About this file

This is a specification document for Anti-Pollution Measures prepared by Herbert, Rowland & Grubic, Inc. for West Manchester Township in Pennsylvania, related to Contract 2026-01, a Maintenance & Emergency Contract for excavation work on the township's sanitary sewer and storm sewer collection and conveyance systems. Sealed bids for the project will be received online until 10:00 AM local time on Wednesday, May 20, 2026, with bids to be publicly opened on PennBID. The contract encompasses emergency and maintenance work for repair of existing utilities upon issuance of work orders by the owner. No pre-bid conference will be held for the project. Bid security in the form of a Certified Check or Bid Bond must be furnished with each bid in an amount not less than 10%.

The specification establishes that the contractor must comply with all provisions of Federal and State statutes, rules, and regulations addressing environmental pollution prevention and preservation of public natural resources pursuant to Pennsylvania Act No. 247. For any earthmoving activities, the contractor is responsible for complying with Department of Environmental Protection Regulation Chapter 102 regarding erosion control, including developing, implementing, and maintaining an erosion and sedimentation control plan that must be available at the earthmoving site. If an erosion and sedimentation control plan is provided in the contract documents or issued by the engineer, it shall be used until the contractor develops a new plan that receives review comments from the County Conservation District and approval from the local political subdivision and engineer.

View the file

Other files

File Type Posted
32 92 19 - Seeding.pdf PDF
31 05 16 - Aggregates For Earthwork.pdf PDF
00 45 36 EEO Certificate.pdf PDF
01 22 00 - Unit Prices.pdf PDF
33 05 05.31 - Hydrostatic Testing.pdf PDF
00 01 01 - YO Cover.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
31 23 16 - Excavation.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
32 12 16 - Asphalt Paving.pdf PDF
31 23 19 - Dewatering.pdf PDF
01 61 00 - Product Requirements.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 01 10 - Table of Contents.pdf PDF
01 42 00 - References.pdf PDF
31 23 16.13 - Trenching.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
Sanitary and Storm Sewer Maintenance & Emergency Construction Details.pdf PDF
33 42 00 - Stormwater Conveyance.pdf PDF
31 10 00 - Site Clearing.pdf PDF
02 57 00 - Sinkhole Remediation.pdf PDF
33 31 11 - Public Sanitary Sewerage Gravity Piping.pdf PDF
33 05 05.43 - Mandrel Testing.pdf PDF
03 20 00 - Concrete Reinforcing.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
00 63 13 - RFI Form.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
00 52 00 - Agmnt btw Own and Cntr for Const Con Stip Price.pdf PDF
31 23 23 - Fill.pdf PDF
33 05 61 - Concrete Manholes and Inlets.pdf PDF
32 13 13 - Concrete Paving.pdf PDF
03 30 00 - Cast-in-Place Concrete.pdf PDF
31 25 00 - Erosion And Sedimentation Controls.pdf PDF
32 17 23 - Pavement Markings.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
31 05 13 - Soils For Earthwork.pdf PDF
33 05 05.36 - Vacuum Testing.pdf PDF
02 41 13.23 - Utility Line Removal.pdf PDF
33 05 05.41 - Air Testing.pdf PDF
33 31 23 - Sanitary Sewerage Force Main Piping.pdf PDF
31 23 16.26 - Rock Removal.pdf PDF
00 31 43 - Permit Applications.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
32 11 23 - Aggregate Base Courses.pdf PDF
00 63 36 - Work Order Form.pdf PDF
Show 40 more

Latest 50 of 69 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

00 73 53 – ANTI-POLLUTION MEASURES

Herbert, Rowland & Grubic, Inc. 00 73 53 - 1 007297.0444

SECTION 00 73 53 – ANTI-POLLUTION MEASURES

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. Duties and requirements of Contractor under various laws and regulations, supplementing the requirements contained in the General Conditions.

1.2 RELATED SECTIONS

A. Section 00 72 00 – General Conditions.

1.3 ENVIRONMENTAL POLLUTION

A. Contractor shall comply with all provisions of Federal and State statutes, rules and regulations dealing with the prevention of environmental pollution, and the preservation of public natural resources that affect the project pursuant to the provisions of Act No.

247 of the General Assembly of the Commonwealth of Pennsylvania, approved October 26, 1972.

1.4 STORMWATER POLLUTION PREVENTION

A. Any Contractor involved in an earthmoving activity is responsible for complying with the

DEP Regulation Chapter 102, Erosion Control. The Contractor must develop, implement and maintain an erosion and sedimentation control plan and must have the plan available at the earthmoving site. If an erosion and sedimentation control plan is contained in the Contract Documents or is issued by the Engineer, it shall be used until such a time that the Contractor develops a new plan and obtains review comments by the County Conservation District and approval by the local political subdivision and the Engineer.

END OF SECTION