About this file

This is a Task Assignment document issued by the State of Florida Department of Environmental Protection (FDEP) to Terracon Consultants, Inc. under Contract Number HW687. The task assignment (DC024E) authorizes Terracon to conduct Soil Vapor Extraction (SVE) system installation and startup at the Cormans Cleaners site located at 3464 SE Dixie Highway, Stuart, Martin County, Florida (ERIC_4924). Gabriel Sostre serves as the FDEP Project Manager, while Donna Cline is Terracon's Project Manager. The task assignment is effective through August 29, 2025, and incorporates a Scope of Work attachment as binding reference material.

The total task assignment value is $99,427.32, comprised of $96,427.32 in fixed unit rate services and $3,000.00 in cost reimbursement for utilities. Deliverables include SVE construction oversight, system startup, and a construction completion report with redlined as-built drawings signed by a professional engineer. The work encompasses five subtasks: project management and Month 1 operations and maintenance (O&M) data collection ($11,460.65); SVE construction, oversight, build, and installation ($73,422.21); system startup and construction completion report ($11,174.46); utilities reimbursement including $3,000 for electrical costs plus a $250 one-time connection fee and $120 handling fee ($3,370.00); and Month 1 O&M activities. Invoice requirements specify FDEP approval of deliverables at each subtask completion, with final invoicing due by July 25, 2025.

View the file

Other files

File Type Posted
CN-370000-HW687-BF01BCO1.pdf PDF
CN-370000-HW687-BF02B.pdf PDF
CN-370000-HW687-BF04ACO4.pdf PDF
CN-370000-HW687-BF05A.pdf PDF
CN-370000-HW687-BF1BCO2.pdf PDF
CN-370000-HW687-BIL02A.pdf PDF
CN-370000-HW687-BIL02C.pdf PDF
CN-370000-HW687-BIL03A.pdf PDF
CN-370000-HW687-BIL1BCO1.pdf PDF
CN-370000-HW687-BIL3ACO1.pdf PDF
CN-370000-HW687-CS04A.pdf PDF
CN-370000-HW687-CSS3BCO1.pdf PDF
CN-370000-HW687-DC002B.pdf PDF
CN-370000-HW687-DC002C.pdf PDF
CN-370000-HW687-DC002E.pdf PDF
CN-370000-HW687-DC002i.pdf PDF
CN-370000-HW687-DC003C.pdf PDF
CN-370000-HW687-DC004A.pdf PDF
CN-370000-HW687-DC005B.pdf PDF
CN-370000-HW687-DC006D.pdf PDF
CN-370000-HW687-DC007B.pdf PDF
CN-370000-HW687-DC007C.pdf PDF
CN-370000-HW687-DC008A.pdf PDF
CN-370000-HW687-DC008E.pdf PDF
CN-370000-HW687-DC010D.pdf PDF
CN-370000-HW687-DC011A.pdf PDF
CN-370000-HW687-DC011C.pdf PDF
CN-370000-HW687-DC011E.pdf PDF
CN-370000-HW687-DC011G.pdf PDF
CN-370000-HW687-DC013A.pdf PDF
CN-370000-HW687-DC014A.pdf PDF
CN-370000-HW687-DC014C.pdf PDF
CN-370000-HW687-DC016A.pdf PDF
CN-370000-HW687-DC018A.pdf PDF
CN-370000-HW687-DC01ACO4.pdf PDF
CN-370000-HW687-DC01ACO5.pdf PDF
CN-370000-HW687-DC01ACO6.pdf PDF
CN-370000-HW687-DC01ACO8.pdf PDF
CN-370000-HW687-DC021B.pdf PDF
CN-370000-HW687-DC023E.pdf PDF
CN-370000-HW687-DC024A.pdf PDF
CN-370000-HW687-DC024D.pdf PDF
CN-370000-HW687-DC025A.pdf PDF
CN-370000-HW687-DC025D.pdf PDF
CN-370000-HW687-DC025E.pdf PDF
CN-370000-HW687-DC027D.pdf PDF
CN-370000-HW687-DC028C.pdf PDF
CN-370000-HW687-DC028F.pdf PDF
CN-370000-HW687-DC028G.pdf PDF
CN-370000-HW687-DC031B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW687

DC024E Completion August 29, 2025

This Task Assignment authorizes Terracon to conduct SVE system installation & startup at the Cormans Cleaners site.

Gabriel Sostre 850-245-8749 Contractor Terracon Consultants, Inc. Contractor

Contractor Donna Cline Contractor 904-479-7415

ERIC_4924

3464 SE Dixie Highway Stuart, Martin County

Cormans Cleaners

Contractor Contractor

✔ $ 96,427.32 ✔ $ 3,000.00

$ 99,427.32

Scope of Work

Terracon Consultants, Inc.

Contractor Donna Cline

Senior Associate / Remediation Engineer Digitally signed by Cline, Donna L DN: cn=Cline, Donna L, ou=General Users, email=Donna.Cline@terracon.com Date: 2025.01.06 14:35:33 -05'00'

Cline, Donna L

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2025.01.06 14:23:56 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

BWC TAFORM 01/18

HW687

DC024E

Subtask 3: System startup and construction completion report.

Subtask 1 & 5: Project management. Month 1 of O&M.

Subtask 4: Utilities

Subtask 2: SVE construction oversight, SVE build, SVE installation.

04/11/2025

05/23/2025

07/25/2025

07/25/2025

Subtask 2: FDEP approval of email summary containing SVE design, equipment, and construction activities as well as invoices pertaining to SVE construction.

Subtask 3: FDEP approval of O&M tables summarizing data collected during startup and construction completion report.

Subtask 1 & 5: FDEP approval of O&M tables summarizing data collected during month 1 of system O&M.

Subtask 4: Cost reimbursement of utilities invoices ($3,000.00). $250.00 one-time fee.

$120.00 handling fee.

$ 73,422.21

$ 11,174.46

$ 11,460.65

$ 3,370.00

$ 99,427.32

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette NNuñez Lt. Governor

Secretary

Memorandum

TO:

FROM:

Negotiation File

ERIC

, Project Manager

SUBJECT: Negotiation Summary Task Assignment (HW687)

DATE: ,

FD

EP

C O

S T

ES

TI

M A

TE

C on tra ct or

Te rra co n

D at e:

1/

3/

Ta sk

H W

C

Su bT as k

Pr oj ec t M an ag em en t Si te

C or m an s C le an er s

ER

IC

_4

Su bT as k

SV

E

C on st ru ct /O ve rs ite , S

VE

B ui ld

In st al l Ac tiv ity

/P ha se

IS

R

Im pl em en ta tio n Su bT as k

St ar tu p, C C

R Pr oj ec t M an ag er

G ab rie l S os tre as k

U til iti es Su bT as k

W ee k 1, M on th o f O

&M

To ta ls

La bo r R at e C at eg or y

$7 0.

Pr oj ec t M an ag er on na

C lin e

.6

.6

$0

.0

Ad m in is tra tiv e 0.

0.

0.

0.

0.

$0

.0

Br ow nf ie ld C on su lta nt

0.

0.

0.

0.

0.

$3 3.

C

AD

D

S pe ci al is t

C hl es ea

F ug at e

.0

0.

.0

0.

2.

$0 .0

D at a

An al ys t &

V is ua liz at io n Sp ec ia lis t

0.

0.

0.

0.

0.

$3 4.

En vi ro nm en ta l T ec hn ic ia n Bi lly P hi llip s

5.

0.

.5

0.

.5

$0

.0

Fi el d G eo lo gi st

0.

0.

0.

0.

0.

$0 .0

Fi el d

Sc ie nt is t 0.

0.

0.

0.

0.

$0

.0

G

IS

T ec hn ic ia n

0.

0.

0.

0.

0.

$0 .0

Pr in ci pa l C on su lta nt

0.

0.

0.

0.

0.

$0 .0

Pr oj ec t G eo lo gi st 0.

0.

0.

0.

0.

$0

.0

Pr oj ec t I nd us tri al

H yg ie ni st 0.

0.

0.

0.

0.

$0

.0

Pr oj ec t S ci en tis t

0.

0.

0.

0.

0.

$7 0.

Se ni or

E ng in ee r D on na

C lin e

.0

9.

7.

0.

3.

$5 1.

Se ni or

G eo lo gi st Sh aw n

O ue lle tte

.0

.0

.5

0.

5.

$0

.0

Se ni or G

IS

A na ly st 0.

0.

0.

0.

0.

$0

.0

Se ni or In du st ria l H yg ie ni st

0.

0.

0.

0.

0.

$0 .0

Se ni or

S ci en tis t 0.

0.

0.

0.

0.

$0

.0

St af f E ng in ee r 0.

0.

0.

0.

0.

$0

.0

St af f S ci en tis t 0.

0.

0.

0.

0.

To ta l H ou rs

7.

.6

3.

.0

0.

.0

D ire ct L ab or

$1

1, 0.

$1 ,3

.1

$6

,3

.7

$3 ,0

.0

$0

.0

$1 ,2

.5

O ve rh ea d

6.

$1

3, 5.

$1 ,5

.4

$7

,3

.8

$3 ,5

.4

$0

.0

$1 ,4

.9

G en

A dm in 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge

.2 6%

$6 ,7

.5

$7

.7

$3

,5

.8

$1 ,7

.3

$0

.0

$6

.6

To ta l L ab or

$3 2, 0.

$3

,7

.3

$1 7, 2.

$8

,2

.7

$0 .0

$3

,3

.1

Tr av el Ve hi cl e R en ta l $1

,4

.0

0.

0.

$0 .0

0.

M ile ag e C os ts

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Ai r F ar e $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pe r d ie m

H ot el

$0 .0

$0

.0

$0 .0

To ta l T ra ve l $1

,4

.0

$8

.0

$3

.0

$0 .0

$2

.0

Su bc on tr ac to r

(E qu ip m en t P ro cu re m en t)

R

EV

C

EF

T

ER

R A

C O

N P ag e

FD

EP

C O

S T

ES

TI

M A

TE

C on tra ct or

Te rra co n at e:

1/ 3/

H

W

C as k

Pr oj ec t M an ag em en t

Si te

C or m an s

C le an er s

ER

IC

_4

Su bT as k

SV

E C on st ru ct

/O ve rs ite

, S

VE

B ui ld

In st al l

Ac tiv ity /P ha se

IS

R Im pl em en ta tio n

Su bT as k

St ar tu p, C

C R

Pr oj ec t M an ag er

G ab rie l S os tre as k

U til iti es

Su bT as k

W ee k

1, M on th o f O &M

To ta ls

ES

D

(S ys te m

B ui ld

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Pr oc ur em en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tr ac to r (S er vi ce s

Pr oc ur em en t) ril lin g (C on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ril lin g (N on -c on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

G

PR

S ur ve y $1

,3

.0

1, 0.

$0 .0

$0

.0

Su rv ey in g $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

C le an

E ar th $6

.0

5.

$0

.0

$0 .0

U til iti es (F

PL

$3 ,0

.0

$0

.0

$0 .0

3, 0.

A ct io n (S ys te m In st al

l) $4

6, 0.

,3

.0

$0

.0

$0 .0

O ne ti m e fe e fo r E le ct ric al c on ne ct io n

$2

.0

$0 .0

$0

.0

0.

Su bc on tra ct or

S ub to ta l $5

1, 5.

$4 8, 5.

$0

.0

$3 ,2

.0

$0

.0

H an dl in g Fe e $4

,9

.5

$4 ,8

.5

$0

.0

0.

To ta l S ub co nt ra ct or C os t

$5 6, 7.

$5

3, 7.

$0 .0

$3

,3

.0

$0 .0

La bo ra to ry

An al yt ic al

C os ts $3

,8

.0

0.

1, 5.

2, 0.

Fa st T ur na ro un d C ha rg es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Sa m pl e

Sh ip pi ng

$2

.0

$0 .0

.0

0.

To ta l L ab or at or y

$4 ,0

.0

$3

.0

$1

,2

.0

$0 .0

$2

,4

.0

Fi el d Ex pe ns es

Pe rs on al

P ro te ct io n

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Ex pe nd ab le s $3

.0

0.

.0

Eq ui pm en t ( D ril lin g re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t ( An al yt ic al re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

ID

W re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

O th er

$1 ,3

.0

$0

.0

5.

0.

To ta l F ie ld E xp en se s

$1 ,6

.0

$2

.0

$4

.0

$0

.0

$9

.0

Su bt ot al

$9 6, 8.

$3

,7

.3

$7 1, 9.

$1

0, 6.

$3 ,3

.0

$7

,0

.1

C om pl et io n

Fe e

$3 ,2

.0

$3

.9

$1

,7

.2

$8

.6

$0 .0

$3

.2

To ta l E st im at ed C os t

$9 9, 7.

$4

,1

.3

$7 3, 2.

$1

1, 4.

$3 ,3

.0

$7

,3

.3

R

EV

C

EF

T

ER

R A

C O

N P ag e

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Cormans Cleaners ERIC_4924 SUBTASK 2: SVE Construction Over Sight, SVE Build, SVE Install

PROPOSAL NO. PHB247038

DATE: 1/3/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

System Installation/ Build Senior Geologist SO Generate Specs for System Build and Installation based on site conditions 4.00 Env Technician BP Preconstruction meeting (Includes travel from WPB ) 4.00 Senior Geologist SO Preconstruction meeting (Includes travel from PSL) 3.00 Senior Geologist SO Prepare task specific HASP 1.00 Senior Geologist SO Permitting Assistance (elec & construction) includes site visit with electrician and utility coord 16.00 Senior Geologist SO Coordinate with land owner & tenants 4.00 Env. Technician BP Develop construction logistics, staging, vehicular access, material storage 4.00

Env. Technician BP Oversite of Construction activities (10 hours/day x 6 days) 60.00 Senior Geologist SO Oversite of Construction Activities, address questions, site visits (6 hour/day x 2 days) 12.00 Env. Technician BP Pick up and Transport Remedial System and Deliver (1 day) 12.00 Env. Technician BP Oversite of Electrical Contractor (8 hours/day x 1.5 day) 12.00 Env. Technician BP Compaction Testing/ Concrete Testing 4.00 Sr. Engineer DC Materials report 4.00 Sr. Engineer DC Develop As-builts (1 hour/day X 5 days) 5.00

Mobilization / Demobilization Senior Geologist SO 2 days (2 hours/day) 4.00 Env. Technician BP 2 trip ( 2 hours round trip) 4.00

Personnel: BP DC SO Hours: 100.00 9.00 44.00 TOTAL LABOR 153.00

VEHICLE TYPE RATE UNIT USEAGE

Truck (Env Tech) $480.00 weeks 1 480.00$

Truck (Sr Geologist) $120.00 day 3 360.00$

TOTAL VEHICLE 840.00$

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Action SVE System Installation 46,300.00$ 1 46,300.00$ (includes electrical subcontractor)

1 -$ Erwin IDW disposal 125.00$ 5 Total includes misc charges 625.00$ GPR Survey $1,300.00 1 1,300.00$

` TOTAL $48,225.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC #IDW

Halocarbons (V-GAC) EPA 8260 (IDW Soil Profile) 73.00$ 1 73.00$ Shipping 2 day 52.00$ 1 52.00$

Modified Proctor 150.00$ 1 150.00$ Compressive Strength 25.00$ 3 75.00$

TOTAL LAB 350.00$

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables 40.00$ day 6 240.00$

TOTAL EQUIPMENT 240.00$

TRAVEL PER DIEM LODGING RATE COSTING UNIT USEAGE TOTALS

Environmental Technician 150.00$ day 0 -$

MEALS RATE COSTING UNIT USEAGE

Environmental Technician 36.00$ day 0 -$

TOTAL -$

SUBTASK 3: System Startup and Construction Completion Report

PROPOSAL NO. PHB247038

DATE: 1/3/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

System Startup

Senior PM/Geologist SO 1.00 Environmental Tech BP Meet IDW Contractor 1.00 Environmental Tech BP Load/unload 1.00 Environmental Tech BP Conduct system startup, optimtize performance, troubleshoot, Meet IDW contractor 8.00 Senior PM/Geologist SO Conduct system startup, optimtize performance, troubleshoot 6.00 Environmental Tech BP Collect soil vapor samples for laboratory analysis 1.50 Senior PM/Geologist SO Recording of lab data into operational tables and calculate mass recovery 1.50

Mobilization / Demobilization Senior PM/Geologist SO 1 days (2 hours/day) 2.00 Env. Technician BP 2 days (2 hours/day) 4.00

Construction Completion Report

Senior PM/Geologist SO Prepare CCR 12.00 Senior PM/Geologist SO Data reduction/evaluation 5.00 Senior PM/Geologist SO Report - prepare final tables and draft exhibits 5.00 CADD Specialist CF Create updated Exhibits and Redlined As-Builts 10.00 Senior Engineer DC 3.00 Senior Engineer DC 4.00

Personnel: SO BP DC CF Hours: 32.50 15.50 7.00 10.00 TOTAL LABOR 65.00

VEHICLE TYPE RATE UNIT USEAGE

Truck (Sr Geologist) 120 day 1 120.00$ Truck (Env Tech) 120 day 2 240.00$

LABORATORY COSTS TOTAL VEHICLE 360.00$

VOCs 200.00$ 5 1,000.00$

Summa Canister 33.00$ 5 165.00$ Sample Shipping Large (2 day) 70.00$ 1 70.00$

TOTAL LAB 1,235.00$

Subcontractor Costs

TOTAL -$

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction / O&M / Pilot Test Kit 360.00$ day 1 360.00$ Construction / O&M Supplies 75.00$ day 1 75.00$ Expendables 40.00$ day 1 40.00$

TOTAL EQUIPMENT 475.00$

As-Built Drawings

TO-15 (VEW1,2,3,Inf,Eff)

Sign and Seal CCR and Redlined As-Built Drawings

PreTask Planning, sampling SOW/coordinate site access, IDW Disposal Coordination

SUBTASK 4: Utilities

PROPOSAL NO. PHB247038

DATE: 1/3/2025

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Startup / Initiation Electric 250.00$ one time 1 250.00$ FPL Electric 500.00$ Month 6 3,000.00$

Subcontractor Handling Fee 20.00$ Month 6 120.00$

TOTAL 3,370.00$

SUBTASK 5: Month 1 of O&M

PROPOSAL NO. PHB247038

DATE: 1/3/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Week 1 O&M Senior PM/Geologist SO 0.50 Senior PM/Geologist SO 1.50 Environmental Tech BP Load/unload 0.50 Environmental Tech BP System O&M, optimize system 4.00 Environmental Tech BP Collect soil vapor samples for laboratory analysis 2.00 Senior PM/Geologist SO Recording of system data into the operational tables, calculate mass recovery and emissions 1.50

Month 1 O&M Senior PM/Geologist SO 0.50 Environmental Tech BP PreTask planning, Load/unload 1.00 Environmental Tech BP System O&M, optimize system 4.00 Environmental Tech BP Collect soil vapor samples for laboratory analysis 2.00 Senior PM/Geologist SO Recording of lab data into operational tables and calculate mass recovery 1.50 Senior Engineer DC 3.00 Cadd Support CF CAD/GIS drawings of ROI and locations of SVE well installations 2.00

Mobilization / Demobilization Env. Technician BP 2 days (2 hours/day) 6.00

Personnel: SO BP CF DC Hours: 5.50 19.50 2.00 3.00 TOTAL LABOR 30.00

VEHICLE TYPE RATE UNIT USEAGE

Truck (Env Tech) 120 day 2 240.00$

TOTAL VEHICLE 240.00$

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC #IDW

VOCs 200.00$ 10 2,000.00$ Summa Canister 33.00$ 10 330.00$

Sample Shipping Large (2 day) 70.00$ 2 140.00$

TOTAL LAB 2,470.00$

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction / O&M / Pilot Test Kit 360.00$ day 2 720.00$ Construction / O&M Supplies 75.00$ day 2 150.00$ Expendables 40.00$ day 2 80.00$

TOTAL EQUIPMENT 950.00$

PreTask Planning, prepare field sampling SOW/coordinate site access

Request sample kit

Month 1 system evaluation and recommendations (sent in an email)

TO-15 (VEW-1, -2, -3, Influent, Effluent)

Request sample kit

645 NW Enterprise Drive #107 Port Saint Lucie, FL 34986

P (772) 343-9787 F (772) 343-0051

Terracon.com

December 20, 2024

Florida Department of Environmental Protection Waste Cleanup Program Waste Management Division 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Attn: Mr. Gabriel Sostre, Environmental Specialist II E: gabriel.sostre@FloridaDEP.gov W: 850-245-8749

Re: Proposal for ISRP Implementation – SVE System Installation & Startup Cormans Cleaners 3464 SE Dixie Highway Stuart, Martin County, Florida

ERIC_4924

Terracon Proposal No. PHB247038

Dear Mr. Sostre:

Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this proposal to the Florida Department of Environmental Program (FDEP) Waste Cleanup Section to implement the Interim Source Removal Plan – Revision 1 (ISRP; Terracon, 2024), approved on June 13, 2024, for the installation of a Soil Vapor Extraction (SVE) system at the Cormans Cleaners (ERIC_4924) facility located at 3464 SE Dixie Highway, Stuart, Martin County, Florida.

Scope of Services

Pre-Construction / Administrative Activities System Construction System Startup and Prepare Construction Completion Report

Workplan, to include red-lined As-Built Drawings Start Up Week 1 system O&M Month 1 system O&M Utilities

See attached LOE for details

Schedule Deliverable is a Construction Completion Report, red-lined As-Built Drawings, and an email summary of 1 month of O&M. Schedule of tasks attached.

Compensation See attached CEF for details.

Proposal for ISR (SVE) System Implementation Cormans Cleaners, ERIC_4924 | Stuart, FL December 20, 2024 | Terracon Proposal No. PHB247038

SCOPE OF WORK

This scope of work was generated based on the approved ISRP. As detailed in the attached Request for Bid – SVE System Construction, the scope of work to be performed by the Remedial Contractor includes the following:

Coordinate transporting, retrofitting and utilizing a Terracon managed FDEP SVE system that is anticipated to come offline in Quarter 1 2025 (Fountain Cleaners, Fabricare) Preconstruction Activities Install up to three SVE wells if the existing three MAGS wells (MAGS-9, 10, and 11) are not accessible and/or in good working condition.

Install underground, 2-inch diameter conveyance piping from SVE wells to system. This item includes approximately 70 linear feet (LF) of aboveground piping and 30 LF of underground trenching.

Install up to two Vapor Monitoring Points (VMPs) if the existing MAGS wells are not accessible and/or in good working condition.

Install aboveground electrical conduit (approximately 130 feet).

Contract the services of an electrical contractor, and ensure 4 hours of electrician time for system startup activities.

Procure and install a vapor phase GAC vessel (included in the system installation quotes).

Transport and dispose asphalt and concrete debris.

Perform Site Restoration and Demobilization. This item includes installation of concrete over trenches and general cleanup.

Terracon personnel will provide oversight of construction activities and verify conformance with the construction drawings, perform system startup, prepare a Construction Completion Report with red-lined As-built Drawings, and conduct Week 1 and Month 1 of system O&M. Terracon will manage the soil IDW generated during the installation of the SVE wells and excess material not returned to the trench during installation of conveyance piping.

DELIVERABLES

The CCR will provide a summary of the SVE design, equipment, and construction activities; red-lined As-Built drawings; and O&M tables summarizing data collected during the startup, Week 1 and Month 1 site visits. The CCR and As-Built Drawings will be signed and sealed by a Professional Engineer.

SCHEDULE

The project will commence upon receipt of Task Assignment. It is anticipated that the system identified will come offline in Quarter 1 of 2025, in which case the projected start of the field work would be Spring 2025, based on current anticipated lead times for procurement of the proposed remedial equipment. A draft timeline of the project schedule is attached. System startup and completion of the CCR is anticipated by August 2025, pending completion of all electrical permits and connections.

December 20, 2024 | Terracon Proposal No. PHB247038

CLOSING REMARKS

Terracon services will be conducted in accordance with the terms and conditions, contained within DEP Waste Cleanup Program (WCP) Contract No. HW687, executed January 5, 2022. It is understood that a Task Assignment will be issued to authorize us to perform this work.

We appreciate the opportunity to provide this proposal and look forward to working with you on this project. If you should have any questions or comments regarding this proposal, please contact either of the undersigned at 772-343-9787.

Sincerely, Terracon Consultants, Inc.

Shawn Ouellette, P.G. Donna Cline, P.E.

Environmental Group Manager Senior Remediation Engineer

Attachments: Cost Spreadsheet Level of Effort Subcontractor Bids Schedule

December 20, 2024 | Terracon Proposal No. PHB247038

SVE Construction Quotes

December , 2024

Re: Cormans Cleaners SVE Install RFB ERIC_4924

3464 SE Dixie Highway, Stuart, FL 34997

Dear Mr. Ouellette

Action Environmental is pleased to provide the following bid for the SVE System Install at the Cormans Cleaners site in Stuart, Florida.

Conditions/Assumptions

Excludes trench plates. Open trenches will be enclosed by safety fencing.

Excludes clean fill Excludes IDW drum disposal.

Excludes density testing.

Assumes regenerated GAC for GAC vessel.

Assumes no coring or saw cutting inside of the building. Assumes MAGS 09 is existing with manhole cover and is adjacent to the interior wall.

Assumes no MOT will be required.

Assumes SVE system is a mobile trailer and not on skids and therefore equipment to offload is not included. Add $1,000 if equipment with forks is required to offload and set.

Excludes SVE manifold construction.

Bid line items are priced as minimum quantities and shall be invoiced accordingly if actual quantities are less than the current estimate.

New power pole to be installed directly adjacent to existing meter bank, just to the Northeast behind the bushes. Assumes FPL will provide power drop.

Electrical conduit will be installed above ground, secured to exterior wall of building above door height from new power pole to system location.

Pricing based on re-using MAGS 8, 9, 10 & 11, add $500 for each well for labor and materials where MAGS are un-usable and must be replaced.

Excludes flow indicators, pressure/temp gauges, relief valves, etc.

Respectfully Submitted, Action Environmental

Chris Cipollina

Environmental Estimator & Project Manager not included. Add $1,000 if equipment with forks is required to offload and set.

Assumes SVE system is a mobile trailer and not on skids and therefore equipment to offload is

REQUEST FOR BID –SVE SYSTEM CONSTRUCTION

Cormans Cleaners ERIC_4924 Stuart, Florida November 22, 2024 Terracon Proposal No. PHD247038

Reliable Responsive Resourceful 13

ATTACHMENT 1: BID SUBMITTAL FORM (PAGE 1 OF 2)

REQUEST FOR BID –SVE SYSTEM CONSTRUCTION FOR CORMANS CLEANERS

E-mail an original along with other required forms to TERRACON CONSULTANTS, INC., Shawn.ouellette@terracon.com

COMPANY NAME:

COMPANY ADDRESS:

STATE OF FLORIDA GENERAL CONTRACTORS LICENSE NUMBER:

PHONE NUMBER:

November 22, 2024 Terracon Proposal No. PHD247038

Reliable Responsive Resourceful 14

QUOTE THE FOLLOWING SERVICES:

ITEM

NO.

DESCRIPTION UNIT OF

MEASURE

ESTIMATED

QUANTITY

UNIT PRICE EXTENDED

PRICE

Mobilization / Contractor Submittals Lump Sum 1 $ $

2 Contractor Submittals Permits Lump Sum 1 $ $

3 SVE / VMP Well Construction/Conversion

Lump Sum 5 $ $

4A SVE Above Grade 2”diameter Schedule 80 piping

LF 70

4B SVE Trenching (in asphalt exterior ) 14”W x 2’D’ x 30L’

LF 30

4C Electrical Conduit Above Grade LF 130

5 Equipment Bollards Lump Sum 1 $

6 System Installation and anchoring

Lump Sum 1 $

7 Site Restoration and Demobilization

Lump Sum 1 $ $

8 Electrical Lump Sum 1

TOTAL $

Quantities and proposed well locations and pipe layout are subject to change – CONTRACTOR to be compensated for actual quantities. Invoices will be paid based on actual quantities and unit rates

1,000

$25

$25

$100 $3,000 $1,750

$14,000

45,300

4,9004,900

1,500 $1,500

$3,9003,900

750 3,750

8,250 8,250

1,000

$14,000

$3,250

November 22, 2024 Terracon Proposal No. PHD247038

Reliable Responsive Resourceful 15

ATTACHMENT 1

BID SUBMITTAL FORM (PAGE 2 OF 2)

Handwritten Signature of Authorized Officer of Company or Agent Date

Printed Name and Title Company Name

December 10, 2024 Handwritten Signature o

December , 2024

Work Plan

Asphalt Removal o Asphalt to be pre-cut prior to trenching for the SVE process line installations. Asphalt to be disposed of properly off-site. Mini excavator with trenching bucket to be utilized for trenching activities. Trenches to be 14-in wide x 2-ft depth. Approximately 30 feet of trenching. Excavated soil will be stockpiled adjacent to the trench, and utilized as backfill after conveyance piping has been installed. Excess soils to be containerized in 55-gallon drums.

Installation and/or reuse of existing SVE wells o Convert existing MAGS wells (MAGS-09, MAGS-10, MAGS-11) to SVE wells, if useable.

If unusable, select new location with engineer’s approval and install new MAGS wells as necessary. New installed wells to be clear via hand auger to 4’ below concrete/asphalt.

SVE wells to be constructed with 2-inch diameter PVC well screens from 1 to 4 feet bgs, 0.020-inch slot size, and 2-inch diameter PVC risers. Annular space to be filled with 20/30 sand filter pack to 3-inches about top of the well screen follow by 30/65 fine sand seal then grouted to surface with neat cement. Exterior SVE wells to be completed with 9-inch diameter manhole. All soils collected to be containerized.

o Convert existing MAGS-08 well to VMP, if useable, installing a flush cleanout plug or manhole. If unusable, select new location with engineer’s approval and install a new VMP. Install two additional exterior VMPS. VMPS to be 2-inch diameter, 0.020-slot screen, screened 1 to 4 feet bgs, with threaded cleanout plug.

Installation of SVE conveyance piping o Install 2-inch diameter sch. 40 PVC SVE conveyance piping piecewise in 14-inch wide by

2-ft depth trench and connect to remedial system influent port for exterior SVE wells.

Interior SVE well conveyance piping to be 2-inch sch. 40 PVC routed up adjacent interior wall and along open-web trusses, secured with pipe hangers, to rear exterior wall and outside through wall and connected to remedial system influent port. Exterior, above-ground piping to be sch. 80 PVC. Wall-mounted conveyance piping to be secured with P3000 Unistrut with clamps.

o Install approximately 130 feet of electrical conduit on exterior wall, with guidance of the electrical contractor, from the remedial compound to the electrical drop and meter area on the southern portion of the building.

Unloading of skid system onsite Proposal assumes SVE system is in a mobile trailer and can be moved into place by delivery vehicle. If SVE system is on skids, it can be moved into place via forklift/skidsteer at an additional cost ($1,000).

Contracting the services of an electrician for the installation o Action will contract the services of an electrical contractor to provide the required electrical service connections. Assumes FPL is able to provide or arrange access to the power duct / meter bank or line drop located on the southern end of the building.

Electrician/contractor to provide necessary meter, disconnect, PVC conduit and wires from transformer to treatment system, and connect to single point on the remedial system approximately 130 feet away.

Site restoration o Resurface trenched areas with 3,000 PSI fiber-reinforced concrete to land surface.

o Maintain clean work areas at the end of each working day and at the completion of the project.

o Ensure excavated material is stored or stockpiles on-site and is covered and contained to prevent contact with the ground, personnel, and run off water.

o Provide dust/odor control as needed to protect surrounding areas and personnel.

o Dispose of all debris properly off-site at an appropriate facility. Engineer to dispose of drummed IDW.

o Restore site to pre-construction conditions.

Terracon – Cormans Cleaners – SVE System Construction

Rough Schedule

Premobilization:

Contact Sunshine 811 Public Utility Locate Submit HASP Permitting as required

Day 1:

Mobilization & Site Preparation Review HASP & Safety Tailgate Convert/Install SVE wells & VMPs

Day 2:

Unload & Place SVE System Saw cuts & trenching Conveyance piping Electrical conveyance piping

Day 3:

Conveyance piping (cont.)

Electrical conveyance piping (cont) Infill Trench Drum excess soil

Day 4:

Install GAC Vessel Resurfacing / Concrete Trench Install Bollards

Day 5:

Site Restoration Dispose of asphalt & concrete Demobilize

Day 6 (Date to be decided by Engineer & FPL):

Startup (coordinate with electrician)

8820 66TH Street North – Pinellas Park, Florida 33782

727.561.7477 – www.pdsflorida.com

RESPONSE TO

REQUEST FOR BID

CORMANS CLEANERS

REMEDIATION SYSTEM

INSTALLATION

STUART FLORIDA

ERIC_4924

DECEMBER 6, 2024

Prepar ed for:

Terracon 645 NW Enterprise Drive

Suite 107 Port St. Lucie, Florida

Attn: Mr. Shawn Ouellette, P.G.

Preferred Drilling Solutions, Inc.

Safety ▪ Quality ▪ Service

Safety ▪ Quality ▪ Service

8820 66th Street North ▪ Pinellas Park, FL 33782 Toll Free: 1-866-235-6753 ▪ Phone: 727-561-7477 ▪ Fax: 727-561-9028

Branch Offices: Lakeland, Live Oak, Bonifay and Milton, FL www.pdsflorida.com

December 6, 2024

Mr. Shawn Ouellette, P.G.

Terracon 645 NW Enterprise Drive - Suite 107 Port St. Lucie, Florida

RE: Response to Request for Bid Remediation System Construction Cormans Cleaners 3464 SE Dixie Highway Stuart, Martin County, Florida

Dear Mr. Ouellette, Preferred Drilling Solutions, Inc. (PDS) is pleased to present this response to your Request for Bid for the installation of remediations system components at the Cormans Dry Cleaners facility located at 3464 SE Dixie Highway in Stuart, Florida. We have prepared our bid based on your November 2024 bid document and email correspondence through December 3, 2024. The narrative following this cover letter outlines our proposed workplan for the project.

Our proposed construction schedule, assuming permits can be obtained from Martin County by mid- February, is included as Attachment I. Our cost proposal is included on the required bid forms as Attachment II. Finally, PDS’ Standard Terms and Conditions are included as Attachment III.

We appreciate the opportunity to provide our remedial construction services to Terracon on this project. Should you have any questions regarding our enclosed response, please do not hesitate to contact our office.

Sincerely, Preferred Drilling Solutions, Inc.

Jon Berntsen, P.G., CBC Chief Operating Officer and Vice President of Construction

Remedial System Construction – Cormans Cleaners December 6, 2024 Stuart, Florida Page 1

CONSTRUCTION WORKPLAN

Preferred Drilling Solutions, Inc. (PDS) has prepared this construction workplan to outline the proposed steps and methodologies that will be followed for the construction of remedial system components at the Cormans Dry Cleaner facility in Stuart, Florida. As indicated in the Request for Bid documentation, the proposed installation will occur around February 2025. Based on this timeframe, a construction schedule of events is included as Attachment I with construction scheduled to commence on February 17, 2025.

Task – Preconstruction Activities

PDS will attend a preconstruction meeting on site with Terracon approximately one week prior to mobilization. Typical topics covered at the meeting include site health and safety, work sequence and methodology, and site owner concerns. Prior to the meeting, PDS will furnish a copy of our site health and safety plan as well as our proposed construction workplan.

Task – Permitting

PDS will work with Terracon to obtain permits from Martin County for the proposed construction activities. Permits will include an electrical permit (provided by electrician under separate task item) and a general construction permit through Martin County. PDS will require Terracon to secure owner signatures on permit forms and a notice of commencement as required by the County.

Task – Mobilization

PDS will mobilize all personnel, equipment, and materials necessary to complete the proposed installation activities. This will include a mini-excavator, box truck, safety barricades/fencing, and system piping.

Task – MAG/VMP Well Conversion

PDS will convert existing wells into the SVE system as appropriate assuming they are fully functional and accessible. This will include coring concrete from around the wellhead and the installation of an 8-inch bolt down manhole. Wellhead assemblies/conveyance connections will be constructed during the piping installation portion of this project. In the event the wells are not able to be utilized, PDS will install new wells per the specifications indicated. The costs included in the bid assume that new wells will be required. Any soil removed during the installation of the wells will be containerized in a 55-gallon drum.

Task – Aboveground Piping

PDS will evaluate the proposed piping run and determine the best location to penetrate the building exterior. Once determined, a 4-inch diameter core hole will be opened to allow the SVE piping to enter the building. As the piping is installed, pipe supports consisting of Unistrut and pipe clamps will be installed. When installed on bar joists, clamps and all-thread will be used; when installed into concrete, concrete anchors (Tapcon or Redhead) will be utilized. If necessary and requested, the piping will be pressure tested before being tied into the vapor extraction point.

Task – Underground Piping

PDS will sawcut and remove the asphalt surface cover along the proposed trenching run. The asphalt will be properly disposed of. The trench run will then be excavated using a mini-excavator to a depth of 2 feet below grade with excavated material placed on visqueen plastic adjacent to the trench. Any deleterious

Remedial System Construction – Cormans Cleaners December 6, 2024 Stuart, Florida Page 2 material will be removed from the trench bed, and the pipe will be installed and connected to the wellhead. If requested, a pressure test will be completed prior to backfilling. The trench will then be backfilled in 6-inch lifts and compacted with a mechanical plate compactor. Following backfilling, the manhole will be set atop the SVE well, and the trench will be finished with a minimum 6-inch thick concrete cap using 4,000 psi concrete with fiber.

Task – Electrical Conduit

PDS will install electrical conduit along the building to a location approximately 130 feet away as specified by the plans. The conduit will be hung on the building utilizing Unistrut and clamps. The actual routing will be determined following an on-site inspection.

Task – Bollards

PDS will install six bollards surrounding the remediation equipment. The bollards will consist of 4-inch diameter Schedule 40 steel set in and filled with concrete. The bollard locations will be opened using a core drill, and the bollard location excavated to depth with a post hole shovel. The hole will be minimum of 10 inches in diameter and 2 feet deep. The bollard will be set in concrete, then painted safety yellow.

Task – Equipment Installation and Anchoring

PDS will offload the remedial equipment using a telescoping boom forklift. The equipment will be inspected then placed in its designated location per the Engineer. Following placement, the conveyance lines installed previously will be connected, and the electrician will perform all wiring connections.

Helical auger hurricane tiedowns will be used to anchor the equipment. Following anchoring, all permit inspections will be completed.

Task – Electrical

A licensed electrician will obtain the necessary permits, construct the required electrical service, disconnect, and meter can, and pass all inspections for their work. Once the system is energized, the electrician will provide up to 4 hours of startup assistance.

Task – Demobilization

Following the completion of all tasks, PDS will perform a broom cleaning of the work area, stage any investigation derived waste drums for management by others, and demobilize from the site.

ATTACHMENT I

PROJECT SCHEDULE

ID

M od e Ta sk N am e

Du ra tio n

St ar t Fi ni sh

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

M T

W T

F S

S M

T W

T F

S S

M T

W T

F S

S M

T W

T F

S S

M T

W T

F S

S M

T W

T F

S S

M T

W T

F S

S M

T W

Ja n

, '2

Ja n

, '2

Ja n

, '2

Fe b

2, '2

Fe b 9, '2

Fe b

Fe b

, '2

Ta sk

Sp lit

M ile st on e

Su m m ar y

Pr oj ec t S um m ar y

In ac tiv e

Ta sk

In ac tiv e

M ile st on e

In ac tiv e

Su m m ar y

M an ua l T as k

Du ra tio n-on ly

M an ua l S um m ar y

Ro llu p

M an ua l S um m ar y

St ar t-on ly

Fi ni sh -o nl y

Ex te rn al

T as ks

Ex te rn al

M ile st on e

De ad lin e

Pr og re ss

M an ua l P ro gr es s

Pa ge

Pr oj ec t:

Co rm an s P ro je ct S ch ed

Da te

: F ri

/6

/2

ATTACHMENT II

BID FORMS

November 22, 2024 Terracon Proposal No. PHD247038

Reliable Responsive Resourceful 13

ATTACHMENT 1: BID SUBMITTAL FORM (PAGE 1 OF 2)

REQUEST FOR BID –SVE SYSTEM CONSTRUCTION FOR CORMANS CLEANERS

E-mail an original along with other required forms to TERRACON CONSULTANTS, INC., Shawn.ouellette@terracon.com

COMPANY NAME:

COMPANY ADDRESS:

STATE OF FLORIDA GENERAL CONTRACTORS LICENSE NUMBER:

PHONE NUMBER:

8820 66th Street North - Pinellas Park, Florida 33782

727-561-7477

CBC1251746

November 22, 2024 Terracon Proposal No. PHD247038

Reliable Responsive Resourceful 14

QUOTE THE FOLLOWING SERVICES:

ITEM

NO.

DESCRIPTION UNIT OF

MEASURE

ESTIMATED

QUANTITY

UNIT PRICE EXTENDED

PRICE

Mobilization / Contractor Submittals Lump Sum 1 $ $

2 Contractor Submittals Permits Lump Sum 1 $ $

3 SVE / VMP Well Construction/Conversion

Lump Sum 5 $ $

4A SVE Above Grade 2”diameter Schedule 80 piping

LF 70

4B SVE Trenching (in asphalt exterior ) 14”W x 2’D’ x 30L’

LF 30

4C Electrical Conduit Above Grade LF 130

5 Equipment Bollards Lump Sum 1 $

6 System Installation and anchoring

Lump Sum 1 $

7 Site Restoration and Demobilization

Lump Sum 1 $ $

8 Electrical Lump Sum 1

TOTAL $

Quantities and proposed well locations and pipe layout are subject to change – CONTRACTOR to be compensated for actual quantities. Invoices will be paid based on actual quantities and unit rates

5,295.005,295.00 2,675.00 2,675.00

$65.00 $4,550.00 $175.25 $5,257.50

$20.25 $2,632.50 3,332.50 $3,332.50

1,950.00

$25,975.00 $25,975.00

59,671.25

961.75 4,808.75

$3,195.003,195.00

$1,950.00

November 22, 2024 Terracon Proposal No. PHD247038

Reliable Responsive Resourceful 15

ATTACHMENT 1

BID SUBMITTAL FORM (PAGE 2 OF 2)

Handwritten Signature of Authorized Officer of Company or Agent Date

Printed Name and Title Company Name

Jon Berntsen, PG, CBC - Chief Operating Officer Preferred Drilling Solutions, Inc.

12/6/2024 andwritten Signature of Auth

ATTACHMENT III

STANDARD TERMS AND CONDITIONS

Ver 2024.12 Page 1 of 4

Date: Job Number:

(hereafter PDS)

Client Name:

(hereafter Client)

Address: 8820 66th Street North Address:

City: Pinellas Park City:

State: Florida Zip: 33782 State: Zip:

Project

Project Name:

Project Location:

City: State: Zip:

Services To Be Rendered Per the attached proposal dated [DATE], Preferred Drilling Solutions, Inc. will complete [].

PDS and Client agree as follows:

SECTION 1. SERVICES

PDS shall provide the Client, with the “Services” set forth in the Proposal with date referenced above. The “Services” shall be performed with respect to the Property identified in the Proposal (the “Site”). The Proposal and any subsequent modification pursuant to Section 21 below shall be governed by these Terms and Conditions. The Terms and Conditions, the Proposal and any subsequent modification pursuant to Section 21 below shall be referred to as the “Agreement”. PDS Services will be performed on behalf of and solely for the exclusive use of Client for the purposes set forth in the Proposal and for no other purpose. Client acknowledges that PDS’S Services require decisions which are based upon judgment stemming from limited data rather than upon scientific certainties. Client, in accepting PDS’S Proposal, acknowledges the inherent risks to Client and its property associated with the work described in the Proposal and with underground work in general.

SECTION 2. BILLING AND PAYMENT

Client will pay PDS for Services performed in accordance with the rates and charges set forth in the Proposal. Unless otherwise specified in the Proposal, invoices for PDS Services will be submitted on a periodic basis, or upon completion of Services, as PDS shall elect. All invoices will be paid by Client within thirty

(30) days after invoice date (NET 30). Invoice balances remaining unpaid for thirty (30) days after invoice date will bear interest from invoice date at 1.5 percent per month or at the maximum lawful interest rate, if such lawful rate is less than 1.5 percent per month. If Client fails to pay any invoice in full within thirty (30) days after invoice date, PDS may, at any time, and without waiving any other rights or claims against Client and without thereby incurring any liability to Client, elect to terminate the performance of Services upon ten (10) days prior written notice by PDS to Client. Notwithstanding any termination of

Services by PDS for non-payment of invoices, Client shall pay PDS in full for all Services rendered by PDS to the date of termination of Services plus all interest, termination costs and expenses incurred by PDS and related to such termination. Client shall be liable to reimburse PDS for all costs and expenses of collection, including reasonable attorneys’ fees. PDS’S non-exercise of any rights or remedies, whether specified herein or otherwise provided by law, shall not be deemed a waiver of any such rights or remedies, nor preclude PDS from the exercise of such rights or other rights and remedies under this instrument or at law.

In the event that PDS is requested or required to provide expert testimony, attend depositions or provide additional services pursuant to a judicial or administrative process involving the Client and the Site, Client shall pay PDS for such services at a rate of 2.0 times the rates set forth in the proposal or the rates associated with the performance of the Services, as well as other necessary and reasonable services and/or attorneys fees incurred by PDS in providing such services.

SECTION 3. TAXES

Services provided are quoted exclusive of all state, local and other taxes or other charges (other than income taxes payable by PDS). In the event such taxes and/or charges become applicable to PDS’S Services, applications or data, Client shall pay any such applicable tax upon receipt of written notice that such tax(es) is/are due.

Client is aware that certain Services provided by PDS to Client may be subject to the provisions of local sales taxes or other federal, state or local taxes or fees. Client understands and agrees that judgments made by PDS and its resultant billings as to which Services are taxable or subject to said fees and which Services are not taxable or subject to said fees may be challenged by the appropriate federal, state or local authority upon audit of PDS. In the event that PDS resolves the audit dispute with the appropriate federal, state or local authority and PDS is required to pay additional tax, fees, penalties or interest due to the manner in which PDS initially billed the Client, PDS shall bill Client for such additional amounts; Client shall indemnify PDS for those expenses and for the cost of the defense of the audit within ten (10) days of receipt of the revised PDS billing. In no event will this give Client the right to intervene or control the dispute between PDS and the appropriate federal, state or local authority.

SECTION 4. SERVICES OF OTHERS

As necessary, PDS engages the specialized services of individual contractors, or other companies to participate in a project. When considered necessary, these firms or other contractors will be used with Client’s approval.

The cost of such services plus a minimum fifteen percent (15%) service charge, unless noted otherwise, will be included in our invoice.

PDS does not undertake a guarantee or assume responsibility for the performance of the contractor(s) or companies(s) or the accuracy of their results or for any subcontractor hired by and under the specific direction of the Client.

SECTION 5. SITE DISTURBANCE

The Client understands that PDS’S use of environmental assessment and remediation techniques and equipment may cause damage to or alteration of the Site or any building or utility line on the Site, as well as other items of real and personal property on the Site. The Client shall use its best and diligent efforts to provide PDS with the plans of public and private utilities which are in Client’s possession and/or other agencies to assist PDS in locating any underground structures including cables, electric lines, tanks, pipes, gas lines, water mains, or other latent or subterranean structures. PDS shall exercise reasonable judgment in performing field exploration required as part of the project.

Efforts will be made to minimize potential alteration of Site conditions during the project.

Ver 2024.12 Page 2 of 4

In the event of damage, PDS shall exercise reasonable judgment in restoring the Site to comparable conditions observed prior to the project. PDS will not be held responsible for subsurface damage at locations selected/directed by Client.

SECTION 6. INDEPENDENT

CONTRACTOR

The parties agree that PDS 1) shall be free from direction and control by the Client except for the selection of work locations (borings, wells, excavations), 2) performs services outside the usual course of, or places of business of, the Client and 3) is engaged in an independently established trade, occupation, profession or business wholly apart from the Client.

The relationship of PDS to Client, therefore, shall be that of independent contractor.

SECTION 7. NONHIRE OF

CONTRACTOR PERSONNEL

It is hereby mutually agreed that Client will not directly or indirectly solicit for hire any employee(s) of PDS’ technical staff, who is associated with efforts called for under this effort, for a period of one (1) year after completion termination of this Agreement. In the event the foregoing provision is breached, liquidated damages equal to twelve (12) months of the employee’s compensation plus any legal expenses associated with the enforcement of this provision shall be paid by the Client to PDS.

SECTION 8. PROPRIETARY METHODS

AND EQUIPMENT

PDS reserves the right to use, for any purpose, any proprietary methods, equipment, skills, and techniques acquired or used by PDS in the performance of the Services. There shall be no restraint to PDS, its employees, agents, or subcontractors in the use of the techniques and skills that may be acquired in the course of performance of this Service. The Client acknowledges that it shall not acquire any Intellectual Property Rights under this Agreement associated with the Services provided or produced by PDS. Any Intellectual Property goodwill arising in the course of this Agreement with respect to said Services developed by PDS shall accrue solely for the benefit of PDS.

SECTION 9. UCC INAPPLICABILITY

Services and/or custom methods provided under this Agreement will not be governed by the Uniform Commercial Code (UCC) and will not be deemed “goods” within the definition of the Uniform Commercial Code.

SECTION 10. TERMINATION

This Agreement may be terminated in whole or in part in writing by either party in the event of a default consisting of substantial failure by either party to fulfill its obligations under this Agreement through no fault of the terminating party; provided that no such termination may be effected unless the defaulting party is given ten (10) days written notice of default and an opportunity to cure the default within a reasonable period. If termination is effected, Client will pay PDS all reimbursable costs which are due as of the effective date of termination, including costs incurred for software and equipment ordered in conformance with the Proposal which is to be delivered to Client and which cannot be canceled or terminated, and in addition, those reimbursable costs incurred in good faith by PDS after the effective date of termination in connection with demobilization of equipment and personnel, and with the cancellation or termination of subcontracts and purchase orders. In the case of termination of Services performed on a fixed price basis, PDS shall be compensated for Services performed as if the Services had been performed on a reimbursable basis.

SECTION 11. CONFIDENTIALITY

PDS will not intentionally divulge technical information designated in writing as “CONFIDENTIAL” and disclosed by Client to PDS other than to its employees or subcontractors with a need to know or to parties designated by Client in writing;

information so marked shall be treated as “Confidential Information”. Confidential Information shall not include: a) information previously known to PDS; b) information that becomes known to PDS through other means;

c) information which is public knowledge; d) information which subsequently becomes public knowledge through no fault of PDS; and

e) information required by law to be disclosed.

Notwithstanding the limitations set forth herein, PDS may disclose Confidential Information in order to comply with laws, regulations, ordinances, court orders, governmental directives, legal obligations and professional standards of conduct regarding the reporting of findings to appropriate public agencies, and to protect against claims or liabilities arising from the performance of the Services under this Agreement. PDS shall be authorized to disclose the existence of this Agreement in any manner, where such disclosure is solely for the benefit of PDS’S marketing initiatives and unrelated to the Client’s “Confidential Information”.

SECTION 12. STANDARD OF CARE

AND WARRANTY

Services performed by PDS under this Agreement will be conducted in a manner consistent with that level of care and skill ordinarily exercised by members of the profession currently practicing in the same locality under similar conditions. PDS’S liability for failure to meet this standard shall be governed by the Indemnification and Limitation of Liability clause below. No other representation or warranty, expressed or implied, and no warranty of merchantability or fitness for purpose, or any other guarantee is included or intended in this Agreement, or in any report, opinion, document or otherwise.

SECTION 13. MUTUAL INDEMNITY

AND ACKNOWLEDGMENTS

Client acknowledges that PDS has not created or contributed to the creation of any oil and/or hazardous materials, pollutants, asbestos, or other potentially dangerous substance that is now or may be in the future discovered or introduced at the Site.

Client agrees to defend, indemnify and hold harmless PDS, its subcontractors, contractors, agents, officers, directors and employees from and against any and all claims for damages and all costs, liability or expense, whether direct, indirect, economic, or consequential, including reasonable attorneys’ fees, and court and arbitration costs, sustained or alleged by any person or entity based upon or arising in connection with the Services provided by PDS and including but not limited to:

1. A release of oil and/or hazardous materials or pollutants;

2. Bodily injury including death and property damage (real or personal) or any other claim of damage, expense or loss, caused by the release, removal, remediation, assessment, evaluation or investigation of oil and/or hazardous materials or pollutants;

3. Removal, assessment, evaluation or investigation of, or remedial action taken because of, the release or suspected release of oil and/or hazardous materials or pollutants;

4. Any federal, state, local or other governmental fines or penalties related to oil and/or hazardous materials or pollutants; or

5. The detection, abatement, removal, or replacement of products, materials, or processes containing asbestos.

The Client covenants that it will reimburse PDS for, or pay over to PDS, all sums of money which PDS shall pay or become liable to pay by reason of any of the foregoing, and will make such payments to PDS as soon as…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .