CN-370000-HW687-DC032C.pdf

PDF 5 MB Posted

Attached to
Master Agreement FL|HW687|519929c0c8a00e44396dc1d8f5fa086b
Contract number
HW687
Issued by
Florida

About this file

This document is a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (FDEP) to Terracon Consultants, Inc. for groundwater monitoring and reporting services at the Celebrity Cleaners site located at 190 State Road 427, #136, Longwood, Seminole County, Florida (ERIC_5485). The underlying contract is HW687, a statewide indefinite delivery vehicle. The Task Assignment is designated DC032C with a completion date of May 1, 2026. The primary contact for FDEP is Gabriel Sostre, Environmental Specialist II (850-245-8749), and the contractor's project manager is Donna Cline, Senior Associate (904-479-7415).

The scope of work authorizes Terracon to conduct groundwater monitoring and reporting activities across four subtasks: (1) Project Management; (2) VOH (Volatile Organic Hydrocarbon) Groundwater Sampling and Reporting, including preparation of INOC packages for 12 off-site parcels; (3) PFAS (Per- and polyfluoroalkyl substances) Sampling and IDW (Investigative-Derived Waste) Management; and (4) preparation of a Groundwater Monitoring Report. The total Task Assignment value is $18,400.46, funded through fixed unit rates rather than fixed price or cost reimbursement. Payment is structured by deliverable with invoicing contingent upon FDEP approval of specific work products: Subtask 2 ($8,445.39) upon approval of INOC packages and field documents; Subtask 3 ($4,198.98) upon approval of PFAS exhibit and IDW Manifest; and Subtasks 1 and 4 ($5,756.09) upon approval of the Groundwater Monitoring Report. The Task Assignment represents a cost reduction of $309.33 (1.65%) from the previous proposal, with total labor hours reduced from 104.81 to 102.65 hours. Deliverables are due by March 27, 2026, with the Groundwater Monitoring Report required within 20 business days of receipt of analytical results.

View the file

Other files

File Type Posted
CN-370000-HW687-BF01A.pdf PDF
CN-370000-HW687-BF01B.pdf PDF
CN-370000-HW687-BF02A.pdf PDF
CN-370000-HW687-BF04A.pdf PDF
CN-370000-HW687-BF04ACO3.pdf PDF
CN-370000-HW687-BIL01B.pdf PDF
CN-370000-HW687-BIL02B.pdf PDF
CN-370000-HW687-BIL03B.pdf PDF
CN-370000-HW687-BIL1BCO2.pdf PDF
CN-370000-HW687-BIL2CCO2.pdf PDF
CN-370000-HW687-CSS02.pdf PDF
CN-370000-HW687-CSS03.pdf PDF
CN-370000-HW687-DC002A.pdf PDF
CN-370000-HW687-DC002G.pdf PDF
CN-370000-HW687-DC006C.pdf PDF
CN-370000-HW687-DC008B.pdf PDF
CN-370000-HW687-DC008D.pdf PDF
CN-370000-HW687-DC009B.pdf PDF
CN-370000-HW687-DC010C.pdf PDF
CN-370000-HW687-DC012A.pdf PDF
CN-370000-HW687-DC014B.pdf PDF
CN-370000-HW687-DC014D.pdf PDF
CN-370000-HW687-DC014H.pdf PDF
CN-370000-HW687-DC015D.pdf PDF
CN-370000-HW687-DC016C.pdf PDF
CN-370000-HW687-DC01ACO9.pdf PDF
CN-370000-HW687-DC021A.pdf PDF
CN-370000-HW687-DC021C.pdf PDF
CN-370000-HW687-DC022A.pdf PDF
CN-370000-HW687-DC023B.pdf PDF
CN-370000-HW687-DC023D.pdf PDF
CN-370000-HW687-DC024B.pdf PDF
CN-370000-HW687-DC024E.pdf PDF
CN-370000-HW687-DC024F.pdf PDF
CN-370000-HW687-DC027A.pdf PDF
CN-370000-HW687-DC028A.pdf PDF
CN-370000-HW687-DC028D.pdf PDF
CN-370000-HW687-DC029C.pdf PDF
CN-370000-HW687-DC02ACO1.pdf PDF
CN-370000-HW687-DC02HCO2.pdf PDF
CN-370000-HW687-DC030A.pdf PDF
CN-370000-HW687-DC031A.pdf PDF
CN-370000-HW687-DC035A.pdf PDF
CN-370000-HW687-DC037A.pdf PDF
CN-370000-HW687-DC03CCO2.pdf PDF
CN-370000-HW687-DC044A.pdf PDF
CN-370000-HW687-DC045B.pdf PDF
CN-370000-HW687-DC049A.pdf PDF
CN-370000-HW687-DC054A.pdf PDF
CN-370000-HW687-DC056A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

HW687

DC032C May 1, 2026

This TA authorizes Terracon to conduct Groundwater Monitoring and Reporting at the Celebrity Cleaners site.

Gabriel Sostre 850-245-8749 Terracon Consultants, Inc.

Donna Cline 904-479-7415

ERIC_5485

190 State Road 427, #136 Longwood, Seminole County 33618

Celebrity Cleaners

$ 18,400.46

$ 18,400.46

Scope of Work

Terracon Consultants, Inc.

Donna Cline

Senior Associate

9/30/25

Digitally signed by Cline, Donna L DN: cn=Cline, Donna L, ou=Domain Users, email=Donna.Cline@terracon.com Date: 2025.09.30 11:39:31 -04'00'

Cline, Donna L

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2025.09.29 16:06:34 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

BWC TAFORM 01/18

Memorandum

FDEP COST ESTIMATE

Contractor: Terracon

Date: 8/29/2025

Task #: DC032C SubTask 1 Project Management

Site: Celebrity Cleaners ERIC_5485 SubTask 2 VOH Groundwater Sampling and Reporting

Activity/Phase: Groundwater Monitoring Report SubTask 3 PFAS Sampling & IDW Management

Project Manager: Gabriel Sostre SubTask 4 Groundwater Monitoring Report

SubTask 5

Totals 1 2 3 4

Labor Rate Category

$72.79 Project Manager Donna Cline 7.40 7.40

$36.06 CADD Specialist Chelsea Fugate 6.00 0.00 3.00 3.00

$46.39 Senior Geologist Derek Barry 46.75 16.75 14.00 16.00

$72.79 Senior Engineer Donna Cline 2.00 0.00 0.00 2.00

$55.34 Senior Geologist Lydia Wing 15.25 1.25 7.00 7.00

$30.43 Environmental Technicia Pat Beers 25.25 23.25 2.00 0.00

Total Hours 102.65 7.40 41.25 26.00 28.00

Direct Labor $4,681.56 $538.59 $1,553.71 $1,205.88 $1,383.38

Overhead 116.00% $5,430.60 $624.76 $1,802.30 $1,398.82 $1,604.72

Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 56.263% $2,633.98 $303.03 $874.16 $678.46 $778.33

Total Labor $12,746.14 $1,466.38 $4,230.17 $3,283.16 $3,766.43

Travel

Vehicle charge $720.00 600.00$ 120.00$ $0.00

Total Travel $720.00 $600.00 $120.00 $0.00

Subcontractor (Services Procurement)

IDW - Petrotech $425.00 $0.00 425.00$ $0.00

Subcontractor Subtotal $425.00 $0.00 $425.00 $0.00

Handling Fee $42.50 $0.00 $42.50 $0.00

Total Subcontractor Cost $467.50 $0.00 $467.50 $0.00

Laboratory

Analytical Costs $1,387.00 1,387.00$ $0.00 $0.00

Sample Shipping $110.00 110.00$ $0.00 $0.00

Total Laboratory $1,497.00 1,497.00$ $0.00 $0.00

Field Expenses

Expendables $219.50 219.50$ $0.00 $0.00

Equipment (Analytical related) $1,375.70 1,375.70$ $0.00 $0.00

Equipment (IDW related) $100.00 100.00$ $0.00 $0.00

Total Field Expenses $1,695.20 $1,695.20 $0.00 $0.00

Subtotal $17,125.84 $1,466.38 $8,022.37 $3,870.66 $3,766.43

Completion Fee $1,274.62 $146.64 $423.02 $328.32 $376.64

Total Estimated Cost $18,400.46 $1,613.02 $8,445.39 $4,198.98 $4,143.07

REV: 02/03 CEF TERRACON Page 1

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Celebrity Cleaners ERIC_5485

SUBTASK 2: VOH Groundwater Sampling and Reporting

PROPOSAL NO. PH1257125

DATE: 8/28/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Groundwater Sampling (Two Person Sampling Crew for a total of 2 days, and One person for 1 additional day)

Senior Geologist LW 1.25

Environmental Technician PB 0.25

Senior Geologist DB 0.25

Senior Geologist DB 1.00

Environmental Technician PB 1.00

Senior Geologist DB 2.00

Environmental Technician PB 3.00

Senior Geologist DB 1.50

Environmental Technician PB 1.50

Senior Geologist DB 12.00

Environmental Technician PB 15.00

Environmental Technician PB 1.50

Senior Geologist DB 0.00

Environmental Technician PB 1.00

INOC Packages for VOH and PFAS

Senior Geologist DB Prepare INOC package for suspected PFAS plume - 12 parcels 0.00

CADD Specialist CF Prepare Exhibits for INOC Packages 0.00

Senior Geologist LW Deliver INOC Package 0.00

Personnel: DB PB LW CF DC

Hours: 16.75 23.25 1.25 0.00 0.00 TOTAL LABOR 41.25

VEHICLE TYPE RATE UNIT USEAGE

Truck (DB) GW Sampling 120.00$ day 2 240.00$

Truck (PB) GW Sampling 120.00$ day 3 360.00$

TOTAL VEHICLE 600.00$

LABORATORY COSTS

PARAMETER RATE # SAMPLES IDW TOTALS

Halocarbons EPA 8260 73.00$ 18 1 1,387.00$

Overnight Shipping 110.00$ 1 110.00$

TOTAL LAB 1,497.00$

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables (2 pp 2 days, 1 pp 1 day) 40.00$ day 5 200.00$

Ice (Sample preservation, 2 bags/day) 6.50$ day 3 19.50$

Analytical Related Shallow Groundwater Sampling Kit(PB) 290.00$ day 2 580.00$

Shallow Groundwater Sampling Kit(DB) 290.00$ day 2 580.00$

Tubing, HDPE 0.30$ ft 629 188.70$

Tubing, silicon (3/16 x 3/8) 3.00$ ft 9 27.00$

IDW Related 55-gallon drum, new 100.00$ each 1 100.00$

TOTAL EQUIPMENT 1,695.20$

Request VOH Sample Kit, PreTask Planning, prepare field sampling and Field Work Request, coordinate IDW staging w tentant

Load/unload equipment and check equipment calibration

Pickup drum for IDW from drum wholesale. Load/unload equipment, and check equipment calibration

Collect water levels from 9 monitoring wells @ 10 minutes per well

Mobilization/Demobilization (1hr per day for 2 days)

Collect 8 Groundwater Samples @ 1.5 hrs per well

Collect water levels from 10 monitoring wells @ (approx) 10 minutes per well

Kick-off meeting (discuss work order, task goal, 'tailgate' and safety)

Kick-off meeting (discuss work order, task goal, 'tailgate' and safety)

Mobilization/Demobilization (1hr per day for 3 days)

Field documents organization

Field documents organization

Collect 10 Groundwater Samples @ 1.5 hrs per well

Containerize IDW, Collect IDW sample

SUBTASK 3: PFAS Sampling & IDW Management

PROPOSAL NO. PH1257125

DATE: 8/29/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning

Senior Geologist LW 0.50

Senior Geologist LW 0.50

Groundwater Sampling activities included in LOE 2

IDW Coordination

Senior Geologist LW 1.00

Environmental Techncian PB 1.00

Environmental Techncian PB 1.00

Report Deliverable for PFAS Sampling

Senior Geologist LW QA/QC field and laboratory data 1.00

Senior Geologist DB Evaluate and summarize groundwater analytical results 2.00

Senior Geologist LW Conclusions and Recommendations for PFAS analysis 2.00

CADD Specialist CF Prepare PFAS exhibit (showing PFOA, PFOS and PFOA+PFAS for each well) 1.00

INOC Packages for PFAS

Senior Geologist DB Prepare INOC package for suspected PFAS plume - 12 parcels 12.00

CADD Specialist CF Prepare Exhibits for INOC Packages 2.00

Senior Geologist LW Deliver INOC Package 2.00

Personnel: LW DB CF PB

Hours: 7.00 14.00 3.00 2.00 TOTAL LABOR 26.00

VEHICLE TYPE RATE UNIT USEAGE

Truck (PB) IDW pick up 120.00$ day 1 120.00$

TOTAL VEHICLE 120.00$

PER DIEM STAFF $0.00 UNIT USEAGE

TOTAL PER DIEM -$

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Petrotech IDW Disposal 425.00$ LS 1 425.00$

TOTAL SUBCONTRACTOR 425.00$

LABORATORY COSTS

PARAMETER RATE # SAMPLES IDW

EPA1633 PFAS analysis by FDEP Laboratory $0 11 -$

TOTAL LAB -$

Request Sample Kit, Coordinate Lab Availability

Update HASP to include PFAS

Prepare IDW Waste Characterization/Generator Profile, schedule and coordinate pickup

Meet Transporter onsite and sign manifest

Mobilize to meet transporter onsite and sign manifest

SUBTASK 4: Groundwater Monitoring Report

PROPOSAL NO. PH4237303

DATE: 8/29/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

GWM Report Deliverable Senior Geologist DB 4.00 Senior Geologist DB 6.00 Senior Geologist LW 1.00 Senior Geologist DB 6.00 Senior Geologist LW 6.00 CADD Specialist CF 3.00 Senior Engineer DC QA assessment of analytical data, conclusions and recommendations 2.00

Personnel: DB PB LW CF DC

Hours: 16.00 0.00 7.00 3.00 2.00 TOTAL LABOR 28.00

Prepare report tables, draft groundwater elevation and analytical isoconcentration figures Prepare report QA/QC field and laboratory data Summarize groundwater analytical results Conclusions and recommendations for supplemental SAR Prepare Figures and Exhibits

January 24, 2025

Terracon Attn: Lydia Wing 1675 Lee Rd Winter Park, FL 32789 Direct: 321-347-3214 Cell: 407-509-3429 Email: Lydia.wing@terracon.com

Re: Dry Cleaner Sites - Drum Disposal Service Central Florida, Tampa, Cocoa, Jacskonville

Lydia, Petrotech Southeast, Inc., a local, family-owned and operated environmental services company, would like to thank you for the opportunity to earn your business. Petrotech is a full-service company, specializing in remediation projects, tank clean outs, used oil recycling, vacuum truck services and drum disposal.

Description of work: Petrotech proposes to provide equipment and personnel, to pick up, transport, and dispose of hazardous and non-hazardous drums of soil and water in accordance with all DOT and EPA regulations. Prior to service, analytical must be provided by the customer, so that proper disposal can be arranged. Rates are based upon standard working hours 8 AM to 5 PM Monday through Friday and are for budgetary purposes only. Final Invoice will reflect actual times and quantities.

Payment Terms: Credit Card payment at the time of service, or Net 30 with approved credit.

All other Petrotech Southeast, Inc. standard terms and conditions shall apply. Any applicable taxes and surcharges shall be invoiced accordingly.

PETROTECH SOUTHEAST, INC. Terracon

Robert Slotabec Date

Robert.slotabec@petrotechse.com

Signature Date

Cell: 321-522-6005 Title:

01/02/2025 08:11 AM PAGE 1 OF 6

Scope of Work

D (407) 618-8389 I M (571) 271-1874

Derek.Barry@terracon.com I Terracon.com

755 PRARIE INDUSTRIAL PKWY,

MULBERRY, FLORIDA, 33860

QUOTE #: 0046853

DATE: 12/31/2024 PROJECT PROPOSAL

CLIENT

DEREK BARRY

TERRACON

5463 W WATERS AVE. SUITE 830, TAMPA, FLORIDA, 33634

P: (571) 271-1874

E-MAIL:DEREK.BARRY@TERRACON.COM

PROJECT DESCRIPTION

T&D DRUMS

OCPS FIRE TRAINING FACILITY, ORLANDO, FL

THE FOLLOWING DESCRIBES OUR UNDERSTANDING OF THE SCOPE OF SERVICES TO BE PERFORMED BY ENVIROSERVE, FOR THE

CLIENT, AT THE ABOVE REFERENCED LOCATION KNOWN AS THE JOB SITE.

FEE STRUCTURE

TRANSPORTATION

ITEM EST.QTY. UNIT PRICE UNIT TOTAL

TRANS & DISPOSAL PER DRUM

NOTES:SUBJECT TO FUEL SURCHARGE,

- $400.00 55 GAL DRUM -

EIC SURCHARGE TO TOTAL INVOICE - $11.00 % -

TOTAL JOB ESTIMATE: $0.00

Job Estimate is for budgetary purposes only. Job will be billed according to time and materials used.

Time and Material Rates shall be charged portal to portal.

Please note that surcharges shall apply for off specification materials.

Applicable taxes and Environmental Fees are not included in our quotation, but shall be charged as applicable to the work.

Durations and Quantities are estimated only, actual fees shall be charged as incurred.

Minimum disposal amounts may apply to bulk disposal.

Tolls are not included in transportation rates

E-manifest fees will apply to hazardous waste manifests

Demurrage charged after one hour loading & unloading

Pricing assumes that drums/pallets are staged on a hard surface, accessible via van truck with liftgate & one driver with drum dolly or pallet jack.

Inaccessible areas (mud, heavy gravel), excessively heavy, deformed, unwieldy drums may require additional labor and equipment to assist. Fees for additional labor and equipment will be charged per EnviroServe's standard T&M rates.

The following materials are not eligible for LTL pricing and require direct or dedicated shipment to the TSDF: Cyanides, DOT Class 4.3 materials, DOT Class 1.4, 1.5 & 1.6 materials, Temperature Controlled/Self Reactive Materials, Odorant Materials (Mercaptans/Thiols), and other reactive/incompatible materials on a case by case basis. High hazardous containers (pails, drums, boxes, cylinders, etc.) will need to be assessed on a case by case basis to determine ability to be transported by EnviroServe.

Pricing for supplies (drums, pails, absorbent pads, etc.) is variable and may be adjusted without notice to account for market increases.

A 11% Environmental Fee will be applied to entire bill.