Q and A.pdf

PDF 108 KB Posted

Attached to
FXSB 19-4014 Radiant Bay Heating 10682 9684
Solicitation number
FA500021R0038
Issued by

About this file

This document contains questions and answers regarding a federal solicitation for radiant bay heating system upgrades at multiple hangars. The solicitation seeks the installation of new infrared tubing heating systems, replacement of rate of rise heat detectors with linear heat detectors, and upgrades to ensure compatibility with existing foam release and flame detection systems. Bidders should review available as-built drawings of the mechanical, electrical, and fire alarm systems, and must comply with all security and flightline driving requirements to access the hangar buildings. Advice is provided on placement of new infrared tubing to avoid locations directly over aircraft. Classification details for explosion-proof requirements in various hangar areas can be found in the original electrical as-built documents.

View the file

Other files

File Type Posted
Solicitation Amendment - FA500021R00380002 SF 30.pdf PDF
8-Bay Structural.pdf PDF
EAFB foam fill report bay 1-8.pdf PDF
7-Bay Civil.pdf PDF
81610 7 BAY AS BUILTS FP drawings.pdf PDF
81610 8 BAY AS BUILTS FP drawings.pdf PDF
7 Bay Pump 2 curve.pdf PDF
EAFB foam fill report bay 9-15.pdf PDF
7 Bay Layout.pdf PDF
8 Bay Pump 2 curve.pdf PDF
8 Bay Pump 2 field test.pdf PDF
7-Bay Architectural.pdf PDF
Elmendorf foam test graph bay 1-8.pdf PDF
7-Bay Structural.pdf PDF
Elmendorf foam test graph bay 9-15.pdf PDF
7 Bay Pump 1 field test.pdf PDF
7 Bay Pump 1 curve.pdf PDF
Solicitation Amendment FA500021R00380001 SF 30.pdf PDF
8 Bay Layout.pdf PDF
E08-1064A_8Bay_AsBuilts.pdf PDF
8-Bay Civil.pdf PDF
8 Bay Pump 1 field test.pdf PDF
8-Bay Architectural.pdf PDF
8 Bay Pump 1 curve.pdf PDF
7 Bay 172700.pdf PDF
7 Bay Pump 2 field test.pdf PDF
E08-1064B_7Bay_AsBuilts.pdf PDF
8 Bay 172706.pdf PDF
Atch 03 General Mechanical Provisions.pdf PDF
Atch 02 Statement of Work 9 Feb 21.pdf PDF
Atch 06 Price Schedule.pdf PDF
Atch 05 AF Form 66.pdf PDF
Atch 01 Open Market General Specs.pdf PDF
Solicitation - FA500021R0038.pdf PDF
Atch 04 Environmental Protection.pdf PDF
Atch 07 Wage Determination.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

• Can asbuilt drawings (mechanical, electrical, and fire alarm) be made available for bidding purposes?

Provided in previous round of answers

• What type of infrared heating system is required for this project? Vacuum pumped full modulation or simple on/off?

Single stage

• Are there escort requirements for these buildings?

Provided in previous round of answers

• SOW 3.6.6 stated “Provide and install linear heat detection to replace the demolished rate of rise detectors”. Please clarify.

Linear heat detectors are a requirement as they have been less likely to false alarm with tube heaters. The cross linked requirement in the SOW is incorrect – cross linked configuration is NOT required.

• Is there any work required on the foam release and flame detection system?

The only requirement is to ensure that the new heaters do not trip the foam release / flame detectors.

- Are as-builts of the Hangers available?

Yes, I will include a DoD SAFE link.

- What are the explosion-proof requirements?

Classification for the various areas of the hangars can be found in the original electrical as-builts

– detail below. Your design must determine if these classifications are still relevant and compliant with current regulations.

- Is there a minimum distance required from top of jet to the heaters?

This will be dependent upon the tubing layout in the facility and the temperature of the section of tubing over the aircraft. Recommend avoiding placing tubing directly over the aircraft, particularly the centerline and vertical stabilizers.

- What are the security requirements required to get into the hangars?

As noted in the site visit, access will require an escort unless the building can be turned over to the contractor. Flightline driving requires Flightline Driving course, available through SF.