CN-370000-HW687-DC025A.pdf

PDF 10 MB Posted

Attached to
Master Agreement FL|HW687|519929c0c8a00e44396dc1d8f5fa086b
Contract number
HW687
Issued by
Florida

About this file

Summary

This document is a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (FDEP) Waste Cleanup Program to Terracon Consultants, Inc. for site assessment and associated reporting at the Majik Touch Cleaners and Laundry commercial drycleaning facility located at 3312 Lithia Pinecrest Road, Valrico, Hillsborough County, Florida. The task assignment is entered pursuant to Contract Number HW687 and was executed on November 22, 2022, with an effective completion date of June 30, 2023.

The scope of work includes six subtasks: project management, soil sampling with Modified Active Gas Survey (MAGS) and camera line inspection, piezometer and interior well installation with lithological profiling and groundwater screening, monitoring well installation and groundwater sampling, investigation-derived waste (IDW) management, and site assessment report preparation. The total fixed unit rate cost is $128,629.37, with invoicing tied to FDEP approval of deliverables in four phases: $55,728.08 upon approval of soil assessment results (due February 28, 2023); $32,833.78 for groundwater screening results (due March 31, 2023); $22,630.16 for monitoring well results (due March 31, 2023); and $17,437.35 for the final site assessment report (due April 30, 2023). The project encompasses multiple subcontractor services including drilling by Groundwater Protection ($31,757.00), geophysical survey by GeoView, Inc. ($1,300.00), surveying by SurvTech Solutions, Inc. ($3,995.00), camera line inspection by Complete Plumbing and Drain ($300.00), and IDW disposal by Erwin Remediation ($2,200.00).

View the file

Other files

File Type Posted
CN-370000-HW687-BF01ACO1.pdf PDF
CN-370000-HW687-BF03ACO1.pdf PDF
CN-370000-HW687-BIL01A.pdf PDF
CN-370000-HW687-BIL2ACO1.pdf PDF
CN-370000-HW687-BIL2BCO1.pdf PDF
CN-370000-HW687-BIL2CCO1.pdf PDF
CN-370000-HW687-BIL3ACO2.pdf PDF
CN-370000-HW687-BIO1ACO1.pdf PDF
CN-370000-HW687-DC001A.pdf PDF
CN-370000-HW687-DC003A.pdf PDF
CN-370000-HW687-DC003D.pdf PDF
CN-370000-HW687-DC005D.pdf PDF
CN-370000-HW687-DC006A.pdf PDF
CN-370000-HW687-DC006B.pdf PDF
CN-370000-HW687-DC008C.pdf PDF
CN-370000-HW687-DC010A.pdf PDF
CN-370000-HW687-DC010B.pdf PDF
CN-370000-HW687-DC011F.pdf PDF
CN-370000-HW687-DC011H.pdf PDF
CN-370000-HW687-DC012D.pdf PDF
CN-370000-HW687-DC013C.pdf PDF
CN-370000-HW687-DC015A.pdf PDF
CN-370000-HW687-DC015C.pdf PDF
CN-370000-HW687-DC019A.pdf PDF
CN-370000-HW687-DC01ACO2.pdf PDF
CN-370000-HW687-DC020A.pdf PDF
CN-370000-HW687-DC020B.pdf PDF
CN-370000-HW687-DC020C.pdf PDF
CN-370000-HW687-DC020D.pdf PDF
CN-370000-HW687-DC023C.pdf PDF
CN-370000-HW687-DC025B.pdf PDF
CN-370000-HW687-DC025C.pdf PDF
CN-370000-HW687-DC025F.pdf PDF
CN-370000-HW687-DC027B.pdf PDF
CN-370000-HW687-DC027C.pdf PDF
CN-370000-HW687-DC02BCO1.pdf PDF
CN-370000-HW687-DC02CCO2.pdf PDF
CN-370000-HW687-DC02DCO1.pdf PDF
CN-370000-HW687-DC02HCO1.pdf PDF
CN-370000-HW687-DC032A.pdf PDF
CN-370000-HW687-DC034A.pdf PDF
CN-370000-HW687-DC034C.pdf PDF
CN-370000-HW687-DC034D.pdf PDF
CN-370000-HW687-DC035F.pdf PDF
CN-370000-HW687-DC036A.pdf PDF
CN-370000-HW687-DC03CCO1.pdf PDF
CN-370000-HW687-DC041C.pdf PDF
CN-370000-HW687-DC041D.pdf PDF
CN-370000-HW687-DC048A.pdf PDF
CN-370000-HW687-DC048B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW687

DC025A Completion June 30, 2023

This TA authorizes costs for site assessment and associated reporting. The total cost of this TA is $128,629.37 and all costs are fixed unit rate.

Dean Cox 850-245-8969 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Terracon Consultants, Inc.

Terracon Consultants, Inc.

Donna Cline 813-321-0340

ERIC_4714

3312 Lithia Pinecrest Road, Valrico (Hillsborough County)

Majik Touch Cleaners and Laundry - Commercial Drycleaning Plant

✔ $ 128,629.37

$ 128,629.37

Scope of Work

Donna Cline

Sr. Remediation Engineer

11/22/22

Teresa Booeshaghi

Teresa Booeshaghi Digitally signed by Teresa Booeshaghi Date: 2022.11.22 13:35:39 -05'00'

11/22/2022

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Soil assessment analytical results summary & certified lab report(s) and litho logs, MAGS test results summary and certified lab report(s), and camera line inspection report (Subtask 2 Soil Sampling, MAGS and Camera Line Inspection)

02/28/2023

Well and piezometer logs & elevations, deep litho boring log, groundwater flow figure, and direct push boring logs & groundwater analytical results summary with certified lab reports (Subtask 3 Well Installs, Litho Log, and Groundwater Screening)

03/31/2023

Well logs, well sampling analytical results summary & certified lab report(s), and survey report (Subtask 4 Monitoring Well Installations & Well Sampling) 03/31/2023

Site Assessment Report and investigation derived waste (IDW) manifests (Subtask 1 Project Management, and Subtask 5 IDW Soil & Groundwater Management, and Subtask 6 Site Assessment Report)

04/30/2023

FDEP approval of soil assessment analytical results summary & certified lab report(s) and litho logs, MAGS test results summary and certified lab report(s), and camera line inspection report (Subtask 2 Soil Sampling, MAGS and Camera Line Inspection)

$ 55,728.08

FDEP approval of well and piezometer logs & elevations, groundwater flow figure, litho boring log, and DP boring logs & groundwater analytical results summary with certified lab reports (Subtask 3 Well Installs, Litho Log, and Groundwater Screening)

$ 32,833.78

FDEP approval of well logs, well sampling analytical results summary & certified lab report(s), and survey report (Subtask 4 Monitoring Well Installations & Well Sampling)

$ 22,630.16

FDEP approval of Site Assessment Report and investigation derived waste (IDW) manifests (Subtask 1 Project Management, and Subtask 5 IDW Soil & Groundwater Management, and Subtask 6 Site Assessment Report)

$ 17,437.35

$ 128,629.37

HW687

DC025A

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Interim Secretary

Memorandum

TO: HW687 Contract File FROM: Dean Cox, Contract Manager SUBJECT: DC025A Majik Touch Cleaners (ERIC_4714) Site Assessment

DATE: 11/22/2022

This TA authorizes costs for site assessment and associated reporting, based on the Terracon TA proposal dated 10/16/22 and cost estimate dated 11/17/22. The total cost of this TA is $128,629.37 and all costs are fixed unit rate. This TA was negotiated - the total cost is $4,642.64 or 4% less than originally proposed.

This is a new site in the DSCP. A site access agreement is in place and is sufficient for the scope of this TA considering all field work is planned to occur onsite. Deliverable due dates were set out farther than usual considering two other site assessments are impending and will be done in a similar time frame.

FDEP COST ESTIMATE

Contractor: Terracon

Date: 11/17/2022 Task #: SubTask 1 Project Management SubTask 6 Site Assessment Report

Site: Majik Touch Cleaners and Laundry ERIC_4714 SubTask 2 Soil Sampling, MAGS, Camera Line Inspection SubTask 7 Activity/Phase: Site Assessment Workplan Investigation SubTask 3 Piezometers, Interior Well, Lithological Log and GW Screening SubTask 8

Project Manager: Dean Cox SubTask 4 Monitoring Well Installation and Groundwater Sampling / Irrigation W SubTask 9 SubTask 5 IDW Soil and GW Management SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$64.50 Project Manager Donna Cline 28.80 28.80 $0.00 Administrative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Brownfield Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$31.25 CADD Specialist Chelsea Fugate 49.50 4.00 5.00 2.50 0.00 38.00 0.00 0.00 0.00 0.00 $0.00 Data Analyst & Visualization Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$17.50 Environmental Technician Corey Olson 40.00 38.00 0.00 0.00 2.00 0.00 0.00 0.00 0.00 0.00 $21.73 Field Geologist Jared Duncan 142.00 34.50 56.00 51.50 0.00 0.00 0.00 0.00 0.00 0.00 $29.28 Staff Engineer Eddy Leon 194.50 73.00 50.50 26.00 1.00 44.00 0.00 0.00 0.00 0.00 $0.00 Staff Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$64.50 Senior Engineer Donna Cline 3.50 3.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $57.69 Senior Geologist Dan Nedvidek 28.50 0.00 18.50 0.00 0.00 10.00 0.00 0.00 0.00 0.00 $0.00 Senior GIS Analyst 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$40.87 Senior Scientist/Engineer Michael Mui 34.00 34.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Hours 520.80 28.80 187.00 130.00 80.00 3.00 92.00 0.00 0.00 0.00 0.00

Direct Labor $16,144.32 $1,857.31 $5,292.46 $3,919.04 $1,958.51 $64.28 $3,052.72 $0.00 $0.00 $0.00 $0.00

Overhead 116.00% $18,727.41 $2,154.48 $6,139.25 $4,546.09 $2,271.87 $74.56 $3,541.16 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.26% $9,082.79 $1,044.92 $2,977.54 $2,204.85 $1,101.86 $36.16 $1,717.46 $0.00 $0.00 $0.00 $0.00 Total Labor $43,954.52 $5,056.71 $14,409.25 $10,669.98 $5,332.24 $175.00 $8,311.34 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF TERRACON Page 1

FDEP COST ESTIMATEContractor: Terracon Date: 11/17/2022

Task #: SubTask 1 Project Management SubTask 6 Site Assessment Report Site: Majik Touch Cleaners and Laundry ERIC_4714 SubTask 2 Soil Sampling, MAGS, Camera Line Inspection SubTask 7

Activity/Phase: Site Assessment Workplan Investigation SubTask 3 Piezometers, Interior Well, Lithological Log and GW Screening SubTask 8 Project Manager: Dean Cox SubTask 4 Monitoring Well Installation and Groundwater Sampling / Irrigation W SubTask 9

SubTask 5 IDW Soil and GW Management SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle charge $2,480.00 1,160.00$ 720.00$ 480.00$ 120.00$ $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $2,480.00 $1,160.00 $720.00 $480.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) - Groundwater Protect $31,757.00 13,474.00$ 9,293.00$ 8,990.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying - SurvTech Solutions, Inc. $3,995.00 $0.00 $0.00 3,995.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 IDW - Erwin Remediation $2,200.00 $0.00 $0.00 $0.00 2,200.00$ $0.00 $0.00 $0.00 $0.00 $0.00 Complete Plumbing and Drain $300.00 300.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Geoview $1,300.00 1,300.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $39,552.00 $15,074.00 $9,293.00 $12,985.00 $2,200.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $3,925.20 $1,477.40 $929.30 $1,298.50 $220.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $43,477.20 $16,551.40 $10,222.30 $14,283.50 $2,420.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $27,077.50 17,494.00$ 9,103.50$ 480.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $27,077.50 $17,494.00 $9,103.50 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $591.50 232.50$ 186.00$ 173.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $975.00 $0.00 325.00$ 650.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $5,103.20 4,090.00$ 315.00$ 698.20$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $575.00 350.00$ 225.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $7,244.70 $4,672.50 $1,051.00 $1,521.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $124,233.92 $5,056.71 $54,287.15 $31,766.78 $22,096.94 $2,715.00 $8,311.34 $0.00 $0.00 $0.00 $0.00 Completion Fee $4,395.45 $505.67 $1,440.93 $1,067.00 $533.22 $17.50 $831.13 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $128,629.37 $5,562.38 $55,728.08 $32,833.78 $22,630.16 $2,732.50 $9,142.47 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF TERRACON Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Majik Touch Cleaners and Laundry ERIC_4714 SUBTASK 2: Soil Sampling, MAGS, Camera Line Inspection

PROPOSAL NO. PH4227411

DATE: 11/17/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning Staff Engineer EL 4.00 Staff Engineer EL 1.00 Senior Engineer DC 2.00 Staff Engineer EL 3.00

Environmental Tech CO 4.00 Staff Engineer EL 1.00 Staff Engineer EL 1.50 Staff Engineer EL 1.50 Soil Sampling / Oversee MAGS Well Installation / Oversee Camera Line Inspection Scope: 9 MAGS well (7 interior, 2 exterior) to a depth of 10 ft bgs with soil investigation, 10 additional soil borings to 10 ft bgs.

Time Duration: 2.5 days Technician CO Load/unload equipment (1 hour/day) 2.00 Staff Engineer EL Direct work, daily safety debrief, record lithological descriptions, oversee MAGS well install 30.00

Oversee camera line inspection Technician CO Collect one sample every 1 foot interval for OVA screening, record measurments 0.00 Field Geologist JD Collect one sample at 0.5, 2, 4, 6, 8 and 10 ft bgs for laboratory analysis (SPLP and VOCs) 30.00 Technician CO Containerize IDW (0.5 hours/day) 1.00 Staff Engineer EL Finalize field notes at end of day for PM evaluation (1 hour/day) 2.00 Cadd Specialist CF Download soil boring and MAGS well locations and soil analytical results to Compass (2 hrs) 2.00

(Terracon's software for FDEP access) MAGS Test Time Duration: 2 Days Senior Scientist/Engineer MM Attend Pre Task Planning meeting and determine technical approach to MAGS 1.00 Environmental Tech CO Deliver and set up MAGS System 2.00 Senior Scientist/Engineer MM Perform and direct MAGS sampling test (9 points x 1.5 hr/point = 13.5, oversee set up / calibration) 20.00 Staff Engineer EL Collect vaccum/pressure and OVA screening measurements, collect samples for lab analysis 20.00 Environmental Tech CO Maintain system operation of the MAGS system, reduce vacuum / flows as directed by Engineer / 20.00

Maintain hoses / decon as approriate between MAGS wells Senior Scientist/Engineer MM Finalize field notes at end of day (1 hour/day) 2.00 Senior Scientist/Engineer MM Interpret field data, perform calculations, and provide update to FDEP (8 hrs) 8.00 Cadd Specialist CF Download MAGS summary data (vacuum and flow measurement) and soil vapor analytical 2.00 results to Compass (Terracon's software for FDEP access) (2 hrs) Mobilization / Demobilizations Senior Engineer DC 1.50 Senior Scientist/Engineer MM 2 Days, MAGS Test (1.5 hour/day) 3.00 Staff Engineer EL 9.00 Techician CO 6 Days, including Initial site visit (1.5 hours/day) CF 9.00 Field Geologist JD 3 Days, soil investigation (1.5 hour/day) 4.00 4.5

Personnel: EL MM JD CO DC Hours: 73.00 34.00 34.50 38.00 3.50 TOTAL LABOR 187.00

VEHICLE TYPE RATE UNIT USEAGE

Truck (Staff Engineer) 480 week 1 480.00$ Truck (Field Technician/Field Geologis 120 days 3 360.00$ Truck (Senior Scientist/Engineer) 120 days 2 240.00$ Auto (Senior Engineer) 80 day 1 80.00$

TOTAL VEHICLE 1,160.00$

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

GeoView, Inc. Borehole utility clearance 1,300.00$ 1 1 1,300.00$ Groundwater Protection Soil borings and MAGS well installatio 13,474.00$ each 1 13,474.00$ Complete Plumbing and DCamera line investigation 300.00$ 300.00$

TOTAL SUBCONTRACTOR 15,074.00$

LABORATORY COSTS

PARAMETER RATE # SAMPLES

Halocarbons EPA 8260 73.00$ 95 6,935.00$ Aromatics EPA 8260 60.00$ 95 5,700.00$ VOCs (soil-prep) 5035 prep 7.00$ 95 665.00$ SPLP Bottle Extraction Method 1312 -$ 0 VOCs Soil Vapor- Full Sc TO-15 200.00$ 18 3,600.00$

Summa Canister 33.00$ 18 594.00$

TOTAL LAB 17,494.00$

6 Days, including Initial site visit (1.5 hours/day)

1 Day, PreTask initial site visit (1.5 hours/day)

Attend initial site visit to meet with owner, determine technical approach to soil / MAGS Investigation Contact owner and conduct pre-drilling site walk with property owner, current tenants, drilling contractor, and FDEP. Designate IDW staging areas, decon pad location, and truck staging areas.

Pre Task Planning, develop soil installation SOW, develop subcontractor scopes of work Prepare Health and Safety Plan

Attend initial site visit and oversee geophysical survey for boring, groundwater screening locations

Prepare soil logging materials and order soil installation kit Request laboratory sample kit (soil sampling, MAGS, groundwater screening, and sampling)

Prepare Health and Safety Plan

SUBTASK 2: Soil Sampling, MAGS, Camera Line Inspection

PROPOSAL NO. PH4227411

DATE: 11/17/2022

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 5 200.00$ Ice (Sample Preservation) 6.50$ each 5 32.50$

Drilling related Analytical related Encore Sampler 16.00$ each 95 (SPLP samples - hold) 1,520.00$

Terra Core Sampler 11.00$ each 95 (VOH samples) 1,045.00$ Soil Assessment Kit 175.00$ day 3 525.00$ MAGS Investigation Kit 500.00$ day 2 1,000.00$

IDW related (Drums provided by Diller) Other Global Positioning System 175.00$ day 2 350.00$

TOTAL EQUIPMENT 4,672.50$

SUBTASK 3: Piezometers, Interior Well, Lithological Log and GW Screening

PROPOSAL NO. PH4227411

DATE: 11/17/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning and Pre-Drilling Tasks (Primarily included in LOE 2) Senior Geologist DN 2.00 Staff Engineer EL 1.50 Piezometer Well Installation and Deep Lithological Boring Scope: 3 Piezometers to a depth of 18 ft bgs, Interior Monitoring Well to a depth of 13 ft bgs, survey Top of casing, advance deep lithological boring to 50 ft bgs Time Duration: 1.5 day Field Geologist JD Load/unload equipment (1 hour/day) 2.00 Staff Engineer EL Direct work, daily safety debrief 10.00 Field Geologist JD Oversee well installation of piezometer, and interior well, and well development, record on MW Install L 10.00 Field Geologist JD 5.00 boring in an upgradient location on-site.

Senior Geologist DN 5.00 Field Geologist JD Containerize IDW 0.50 Staff Engineer EL Prepare draft well and boring logs and field notes for PM evaluation (1 hr/day) 1.00 CADD Specialist CF Download lithology, field notes, gw flow direction to Compass (2 hrs/day) 2.00

(Terracon's software for FDEP access) Direct Push Boring with Screen Point Sampling Scope: 9 Locations to a Depth of 50 feet, collect screen point samples @ 10-14, 16-20, 26-30, 36-40, 46-50 ft bgs, total of 45 screen point sample Time Duration: 3 days Field Geologist JD Load/unload equipment (1 hour/day) 2.00 Staff Engineer EL Direct work, daily safety debrief, record lithology, assist with sample collection, coordinate lab pickup of 30.00 groundwater samples for rush TAT Field Geologist JD Collect field screened samples, record notes/observations in field book, oversee pressure grouting of 30.00 borehole, complete chain of custody Senior Geologist DN 5.00 Field Geologist JD Containerize IDW 0.50 Staff Engineer EL Prepare draft well and boring logs and field notes for PM evaluation (1 hr/day) 2.00 Senior Geologist DN Evaluate gw screening data, communicate with FDEP (1 hr/day) 2.00 CADD Specialist CF Download groundwater screening location and groundwater results to Compass (2 hrs/day) 3.00

(Terracon's software for FDEP access) Mobilization / Demobilizations Senior Geologist DN 4.50 Staff Engineer EL 6.00 Field Geologist JD 4 Days (1.5 hour/day) 6.00

Personnel: EL JD DN CF Hours: 50.50 56.00 18.50 5.00 TOTAL LABOR 130.00

VEHICLE TYPE RATE UNIT USEAGE

Truck (Staff Engineer) 120 day 4 480.00$ Truck (Field Geologist) 120 day 0 -$ Car (Senior Geologist) 80 day 3 240.00$

TOTAL VEHICLE 720.00$

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Groundwater Protection Piezometer, Lithology, GW Screen 9,293.00$ each 1 9,293.00$

TOTAL SUBCONTRACTOR 9,293.00$

LABORATORY COSTS

PARAMETER RATE # SAMPLES

Halocarbons EPA 8260 73.00$ 45 3,285.00$ Aromatics EPA 8260 60.00$ 45 2,700.00$ Emergency Turn-Around 8260 VOH (short list only) 69.30$ 45 (110% of $63.00/sample) 3,118.50$

TOTAL LAB 9,103.50$

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 4 160.00$

Ice (Sample Preservation) 6.50$ each 4 26.00$ Drilling related Monitoring Well Installation Kit 325.00$ day 1 325.00$ Analytical related YSI 105.00$ day 3 315.00$ IDW related (Drums provided by Diller) Other Total Survey Station 50.00$ day 1 50.00$

Global Positioning System 175.00$ day 1 175.00$

TOTAL EQUIPMENT 1,051.00$

Attend initial site visit to meet with owner, determine technical approach to groundwater Investigation Prepare soil logging materials and well installation kit.

Senior geologist oversight of deep lithological boring, records lithological descriptions

Survey top of casing elevation of three piezometers, assess gw flow direction, and install lithological

Senior geologist oversight / technical QA/QC of operations

3 Days, PreTask initial site visit (1.5 hours/day) 4 Days (1.5 hours/day)

SUBTASK 4: Monitoring Well Installation and Groundwater Sampling / Irrigation Well Sampling

PROPOSAL NO. PH4227411

DATE: 11/17/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning and Pre-Drilling Tasks (Primarily included in LOE 2) Staff Engineer EL 1.00

Monitoring Well Installation Scope: 6 Intermediate Wells to a depth of 30 ft bgs, 1 Deep Monitoring Well to a depth of 50 feet Time Duration: 2 days Field Geologist JD Load/unload equipment (1 hour/day) 1.50 Staff Engineer EL Direct work, daily safety debrief, oversee subcontracted surveyor, coordinate sample pickup by lab 20.00 Field Geologist JD Oversee well installation, well development, record on MW Install Log, IDW 20.00 Field Geologist JD Containerize IDW 0.00 Staff Engineer EL Prepare draft well and boring logs and field notes for PM evaluation (1 hr/day) 2.00 Groundwater Sampling Scope: 11 New Monitoring Wells (includes 1 interior monitoring well, 6 intermediate wells, 1 deep monitoring well and 3-shallow piezometer wells) and the Irrigation Well (offsite at WaWa) Time Duration: 2 days Field Geologist JD Load/unload equipment (1 hour/day) 1.50 Field Geologist JD Collect water levels (11 wells, 10 minutes/well) 2.00 Field Geologist JD Containerize IDW (0.5 hrs/day) 0.50 Field Geologist JD Collect groundwater samples for PFAS and VOHs (11 wells, 1.5 hours each) 16.50 Field Geologist JD Collect irrigation well sample (adjacent WaWa property) for PFAS and VOHs 1.50 Field Geologist JD Collect soil and groundwater IDW samples from the 55-gallon drums 1.00 Field Geologist JD Prepare gw sampling and calibration logs and field notes for PM evaluation (1 hr/day) 1.00 CADD Specialist CF Download monitoring well locations and groundwater results to Compass (2 hrs/day) 2.50

(Terracon's software for FDEP access) Mobilization / Demobilizations Staff Engineer EL 3.00 Field Geologist JD 4 Days (1.5 hour/day) 6.00

Personnel: EL JD DN CF Hours: 26.00 51.50 0.00 2.50 TOTAL LABOR 80.00

VEHICLE TYPE RATE UNIT USEAGE

Truck (Staff Engineer) 120 day 2 240.00$ Truck (Field Geologist) 120 day 2 240.00$ Truck (Senior Geologist) 120 day 0 -$

TOTAL VEHICLE 480.00$

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Groundwater Protection MW Installation 8,990.00$ lump sum 1 8,990.00$ SurvTech Survey, Location and Elevation 3,995.00$ 1 3,995.00$

TOTAL SUBCONTRACTOR 12,985.00$

LABORATORY COSTS

PARAMETER RATE # SAMPLES IDW

Halocarbons EPA 8260 73.00$ 12 1,168.00$ Aromatics EPA 8260 60.00$ 12 720.00$ PFAS FDEP laboratory performs analysis -- -- -$ Sample Shipping Small Cooler (overnight) 110.00$ 1 110.00$

TOTAL LAB 1,998.00$

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 4 160.00$

Ice (Sample Preservation) 6.50$ each 2 13.00$ Drilling related Monitoring Well Installation Kit 325.00$ day 2 650.00$ Analytical related Groundwater Sampling Kit 290.00$ day 2 580.00$

Tubing, HDPE 0.30$ ft 334 100.20$ Tubing, silicon (3/16 x 3/8) 3.00$ ft 6 18.00$

IDW related (Drums provided by Diller)

TOTAL EQUIPMENT 1,521.20$

2 Days (1.5 hours/day)

Prepare monitoring well installation materials and well installation kit.

SUBTASK 5: IDW Soil and GW Management

PROPOSAL NO. PH4227411

DATE: 11/17/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Coordinate IDW T&D Staff Engineer EL 1.00 Environmental Technician CO 2.00

TOTAL LABOR 3.00

VEHICLE TYPE RATE UNIT USEAGE

Truck (IDW management) 120 day 1 120.00$

TOTAL VEHICLE 120.00$

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Erwin Remediation 100.00$ each 22 2,200.00$

TOTAL SUBCONTRACTOR 2,200.00$

IDW Disposal (soil / groundwater excluding haz mat)

Coordinate IDW T&D: Mobilize to site, meet transporter to sign manifests Prepare waste characterization/Generator Profile (potential for hazardous waste)

SUBTASK 6: Site Assessment Report

PROPOSAL NO. PH4227411

DATE: 11/17/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Report Deliverable Staff Engineer EL Prepare report tables and draft maps 6.00 Staff Engineer EL 18.00 Staff Engineer DN QA/QC field and laboratory data 3.00

Staff Engineer EL 20.00 Senior Geologist DN Water Quality Parameters Summary Evaluation 2.00 Senior Geologist DN Groundwater Analytical Results and Trend Graphs Summary Evaluation 2.00 Senior Geologist DN Conclusions/Recommendations 3.00

Staff Engineer EL 25.00 CADD Specialist CF Prepare base figures and Exhibits (site setting, potable wells, groundwater flow, cross sections, 13.00 and concentrations maps) Personnel: EL JD DN CF

Hours: 44.00 0.00 10.00 38.00 TOTAL LABOR 92.00

Prepare GINT boring logs (9 DPT Screen points, 19 soil locations, 1 lithological), to include well construction diagrams, lithological descriptions, and prepare cross sections

Prepare GINT boring logs (1.5 hours per well), well construction diagrams, lithological descriptions, and cross sections (1 hour per well)

Prepare draft report introduction, site history, recent activities summary, and discussion of results

5463 West Waters Avenue

Tampa, FL 33684

P (813) 221-0050

F (813) 221-0051

Terracon.com

October 16, 2022

Florida Department of Environmental Protection

Waste Cleanup Program

Waste Management Division

2600 Blair Stone Road

Tallahassee, Florida 32399-2400

Attn: Mr. Dean Cox, Environmental Consultant

E: Dean.Cox@FloridaDep.gov

W: 850-245-8969

M: 727-686-6502

Re: Proposal for Site Assessment Work Plan Implementation

Majik Touch Cleaners and Laundry – Commercial Drycleaning Plant

3312 Lithia Pinecrest Road

Valrico, Hillsborough County, Florida

ERIC_4714

Task Assignment HW687

Terracon Proposal No. PH1227411

Dear Mr. Cox:

Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this proposal to the

Florida Department of Environmental Program (FDEP) Waste Cleanup Program (WCP) to implement the FDEP approved Site Assessment Workplan (SAWP), Revision 1.0, dated September 13, 2022 for

Majik Touch Cleaners and Laundry – Commercial Drycleaning Plant (ERIC_4714) located at 3312 Lithia

Pinecrest Road, Hillsborough County, Florida. The objective of this site assessment is to assess for the horizontal and vertical extent of on-site chlorinated solvent contamination.

Scope of Services

◼ Subtask 1. Project Management

◼ Subtask 2. Soil Sampling, Modified Active Gas Survey (MAGS), Camera Line Inspection

◼ Subtask 3. Installation of Piezometer and Interior Well, Advance

Lithological Profile Boring, and Groundwater Profile Assessment, ◼ Subtask 4. Monitoring Well Installation, Irrigation and

Groundwater Sampling

◼ Subtask 5. Investigative Derived Waste Management

◼ Subtask 6. Preparation of Site Assessment Report

See attached LOE for details

Schedule

Submit Site Assessment Report of on-site activities within 30 business days following receipt of laboratory results.

Compensation

See attached CEF for details.

mailto:Dean.Cox@FloridaDep.gov

Proposal for Site Assessment Workplan Investigation

Majik Touch Cleaners and Laundry, ERIC_4714 ■ Valrico, FL

October 16, 2022 ■ Terracon Proposal No. PH1227131

SCOPE OF SERVICES

Subtask 1 – Project Management

Eddy Leon, E.I. will serve as the Project Manager during the field investigation. Donna Cline, P.E., and

Dan Nedvidek, P.G., will be involved throughout the project, serving as Authorized Project Reviewers.

Subtask 2 - Soil Sampling, Modified Active Gas Sampling (MAGS), and Camera Line Inspection

Terracon will prepare health and safety plan. Pre-Task Planning will also be performed to prepare for field investigations.

Utility Locate

Prior to conducting the soil sampling, monitoring well installations, and DPT groundwater profile assessment, Terracon will subcontract the services of a subsurface geophysical survey company to identify potential subsurface utilities or obstructions. GeoView was the low bid and estimates that the work will take one day to complete. The geophysical survey bids are attached. As a cost saving measure, no additional mobilization costs will be incurred as the subsurface utility survey will begin the same day as soil sampling activities.

Soil Investigation

Terracon will collect soil samples via hand-auger and DPT from 10 proposed soil locations (only) and from the 9 proposed MAGS locations as described in SAWP (Terracon 2022). Terracon will collect soil samples from 0.5, 2, 4, 6, 8 and 10 feet (ft) below ground surface (BGS), or to the top of the water table, via hand auger and/or from the DPT soil samples at each soil boring location. Terracon has contracted with Groundwater Protection to perform the concrete coring and complete the soil borings.

Terracon personnel will also field screen the soils with an OVA-PID, document the lithology observed at each of these soil boring locations, and will record the Global Positioning System (GPS) coordinates of completed borings. Based on the number of proposed boring locations and depth intervals, Terracon will collect up to 95 soil samples for total Volatile Organic Compounds and Synthetic Precipitation

Leaching Procedure (SPLP). The SPLP samples will remain on hold until the results from the full list

VOC results are received. SPLP extraction and VOC analysis will be performed with FDEPs discretion on those samples that report concentrations exceeding the respective soil Cleanup Target Level. This additional analysis will be considered a Work Change Directive/Task Assignment Change Order. The approximate sampling locations, depth intervals, matrices, analytes and laboratory methods, rationale, and screening criteria are summarized in the SAWP (Terracon, 2022). The soil borings will be pressure grouted with neat cement / bentonite mixture. As detailed in the SAWP, 9 of these soil borings will be completed to MAGS wells.

Modified Active Gas Survey (MAGS)

The MAGS test will be performed over a period of 2 days.

Camera Line Investigation

During the soil sampling activities, Terracon will subcontract the services of a licensed plumber to perform a camera line investigation. Complete Plumbing and Drain was the low bid and will provide a video of the camera line investigation. As a cost saving measure, no additional mobilization costs will be incurred as the camera line investigation will be performed the same time as soil sampling or MAGS testing activities.

Subtask 3 - Piezometer and Interior Well Installation, Lithological Profiling, Groundwater

Profile Assessment, Monitoring Well Installation, Irrigation and Monitoring Well Sampling

Piezometer and Interior Well Installation, Lithological Profile

Three piezometers will be installed at the site, screened 8 to 18 ft BGS (based on an estimated depth to water of 10 ft BGS), the piezometers will be surveyed to assess groundwater flow direction, and the lithological boring will be installed within an upgradient hydraulic location. The lithological profile boring will be advanced to an estimated depth of 50 ft BGS, and Terracon’s geologist will be on-site to describe the lithology.

The interior monitoring well will be installed using with a 5 ft screen to a depth of 13 ft bgs.

Groundwater Protection has offered to bring a small rig to install the interior monitoring well. If this drill rig is able to install the well inside the building, then Terracon may advise FDEP and propose a 10 ft screen length.

DPT Groundwater Profile Assessment

The objective of the DPT groundwater profile assessment is to evaluate the extent and magnitude of drycleaning COI within the on-site property boundary. Terracon anticipates advancing up to 9 DPT groundwater borings and collecting groundwater samples from 16 to 20, 26 to 30, 36 to 40, 46 to 50, or until refusal at each location. The groundwater samples will be submitted to the laboratory for analysis of full list VOCs. As detailed in the SAWP, the VOH (short list) will be requested for 24-hour turnaround time. Daily updates of activities will be uploaded within 24 hours on the Terracon website

Compass, to allow FDEP access to the site activities, and groundwater analytical results.

Based on the number of proposed boring locations and depth intervals, Terracon will collect up to 45 groundwater samples. Additional details are summarized in the SAWP (Terracon, 2022).

Subtask 4 -Monitoring Well Installation, Irrigation and Monitoring Well Sampling

Monitoring Well Installation

Terracon will oversee the installation of six intermediate and 1 deep monitoring wells. The proposed locations for the monitoring wells are shown in the SAWP (Terracon, 2022). Terracon will advise with

FDEP on the proposed locations, and the monitoring wells will not be installed unless the locations are agreed on by FDEP.

It is anticipated that the proposed intermediate monitoring wells will be installed to a depth of approximately 30 ft BGS, with 10 ft pre-packed screen. The deep monitoring well is proposed to a depth of 50 ft BGS, with 5-ft of pre-packed screen. Each well will be completed flush to ground surface in an 8-inch diameter manhole set within a 2-ft by 2-ft by 4-inch concrete pad. Monitoring wells will be developed until the water is visibly free of sediment.

Monitoring Well Sampling

Groundwater samples from the 3 piezometers, 6 intermediate, 1 deep, and 1 shallow interior newly installed monitoring well, in accordance with the FDEP SOPs. Prior to monitoring well sampling, Terracon will collect depth-to-water measurements. The analytes and laboratory methods are summarized in the SAWP (Terracon, 2022), and will include full list VOCs and PFAS analysis.

As a cost saving measure, no additional mobilization costs will be incurred as the specific purpose survey by SurvTech Solutions, Inc. will begin the same day as groundwater sampling activities.

Subtask 5 –Investigation Derived Waste

Decontamination activities will take place at a designated staging and laydown area. The soil and water IDW will be containerized in 55-gallon drums and staged on-Site at a designated location. It is estimated that 22 drums of IDW will be generated in Subtasks 2, 3 and 4, and the transportation and disposal costs for the drums are included under Subtask 5.

Terracon recommends subcontracting Erwin Remediation, Inc. (Erwin) for IDW transportation and disposal. Terracon will provide oversight of the IDW pickup, and sign waste manifests as an agent of

FDEP.

Subtask 6 –Site Assessment Report

Terracon will prepare a Site Assessment Report that will detail and summarize the groundwater sampling activities, field observations, and results of soil and groundwater analysis and will include data tables and exhibits of groundwater flow and soil and groundwater concentrations. Conclusions and recommendations will include a summary of results and recommendations for future sampling or remedial activities.

SCHEDULE

It is estimated that the drilling activities may be completed within a 10-day period. Due to the expedited schedule while performing work at an active commercial drycleaning facility, Terracon recommends having three Terracon personnel on-site. Daily updates of activities will be uploaded within 24 hours on the Terracon website Compass, to allow FDEP access to the site activities, and groundwater and soil analytical and investigative results. Terracon anticipates the deliverable of site assessment activities within 30 business days of receipt of analytical results.

CLOSING REMARKS

Terracon services will be conducted in accordance with the terms and conditions, contained within DEP

Waste Cleanup Program (WCP) Contract No. HW687, executed January 5, 2022. It is understood that a Task Assignment will be issued to authorize us to perform this work.

We appreciate the opportunity to provide this proposal and look forward to working with you on this project. If you should have any questions or comments regarding this proposal, please contact either of the undersigned at 813-221-0050.

Sincerely, Terracon Consultants, Inc.

FOR

Eddy Leon, E.I. Donna Cline, P.E.

Staff Engineer Senior Remediation Engineer

Attachments: Cost Spreadsheet

Level of Effort dlcline Stamp dlcline Stamp dlcline Stamp

Action

Environmental

Preferred Drilling

Solutions

Groundwater

Protection

Drilling Specifications 38,462.50$ 37,725.00$ 31,757.00$

Total 38,462.50$ 37,725.00$ 31,757.00$

Selected FL Licensed Driller: Groundwater Protection

3-Bid Summary SAWP Implementation

Majik Touch Cleaners and Laundry ERIC_4714

Terracon Proposal No. PH4227411

Majik Touch Cleaners and Laundry, ERIC_4714

DRILLING SPECIFICATIONS

Site and Address: Majik Touch Cleaners & Laundry, 3312 Lithia Pinecrest Road, Valrico, Hillsborough County, Florida

Item No.

Estimate Time to Complete

(days) Unit of Measure Estimated Quantity Linear Feet

Unit Price/Linear

Feet Extended

Price

0 -- Lump Sum 1 -- $400.00 400.00$

1 -- Lump Sum 1 -- $8,065.00 8,065.00$

2 -- Lump Sum 1 -- $300.00 300.00$

3 -- Lump Sum 1 -- -$

4 1 Lump Sum 9 90 $220.50 1,984.50$

5 0.5 Lump Sum 10 100 $250.00 2,500.00$

6 0.5 Lump Sum 1 13 $1,031.00 1,031.00$

7 0.5 Lump Sum 3 54 $809.00 2,427.00$

8 1 Boring 1 50 $1,320.00 1,320.00$

9A 2 Boring 9 450 $920.00 8,280.00$

9B 2.5 Boring 9 450 $350.00 3,150.00$

10 1.5 Well 6 180 $865.00 5,190.00$

11 0.5 Well 1 50 $1,275.00 1,275.00$

12 -- Drum 8 Drum $55.00 440.00$

13 -- Lump Sum 1 Lump Sum $2,500.00 2,500.00$

14 -$

TOTAL NO. DAYS 10 TOTAL 38,462.50$

"PFAS-Free" water source: Samples of the driller's shop water will be required to be analyzed for PFAS by the FDEP Laboratory prior to use on-site. If water has been previously tested and approved for use please provide letter or copy of lab data with this solicitation.

General Information: Terracon is soliciting quotes from three (3) Florida licensed well contractors, on behalf of the FDEP Waste Cleanup Program, for the following scope of services. The driller will be responsible for all necessary permits, public utility locates, equipment and personnel to complete this scope of work. The driller should be aware that increases in scope may occur once the work has begun.

Preconstruction Meeting

Drillers Signature:

License No.: 9539

727.637.9956

Decontamination: All downhole tools will be decontaminated prior to and between each sample interval location (i.e. every foot during hand auger advancement and every five feet during macrocore advancement). Specific decontamination procedures include alconox scrub and steam wash and apply for all drilling equipment and downhole tools (e.g., tremie pipe, hoses). Decontamination fluids and solids will be containerized separetly. Offeror’s equipment shall arrive clean and free of soil or dirt from its previous work location.

Investigation Derived Waste (IDW) and Trash: Soil cuttings, decontamination water and solids, and development water (IDW) generated during well installation will be drummed. The Driller will supply a sufficient number of FDOT-approved 55-gallon steel drums to contain all IDW generated during site activities. The Offeror will be required to consolidate the IDW drums into one central location.

Drilling Conditions: The site is an active facility, operating as a drycleaner. The site has limited space. It should be assumed that potable water and electricity are not available.

The depth to water is estimated at 10 feet bgs.

Health and Safety: Work is expected to be perfomed in Level D personal protective equipment. The primary contaminats of concern at the site are chlorinated solvents, tetrachloroethene. Proper safey procedures to minimize contact with contaminated site media is required. Site personnel are required to be 40-hour OSHA trained.

3007 N 50th Street Tampa FL 33619

Hand Augered/DPT Soil Borings to Water Table (Est. @ 10')

Shallow Piezometer Installation

Subcontractor Deliverables Soil Gas (MAGS) Well Installation and Soil Sampling

Deep Lithological Boring

Direct Push Boring with Screenpoint Sampling

Shallow Monitoring Well Installation (interior)

Company Name:

Direct push boring adjacent to screen point sampling location

Line items 8-12 will be invoiced based upon actual quantities/depths completed in the field.

Deep Monitoring Well Installation Drums (contractor to estimate IDW based on specs) Demobilization Contactor Specific / Other (include description below)

Company Address:

Phone:

Mobilization and Per Diem Permitting

Action Environmental

Item Description

Intermediate Monitoring Well Installation

Page 1 of3 Terracon Project No. H4227285

Install Method Well Material Total Depth Screen

Interval

4 Hand Auger 2” SCH 40 PVC

One foot above the seasonal high water table (approx. 10')

2-9'

Hand Auger /

DPT

N/A 10' N/A

Hand

Auger/Dolly Rig

1" SCH 40 PVC

prepacked well

13'

5' screen based on total depth

eg. 8-13'

Hand Auger to 5' DPT to 40-50' max

N/A 50' N/A

(0.25-1'): sand (1-2'): grout (1-9'): sand

Neat cement grout to surface, concrete patch in asphalt/pavement

(0-2'): neat cement (2-3'): 30/65 fine sand (3-13'): 20/30 sand borehole properly sealed with bentonite chips or neat cement grout, asphalt surface patch

Backfill Interval

ITEM

NO

Completion logs, permits, sunshine utility locate number, 40-hour OSHA certificates Installation of 9 MAGS wells and soil sample collection at the locations shown on Exhibit 4. Soil Samples will be collected continuously for OVA screening and for lab analysis to the terminal depth of each location, the hand auger is expected to be decontaminated every foot, soil samples will be collected every 2-feet. Indoor wells to be completed with sand to 2-3" below ground surface. Outside wells to be finished in a 8" well manhole and 2x2-ft concrete well pad.

Inside Building Surface (7 MAGS/Soil Gas Wells): Concrete floor (core drill) Outside Surface (2 MAGS/Soil Gas Wells): Dirt/grass

Mobilization to include: all equipment necessary to complete the identified scope of work, including drill rig, tooling, trucks, restoration or repair of damaged surfaces (e.g. repair of concrete, if damaged by drill rig)

Permitting for wells

Item Specifications

Deep lithological boring to include DPT sample collection continuous core every 5 feet.

Surface: asphalt

Shallow Interior Monitoring Well installation to include: installation by hand or dolly rig (preffered method) at the location shown on Exhibit 5, soil sampling continuously for OVA screening, installation of 1" prepacked monitoring well to approximately 13', well to be completed with 6 or 8" well locking manhole

Surface: concrete (core drill)

Advancement of 10 soil borings for soil sampling at the locations shown on Exhibit 4. Soil Samples will be collected continuously for OVA screening and for lab analysis to the terminal depth of each location, the hand auger is expected to be decontaminated every foot, soil samples will be collected every foot.

Surface: concrete (core drill), asphalt/pavement (core drill), and grass

Construction Details

Page 2 of3

Install Method Well Material Total Depth Screen

Interval

8 DPT

1" SCH 40 PVC

prepacked well

18' 10' screen 8-18'

9A Hand Auger to 5' DPT to 50'

N/A 50'

0-5' 5-10' 10-15' 15-20' 20-25'

9B Hand Auger to 5' DPT to 50'

N/A DPT 4' retractable screenpoint for sample collection

50'

5-intervals 10-14' 16-20' 26-30' 36-40' 46-50'

10 DPT 1” SCH 40 PVC 30'

10' pre-packed screen based on total depth

eg. 20-30'

11 DPT 1” SCH 40 PVC 50'

5' pre-packed screen based on total depth

eg. 45-50'

ITEM

NO

Item Specifications

Construction Details

Backfill Interval borehole properly sealed with bentonite chips or neat cement grout, asphalt surface patch

(0-23'): neat cement (23-24'): 30/65 fine sand (24-30'): 20/30 sand

(0-41'): neat cement (41-43'): 30/65 fine sand (43-50'): 20/30 sand

Demobilization to include staging of drums, restoration of property, and cleanup required from exploration activities

Deep monitoring wells to be completed with 6 or 8" DOT Locking manhole cover completed flush to grade with 2x2' concrete pad. Location to be determined.

ground surface: dirt/asphalt

Drums for IDW:

All soil will be drummed All water will be drummed separately from soil

Direct push groundwater sample screenpoint collection (9 locations) to include: Groundwater samples to be collected from 4' DPT screenpoint every 10 feet. (10-14', 16-20', 26-30', 36-40', 46 - 50') Terracon to perform groundwater sample collection (anticipated time to collect samples: 30 min) DPT screen point sampling locations shown on Exhibit 5.

3 shallow Piezometer installation to include: soil sampling continuously for OVA screening, installation of 1" prepacked monitoring well. Wells to be completed with 6 or 8" DOT Locking manhole cover completed flush to grade with 2x2' concrete pad, The investigative derived waste will be containerized into a FDOT 55-gallon drum for offsite disposal.

Direct push soil boring adjacent to screenpoint sampling location collection (9 locations) to include: Hand auger 0-5 feet and continuous macrocore collection every 5 feet to terminal depth of boring (5-10, 10-15, …)

DPT screen point sampling locations shown on Exhibit 5.

borehole properly sealed with bentonite chips or neat cement grout, asphalt surface patch

Intermediate monitoring wells to be completed with 6 or 8" DOT Locking manhole cover completed flush to grade with 2x2' concrete pad. Location to be determined.

ground surface: dirt/asphalt

(0-6'): neat cement (6-7'): 30/65 fine sand (7-18'): 20/30 sand

Page 3 of3

Site and Address: Majik Touch Cleaners & Laundry, 3312 Lithia Pinecrest Road, Valrico, Hillsborough County, Florida

Item No.

Estimate Time to Complete

(days) Unit of Measure Estimated Quantity Linear Feet

Unit Price/Linear

Feet Extended

Price

0 -- Lump Sum 1 -- $475.00 475.00$

1 -- Lump Sum 1 -- $900.00 900.00$

2 -- Lump Sum 1 -- $100.00 100.00$

3 -- Lump Sum 1 -- -$

4 1.5 Lump Sum 9 90 $450.00 4,050.00$

5 0.75 Lump Sum 10 100 $130.00 1,300.00$

6 0.75 Lump Sum 1 13 $750.00 750.00$

7 0.5 Lump Sum 3 54 $950.00 2,850.00$

8 0.5 Boring 1 50 $750.00 750.00$

9A 2 Boring 9 450 $725.00 6,525.00$

9B 2 Boring 9 450 $725.00 6,525.00$

10 1.5 Well 6 180 $1,575.00 9,450.00$

11 0.5 Well 1 50 $1,975.00 1,975.00$

12 -- Drum 22 Drum $75.00 1,650.00$

13 -- Lump Sum 1 Lump Sum $900.00 900.00$

14 -$

TOTAL NO. DAYS 10 1437 TOTAL 37,725.00$

Company Address:

Phone:

Mobilization and Per Diem

Permitting

Preferred Drilling Solutions, Inc.

Item Description

Intermediate Monitoring Well Installation

Deep Monitoring Well Installation

Drums (contractor to estimate IDW based on specs)

Demobilization

Contactor Specific / Other (include description below)

Decontamination: All downhole tools will be decontaminated prior to and between each sample interval location (i.e. every foot during hand auger advancement and every five feet during macrocore advancement). Specific decontamination procedures include alconox scrub and steam wash and apply for all drilling equipment and downhole tools (e.g., tremie pipe, hoses).

Decontamination fluids and solids will be containerized separately. Offeror’s equipment shall arrive clean and free of soil or dirt from its previous work location.

Investigation Derived Waste (IDW) and Trash: Soil cuttings, decontamination water and solids, and development water (IDW) generated during well installation will be drummed. The Driller will supply a sufficient number of FDOT-approved 55-gallon steel drums to contain all IDW generated during site activities. The Offeror will be required to consolidate the IDW drums into one central location.

Drilling Conditions: The site is an active facility, operating as a drycleaner. The site has limited space. It should be assumed that potable water and electricity are not available. The depth to water is estimated at 10 feet bgs.

Health and Safety: Work is expected to be performed in Level D personal protective equipment. The primary contaminates of concern at the site are chlorinated solvents, tetrachloroethene. Proper safety procedures to minimize contact with contaminated site media is required. Site personnel are required to be 40-hour OSHA trained.

8820 66th St N, Pinellas Park, FL

Hand Augered/DPT Soil Borings to Water Table (Est. @ 10')

Shallow Piezometer Installation

Subcontractor Deliverables

Soil Gas (MAGS) Well Installation and Soil Sampling

Deep Lithological Boring

Direct Push Boring with Screen point Sampling

Shallow Monitoring Well Installation (interior)

Company Name:

Direct push boring adjacent to screen point sampling location

Line items 8-12 will be invoiced based upon actual quantities/depths completed in the field.

"PFAS-Free" water source: Samples of the driller's shop water will be required to be analyzed for PFAS by the FDEP Laboratory prior to use on-site. If water has been previously tested and approved for use please provide letter or copy of lab data with this solicitation.

General Information: Terracon is soliciting quotes from three (3) Florida licensed well contractors, on behalf of the FDEP Waste Cleanup Program, for the following scope of services. The driller will be responsible for all necessary permits, public utility locates, equipment and personnel to complete this scope of work. The driller should be aware that increases in scope may occur once the work has begun.

Preconstruction Meeting

Drillers…

This is the start of the file's text. The full file is on GovTribe.