Task Assignment Summary

This is a Task Assignment (TA Number DC012D) issued under Contract HW687 between the State of Florida Department of Environmental Protection (FDEP) and Terracon Consultants, Inc. The assignment authorizes work at the Palace Dry Cleaners site located at 733 South Orange Blossom Trail, Apopka, Orange County, Florida (Project Number ERIC_5049). The Department Project Manager is Patrick McGrane, and the Contractor's Project Manager is Donna Cline. The Task Assignment is effective through November 14, 2025.

Terracon Consultants, Inc. is authorized to conduct quarterly groundwater monitoring and Post Active Remedial Monitoring (PARM) events at the contaminated site, including laboratory analysis of five groundwater monitoring wells (MW002, MW004, MW005D, MW006S, and MW007), preparation of email deliverables for two quarterly sampling events, and a final Site Rehabilitation Completion Report (SRCR) for the fourth sampling event. The work scope includes 107 total labor hours distributed across five subtasks: project management, three quarterly PARM reports with laboratory analysis, and investigation-derived waste (IDW) disposal. The total Task Assignment value is $17,060.28, with payment structured as a fixed unit rate. Invoicing is contingent upon submission and FDEP approval of deliverables, with scheduled payments of $3,954.63 for Quarter 2, $3,767.49 for Quarter 3, and $9,338.16 for Quarter 4 and site rehabilitation completion, all due by August 29, 2025. Work is to be performed in accordance with the October 4, 2024 Scope of Work, Cost Estimate, and Bid Documentation.

View the file

Other files

File Type Posted
CN-370000-HW687-BF01BCO1.pdf PDF
CN-370000-HW687-BF02B.pdf PDF
CN-370000-HW687-BF04ACO4.pdf PDF
CN-370000-HW687-BF05A.pdf PDF
CN-370000-HW687-BF1BCO2.pdf PDF
CN-370000-HW687-BIL02A.pdf PDF
CN-370000-HW687-BIL02C.pdf PDF
CN-370000-HW687-BIL03A.pdf PDF
CN-370000-HW687-BIL1BCO1.pdf PDF
CN-370000-HW687-BIL3ACO1.pdf PDF
CN-370000-HW687-CS04A.pdf PDF
CN-370000-HW687-CSS3BCO1.pdf PDF
CN-370000-HW687-DC002B.pdf PDF
CN-370000-HW687-DC002C.pdf PDF
CN-370000-HW687-DC002E.pdf PDF
CN-370000-HW687-DC002i.pdf PDF
CN-370000-HW687-DC003C.pdf PDF
CN-370000-HW687-DC004A.pdf PDF
CN-370000-HW687-DC005B.pdf PDF
CN-370000-HW687-DC006D.pdf PDF
CN-370000-HW687-DC007B.pdf PDF
CN-370000-HW687-DC007C.pdf PDF
CN-370000-HW687-DC008A.pdf PDF
CN-370000-HW687-DC008E.pdf PDF
CN-370000-HW687-DC010D.pdf PDF
CN-370000-HW687-DC011A.pdf PDF
CN-370000-HW687-DC011C.pdf PDF
CN-370000-HW687-DC011E.pdf PDF
CN-370000-HW687-DC011G.pdf PDF
CN-370000-HW687-DC013A.pdf PDF
CN-370000-HW687-DC014A.pdf PDF
CN-370000-HW687-DC014C.pdf PDF
CN-370000-HW687-DC016A.pdf PDF
CN-370000-HW687-DC018A.pdf PDF
CN-370000-HW687-DC01ACO4.pdf PDF
CN-370000-HW687-DC01ACO5.pdf PDF
CN-370000-HW687-DC01ACO6.pdf PDF
CN-370000-HW687-DC01ACO8.pdf PDF
CN-370000-HW687-DC021B.pdf PDF
CN-370000-HW687-DC023E.pdf PDF
CN-370000-HW687-DC024A.pdf PDF
CN-370000-HW687-DC024D.pdf PDF
CN-370000-HW687-DC025A.pdf PDF
CN-370000-HW687-DC025D.pdf PDF
CN-370000-HW687-DC025E.pdf PDF
CN-370000-HW687-DC027D.pdf PDF
CN-370000-HW687-DC028C.pdf PDF
CN-370000-HW687-DC028F.pdf PDF
CN-370000-HW687-DC028G.pdf PDF
CN-370000-HW687-DC031B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

HW687

DC012D November 14, 2025

This Task Assignment authorizes Terracon to conduct quarterly groundwater sampling events at the Palace Dry Cleaners site in accordance with the October 4, 2024 Scope of Work, Cost Estimate, and Bid Documentation.

Patrick McGrane 850-245-8899 Terracon Consultants, Inc.

Donna Cline 904-479-7415

ERIC_5049

733 South Orange Blossom Trail, Apopka, Orange County

Palace Dry Cleaners

$ 17,060.28

$ 17,060.28

Scope of Work

Terracon Consultants, Inc.

Donna Cline

Senior Associate / Remediation Engineer

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2024.10.17 10:58:19 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

BWC TAFORM 01/18

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton

Secretary

Memorandum

TO: Negotiation File Palace Dry Cleaners

Apopka, Orange County

ERIC_5049

FROM: Patrick McGrane, Project Manager

SUBJECT: Negotiation Summary Task Assignment DC012D (HW687)

DATE: October 16, 2024

This Task Assignment authorizes Terracon Consultants, Inc. to conduct quarterly groundwater monitoring at the Palace Dry Cleaners site. Following SVE system shutdown in June 2024, four consecutive clean groundwater sampling events at previously impacted wells are necessary for the site to meet the conditions of closure under Risk Management Option I (RMO I). The first event was performed after shutdown evaluation began in May of 2024. Three more quarterly sampling events are authorized in this task assignment, with a Site Rehabilitation Completion Report submitted as the final deliverable.

The total cost for this project is $17,060.28 with 107 total labor hours. All work is to be completed in accordance with the October 4, 2024, Scope of Work, Cost Estimate, and Bid Documentation.

Terracon may invoice according to the included schedule.

FDEP COST ESTIMATE

Contractor: Terracon HW687

Date: 10/16/2024 PH1247F35

Task #: SubTask 1 Project Management

Site: SubTask 2 PARM Report Quarter 2

Activity/Phase: PARM - 3 Additional Quarters and SRCR SubTask 3 PARM Report Quarter 3

Project Manager: Patrick McGrane SubTask 4 PARM Report Quarter 4 and SRCR

SubTask 5 IDW Disposal

Totals 1 2 3 4 5

Labor Rate Category

$70.14 Project Manager Donna Cline 7.54 7.54

$70.14 Senior Engineer Donna Cline 8.00 2.00 2.00 4.00 0.00

$33.31 CADD Specialist Chelsea Fugate 10.00 2.00 2.00 6.00 0.00

$29.10 Environmental Technician Pat Beers 32.00 11.00 10.00 11.00 0.00

$30.34 Staff Scientist Rachael McCullough 31.50 5.50 5.50 18.50 2.00

$71.63 Senior Engineer Greg Sattler 18.00 4.00 4.00 9.00 1.00

Total Hours 107.04 7.54 24.50 23.50 48.50 3.00

Direct Labor $4,599.63 $529.16 $980.39 $951.29 $2,006.48 $132.31

Overhead 116.00% $5,335.58 $613.83 $1,137.25 $1,103.50 $2,327.52 $153.48

Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 56.26% $2,587.77 $297.71 $551.57 $535.20 $1,128.85 $74.44

Total Labor $12,522.98 $1,440.70 $2,669.21 $2,589.99 $5,462.85 $360.23

Travel

Vehicle charge $480.00 120.00 120.00 120.00$ 120.00$

Mileage Costs $0.00 0.00 $0.00 $0.00 $0.00

Air Fare $0.00 0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 0.00 $0.00 $0.00 $0.00

Total Travel $480.00 $120.00 $120.00 $120.00 $120.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (DPT) $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00

Surveying - SurvTech Solutions, Inc. $0.00 $0.00 $0.00 $0.00 $0.00

IDW - Petrotech Southeast $215.00 $0.00 $0.00 $0.00 215.00$

Geophysical - Geoview $0.00 $0.00 $0.00 $0.00 $0.00

MOT - MOT Plans $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $215.00 $0.00 $0.00 $0.00 $215.00

Handling Fee $21.50 $0.00 $0.00 $0.00 $21.50

Total Subcontractor Cost $236.50 $0.00 $0.00 $0.00 $236.50

Laboratory

Analytical Costs $1,168.00 $365.00 $365.00 $438.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $156.00 $52.00 $52.00 $52.00 $0.00

Total Laboratory $1,324.00 $417.00 $417.00 $490.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $139.50 $46.50 $46.50 $46.50 $0.00

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $1,005.00 $335.00 $335.00 $335.00 $0.00

Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00

Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $1,244.50 $481.50 $381.50 $381.50 $0.00

Subtotal $15,807.98 $1,440.70 $3,687.71 $3,508.49 $6,454.35 $716.73

Completion Fee $1,252.30 $144.07 $266.92 $259.00 $546.29 $36.02

Total Estimated Cost $17,060.28 $1,584.77 $3,954.63 $3,767.49 $7,000.64 $752.75

Palace Cleaners ERIC_5049

REV: 02/03 CEF TERRACON Page 1

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Palace Cleaners ERIC_5049

SUBTASK 2: PARM Report Quarter 2

PROPOSAL NO. PH1247F35

DATE: 10/16/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning and Groundwater Sampling

Senior Engineer GS Verification of property ownership, notify responsible parties of field activities 1.0

Staff Scientist RM 2.5

Field Activities

Environmental Technician PB Obtain IDW Drum 1.00

Environmental Technician PB Load/unload equipment (1 hr./day) 1.00

Environmental Technician PB Mobe/Demobe from Site (1.5 hr./day) 1.50

Environmental Technician PB DTW collection, pre an post equipment calibration 2.00

Environmental Technician PB Groundwater sampling 5 wells (1 well/hour) 5.00

Environmental Technician PB Containerize purge water in IDW drum 0.50

Reporting - Email Deliverable

Staff Scientist RM 3.00

Senior Engineer GS Prepare report email summary, summarize groundwater analytical results 3.00

Senior Engineer DC Provide report email conclusions and recommendation 2.00

CADD Specialist CF Prepare Exhibits (groundwater flow and concentrations maps) 2.00

Senior Geologist SO 3 Days, project oversite (travel from Port St. Lucie) 0.00

Personnel: GS RM PB DC CF

Hours: 4.00 5.50 11.00 2.00 2.00 TOTAL LABOR 24.50

VEHICLE TYPE RATE UNIT USEAGE

Truck (Environmental Technician) 120.00$ days 1 120.00$

TOTAL VEHICLE 120.00$

LABORATORY COSTS

PARAMETER RATE # SAMPLES IDW Units

GW VOHs - Halocarbons USEPA 8260 73.00$ 5 $365.00

Sample Shipping Small Cooler (2 day) 52.00$ 1 $52.00

TOTAL LAB $417.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 1 40.00$

Ice - samples 6.50$ each 1 6.50$

Analytical Shallow Groundwater Sampling Kit 290.00$ day 1 290.00$

Tubing, HDPE 0.30$ ft 100 30.00$

Tubing, silicon (3/16 x 3/8) 3.00$ ft 5 15.00$

IDW Drum 100.00$ each 1 100.00$

TOTAL EQUIPMENT 481.50$

Prepare field documents and equipment for the groundwater sampling event, order sample kits

Prepare updated tables and draft maps

SUBTASK 3: PARM Report Quarter 3

PROPOSAL NO. PH1247F35

DATE: 10/16/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning and Groundwater Sampling

Senior Engineer GS Verification of property ownership, notify responsible parties of field activities 1.0

Staff Scientist RM 2.5

Field Activities

Environmental Technician PB Obtain IDW Drum / Use same drum from Quarter 2 0.00

Environmental Technician PB Load/unload equipment (1 hr./day) 1.00

Environmental Technician PB Mobe/Demobe from Site (1.5 hr./day) 1.50

Environmental Technician PB DTW collection, pre an post equipment calibration 2.00

Environmental Technician PB Groundwater sampling 5 wells (1 well/hour) 5.00

Environmental Technician PB Containerize purge water in IDW drum 0.50

Reporting - Email Deliverable

Staff Scientist RM 3.00

Senior Engineer GS Prepare report email summary, summarize groundwater analytical results 3.00

Senior Engineer DC Provide report email conclusions and recommendation 2.00

CADD Specialist CF Prepare Exhibits (groundwater flow and concentrations maps) 2.00

Senior Geologist SO 3 Days, project oversite (travel from Port St. Lucie) 0.00

Personnel: GS RM PB DC CF

Hours: 4.00 5.50 10.00 2.00 2.00 TOTAL LABOR 23.50

VEHICLE TYPE RATE UNIT USEAGE

Truck (Environmental Technician) 120.00$ days 1 120.00$

TOTAL VEHICLE 120.00$

PER DIEM STAFF RATE UNIT USEAGE

Hotel SO 36.00$ 0 -$

Per diem SO 150.00$ 0 -$

TOTAL PER DIEM -$

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

TOTAL SUBCONTRACTOR -$

LABORATORY COSTS

PARAMETER RATE # SAMPLES IDW Units

GW VOHs - Halocarbons USEPA 8260 73.00$ 5 $365.00

Sample Shipping Small Cooler (2 day) 52.00$ 1 $52.00

TOTAL LAB $417.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 1 40.00$

Ice - samples 6.50$ each 1 6.50$

Analytical Shallow Groundwater Sampling Kit 290.00$ day 1 290.00$

Tubing, HDPE 0.30$ ft 100 30.00$

Tubing, silicon (3/16 x 3/8) 3.00$ ft 5 15.00$

IDW Drum (Use existing drum) 100.00$ each 0 -$

TOTAL EQUIPMENT 381.50$

Prepare updated tables and draft maps

Prepare field documents and equipment for the groundwater sampling event, order sample kits

SUBTASK 4: PARM Report Quarter 4 and SRCR

PROPOSAL NO. PH1247F35

DATE: 10/16/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning and Groundwater Sampling

Senior Engineer GS Verification of property ownership, notify responsible parties of field activities 1.0

Staff Scientist RM 2.5

Field Activities

Environmental Technician PB Obtain IDW Drum / Use same drum from Quarter 3 0.00

Environmental Technician PB Load/unload equipment (1 hr./day) 1.00

Environmental Technician PB Mobe/Demobe from Site (1.5 hr./day) 1.50

Environmental Technician PB DTW collection, pre an post equipment calibration 2.00

Environmental Technician PB Groundwater sampling 5 wells (1 well/hour) 5.00

Environmental Technician PB Collect sample from IDW drum and position for pickup 1.00

Environmental Technician PB Containerize purge water in IDW drum and position for pickup 0.50

Reporting - SRCR

Staff Scientist RM 16.00

Senior Engineer GS Evaluate and summarize soil and groundwater historical and present summary evaluation 8.00

Senior Engineer DC Provide report conclusions and recommendation 4.00

CADD Specialist CF Prepare base figures and Exhibits (historical soil, historical groundwater flow and concentrations maps) 6.00

Personnel: GS RM PB DC CF

Hours: 9.00 18.50 11.00 4.00 6.00 TOTAL LABOR 48.50

VEHICLE TYPE RATE UNIT USEAGE

Truck (Environmental Technician) 120.00$ days 1 120.00$

TOTAL VEHICLE 120.00$

PER DIEM STAFF RATE UNIT USEAGE

Hotel 36.00$ 0 -$

Per diem 150.00$ 0 -$

TOTAL PER DIEM -$

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

TOTAL SUBCONTRACTOR -$

LABORATORY COSTS

PARAMETER RATE # SAMPLES IDW Units

GW VOHs - Halocarbons USEPA 8260 Short List 73.00$ 5 1 $438.00

Sample Shipping Small Cooler (2 day) 52.00$ 1 $52.00

TOTAL LAB $490.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 1 40.00$

Ice - samples 6.50$ each 1 6.50$

Analytical Shallow Groundwater Sampling Kit 290.00$ day 1 290.00$

Tubing, HDPE 0.30$ ft 100 30.00$

Tubing, silicon (3/16 x 3/8) 3.00$ ft 5 15.00$

IDW Drum (Use existing drum) 100.00$ each 0 -$

TOTAL EQUIPMENT 381.50$

Prepare report table, draft maps, and prepare SRCR report - summarize soil and gw historical data

Prepare field documents and equipment for the groundwater sampling event, order sample kits

SUBTASK 5: IDW Disposal

PROPOSAL NO. PH1247F35

DATE: 10/16/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Coordinate IDW T&D - Drilling & Purge water IDW

Senior Engineer GS 1.00

Staff Scientist RM 2.00

Personnel: RM GS

Hours: 2.00 1.00 TOTAL LABOR 3.00

VEHICLE TYPE RATE UNIT USEAGE

Truck (IDW management) $120 day 1 120.00$

TOTAL VEHICLE 120.00$

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Petrotech 90.00$ drum 1 215.00$

TOTAL SUBCONTRACTOR 215.00$

IDW Disposal (purge water - single

Prepare waste characterization/Generator Profile

Coordinate IDW T&D: Mobilize to site, meet transporter to sign manifests