7 Bay Pump 1 field test.pdf

PDF 36 KB Posted

Attached to
FXSB 19-4014 Radiant Bay Heating 10682 9684
Solicitation number
FA500021R0038
Issued by

About this file

This document contains the results of a fire pump field test and information on a related federal contract opportunity. The field test results provide equipment details and performance readings for a 1500 GPM fire pump at various pressures and flows. Test results show the pump meets the manufacturer's rated capacity of 1500 GPM at 100 PSI.

The related federal solicitation is for radiant bay heating services at a Department of the Air Force Pacific Air Forces facility. Solicitation number FA500021R0038 has an opportunity type listed as solicitation. The description notes additional details are provided in attachments. The solicitation involves the Department of the Air Force Pacific Air Forces and relates to contract number FXSB 19-4014 for radiant bay heating systems.

View the file

Other files

File Type Posted
Solicitation Amendment - FA500021R00380002 SF 30.pdf PDF
8-Bay Structural.pdf PDF
EAFB foam fill report bay 1-8.pdf PDF
7-Bay Civil.pdf PDF
81610 7 BAY AS BUILTS FP drawings.pdf PDF
81610 8 BAY AS BUILTS FP drawings.pdf PDF
7 Bay Pump 2 curve.pdf PDF
EAFB foam fill report bay 9-15.pdf PDF
7 Bay Layout.pdf PDF
8 Bay Pump 2 curve.pdf PDF
8 Bay Pump 2 field test.pdf PDF
7-Bay Architectural.pdf PDF
Q and A.pdf PDF
Elmendorf foam test graph bay 1-8.pdf PDF
7-Bay Structural.pdf PDF
Elmendorf foam test graph bay 9-15.pdf PDF
7 Bay Pump 1 curve.pdf PDF
Solicitation Amendment FA500021R00380001 SF 30.pdf PDF
8 Bay Layout.pdf PDF
E08-1064A_8Bay_AsBuilts.pdf PDF
8-Bay Civil.pdf PDF
8 Bay Pump 1 field test.pdf PDF
8-Bay Architectural.pdf PDF
8 Bay Pump 1 curve.pdf PDF
7 Bay 172700.pdf PDF
7 Bay Pump 2 field test.pdf PDF
E08-1064B_7Bay_AsBuilts.pdf PDF
8 Bay 172706.pdf PDF
Atch 03 General Mechanical Provisions.pdf PDF
Atch 02 Statement of Work 9 Feb 21.pdf PDF
Atch 06 Price Schedule.pdf PDF
Atch 05 AF Form 66.pdf PDF
Atch 01 Open Market General Specs.pdf PDF
Solicitation - FA500021R0038.pdf PDF
Atch 04 Environmental Protection.pdf PDF
Atch 07 Wage Determination.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fire Pump Field Test

Fire Pump Equipment Information Customer Blue Scope Constructon

Pump AC Pump 1580 09-056125-01-02 1775 CW Project 7 Bay Weather Shelter,EAFB,AK

Motor Emerson P098698555 125 HP 1780 RPM 480vac 3 PHASE Theoretical points Certified/Shop Curve DATE 6/29/2010

Control Cutler-Hammer FD-90 LMR Plus 125 16B-1915E 480vac GPM PSI GPM PSI TDH

0 111 0 118 50

PUMP TEST READINGS FOR PUMP No. 1 750 110 750 118 85 GMW Fire Protection

Manual Input 1500 102 1500 104 120 6108 Mckay

Pump Rating 1500 gpm @ 100 psi. Rated RPM= 1775 2250 78 130 Anchorage, AK 99518

Flow Orifice in. 1.75 1.75 1.75 Phone 336-5000 Fax 336-5050 Applied Coefficient 100 100 100

Hose Monster 100.00 Manual Input

PRESSURE READINGS

P it o t

N o

P it o t

N o

P it o t

N o

P it o t

N o

P it o t

N o

P it o t

N o

RPM % of Rated % of Rated Adjusted Adjusted V o lt s /2

V o lt s /3

V o lt s /3

A m p s

A m p s

A m p s

Suction Discharge Pitot Readings Reading Flow Net Head Capacity Net Head Flow Net Head

50 psi. 174 psi. 0 1793 0 124 0% 111% 0 124 468 469 469 63 64 66 Churn

45 psi. 166 psi. 33 1788 760 121 50% 121% 768 121 467 469 469 97 100 101 50%

40 psi. 148 psi. 34 34 1782 1552 108 103% 108% 1558 108 467 468 468 128 131 133 100%

35 psi. 130 psi. 34 34 35 1783 2333 95 155% 95% 2342 95 467 468 468 141 144 145 150%

Per NFPA# 20

Settings PSI

Jockey off 170

Jockey on 160

Timer 10 Mins

Main on 150

Main off 140

Sequential 10 Sec

Min run 10 Mins

Check List

Alignment GOOD

Voltage OK

Manual Starts x6 YES OK

Auto Starts x10x6 YES OK

Flow Test Hose Monste

Alarms Yes OK

Pump Running YES OK

Power YES OK

Common YES OK

Special

0 500 1000 1500 2000 2500

N e t A d ju s te d H e a d P

S I

Net Adjusted Flow GPM

Mfg. Curve

Test results

Theoretical

File details come from the government source that posted it. Updated .