This document comprises multiple Task Assignment Change Orders (TACOs) between the State of Florida Department of Environmental Protection (FDEP) and Terracon Consultants, Inc. for work under Contract Number HW687. The contract involves environmental site cleanup and assessment services across multiple sites in Florida, with project management overseen by Dean Cox for FDEP and Donna Cline for Terracon.
The document details two primary change orders: TACO #5 and TACO #4. TACO #5, effective November 29, 2023, adds $7,811.29 as a fixed unit rate for a site review meeting, bringing the total task value to $42,951.58. This cost addition was negotiated to be $892.85 (10%) less than originally proposed. TACO #4, effective May 13, 2023, adjusts the task compensation to $35,140.29, representing a $4,500 increase from the prior value of $30,640.29, also structured as fixed unit rate pricing. Deliverables include site status table updates, field notes and photos, PRAC meeting attendance documentation, site review meeting summary notes, and documentation of critical response site activities. The invoicing structure requires FDEP approval of each deliverable component before payment, with invoice amounts ranging from $1,359.88 to $22,280.41 across various approved activities. Cost estimates detail labor expenses for senior-level staff (geologists, scientists, and project managers), vehicle charges, lodging, and per diem, with completion fees included in the total pricing.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Name:
4. ☐ There are no changes to the TA compensation.
☐ The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO ☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. ☐ There are no changes to the TA Expiration Date.
☐ The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. ☐ There are no changes to the Attachments.
☐ Attachment ___ is replaced with Attachment -____.
7. ☐ No Additional Changes.
☐ Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
DC001A 5 HW687
This TACO adds $7,811.29 for a site review meeting. This entire amount is fixed unit rate.
Dean Cox 850-245-8969 Contractor Contractor
Contractor Contractor
Contractor
Terracon Consultants, Inc.
Donna Cline 813-321-0340 multiple multiple
✔ $ 42,951.58 $ 35,140.29
$ 42,951.58 $ 35,140.29 ✔ Completion
Completion 0
✔ 1 1 5
Kelly Crain
Digitally signed by Jennifer Farrell Date: 2023.11.29 12:16:21 -05'00'
N/A
Cline, Donna L Typewriter Donna Cline
Senior Associate
11/29/2023
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01_18
Contract Number:
Task Assignment #:
Change Order #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW687
DC001A
$ 42,951.58
Sites Status Table update, along with any new owner or property information related to any need for site access authorization or offsite notification.
Two signatures each by two contractor staff - one signature each on the daily PRAC meeting sign-in & sign-out sheet(s) for each of the two meeting days.
Field notes and photos for Hurricane Ian SVE system shutdowns/disconnections.
Signatures by at least two contractor staff per day - one signature per staff member in attendance on each of the daily PRAC meeting sign-in & sign-out sheet(s).
Site review meeting summary notes.
Documentation of as-needed critical response site activities requested by the Waste Site Cleanup Section.
DEP approval of Sites Status Table update, along with any new owner or property information related to any need for site access authorization or offsite notification.
DEP approval of field notes and photos for Hurricane Ian SVE system shutdowns/disconnections.
DEP approval of signatures by at least two contractor staff - one signature per staff member on each of the daily PRAC meeting sign-in & sign-out sheet(s).
DEP approval of documentation of as-needed critical response site activities requested by the Waste Site Cleanup Section.
DEP approval of site review meeting summary notes (Subtask 1 Project Management and Subtask 2 Site Review Meeting Travel & Attendance).
DEP approval of two signatures each by two contractor staff - one signature each on the daily PRAC meeting sign-in & sign-out sheet(s) for each of the two meeting days.
04/15/2022
08/31/2022
10/31/2022
05/24/2023
01/04/2027
12/31/2023
$ 4,500.00
$ 22,280.41
$ 1,359.88
$ 4,500.00
$ 7,811.29
$ 2,500.00
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Interim Secretary
Negotiation Summary
TO: HW687 Contract File FROM: Dean Cox, Contract Manager SUBJECT: DC001A-5 Site Review Meeting
DATE: 11/17/23
This TACO adds $7,811.29 for a site review meeting. This entire amount is fixed unit rate. The total task cost is now $42,951.58 and this entire cost is fixed unit rate. This TA was negotiated - the total cost is $892.85 or 10% less than originally proposed.
This cost addition is for a standard site review meeting, conducted periodically during the contract. Terracon did not submit their TA proposal in time to execute a TA for the meeting, so the cost was approved by a WCD to the Critical Response TA DC001A.
FDEP COST ESTIMATE
Contractor: Terracon
Date: 11/17/2023 Task #: SubTask 1 Site Review Meeting - Travel & Attendance SubTask 6
Site: Multiple Site SubTask 2 SubTask 7 Activity/Phase: Site Review Meeting SubTask 3 SubTask 8
Project Manager: Dean Cox SubTask 4 SubTask 9 SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$67.74 Project Manager Donna Cline 3.90 3.90 $0.00 Administrative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Brownfield Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 CADD Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Data Analyst & Visualization Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$50.00 Senior Geologist Shawn Ouellette 14.00 14.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior GIS Analyst 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$51.97 Senior Scientist/Geologist Lydia Wing 14.00 14.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$43.27 Senior Project Manager/E Michael Mui 14.00 14.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 45.90 3.90 42.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $2,297.70 $264.34 $2,033.36 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 116.00% $2,665.33 $306.63 $2,358.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.26% $1,292.69 $148.72 $1,143.97 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $6,255.72 $719.69 $5,536.03 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 1
FDEP COST ESTIMATEContractor: Terracon Date: 11/17/2023
Task #: SubTask 1 Site Review Meeting - Travel & Attendance SubTask 6 Site: Multiple Site SubTask 2 SubTask 7
Activity/Phase: Site Review Meeting SubTask 3 SubTask 8 Project Manager: Dean Cox SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle charge $480.00 480.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $450.00 450.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $930.00 $930.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) - GPI/EDS $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying - SSMC $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 IDW - Erwin Remediation $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Geoview $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Camera Line (Sunshine) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $7,185.72 $719.69 $6,466.03 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $625.57 $71.97 $553.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $7,811.29 $791.66 $7,019.63 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Multiple SUBTASK 1: Site Review Meeting - Travel & Attendance
PROPOSAL NO.
DATE: 11/17/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning Senior Geologist SO 6.00 Senior Scientist/Geologis LW 6.00 Senior PM/Engineer MM Site Review Meeting 6.00
Mobilization / Demobilizations Senior Geologist SO 8.00 Senior Scientist/Geologis LW 8.00 Senior PM/Engineer MM Roundtrip travel from Tampa 8.00
Personnel: SO LW MM NK CN Hours: 14.00 14.00 14.00 0.00 0.00 TOTAL LABOR 42.00
VEHICLE TYPE RATE UNIT USEAGE
Shawn Car 80.00$ day 2 160.00$ Lydia Car 80.00$ days 2 160.00$ Mike Car 80.00$ days 2 160.00$
TOTAL VEHICLE 480.00$
PER DIEM STAFF RATE UNIT USEAGE
Lodging Shawn Ouellette $150.00 days 1 150.00$ Meals Shawn Ouellette $36.00 days 0 -$ Lodging Lydia Wing $150.00 days 1 150.00$ Meals Lydia Wing $36.00 days 0 -$ Lodging Michael Mui $150.00 days 1 150.00$ Meals Michael Mui $36.00 days 0 -$
TOTAL PER DIEM 450.00$
Roundtrip travel from Port St. Lucie
Site Review Meeting Site Review Meeting
Roundtrip travel from Winter Park
| DC001A-5.pdf |
| DC001A-5 NS.pdf |
| CEF LOE Site Review Meeting_DEPcomments231116.pdf |
| Cost Estimate |
| LOE 1 Meeting |
| WCD1.pdf |
| HW687 DC001A-4_Page_1.pdf |
| HW687 DC001A-4_Page_2.pdf |