EAFB foam fill report bay 1-8.pdf
PDF 17 KB Posted
- Attached to
- FXSB 19-4014 Radiant Bay Heating 10682 9684
- Solicitation number
- FA500021R0038
About this file
This document contains a foam fill report for aircraft hangar bays 1-8 at Elmendorf Air Force Base and a related federal contract opportunity. The foam fill report details the filling of a 200 gallon Ansul foam suppression system tank with 2-3/4% Ansul Jet-X concentrate by GMW Fire Protection. It provides information on the system components, fill procedures, test results meeting 3% standards, and customer and Ansul certifications.
The related federal contract opportunity is solicitation number FA500021R0038 for radiant bay heating at facility 10682. The Department of the Air Force Pacific Air Forces is the issuing agency. No other details are provided on the required products or services.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FILLING SERVICE REPORT
ANSUL REP: Thomas Wolff DATE: Tuesday, June 29, 2010
SOLD TO: Ansul, Inc. JOB NO: #2253
One Stanton Street CONTACT: Troy Wiltbank
Marinette, WI 54143-2542 PHONE: 253-306-4296
INSTALLATION CONTRACTOR: GMW Fire Protection CONTACT: Clayton Johnson
6108 McKay Street PHONE: 907-336-5000
Anchorage, AK 99501 EMAIL:
SIZE: 200 HA/VA VA SERIAL# 107269 CONTROLLER: (8) 4"
CONCENTRATE: Ansul Jet X TYPE: Hi-ex %: 2-3/4% FILL AUTHORIZATION Troy Wiltbank COMPANY Tyco Fire Suppression & Building Products
FILL LOCATION:
NAME OF USER: Elmendorf AFB
ADDRESS: Hangar 26 CONTACT: Steve Frere
Anchorage, AK PHONE: 907-552-9955
DESCRIPTION OF SYSTEM: Aircraft hangar bays: 1 - 8. Each protected by (3) Jet-X-15A hi-ex generators.
CONTROLLER LOCATED: Approximate 15 to 20' away from top concentrate discharge of foam tank.
FILL PROCEDURE: GALLONS FILLED: Filled by GMW Fire Protection
SYSTEM: PRESSURIZED: XX NON-PRESSURIZED RELIEF VALVE:
ISOLATION VALVE Hydraulic actuator DELUGE VALVE:
TEST DESCRIPTION See attached foam test results.
TEST RESULTS: 3% XX 6% OTHER
UNIT TOPPED OFF: YES XX NO # OF GALLONS Refilled by GMW Fire Protection
CUSTOMER CERTIFICATION: FILL/TEST BY: Steve Frere DATE: 6/29/10
ANSUL CERTIFICATION: FILL/TEST BY: Thomas Wolff DATE: 6/29/10
OPERATION MANUAL RECEIVED BY: DATE:
COMPANY:
NOTES: 1. Actual estimated capacity of the tank is approx. 220 gallons.
2. In accordance with NFPA 11, chapter 7 and NFPA 25, table 8-2: an annual inspection of the system is required.
File details come from the government source that posted it. Updated .