CN-370000-HW687-CS04A.pdf
PDF 1 MB Posted
- Contract number
- HW687
- Issued by
- Florida
About this file
This document is a Task Assignment (TA CS04A) issued under Contract Number HW687 between the State of Florida Department of Environmental Protection (DEP) and Terracon Consultants, Inc. The task assignment authorizes work at the British American Auto Repair site located at 241 S. Palmetto Avenue, Daytona Beach, Volusia County, Florida (Site ID ERIC_9574). The work is being conducted using federal funds from the CERCLA Site Screening Program (CSS) cooperative agreement administered by DEP on behalf of the EPA. Claire Field serves as the DEP Project Manager, while Evan Anselmo is the contractor's project manager.
The task assignment requires Terracon Consultants, Inc. to conduct a site visit and prepare a Field Sampling Plan (FSP) and Health and Safety Plan (HASP) in accordance with the Cost Proposal/Level of Effort (CP/LOE) submitted on February 16, 2026. The work is divided into two subtasks: Subtask 1 (Project Management) at $639.00 and Subtask 2 (Pre-Site Investigation Activities including HSP development, site visit, and FSP preparation) at $5,185.40, for a total Task Assignment value of $5,824.40. Deliverables are due by April 30, 2026, with Department approval of project management and field notes from the site visit, Field Sampling Plan, and Health and Safety Plan required for invoice payment. The task assignment is effective February 19, 2026, and has a completion date of May 29, 2026.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW687
CS04A Completion May 29, 2026
Terracon Consultants, Inc. will conduct a site visit and prepare a Field Sampling Plan/HASP in accordance with the Cost Proposal/Level of Effort (CP/LOE) submitted to the Department (DEP) on February 16, 2026.
Claire Field (850) 245 - 8970 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Terracon Consultants, Inc.
Terracon Consultants, Inc.
Evan Anselmo (407) 740 - 6110
ERIC_9574
241 S. Palmetto Avenue Daytona Beach, Volusia County
British American Auto Repair
✔ $ 5,824.40
$ 5,824.40
Scope of Work
Donna Cline
Senior Associate
02/19/2026
Digitally signed by Cline, Donna L DN: cn=Cline, Donna L, ou=Domain Users, email=Donna.Cline@terracon.com Date: 2026.02.19 11:11:04 -05'00'
Cline, Donna L
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2026.02.19 10:33:39 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Department approval of Project Management (Subtask 1) 04/30/2026
Department approval of Field notes from Site visit, Field Sampling Plan, and Health and Safety Plan (Subtask 2). 04/30/2026
Department approval of Project Management (Subtask 1) $ 639.00
Department approval of Field notes from Site visit, Field Sampling Plan, and Health and Safety Plan (Subtask 2). $ 5,185.40
$ 5,824.40
HW687
CS04A
Memorandum TO: Terracon Consultants, Inc. HW687 Contract File
FROM: Claire Field, Contract Manager
SUBJECT: Negotiation Summary – Task Assignment (TA) CS04A British American Auto Repair - Site ID # ERIC_9574 Pre-Site Inspection Activities
DATE: February 18, 2026
This Task Assignment (TA) is intended for conducting a site visit to locate potential sampling locations and the preparation of a Field Sampling Plan/Health and Safety Plan for the British American Auto Repair site. The services are being conducted using federal funds from the CERCLA Site Screening Program (CSS) cooperative agreement that is administered by DEP on behalf of EPA.
Subtask 1: Project Management This subtask is a percentage of the overall project and has been negotiated as a contract rate. It includes project management, overhead, general, administrative, and fringe. The agreed upon cost of this subtask is $639.00.
Subtask 2: Pre-Site Investigation Activities Under this subtask, Terracon will also conduct a site visit to survey the area, meet the site owner/representative, locate the existing monitoring wells, measure depth to water and well depth of each existing monitoring well, and evaluate the locations of the proposed soil borings and well installations. The agreed upon cost of this subtask is $5,185.40.
www.FloridaDEP.gov http://www.floridadep.gov/
Negotiation Summary – Task Assignment (TA) CS04A British American Auto Repair - Site ID # ERIC_9574, Daytona Beach, Volusia County HASP and FSP February 18, 2026
Summary DEP’s CSS Project Manager and Terracon’s Project Manager have both agreed to the scope of work, and associated costs. The final cost associated with this TA is $5,824.40. Documentation of these costs is included in the Level of Effort/Cost Proposal (LOE-CP) Form and LOE-CP letter provided by Terracon on February 16, 2026, as well as the Task Assignment Form for CS04A prepared by DEP. The final deliverable must be received by DEP no later than April 30, 2026.
www.FloridaDEP.gov http://www.floridadep.gov/
8001 Baymeadows Way, Suite 1 Jacksonville, Florida 32256
P (904) 479-7415 F (904) 268-5255
Terracon.com
February 16, 2026
Florida Department of Environmental Protection CERCLA Site Screening Section Division of Waste Management 2600 Blair Stone Road Tallahassee, Florida 32399-2400
Attn: Claire Field, CERCLA Project Manager E: Claire.Field@FloridaDEP.gov W: 850-245-8970
Re: Proposal for Health and Safety Plan and Field Sampling Plan Preparation British American Auto Repair 241 S. Palmetto Ave.
Daytona Beach, Volusia County, Florida
ERIC_9574
Task Assignment HW687 Terracon Proposal No. PEQ267050
Dear Ms. Field:
Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this proposal to the Florida Department of Environmental Program (FDEP) CERCLA Site Screening Section to prepare a Health and Safety Plan (HSP) and Field Screening Plan (FSP) for the British American Auto Repair (ERIC_9574) facility located at 241 S. Palmetto Ave. Daytona Beach, Volusia County, Florida.
Scope of Services
Prepare a Health and Safety Plan (HSP) Prepare Field Sampling Plan (FSP) to include a site visit to assist with sample location placement and site access considerations See attached LOE for details
Schedule
Deliverable of HSP within 3 business days following the issuance of the TA.
Deliverable of field notes from site visit with 3 business days following site visit.
Deliverable of FSP within 10 business days following site visit.
Compensation See attached CEF for details.
Proposal for Health and Safety Plan and Field Sampling Plan Preparation British American Auto Repair, ERIC_9574 ■ Daytona Beach, FL February 16, 2026 ■ Terracon Proposal No. PEQ267050
SCOPE OF SERVICES
Following discussions with Scott Sweeney, Gillian Garner, and Claire Field via conference call on February 5, 2026, the summary of the work to be performed for the initial TA includes the following:
Subtask 1: Project Management This scope is provided for in the template worksheet
Subtask 2: Health and Safety Plan, Site Visit and Prepare FSP Develop an HSP Conduct a site visit, to include o a meeting with owner/site representative, including a discussion about potentially advancing soil borings through the floor slab, exterior sample locations o Identify and GPS the location of the existing monitoring wells to be sampled, to include measuring the depth to water and well depth in each of the monitoring wells to, and o evaluate and GPS the location of the FDEP proposed soil borings and well installations.
Discuss site visit with FDEP and proposed sample locations (if differs from initial discussion);
Preparation of a FSP to include a review of the site history/project planning, data generation and acquisition, assessment oversight, and data validation and usability.
SCHEDULE
Deliverables will consist of the HSP within 3 business days following the issuance of the TA, field notes from site visit within 3 business days of field visit and the FSP within 10 business days following the site visit.
CLOSING REMARKS
Terracon services will be conducted in accordance with the terms and conditions, contained within DEP Waste Cleanup Program (WCP) Contract No. HW687, executed January 5, 2022.
It is understood that a Task Assignment will be issued to authorize us to perform this work.
Proposal for Health and Safety Plan and Field Sampling Plan Preparation British American Auto Repair, ERIC_9574 ■ Daytona Beach, FL February 16, 2026 ■ Terracon Proposal No. PEQ267050
We appreciate the opportunity to provide this proposal and look forward to working with you on this project. If you should have any questions or comments regarding this proposal, please contact either of the undersigned at (407) 740-6110 or (904) 539-7371.
Sincerely, Terracon Consultants, Inc.
Evan Anselmo, P.E. Donna Cline, P.E.
Project Environmental Engineer Senior Associate / Remediation Engineer
Attachments: Cost Spreadsheet Level of Effort
FDEP COST ESTIMATEContractor: Terracon Consultants, Inc Date: 2/16/2026
Task #: SubTask 1 Project Management SubTask 6 Site: British American Auto Repair SubTask 2 HSP, Site Visit, and FSP SubTask 7
Activity/Phase: FSP and HSP SubTask 3 SubTask 8 Project Manager: Claire Field SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$46.59 Project Manager Evan Aneslmo 4.58 4.58 $46.59 Senior Engineer Evan Aneslmo 26.00 26.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Scientist . 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$75.48 Senior Engineer Donna Cline 4.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $32.00 Project Geologist Cali May 4.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 38.58 4.58 34.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $1,854.62 $213.36 $1,641.26 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 116.00% $2,151.36 $247.50 $1,903.86 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.263% $1,043.47 $120.04 $923.42 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $5,049.45 $580.91 $4,468.54 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel Vehicle $0.00 120.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Meals $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 -$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Site Visit) $150.00 150.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $150.00 $150.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $5,319.45 $580.91 $4,738.54 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $504.95 $58.09 $446.85 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $5,824.40 $639.00 $5,185.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Cost from Prior CEF: $0.00 Manual Entry Cost from Delta CEF; $0.00 Manual Entry Cost (Prior + Delta): $0.00 Auto-Calculated
Rounding Error: $5,824.40 Auto-Calculated Final Total Cost: $5,824.40 Auto-Calculated
REV: 09/25 CEF Page 1
CS04A
SITE : British American Auto Repair SUBTASK 2: HSP, Site Visit, and FSP
DATE: 2/16/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
HASP
Project Engineer EA 2.0
FSP
Site Visit Project Engineer EA FSP Site Visit, includes 3 hour roundtrip mob 6.00 Deliverable Senior Engineer EA Prepare FSP 18.00 Senior Engineer DC QA/QC FSP 4.00 CADD Specialist CM Preparation of Exhibits for FSP - Site location, proposed sample & well locations 4.00
Personnel: EA DW DC TP CM Hours: 26.00 0.00 4.00 0.00 4.00 TOTAL LABOR 34.00
TRAVEL TYPE RATE UNIT USEAGE
Truck (EA) - FSP Site Visit 120.00$ day 1 120.00$
TOTAL TRAVEL 120.00$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Other Site Reconnaisance Kit 150.00$ day 1 150.00$
TOTAL EQUIPMENT 150.00$
Prepare Health and Safety Plan
| HW687_CSS03_British American Auto Repair TA_V1.pdf |
| HW687_CSS03_British American Auto Repair.pdf |
| HSP-FSP Proposal - British American Auto Repair ERIC_9574.pdf |
British American - TA_1_Memo.pdf