33 05 05.31 - Hydrostatic Testing.pdf

PDF 220 KB Posted

Attached to
Contract 2026-01: Maintenance & Emergency Contract (Excavation) – Project No. 7297. 0444
Solicitation number
Not on record
Issued by
York County, Pennsylvania

About this file

This is a technical specification document for hydrostatic testing procedures prepared by Herbert, Rowland & Grubic, Inc. for West Manchester Township's Contract 2026-01: Maintenance & Emergency Contract (Excavation) in Pennsylvania. The specification establishes requirements for hydrostatic testing of pressure piping systems, including ductile iron, PVC, and polyethylene (PE) piping commonly used in municipal sanitary sewer force mains and low-pressure sanitary sewer collection systems. Before commencing testing activities, contractors must submit testing procedures, a list of test equipment, testing sequence schedules, provisions for flushing and test water disposal, and test gage calibration certificates. The specification requires contractors to perform hydrostatic testing to verify the acceptance of installed pressure piping and to identify, correct, and retest any failures until successful results are achieved.

Testing procedures are established according to AWWA C600 standards for ductile iron and PVC piping and ASTM F2164 standards for PE piping. Standard test pressure is 150 psi unless the Township Engineer requires higher pressure based on material specifications. For ductile iron and PVC piping, testing must be conducted for at least two hours with pressure maintained within plus or minus 5.0 psi of test pressure, with maximum allowable leakage calculated using a specified formula based on pipe length, diameter, and average test pressure. For PE piping, testing includes a four-hour initial expansion phase followed by a one-hour pressure monitoring phase at a reduced pressure of 10 psi below the target pressure. All visible leakage must be corrected regardless of quantity, and any piping showing leakage greater than allowable limits must be located, repaired, and retested until acceptance criteria are met.

View the file

Other files

File Type Posted
32 92 19 - Seeding.pdf PDF
31 05 16 - Aggregates For Earthwork.pdf PDF
00 45 36 EEO Certificate.pdf PDF
01 22 00 - Unit Prices.pdf PDF
00 01 01 - YO Cover.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
31 23 16 - Excavation.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
00 73 53 - Anti-Pollution Measures.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
32 12 16 - Asphalt Paving.pdf PDF
31 23 19 - Dewatering.pdf PDF
01 61 00 - Product Requirements.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 01 10 - Table of Contents.pdf PDF
01 42 00 - References.pdf PDF
31 23 16.13 - Trenching.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
Sanitary and Storm Sewer Maintenance & Emergency Construction Details.pdf PDF
33 42 00 - Stormwater Conveyance.pdf PDF
31 10 00 - Site Clearing.pdf PDF
02 57 00 - Sinkhole Remediation.pdf PDF
33 31 11 - Public Sanitary Sewerage Gravity Piping.pdf PDF
33 05 05.43 - Mandrel Testing.pdf PDF
03 20 00 - Concrete Reinforcing.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
00 63 13 - RFI Form.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
00 52 00 - Agmnt btw Own and Cntr for Const Con Stip Price.pdf PDF
31 23 23 - Fill.pdf PDF
33 05 61 - Concrete Manholes and Inlets.pdf PDF
32 13 13 - Concrete Paving.pdf PDF
03 30 00 - Cast-in-Place Concrete.pdf PDF
31 25 00 - Erosion And Sedimentation Controls.pdf PDF
32 17 23 - Pavement Markings.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
31 05 13 - Soils For Earthwork.pdf PDF
33 05 05.36 - Vacuum Testing.pdf PDF
02 41 13.23 - Utility Line Removal.pdf PDF
33 05 05.41 - Air Testing.pdf PDF
33 31 23 - Sanitary Sewerage Force Main Piping.pdf PDF
31 23 16.26 - Rock Removal.pdf PDF
00 31 43 - Permit Applications.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
32 11 23 - Aggregate Base Courses.pdf PDF
00 63 36 - Work Order Form.pdf PDF
Show 40 more

Latest 50 of 69 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

33 05 05.31 - HYDROSTATIC TESTING

Herbert, Rowland & Grubic, Inc. 33 05 05.31 - 1 007297.0444

SECTION 33 05 05.31 - HYDROSTATIC TESTING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes: Hydrostatic testing of pressure piping.

B. Related Requirements:

1. Section 33 31 23 - Sanitary Sewerage Force Main Piping: Pipe materials and accessories normally encountered with municipal sanitary sewage force mains.

2. Section 33 31 26 - Sanitary Pressure Sewer Piping: Pipe materials and accessories normally encountered with low-pressure sanitary sewage collection systems where on-lot grinder pumps convey domestic sewage.

1.2 REFERENCE STANDARDS

A. American Water Works Association:

1. AWWA C600 - Installation of Ductile-Iron Water Mains and Their Appurtenances.

B. American Standard Testing Methods:

1. ASTM F 2164 - Standard Practice for Field Leak Testing of Polyethylene (PE) and

Crosslinked Polyethylene (PEX) Pressure Piping Systems Using Hydrostatic Pressure.

1.3 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Submit following items prior to start of testing:

1. Testing procedures.

2. List of test equipment.

3. Testing sequence schedule.

4. Provisions for disposal of flushing and test water.

5. Certification of test gage calibration.

C. Test and Evaluation Reports: Indicate results of piping tests.

1.4 REQUIREMENTS

A. Hydrostatic Testing shall be performed to determine the acceptance of the pressure piping installed.

B. The Contractor shall determine and correct the causes of test failure and retest until successful test results are achieved.

Herbert, Rowland & Grubic, Inc. 33 05 05.31 - 2 007297.0444

PART 2 - PRODUCTS

2.1 HYDROSTATIC TESTING

A. Equipment:

1. Pressure pump.

2. Pressure hose.

3. Water meter.

4. Test connections.

5. Pressure relief valve.

6. Pressure Gage: Calibrated to 0.1 psi.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Section 01 73 00 - Execution Requirements: Requirements for installation examination.

B. Verify that piping is ready for testing.

C. Verify that trenches are backfilled.

D. Verify that pressure piping thrust restraints have been installed.

3.2 FIELD QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements: Requirements for inspecting and testing.

B. Testing of Pressure Ductile Iron or PVC Piping:

1. Test system according to AWWA C600 and following:

a. Hydrostatically test each portion of pressure piping, including valved section, at 150 psi unless Township and/or Township Engineer requires a higher testing pressure based on the material.

b. Conduct hydrostatic testing for at least two hours.

c. Slowly fill with water portion of piping to be tested, expelling air from piping at high points.

d. Install corporation cocks at high points.

e. Close air vents and corporation cocks after air is expelled.

f. Raise pressure to specified test pressure.

g. Observe joints, fittings, and valves undergoing testing.

h. Remove and renew cracked pipes, joints, fittings, and valves that show visible leakage.

i. Retest.

j. Correct visible deficiencies and continue testing at same test pressure for additional two hours to determine leakage rate.

k. Maintain pressure within plus or minus 5.0 psi of test pressure.

l. Leakage is defined as quantity of water supplied to piping necessary to maintain test pressure during period of testing.

m. Compute maximum allowable leakage using following formula:

Herbert, Rowland & Grubic, Inc. 33 05 05.31 - 3 007297.0444

1) L = [SD x sqrt(P)]/C.

2) L = testing allowance, gph.

3) S = length of pipe tested, feet.

4) D = nominal diameter of pipe, inches.

5) P = average test pressure during hydrostatic testing, psig.

6) C = 148,000.

7) If pipe undergoing testing contains sections of various diameters, calculate allowable leakage from sum of computed leakage for each pipe size.

2. If testing of piping indicates leakage greater than that allowed, locate source of leakage, make corrections, and retest until leakage is within acceptable limits.

3. Correct visible leaks regardless of quantity of leakage.

C. Testing of Pressure PE Piping:

1. Test system according to ASTM F2164 and following:

a. Hydrostatically test each portion of pressure piping, including valved section, at 150 psi unless Township and/or Township Engineer requires a higher testing pressure based on the material.

b. Initial expansion phase:

1) Slowly fill with water portion of piping to be tested, expelling air from piping at high points.

2) Install corporation cocks at high points.

3) Close air vents and corporation cocks after air is expelled.

4) Raise pressure to specified test pressure.

5) Observe joints, fittings, and valves undergoing testing.

6) Add make-up water as necessary to maintain maximum test pressure for 4 hours.

c. Test Phase:

1) Immediately after expansion phase, reduce test pressure by 10 psi and stop adding makeup water.

2) Monitor pressure for 1 hour.

d. Remove and renew cracked pipes, joints, fittings, and valves that show visible leakage.

e. Retest after section is depressurized for 8 hours, minimum.

f. If no visual leakage is observed and test pressure remains within 5% of the target pressure, no leakage is indicated.

2. If testing of piping indicates leakage, locate source of leakage, make corrections, and retest until leakage is within acceptable limits.

3. Correct visible leaks regardless of quantity of leakage.

END OF SECTION