This pre-solicitation notice announces an upcoming Multiple Award Construction Contract (MACC) solicitation to be issued by the 20th Contracting Squadron at Shaw Air Force Base in South Carolina. The solicitation will be a requirements contract for broad construction and repair projects at Shaw AFB, Poinsett Weapons Range, and Wateree Recreation Facility over a five year period. Work may include water, sewer and utility systems, buildings, roads, electrical systems, fire suppression, hazardous material abatement, and more. The solicitation will be set aside for HUBZone small businesses and issued via sealed bid as an Invitation for Bid available on October 1, 2019. Site visits will be held on October 10, 2019. The Air Force intends to award six contracts with a total ceiling of over $150 million. Contractors must register in the System for Award Management and Wide Area Workflow systems.
FA480319BA0003_Attachments11 AF Form 66
View the file
Other files for this federal contract opportunity
Show all 38
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NCOC-A
| PROJECT NUMBER : | PROJECT TITLE: | SOLICITATION/CONTRACT NO.: | ||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | ALJB 99-0048 | CNST Tent City Latrine Trailers | ||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | OTHER | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DIS- APPROVED | |||||||||||||||||||
| 1 | Air Conditioning Units | x | x | x | x | |||||||||||||||
| 2 | Stairs | x | ||||||||||||||||||
| 3 | Frame Detail | x | x | |||||||||||||||||
| 4 | Water heaters | x | x | x | x | x | ||||||||||||||
| 5 | Shut-off valves | x | x | x | x | |||||||||||||||
| 6 | Plumbing detail | x | ||||||||||||||||||
| 7 | Roof & ceiling detail | x | ||||||||||||||||||
| 8 | Exhaust fan detail | x | x | x | x | |||||||||||||||
| 9 | Acoustic materials | x | x | |||||||||||||||||
| 10 | Smoke detector | x | x | x | x | x | Drawing shall show location and specs | |||||||||||||
| 11 | Fixture detail | x | x | x | x | x | Faucets | |||||||||||||
| 12 | Interior wall schematic | x | x | |||||||||||||||||
| 13 | Floor drainage schematic | x | ||||||||||||||||||
| 14 | Floor detail | x | ||||||||||||||||||
| 15 | Electrical detail | x | x | x | x | |||||||||||||||
| 16 | Toilets | x | x | x | ||||||||||||||||
| 17 | Sinks | x | x | x | ||||||||||||||||
| 18 | Showers | x | x | x | x | x | ||||||||||||||
| 19 | Exterior color | x | ||||||||||||||||||
| 20 | Exterior door | x | x | x | ||||||||||||||||
| 21 | Shower bench | x | x | |||||||||||||||||
| 22 | Floor mats | x | x | |||||||||||||||||
| 23 | 35% Drawings | x | ||||||||||||||||||
| 24 | 65% Drawings | x | ||||||||||||||||||
| 25 | 95% Drawings | x | ||||||||||||||||||
| 26 | As-Built Drawings | x | ||||||||||||||||||
| 27 | Construction schedule | x | Within 1 week of Notice to Proceed |
Solicitation No. F38604-99-1480 Attachment 6
AF FORM 66
(Computer Generated) PAGE &P of &N