Elmendorf foam test graph bay 1-8.pdf

PDF 18 KB Posted

Attached to
FXSB 19-4014 Radiant Bay Heating 10682 9684
Solicitation number
FA500021R0038
Issued by

About this file

This document contains results from foam testing conducted at Elmendorf Air Force Base. Foam testing was performed on eight separate aircraft hangar bays protected by Jet-X foam generators. Tests measured refractive index, pressure, flow rate and pattern for each hangar bay. Refractive index readings ranged from 1.3343 to 1.3344, within specifications. The tests were observed by representatives from Ansul and the Air Force to verify system operation and foam concentration levels.

The related federal contract opportunity is a solicitation from the Department of the Air Force Pacific Air Forces for radiant bay heating. No further details are provided on required products or services, response dates, or other salient information.

View the file

Other files

File Type Posted
Solicitation Amendment - FA500021R00380002 SF 30.pdf PDF
8-Bay Structural.pdf PDF
EAFB foam fill report bay 1-8.pdf PDF
7-Bay Civil.pdf PDF
81610 7 BAY AS BUILTS FP drawings.pdf PDF
81610 8 BAY AS BUILTS FP drawings.pdf PDF
7 Bay Pump 2 curve.pdf PDF
EAFB foam fill report bay 9-15.pdf PDF
7 Bay Layout.pdf PDF
8 Bay Pump 2 curve.pdf PDF
8 Bay Pump 2 field test.pdf PDF
7-Bay Architectural.pdf PDF
Q and A.pdf PDF
7-Bay Structural.pdf PDF
Elmendorf foam test graph bay 9-15.pdf PDF
7 Bay Pump 1 field test.pdf PDF
7 Bay Pump 1 curve.pdf PDF
Solicitation Amendment FA500021R00380001 SF 30.pdf PDF
8 Bay Layout.pdf PDF
E08-1064A_8Bay_AsBuilts.pdf PDF
8-Bay Civil.pdf PDF
8 Bay Pump 1 field test.pdf PDF
8-Bay Architectural.pdf PDF
8 Bay Pump 1 curve.pdf PDF
7 Bay 172700.pdf PDF
7 Bay Pump 2 field test.pdf PDF
E08-1064B_7Bay_AsBuilts.pdf PDF
8 Bay 172706.pdf PDF
Atch 03 General Mechanical Provisions.pdf PDF
Atch 02 Statement of Work 9 Feb 21.pdf PDF
Atch 06 Price Schedule.pdf PDF
Atch 05 AF Form 66.pdf PDF
Atch 01 Open Market General Specs.pdf PDF
Solicitation - FA500021R0038.pdf PDF
Atch 04 Environmental Protection.pdf PDF
Atch 07 Wage Determination.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOAM TEST RESULTS

ELMENDORF AFB HANGAR 26

Date: Tuesday, June 29, 2010 TEST Bay Proportioner Nozzle Piezomtr/Pitot Actual *Refractive Test Discharge

Customer: Elmendorf AFB # Size Dia Pressure Flow Index Percent Duration

Location: Hangar 26 1 1 4" 1.3344 3-1/4% 60 seconds

Anchorage, AK 2 2 4" 1.3343 3% 60 seconds

Description: Aircraft hangar bays 1 - 8. Each 3 3 4" 1.3343 3% 60 seconds separately protected by (3) Jet-X 4 4 4" 1.3344 3-1/4% 60 seconds generators. 5 5 4" 1.3344 3-1/4% 60 seconds

Certification: Steve Frere 6 6 4" 1.3344 3-1/4% 60 seconds

Ansul Rep: Thomas Wolff 7 7 4" 1.3344 3-1/4% 60 seconds

8 8 4" 1.3344 3-1/4% 60 seconds

Refractive Samples:

Water 1.3330

0.50%

1%

1.50%

2% 1.3339

2.50%

3% 1.3343

3.50%

4%

4.50%

5% 1.3352

5.50%

6%

6.50%

7%

7.50%

8%

8.50%

9%

Concentrate: 2-3/4%

Ansul Jet-X

TEST DESCRIPTION: Each system was separately manually activated. Duration, operation of valves, flow and pattern were established through-out each hangar bay area. Foam percents were verified with a refractometer.

1.3326

1.3328

1.3330

1.3332

1.3334

1.3336

1.3338

1.3340

1.3342

1.3344

1.3346

1.3348

1.3350

1.3352

1.3354

Water 1% 2% 3% 4% 5% 6% 7% 8% 9%

R e fr a c ti v e I n d e x

File details come from the government source that posted it. Updated .