Atch 05 AF Form 66.pdf

Air Force Form PDF 631 KB Posted

Attached to
FXSB 19-4014 Radiant Bay Heating 10682 9684
Solicitation number
FA500021R0038
Issued by

About this file

This document is a schedule of material submittals for the federal contract opportunity FA500021R0038 for Radiant Bay Heating at the Pacific Air Forces. The contractor must submit plans and documentation for demolition, mechanical, electrical, architectural, and closeout items by various dates ranging from notice-to-proceed through final completion. Key submittals include a construction schedule due three days after notice-to-proceed, shop drawings and manufacturer recommendations for gas piping and infrared tube heaters due 30 and 90 days after notice-to-proceed respectively, wiring and EMCS layouts due 30 days after notice-to-proceed, and as-built drawings in AutoCAD and on Mylar due seven days after final completion. The schedule provides submission dates for required documentation to the project engineer and contracting administrator to support the Radiant Bay Heating project for the Department of the Air Force Pacific Air Forces.

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

File Type Posted
Solicitation Amendment - FA500021R00380002 SF 30.pdf PDF
8-Bay Structural.pdf PDF
EAFB foam fill report bay 1-8.pdf PDF
7-Bay Civil.pdf PDF
81610 7 BAY AS BUILTS FP drawings.pdf PDF
81610 8 BAY AS BUILTS FP drawings.pdf PDF
7 Bay Pump 2 curve.pdf PDF
EAFB foam fill report bay 9-15.pdf PDF
7 Bay Layout.pdf PDF
8 Bay Pump 2 curve.pdf PDF
8 Bay Pump 2 field test.pdf PDF
7-Bay Architectural.pdf PDF
Q and A.pdf PDF
Elmendorf foam test graph bay 1-8.pdf PDF
7-Bay Structural.pdf PDF
Elmendorf foam test graph bay 9-15.pdf PDF
7 Bay Pump 1 field test.pdf PDF
7 Bay Pump 1 curve.pdf PDF
Solicitation Amendment FA500021R00380001 SF 30.pdf PDF
8 Bay Layout.pdf PDF
E08-1064A_8Bay_AsBuilts.pdf PDF
8-Bay Civil.pdf PDF
8 Bay Pump 1 field test.pdf PDF
8-Bay Architectural.pdf PDF
8 Bay Pump 1 curve.pdf PDF
7 Bay 172700.pdf PDF
7 Bay Pump 2 field test.pdf PDF
E08-1064B_7Bay_AsBuilts.pdf PDF
8 Bay 172706.pdf PDF
Atch 03 General Mechanical Provisions.pdf PDF
Atch 02 Statement of Work 9 Feb 21.pdf PDF
Atch 06 Price Schedule.pdf PDF
Atch 01 Open Market General Specs.pdf PDF
Solicitation - FA500021R0038.pdf PDF
Atch 04 Environmental Protection.pdf PDF
Atch 07 Wage Determination.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LI

N

E N

U M

B ER Note: 3 copies required per submittal. Government will retain all submittals.Provide an electronic copy for each submittal.

C

ER

TI

F.

O F

C O

M

PL

IA

N

C E

SH

O

P D

R

AW

IN

G

S

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

TU

R

U R

'S R

EC

O

M M

EN

D

AT

IO

N

C

AT

AL

O

G D

AT

A

O &M

R

EC

O M

M

EN

D

AT

IO

N

S

C

AL

C U

LA

TI

O N

S

W

AR

R

AN

TY

D R

AW

IN

G S

R

EP

O R

T

TE

ST

R

ES

U

LT

S

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E

TO

C O

N

TR

AC

TI

N G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

SU

BM

IT

TA

L N

U M

BE

R

S

AP

PR

O

VE

D

D

IS

AP

PR

O

VE

D

C O

N

TR

AC

TO

R S

U

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

NOTES

GENERAL

1 Project Specific Form 66 X NTP + 3 2 Construction Schedule X NTP + 7

3 TCN Schedule (electronic required, hard copy optional) N/A

4 Contractor's Health, Safety, and Environment Plan X NTP + 7 5 Contractor's QA/QC Plan X NTP + 7

DEMOLITION

6 Demolition Plan X X X NTP+30

MECHANICAL

7 Gas Piping X X NTP+30 8 Infrared Tube Heaters X X X X NTP+90

ELECTRICAL

9 Wiring Layout X X NTP + 30 10 Fire Alarm Modifications / Heat Detection X X X 11 EMCS Layout X NTP + 30

ARCHITECTURAL

12 Doors X X NTP+90 13 Door Hardware X X NTP+90 14 Flooring X X NTP+90 15 Tile and Finishes X X NTP+90 16 Plan and Elevation of Finishes X NTP+30

CLOSEOUT

17 O&M maint data and maint manuals & Manufacturer's Warranty X X X Install + 4

18 Factory and Field Test Certificates, Logs and Test Results X Install + 7

19 Inspection Logbook Before

Acceptance

20 As Builts (electronic in AutoCAD and hard copies on Mylar) X Final + 7

SOLICITATION /CONTRACT NUMBERPROJECT NAME

Radiant Bay Heating 10682 9684

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT NUMBER

FXSB 19-4014

AF FORM 66, OCT 99 Previous Edition Will Be Used

FA500021R0038

FXSB 19-4014 Radiant Bay Heating 10682 9684

Attachment 5 – AF Form 66

File details come from the government source that posted it. Updated .