33 31 23 - Sanitary Sewerage Force Main Piping.pdf

PDF 230 KB Posted

Attached to
Contract 2026-01: Maintenance & Emergency Contract (Excavation) – Project No. 7297. 0444
Solicitation number
Not on record
Issued by
York County, Pennsylvania

About this file

This is a technical specification document for sanitary sewerage force main piping work under a maintenance and emergency contract issued by West Manchester Township in Pennsylvania (Project No. 7297.0444). The specification establishes standards for the installation of force mains, bedding materials, and related piping systems for the township's sanitary sewer collection and conveyance systems. The work includes materials and installation procedures for ductile-iron piping (Class 53, 350 psig pressure rating) and polyethylene piping (200 psig pressure rating) in sizes ranging from 3 inches to 12 inches nominal diameter. The specification references multiple ASTM International, AWWA, and AASHTO standards for materials testing, compaction requirements, and quality control. Key installation requirements include bedding placement in continuous layers not exceeding 8 inches, minimum 12-inch compacted cover over pipe, thrust restraints at bends and directional changes, pressure testing per hydrostatic standards, and pipe markers for identification. The contract operates as an on-demand work authorization system through which West Manchester Township will issue Work Orders for specific emergency and maintenance projects as needed.

The specification document does not establish pricing terms, as this is a technical standard document rather than a price schedule. The related bid solicitation indicates that sealed bids are due by 10:00 AM on Wednesday, May 20, 2026, with bid security required in the amount of 10% (in the form of a certified check or bid bond). No pre-bid conference is scheduled for this project. The contract is structured as a maintenance and emergency contract covering repair of existing sanitary and storm sewer facilities for West Manchester Township's utilities, with work to be authorized through individual Work Orders issued by the Owner. Bidding documents are available through the PennBID website (https://pennbid.bonfirehub.com/), and prospective bidders are encouraged to register as plan holders for updates on addenda and other project information.

View the file

Other files

File Type Posted
32 92 19 - Seeding.pdf PDF
31 05 16 - Aggregates For Earthwork.pdf PDF
00 45 36 EEO Certificate.pdf PDF
01 22 00 - Unit Prices.pdf PDF
33 05 05.31 - Hydrostatic Testing.pdf PDF
00 01 01 - YO Cover.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
31 23 16 - Excavation.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
00 73 53 - Anti-Pollution Measures.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
32 12 16 - Asphalt Paving.pdf PDF
31 23 19 - Dewatering.pdf PDF
01 61 00 - Product Requirements.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 01 10 - Table of Contents.pdf PDF
01 42 00 - References.pdf PDF
31 23 16.13 - Trenching.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
Sanitary and Storm Sewer Maintenance & Emergency Construction Details.pdf PDF
33 42 00 - Stormwater Conveyance.pdf PDF
31 10 00 - Site Clearing.pdf PDF
02 57 00 - Sinkhole Remediation.pdf PDF
33 31 11 - Public Sanitary Sewerage Gravity Piping.pdf PDF
33 05 05.43 - Mandrel Testing.pdf PDF
03 20 00 - Concrete Reinforcing.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
00 63 13 - RFI Form.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
00 52 00 - Agmnt btw Own and Cntr for Const Con Stip Price.pdf PDF
31 23 23 - Fill.pdf PDF
33 05 61 - Concrete Manholes and Inlets.pdf PDF
32 13 13 - Concrete Paving.pdf PDF
03 30 00 - Cast-in-Place Concrete.pdf PDF
31 25 00 - Erosion And Sedimentation Controls.pdf PDF
32 17 23 - Pavement Markings.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
31 05 13 - Soils For Earthwork.pdf PDF
33 05 05.36 - Vacuum Testing.pdf PDF
02 41 13.23 - Utility Line Removal.pdf PDF
33 05 05.41 - Air Testing.pdf PDF
31 23 16.26 - Rock Removal.pdf PDF
00 31 43 - Permit Applications.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
32 11 23 - Aggregate Base Courses.pdf PDF
00 63 36 - Work Order Form.pdf PDF
Show 40 more

Latest 50 of 69 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

33 31 23 - SANITARY SEWERAGE FORCE MAIN PIPING

Herbert, Rowland & Grubic, Inc. 33 31 23 - 1 007297.0444

SECTION 33 31 23 - SANITARY SEWERAGE FORCE MAIN PIPING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Force mains.

2. Bedding and cover materials.

B. Related Requirements:

1. Section 03 30 00 - Cast-in-Place Concrete: Concrete material requirements.

2. Section 31 05 13 - Soils for Earthwork: Soil backfill from above pipe to finish grade.

3. Section 31 05 16 - Aggregates for Earthwork: Aggregate for pipe bedding and cover.

4. Section 31 23 16.13 - Trenching: Excavation, backfilling, compacting, and fill over underground pipe markers.

5. Section 31 23 23 - Fill: Requirements for fill over underground pipe markers.

6. Section 33 05 05.31 - Hydrostatic Testing: Pressure testing of completed force mains.

7. Section 33 05 09.33 - Thrust Restraint for Utility Piping: Thrust restraints as required by this Section.

8. Section 33 05 61 - Concrete Manholes: Connection to sanitary sewerage system.

9. Section 33 05 97 - Identification and Signage for Utilities: Pipe markers.

1.2 REFERENCE STANDARDS

A. American Association of State Highway and Transportation Officials:

1. AASHTO T180 - Standard Method of Test for Moisture-Density Relations of Soils

Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop.

B. American Water Works Association:

1. AWWA C104 - Cement-Mortar Lining for Ductile-Iron Pipe and Fittings.

2. AWWA C110 - Ductile-Iron and Gray-Iron Fittings.

3. AWWA C111 - Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings.

4. AWWA C151 - Ductile-Iron Pipe, Centrifugally Cast.

5. AWWA C900 - Polyvinyl Chloride (PVC) Pressure Pipe and Fabricated Fittings, 4 In.

through 12 In. (100 mm through 300 mm), for Water Transmission and Distribution.

C. ASTM International:

1. ASTM D698 - Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/ft3 (600 kN-m/m3).

2. ASTM D1557 - Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kN-m/m3).

3. ASTM D1785 - Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe, Schedules 40, 80, and 120.

Herbert, Rowland & Grubic, Inc. 33 31 23 - 2 007297.0444

4. ASTM D2241 - Standard Specification for Poly(Vinyl Chloride) (PVC) Pressure- Rated Pipe (SDR Series).

5. ASTM D2466 - Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 40.

6. ASTM D2467 - Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 80.

7. ASTM D6938 - Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth).

D. Ductile Iron Pipe Research Association (DIPRA):

1. Thrust Restraint Design for Ductile Iron Pipe.

1.3 COORDINATION

A. Coordinate Work of this Section with connection to existing municipal sewer utility service.

1.4 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Product Data: Submit manufacturer information indicating pipe material used, pipe accessories, valves, and restrained joint details and materials.

C. Shop Drawings:

1. Indicate piping piece numbers and locations.

2. Indicate restrained joint locations.

D. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.

E. Manufacturer Instructions: Indicate special procedures required to install specified products.

F. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections.

1.5 CLOSEOUT SUBMITTALS

A. Project Record Documents: Record invert elevations and actual location of pipe runs and connections.

B. Identify and describe unexpected variations to subsoil conditions or discovery of uncharted utilities.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Section 01 61 00 - Product Requirements: Requirements for transporting, handling, storing, and protecting products.

Herbert, Rowland & Grubic, Inc. 33 31 23 - 3 007297.0444

B. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage.

C. Storage:

1. Store materials according to manufacturer instructions.

2. Do not place materials on private property without written permission of property owner.

3. Do not stack pipe higher than recommended by pipe manufacturer.

D. Protection:

1. Protect materials from moisture and dust by storing in clean, dry location remote from construction operations areas.

2. Store gaskets for mechanical and push-on joints in cool and dry location, out of direct sunlight, and not in contact with petroleum products.

3. Provide additional protection according to manufacturer instructions.

1.7 EXISTING CONDITIONS

A. Field Measurements:

1. Verify field measurements prior to fabrication.

2. Indicate field measurements on Shop Drawings.

PART 2 - PRODUCTS

2.1 FORCE MAIN

A. Ductile-Iron Piping

1. Ductile-Iron Pipe:

a. Comply with AWWA C151 and AWWA C104.

b. Interior Liner: Proteco 401, Tnemec Permashield 431, or approved equal.

c. Exterior coating: Standard – Asphaltic coating.

d. Pressure Classes: Class 53, 350 psig.

2. Ductile-Iron Fittings:

a. Comply with AWWA C110.

b. Pressure Rating: 250 psig.

c. Interior Liner: Proteco 401, Tnemec Permashield 431, or approved equal.

d. Exterior coating: Standard – Asphaltic coating.

3. Joints:

a. Comply with AWWA C111.

b. Type: Mechanical or restrained.

4. Rubber Gaskets, Lubricants, Glands, Bolts, and Nuts: Comply with AWWA C111.

B. Polyethylene (PE) Piping:

1. Pipe:

a. Pipe Size 3-Inch Nominal Size and Smaller: Comply with ASTM D3035, DR- 11, IPS, for 200 psig pressure rating.

b. Pipe Size 6-Inch Nominal Size: Comply with AWWA C906-21, DR-11, DIPS for 200 psig pressure rating.

Herbert, Rowland & Grubic, Inc. 33 31 23 - 4 007297.0444

2. Materials:

a. Comply with ASTM D3350.

b. Minimum Cell Classification: 445574C.

c. Designation: PE 4710.

3. Fittings:

a. Comply with AWWA C901.

b. Style: Molded or fabricated.

4. Joints:

a. Fusion: Butt, Socket, and Electrofusion.

b. Threaded: NPT.

c. Mechanical Joint Adapters: Provide with ductile iron gland ring and corrosion resistant steel bolts. Pressure rating must equal the pipe rating.

d. Flanged Adapters: Provide with ductile iron bolt ring and 316 stainless steel bolts. Pressure rating must equal the pipe rating.

2.2 MATERIALS

A. Bedding and Cover: AASHTO No. 8 in accordance with Section 31 05 16 - Aggregates for Earthwork.

B. Backfill from above Pipe to Finish Grade: Comply with Section 31 23 23 – Fill and applicable details.

2.3 MIXES

A. Concrete: As specified in Section 03 30 00 - Cast-in-Place Concrete.

2.4 ACCESSORIES

A. Pipe Markers: As specified in Section 33 05 97 – Identification And Signage For Utilities.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Section 01 73 00 - Execution Requirements: Requirements for installation examination.

B. Verify that trench cut is ready to receive Work.

C. Verify that excavations, dimensions, and elevations are as indicated on Work Orders.

3.2 PREPARATION

A. Section 01 73 00 - Execution Requirements: Requirements for installation preparation.

B. Correct over-excavation with coarse aggregate.

C. Remove large stones or other hard matter capable of damaging pipe or of impeding consistent backfilling or compaction.

Herbert, Rowland & Grubic, Inc. 33 31 23 - 5 007297.0444

3.3 INSTALLATION

A. Bedding:

1. Excavate pipe trench as specified in Section 31 23 16.13 - Trenching.

2. Place bedding material at trench bottom.

3. Level materials in continuous layers not exceeding 8 inches in depth.

4. Maintain optimum moisture content of bedding material to attain required compaction density.

B. Piping:

1. Install pipe, fittings, and accessories as indicated on Work Orders.

2. Route piping in straight line.

3. Install bedding at sides and over top of pipe to minimum compacted thickness of

12 inches.

4. Backfilling and Compacting:

a. As specified in Section 31 23 23 – Fill.

b. Do not displace or damage pipe while compacting.

5. Connect to municipal sewer system.

6. Pipe Markers: As specified in Section 33 05 97 – Identification and Signage For

Utilties.

C. Thrust Restraints:

1. Provide pressure pipeline with restrained joints or concrete thrust blocking at bends, tees, and changes in direction.

2. Construct concrete thrust blocking as indicated on Work Orders.

3. As specified in 33 05 09.33 - Thrust Restraint for Utility Piping.

D. Cradles and Encasements:

1. Provide concrete cradles and encasements for pipelines where indicated on Work

Orders and as specified in Section 03 30 00 - Cast-in-Place Concrete.

3.4 FIELD QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements: Requirements for inspecting and testing.

B. Inspections: Request inspection by Engineer prior to and immediately after placing bedding.

C. Pressure Testing: As specified in Section 33 05 05.31 - Hydrostatic Testing.

3.5 PROTECTION

A. Section 01 73 00 - Execution Requirements: Requirements for protecting finished Work.

B. Protect pipe and aggregate cover from damage or displacement until backfilling operation is in progress.

END OF SECTION