This is a Task Assignment (TA) document issued under the Florida Department of Environmental Protection (FDEP) Waste Cleanup Program (WCP) Contract Number HW687. The task assignment DC011A was executed between the State of Florida Department of Environmental Protection and Terracon Consultants, Inc., with Dean Cox serving as the Department Project Manager and Donna Cline as the Contractor's Project Manager. The work is performed at 60 Minute Cleaners (ERIC_4806), located at 1145 20th Place, Vero Beach, Florida, and is associated with a groundwater monitoring and remedial action project for an active PCE drycleaning facility.

The task assignment authorizes groundwater monitoring, related waste handling and disposal, sample shipping and analysis, and equipment procurement for a total fixed unit rate value of $11,547.76, comprising 63.50 hours of labor. Work activities include field preparation and groundwater sampling (35.5 hours), preparation of a groundwater monitoring report (24 hours), analytical testing costs ($1,710 for EPA 8260C analysis and $1,080 for dissolved gases testing), equipment and supplies ($1,968.10), travel expenses ($888), and industrial waste disposal ($110). The deliverable is a Groundwater Monitoring Report due July 15, 2022, with full invoice submission upon FDEP approval of the report by the completion date of September 30, 2022. Labor costs in the original proposal were reduced by 10%, resulting in an overall TA cost reduction of approximately $1,204.60. The task serves as a groundwater Remedial Action Management (NAM) update to evaluate plume location, contaminant concentrations, and dissolved gas results to determine the need for additional remedial action and assist in selecting a site closure path.

View the file

Other files

File Type Posted
CN-370000-HW687-BF01ACO1.pdf PDF
CN-370000-HW687-BF03ACO1.pdf PDF
CN-370000-HW687-BIL01A.pdf PDF
CN-370000-HW687-BIL2ACO1.pdf PDF
CN-370000-HW687-BIL2BCO1.pdf PDF
CN-370000-HW687-BIL2CCO1.pdf PDF
CN-370000-HW687-BIL3ACO2.pdf PDF
CN-370000-HW687-BIO1ACO1.pdf PDF
CN-370000-HW687-DC001A.pdf PDF
CN-370000-HW687-DC003A.pdf PDF
CN-370000-HW687-DC003D.pdf PDF
CN-370000-HW687-DC005D.pdf PDF
CN-370000-HW687-DC006A.pdf PDF
CN-370000-HW687-DC006B.pdf PDF
CN-370000-HW687-DC008C.pdf PDF
CN-370000-HW687-DC010A.pdf PDF
CN-370000-HW687-DC010B.pdf PDF
CN-370000-HW687-DC011F.pdf PDF
CN-370000-HW687-DC011H.pdf PDF
CN-370000-HW687-DC012D.pdf PDF
CN-370000-HW687-DC013C.pdf PDF
CN-370000-HW687-DC015A.pdf PDF
CN-370000-HW687-DC015C.pdf PDF
CN-370000-HW687-DC019A.pdf PDF
CN-370000-HW687-DC01ACO2.pdf PDF
CN-370000-HW687-DC020A.pdf PDF
CN-370000-HW687-DC020B.pdf PDF
CN-370000-HW687-DC020C.pdf PDF
CN-370000-HW687-DC020D.pdf PDF
CN-370000-HW687-DC023C.pdf PDF
CN-370000-HW687-DC025B.pdf PDF
CN-370000-HW687-DC025C.pdf PDF
CN-370000-HW687-DC025F.pdf PDF
CN-370000-HW687-DC027B.pdf PDF
CN-370000-HW687-DC027C.pdf PDF
CN-370000-HW687-DC02BCO1.pdf PDF
CN-370000-HW687-DC02CCO2.pdf PDF
CN-370000-HW687-DC02DCO1.pdf PDF
CN-370000-HW687-DC02HCO1.pdf PDF
CN-370000-HW687-DC032A.pdf PDF
CN-370000-HW687-DC034A.pdf PDF
CN-370000-HW687-DC034C.pdf PDF
CN-370000-HW687-DC034D.pdf PDF
CN-370000-HW687-DC035F.pdf PDF
CN-370000-HW687-DC036A.pdf PDF
CN-370000-HW687-DC03CCO1.pdf PDF
CN-370000-HW687-DC041C.pdf PDF
CN-370000-HW687-DC041D.pdf PDF
CN-370000-HW687-DC048A.pdf PDF
CN-370000-HW687-DC048B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW687

DC011A Completion September 30, 2022

This task assignment (TA) authorizes costs associated with groundwater monitoring, related waste handling & disposal, sample shipping & analysis, and equipment. The total cost for this TA is $11,547.76 with 63.50 hours of labor. All costs are fixed unit rate.

Dean Cox 850-245-8969 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Terracon Consultants, Inc.

Terracon Consultants, Inc.

Donna Cline 813-321-0340

ERIC_4806

1145 20th Place, Vero Beach FL

60 Minute Cleaners

✔ $ 11,547.76

$ 11,547.76

Scope of Work

William E. Burns, Jr.

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2022.05.25 11:20:22 -04'00'

N/A dlcline Typewriter Donna Cline dlcline Typewriter Senior Remediation Engineer

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Groundwater Monitoring Report 07/15/2022

FDEP approval of Groundwater Monitoring Report (Subtask 1 Project Management and Subtask 2 Groundwater Monitoring and Subtask 3 Groundwater Monitoring Report)

$ 11,547.76

$ 11,547.76

HW687

DC011A

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Interim Secretary

Memorandum

TO: HW687 Contract File FROM: Dean Cox, Contract Manager SUBJECT: DC011A Groundwater Monitoring @ 60 Minute Cleaners (ERIC_4806)

DATE: 5/25/2022

This task assignment (TA) authorizes costs associated with groundwater monitoring, related waste handling & disposal, sample shipping & analysis, and equipment. The total cost for this TA is $11,547.76 with 63.50 hours of labor. All costs are fixed unit rate.

The labor costs in the contractor’s original proposal were reduced by 10%, resulting in a TA total cost reduction of approximately 10%, amounting to $1,204.60 lower cost.

This TA serves as a groundwater NAM update. Groundwater plume location and contaminant concentrations will be evaluated along with groundwater dissolved gases results to better determine the need for any additional remedial action. Results will also assist in choosing a site closure path, RMO I or RMO III.

The facility is an active PCE drycleaner. It has a potential buyer who plans to use petroleum based drycleaning solvent. The site access agreement was verified as valid.

FDEP COST ESTIMATE

Contractor: Terracon

Date: 5/24/2022 Task #: DC0011A SubTask 1 Project Management SubTask 6

Site: 60 Minute Cleaners ERIC_4806 SubTask 2 Groundwater Monitoring SubTask 7 Activity/Phase: GW Sampling and Monitoring Report SubTask 3 Groundwater Monitoring Report SubTask 8

Project Manager: Dean Cox SubTask 4 SubTask 9 SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$64.50 Project Manager Donna Cline 4.00 4.00 $0.00 Administrative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Brownfield Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$22.25 CADD Specialist Andy Schifano 4.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Data Analyst & Visualization Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$24.75 Environmental Technician Pete Christianson 28.00 28.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 GIS Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$31.56 Project Scientist Laura Sebastian 9.00 4.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior GIS Analyst 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$49.69 Senior Scientist Lydia Wing 18.50 3.50 15.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Hours 63.50 4.00 35.50 24.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $2,243.40 $258.09 $993.16 $992.15 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 116.00% $2,602.34 $299.38 $1,152.07 $1,150.89 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.26% $1,262.13 $145.20 $558.75 $558.18 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $6,107.87 $702.67 $2,703.98 $2,701.22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF TERRACON Page 1

FDEP COST ESTIMATEContractor: Terracon Date: 5/24/2022

Task #: DC0011A SubTask 1 Project Management SubTask 6 Site: 60 Minute Cleaners ERIC_4806 SubTask 2 Groundwater Monitoring SubTask 7

Activity/Phase: GW Sampling and Monitoring Report SubTask 3 Groundwater Monitoring Report SubTask 8 Project Manager: Dean Cox SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $480.00 480.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $408.00 $408.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $888.00 $888.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $100.00 100.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $10.00 $10.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $1,710.00 1,710.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $153.00 153.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,863.00 $1,863.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $120.00 120.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,412.10 1,412.10$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 100.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $336.00 336.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,968.10 $1,968.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $10,936.97 $702.67 $7,533.08 $2,701.22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $610.79 $70.27 $270.40 $270.12 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $11,547.76 $772.94 $7,803.48 $2,971.34 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF TERRACON Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : 60 Minutes Cleaners ERIC_4806 SUBTASK 2: Annual Groundwater Monitoring and Reporting

PROPOSAL NO. PHD1227023

DATE: 5/24/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning and Groundwater Sampling Senior Scientist/Geologist LW 1.00 Senior Scientist/Geologist LW 1.00 Senior Scientist/Geologist LW 1.00

Env Technician PC Load/unload 1.00 Env Technician PC Mobilization/Demobilization (from Winter Park) 3.50 Env Technician PC Access wells and replace locks and caps (14 wells) 1.00 Env Technician PC Collect groundwater levels (9 wells,10 minutes per well) 1.50 Env Technician PC Collect groundwater samples (13 total wells (9 wells, 4 injection wells) at 1.5 hours each) 19.50 Env Technician PC Containerize IDW in a central location 0.50 Env Technician PC Evaluate SVE system and document site conditions 1.00

Coordinate IDW T&D Senior Scientist/Geologist LW 0.50 Project Scientist LS 4.00

TOTAL LABOR 35.5

VEHICLE TYPE RATE UNIT USEAGE

Truck (groundwater sampling) 120 day 3 360.00$ Truck (IDW Coordination) 120 day 1 120.00$

TOTAL VEHICLE 480.00$

PER DIEM STAFF RATE UNIT USEAGE

PC $150.00 per night stay 2 300.00$ PC $36.00 per day 3 108.00$

TOTAL PER DIEM 408.00$

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Erwin Remediation IDW Disposal 100.00$ each 1 100.00$

Subcontractor Handling Fee 10% 0 10.00$

TOTAL SUBCONTRACTOR 110.00$

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC* #IDW TOTALS

Halocarbons (short list) EPA 8260 63.00$ 9 0 1 630.00$ Fe EPA 1610 13.50$ 0 -$ Na EPA 1610 13.50$ 0 -$ pH EPA 150.1 10.00$ 0 -$ Chloride SM4500-Cl 20.00$ 0 -$ Sulfate 375.2/300.0 31.00$ 0 -$

TDS SM2540C 16.00$ 0 -$

TOC SM5310C 30.00$ 0 -$

Color SM2120B 13.00$ 0 -$ Dissolved gasses RSK-175 180.00$ 6 1,080.00$ Sample Shipping Large Cooler (2 day) 70.00$ 2 140.00$ Sample Preparation Ice 6.50$ 2 13.00$

TOTAL LAB 1,863.00$

* No charge for trip blanks

Request sample kit Prepare Health and Safety Plan PreTask Planning, prepare field sampling SOW/coordinate site access

Prepare waste characterization/Generator Profile Coordinate IDW T&D: Mobilize to site, meet transporter to unlock secure area for pickup

SITE : 60 Minutes Cleaners ERIC_4806 SUBTASK 2: Annual Groundwater Monitoring and Reporting

PROPOSAL NO. PHD1227023

DATE: 5/24/2022

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Deep groundwater sampling k 415.00$ day 3 1,245.00$ Tubing, HDPE 0.30$ ft 417 125.10$ Tubing, silicon (3/16 x 3/8) 3.00$ ft 14 42.00$ Expendables 40.00$ day 3 120.00$ Lock, key operated 7.00$ ea 14 98.00$ well, cap 2" 17.00$ ea 14 238.00$ 55-gallon drum, new 100.00$ drum 1 100.00$

TOTAL EQUIPMENT 1,968.10$

SITE : 60 Minute Cleaners ERIC_4806 SUBTASK 3: Annual Groundwater Monitoring Report

PROPOSAL NO. PH1227140

DATE: 5/24/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Report Deliverable Project Scientist LS Prepare report tables, draft groundwater elevation and analytical isoconcentration figures 4.00

Senior Scientist/Geologist LW Prepare report 7.00 Senior Scientist/Geologist LW QA/QC field and laboratory data 1.00 Senior Scientist/Geologist LW Summarize groundwater analytical results 2.00 Senior Scientist/Geologist LW Summarize groundwater geochemistry field results 1.00 Senior Scientist/Geologist LW Conclusions/Recommendations 4.00

Project Scientist LS Complete FDEP GIS / ADaPT tables 1.00

GIS Technician AS Prepare and update TetraTech base Figures and Exhibits 4.00 (3 groundwater flow and 1 concentration map)

TOTAL LABOR 24.0

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE -$

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM -$

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

TOTAL SUBCONTRACTOR -$

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC* #IDW TOTALS

TOTAL LAB -$

* No charge for trip blanks

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT -$

Ranking by fee

Sub Solids non-haz 55-gal drum

Liquids non-haz

55-gal drum Additional pricing conditions

Minority Y/N

Regions* Contact Name Contact # email

1 Erwin Remediation 100.00$ 100.00$ all inclusive No All Johnathan Erwin 850-292-6511 erwinremediation@gmail.com

2 Clean Earth $63+$45=$108 $65+$45 =$110 15% EEI on total disposal, stop fee $100, 55% FSC of total transportation

No All Ryan Penfield 843-562-7481 rpenfield@harsco.com

3A Whatever Waste 150.00$ 150.00$ all included No North and

Central Florida

John 904-881-1957 John@whateverwaste.com

3B Whatever Waste 200.00$ 200.00$ all included No South Florida

John 904-881-1957 John@whateverwaste.com

* Regions that are specified with "All" of Florida, are not inclusive of the Keys

Erwin Remediation is the selected IDW Contractor

IDW Contractors, All of Florida (Except the Keys)

408 Ditmar Street

Pensacola, FL 32503

ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562

(850) 292-6511

To: Mr. Sid O’Neal

Terracon

3559 Timberlane School Road

Tallahassee, FL 32312

March 4, 2022

Re: Non-Hazardous Drum Disposal – State of Florida

Mr. O’Neal:

The price for the transportation and disposal (T&D) of drums of non-hazardous soil, mud and water located in the State of Florida is listed below.

Non-Hazardous Chlorinated VOHs, Petroleum and Metals:

Description Rate Unit

T&D - Non-Haz Soil $ 100.00 Per Drum

T&D - Non-Haz Mud/Water $ 100.00 Per Drum

The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida

Keys. Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.

Respectfully, Jonathan Erwin

Erwin Remediation, Inc.

Email: ErwinRemediation@Gmail.com

Office: (850) 292-6511 mailto:Remediation@Gmail.com

Cline, Donna L

From: O'Neal, Sid L Sent: Wednesday, March 9, 2022 12:12 PM To: Cline, Donna L; Wing, Lydia; Lewis, Tom E Subject: FW: :EXTERNAL: RFQ - Non-Haz T&D

Here’s an email quote from Clean Earth. Should be the final one needed

Thanks, Sid O’Neal Senior Scientist I Environmental

3559 Timberlane School Road I Tallahassee, Florida 32312 D (850) 692-7189 I F (850) 692-7186 I M (229) 400-5108 sid.oneal@terracon.com I Terracon.com

From: Penfield, Ryan L <rpenfield@harsco.com> Sent: Wednesday, March 9, 2022 12:09 PM To: O'Neal, Sid L <Sid.O'neal@terracon.com> Subject: RE: :EXTERNAL: RFQ - Non-Haz T&D

Hello Sid, Non haz liquids (NH-L-20) $65 per drum Non haz solids (NH-S-10) $63 per drum 15% EEI on total disposal

Transportation (excluding the KEYS) Stop fee $100 Per Drum Trans $45 FSC based upon DOE currently 55% of total trans

This will be good for all of Florida except the keys.

Ryan Penfield

Environmental Specialist

M 843.562.7841 O 1.800.739.9156 rpenfield@harsco.com www.cleanearthinc.com

402 Webster Chapel Road, Glencoe , AL 35905

From: O'Neal, Sid L <Sid.O'neal@terracon.com> Sent: Wednesday, March 9, 2022 11:59 AM To: Penfield, Ryan L <rpenfield@harsco.com> Subject: :EXTERNAL: RFQ - Non-Haz T&D

Hi Larry, Was just following up from yesterday’s phone call in case you have my email wrong.

Need quote for Non-Haz Drum T&D – soil and gw waste for all Florida regions covering north, central, and south regions

Thanks, Sid O’Neal Senior Scientist I Environmental

3559 Timberlane School Road I Tallahassee, Florida 32312 D (850) 692-7189 I F (850) 692-7186 I M (229) 400-5108 sid.oneal@terracon.com I Terracon.com

Terracon provides environmental, facilities, geotechnical, and materials consulting engineering services delivered with responsiveness, resourcefulness, and reliability.

Private and confidential as detailed here (www.terracon.com/disclaimer). If you cannot access the hyperlink, please e-mail sender.

CAUTION : This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.

You don't often get email from sid.o'neal@terracon.com. Learn why this is important

Whatever Waste, LLC 904.881.1957

3834 Mandarin Woods Dr. No.

Jacksonville, Florida

32223 United States

Overview RE: Non-hazardous Waste Drum Transport & Disposal LOC: North Florida (Jacksonville >< Pensacola) Central Florida (Greater Orlando >< Greater Tampa)

Good day Sid and Tom:

Whatever Waste appreciates the opportunity to price non-hazardous waste drums at facilities or sites throughout the North and Central Florida regions.

Overview Manifest, transport and dispose of non-hazardous petroleum contaminated soil, solids or liquids (including but not limited to PCW, IDW, groundwater, well drilling, and tank cleaning) in 55-gallon DOT shippable drums

Pricing

Prepared For Sid O'Neal Sr. Scientist

Terracon 3559 Timberlane School Road

Tallahassee, FL 32312

Proposal Number 030822.1

Proposal Date 03/08/2022

Description Rate Qty Line Total

Solids or Liquids Drums (each)

$150.00 1 $150.00

$0.00 1 $0.00

Notes Pricing includes assisting with waste profiling and analytical testing advisement unless the waste stream falls under a blanket profile.

Pricing and non-hazardous disposal acceptance of the drums is based on the waste being on-specification and RCRA non-hazardous. Required analytical testing data TBD based on disposal facility requirements DOT shippable drums must be on a hard surface and accessible location.

Drum pickup time frame can range from one week to several weeks based on location Whatever Waste also quotes hazardous waste drum transport and disposal

Terms

Whatever Waste will invoice actual amounts or volumes unless minimum quantities apply Due to pricing volatility in national and international energy sectors the non-hazardous waste drum transport and disposal rate will increase by $15.00 per drum for every $0.50 per gallon over $5.00 per gallon No-load stop fee if called off in transit or on-site $125.00 Payment is due in 30 days from email receipt of invoice

Sid O'Neal Sr. Scientist, Terracon

Subtotal

Tax

150.00

0.00

Proposal Total (USD) $150.00

Whatever Waste, LLC 904.881.1957

3834 Mandarin Woods Dr. No.

Jacksonville, Florida

32223 United States

Overview RE: Non-hazardous Waste Drum Transport & Disposal LOC: South Florida (south of Lake Okeechobee north end) Florida Keys

Good day Sid and Tom:

Whatever Waste appreciates the opportunity to price non-hazardous waste drums at facilities or sites throughout South Florida and the Florida Keys.

Overview Manifest, transport and dispose of non-hazardous petroleum contaminated soil, solids or liquids (including but not limited to PCW, IDW, groundwater, well drilling, and tank cleaning) in 55-gallon DOT shippable drums

Pricing

Prepared For Sid O'Neal Sr. Scientist

Terracon 3559 Timberlane School Road

Tallahassee, FL 32312

Proposal Number 030822.2

Proposal Date 03/08/2022

Description Rate Qty Line Total

Solids or Liquids Drums (each) (South Florida)

$200.00 1 $200.00

Solids or Liquid Drums (each) (Florida Keys)

$275.00 1 $275.00

Notes Pricing includes assisting with waste profiling and analytical testing advisement unless the waste stream falls under a blanket profile.

Pricing and non-hazardous disposal acceptance of the drums is based on the waste being on-specification and RCRA non-hazardous. Required analytical testing data TBD based on disposal facility requirements DOT shippable drums must be on a hard surface and accessible location.

Drum pickup time frame can range from one week to several weeks based on location Whatever Waste also quotes hazardous waste drum transport and disposal

Terms

Whatever Waste will invoice actual amounts or volumes unless minimum quantities apply Due to pricing volatility in national and international energy sectors the non-hazardous waste drum transport and disposal rate will increase by $15.00 per drum for every $0.50 per gallon over $5.00 per gallon No-load stop fee if called off in transit or on-site $175.00 Payment is due in 30 days from email receipt of invoice

Sid O'Neal Sr. Scientist, Terracon

Subtotal

Tax

475.00

0.00

Proposal Total (USD) $475.00

DC011A.pdf
memo DC011A.pdf
DC011A CEF-LOE_FDEPedits220524.pdf
Cost Estimate
LOE Subtask 2
LOE Subtask 3
DC011Aproposal220520_Page_6.pdf
DC011Aproposal220520_Page_7.pdf
DC011Aproposal220520_Page_8.pdf
IDWbids.pdf
ErwinRemediation Quote - Terracon - Drum - All Regions - 03.04.2022
Clean Earth
Whatever Waste - Drum Quote Proposal 030822.1
Whatever Waste Proposal 030822.2 - South Region

File details come from the government source that posted it. Updated .