image006.png
This would be around $475 total including tax.
Thank you,
- Jon Cell #813-758-7000 Office #813-600-7884 1019 S 82nd St, Tampa
On Mon, Aug 21, 2023 at 11:34 AM Fetter, Ryan <Ryan.Fetter@terracon.com> wrote:
Hi Jon –
How much would you charge to setup and takedown signage in the ROW along Dale Mabry Hwy? It would be for 1 day and signage only necessary in front of the address:
10330 N Dale Mabry Highway
Tampa, FL
It would be work on the shoulder under FDOT Index 602.
Let me know if you have any questions.
Ryan mailto:jon@motplans.com mailto:Ryan.Fetter@terracon.com
Some people who received this message don't often get email from ryan.fetter@terracon.com. Learn why this is important
From: Jaime Gonzalez To: Fetter, Ryan Cc: Tyler Stultz; Victoria Fernandez Subject: FW: ROW Signage Along Dale Mabry Date: Tuesday, November 28, 2023 4:11:04 PM Attachments: image001.png image002.png image003.png image004.png image005.png image006.png
Ryan, The Price is $1200. 00
Set up and Go. Pick up at the end of the day
From: Fetter, Ryan <Ryan.Fetter@terracon.com> Sent: Tuesday, November 28, 2023 3:11 PM To: info <info@AcmeBarricades.com> Subject: ROW Signage Along Dale Mabry
Hello -
How much would you charge to setup and take down signage in the ROW along Dale Mabry Hwy? It would be for one day and signage only necessary in front of the address:
10330 N Dale Mabry Highway Tampa, FL
It would be work on the shoulder under FDOT Index 602.
Let me know if you have any questions.
Ryan Fetter Senior Staff Geologist
5463 W Waters Ave. Suite 830 I Tampa, FL 33634 M (727) 459-1791 I F (813) 221-0051 ryan.fetter@terracon.com | Terracon.com mailto:ryan.fetter@terracon.com https://urldefense.com/v3/__https://aka.ms/LearnAboutSenderIdentification__;!!JrcuqBw_IQ!jbZ7g5yNhYwmrqI6e7Pls4JOLp3uhYn_K8YD7AFhiVPVkP1OoiEsym7SPQIsZvKp7zmnY1FIKAEuLTFgMJ04IcEWDo4$ https://urldefense.com/v3/__https://aka.ms/LearnAboutSenderIdentification__;!!JrcuqBw_IQ!jbZ7g5yNhYwmrqI6e7Pls4JOLp3uhYn_K8YD7AFhiVPVkP1OoiEsym7SPQIsZvKp7zmnY1FIKAEuLTFgMJ04IcEWDo4$ mailto:JGonzalez@acmebarricades.com mailto:Ryan.Fetter@terracon.com mailto:tstultz@acmebarricades.com mailto:vfernandez@AcmeBarricades.com mailto:Ryan.Fetter@terracon.com mailto:info@AcmeBarricades.com mailto:ryan.fetter@terracon.com https://urldefense.proofpoint.com/v2/url?u=http-3A__www.terracon.com_&d=DwMFAg&c=euGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM&r=hv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ&m=UKXPox2n5382PGTN2VrTbe4VtYrm16zJ63P83g5l7so&s=9YhIaFov_exbEN_l2-usi9wsgueslN6iK-uk_5gi-Y0&e=
From: Fetter, Ryan To: Fetter, Ryan Subject: RE: ROW Signage Along Dale Mabry Date: Wednesday, November 29, 2023 11:59:37 AM Attachments: image001.png image002.png image003.png image004.png image005.png image006.png
No Response. No Bid.
From: Fetter, Ryan Sent: Tuesday, November 28, 2023 3:03 PM To: cmcgowan@roadsafetraffic.com Subject: ROW Signage Along Dale Mabry
Hello Crystal
How much would you charge to setup and take down signage in the ROW along Dale Mabry Hwy? It would be for one day and signage only necessary in front of the address:
10330 N Dale Mabry Highway Tampa, FL
It would be work on the shoulder under FDOT Index 602.
Let me know if you have any questions.
Ryan
Ryan Fetter Senior Staff Geologist
5463 W Waters Ave. Suite 830 I Tampa, FL 33634 M (727) 459-1791 I F (813) 221-0051 ryan.fetter@terracon.com | Terracon.com mailto:ryan.fetter@terracon.com https://urldefense.proofpoint.com/v2/url?u=http-3A__www.terracon.com_&d=DwMFAg&c=euGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM&r=hv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ&m=UKXPox2n5382PGTN2VrTbe4VtYrm16zJ63P83g5l7so&s=9YhIaFov_exbEN_l2-usi9wsgueslN6iK-uk_5gi-Y0&e= https://urldefense.proofpoint.com/v2/url?u=https-3A__urldefense.com_v3_-5F-5Fhttps-3A_www.facebook.com_terracon_-5F-5F-3B-21-21JrcuqBw-5FIQ-211SpVbJb-5FrY0kTr8TysKMCpb-2DWhPTlkAJ0xnUDh7mYRHK0FPQL-2DUIUOXZG3t5N9dLgsA-24&d=DwMFAg&c=euGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM&r=hv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ&m=UKXPox2n5382PGTN2VrTbe4VtYrm16zJ63P83g5l7so&s=A5bwaFUvd1YtUifMemQG0FErOs8h2rW5sHyL5QoSVQw&e= https://urldefense.proofpoint.com/v2/url?u=https-3A__urldefense.com_v3_-5F-5Fhttps-3A_twitter.com_terraconlife-5F-5F-3B-21-21JrcuqBw-5FIQ-211SpVbJb-5FrY0kTr8TysKMCpb-2DWhPTlkAJ0xnUDh7mYRHK0FPQL-2DUIUOXZG3t5oyMUia4-24&d=DwMFAg&c=euGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM&r=hv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ&m=UKXPox2n5382PGTN2VrTbe4VtYrm16zJ63P83g5l7so&s=N_uUHzzC8XdO9o05BLzFunuXX8cCv_kB_k8h182n0jc&e= https://urldefense.proofpoint.com/v2/url?u=https-3A__urldefense.com_v3_-5F-5Fhttps-3A_www.linkedin.com_company_terracon_mycompany_-5F-5F-3B-21-21JrcuqBw-5FIQ-211SpVbJb-5FrY0kTr8TysKMCpb-2DWhPTlkAJ0xnUDh7mYRHK0FPQL-2DUIUOXZG3t5NQwUbVk-24&d=DwMFAg&c=euGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM&r=hv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ&m=UKXPox2n5382PGTN2VrTbe4VtYrm16zJ63P83g5l7so&s=hOqesHwLsoZvPsejmr2YteIiAFXhYwa1mrh6SlvjN_M&e= https://urldefense.proofpoint.com/v2/url?u=https-3A__urldefense.com_v3_-5F-5Fhttps-3A_www.instagram.com_terraconlife_-5F-5F-3B-21-21JrcuqBw-5FIQ-211SpVbJb-5FrY0kTr8TysKMCpb-2DWhPTlkAJ0xnUDh7mYRHK0FPQL-2DUIUOXZG3t5TOf1IyQ-24&d=DwMFAg&c=euGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM&r=hv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ&m=UKXPox2n5382PGTN2VrTbe4VtYrm16zJ63P83g5l7so&s=5Vx6u5wlNt52SGdv2uKlznpNUtHDWJgU8KZwwi7g0l0&e= https://urldefense.proofpoint.com/v2/url?u=https-3A__urldefense.com_v3_-5F-5Fhttps-3A_www.youtube.com_channel_UCnME-5FjcG0b6CH5xxwdrtDZw-5F-5F-3B-21-21JrcuqBw-5FIQ-211SpVbJb-5FrY0kTr8TysKMCpb-2DWhPTlkAJ0xnUDh7mYRHK0FPQL-2DUIUOXZG3t55XAtSwc-24&d=DwMFAg&c=euGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM&r=hv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ&m=UKXPox2n5382PGTN2VrTbe4VtYrm16zJ63P83g5l7so&s=1fW1ngulCZgLUbG7_CqrmF7_-gK-i6Dguw0p6Y75fAI&e=
L
NO CHARGE FOR SITE STOP FEE AS OF
APRIL 1, 2023
Andrew Kucek
| ROW Signage Quotes.pdf |
| ROW Signage |
| HW687 DC021B needs ROW signage bids.pdf |
| DC021B.pdf |
| DC021B SSAcomplPropCEF-LOE230830_corrected231128.pdf |
| Cost Estimate |
| LOE 2 Well Install |
| LOE 3 Groundwater Sampling |
| LOE 4 IDW |
| LOE 5 Report |
| LOE 6 Drill H2O Sampling PFAS |
| HW687 DC021B.pdf |
| DC021B NS.pdf |
| DC021B SSAcompletionProposal230830.pdf |