This is a Dewatering technical specification document prepared by Herbert, Rowland & Grubic, Inc. for West Manchester Township's Contract 2026-01: Maintenance & Emergency Contract (Project No. 7297.0444) in Pennsylvania. The specification outlines comprehensive dewatering and surface water control requirements for excavation work related to the township's sanitary sewer and storm sewer collection and conveyance systems. The dewatering system must lower the water table within excavation areas, relieve hydrostatic pressures in confined water-bearing strata, prevent damage to adjacent properties and utilities, and maintain stability of excavation sides and bottoms. Contractors must provide standby equipment including dewatering pumps, pump power units, portable electric generators, and filter bags, maintaining at least one of each type on-site and ready for immediate deployment. The specification requires continuous system operation until backfill reaches a minimum of two feet above the normal ground water table elevation and mandates compliance with all applicable regulatory authorities regarding water discharge and disposal, including obtaining National Pollutant Discharge Elimination System (NPDES) permits where necessary. Sealed bids are due by 10:00 AM local time on Wednesday, May 20, 2026, with bid security required in the form of a Certified Check or Bid Bond in an amount not less than 10 percent.

The specification does not establish specific pricing terms, as this is a technical requirements document rather than a bid solicitation summary. No incumbent contractor is identified, set-asides are not mentioned, and funding sources are not detailed within this document. The work is to be performed on an as-needed basis through Work Orders issued by West Manchester Township, making this an indefinite-term maintenance and emergency contract. Contractors are required to notify the PA One Call System not less than three working days before performing work to ensure underground utilities are located and marked, and all dewatering operations must comply with local erosion and sedimentation control requirements and storm water management regulations.

View the file

Other files

File Type Posted
32 92 19 - Seeding.pdf PDF
31 05 16 - Aggregates For Earthwork.pdf PDF
00 45 36 EEO Certificate.pdf PDF
01 22 00 - Unit Prices.pdf PDF
33 05 05.31 - Hydrostatic Testing.pdf PDF
00 01 01 - YO Cover.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
31 23 16 - Excavation.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
00 73 53 - Anti-Pollution Measures.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
32 12 16 - Asphalt Paving.pdf PDF
01 61 00 - Product Requirements.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 01 10 - Table of Contents.pdf PDF
01 42 00 - References.pdf PDF
31 23 16.13 - Trenching.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
Sanitary and Storm Sewer Maintenance & Emergency Construction Details.pdf PDF
33 42 00 - Stormwater Conveyance.pdf PDF
31 10 00 - Site Clearing.pdf PDF
02 57 00 - Sinkhole Remediation.pdf PDF
33 31 11 - Public Sanitary Sewerage Gravity Piping.pdf PDF
33 05 05.43 - Mandrel Testing.pdf PDF
03 20 00 - Concrete Reinforcing.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
00 63 13 - RFI Form.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
00 52 00 - Agmnt btw Own and Cntr for Const Con Stip Price.pdf PDF
31 23 23 - Fill.pdf PDF
33 05 61 - Concrete Manholes and Inlets.pdf PDF
32 13 13 - Concrete Paving.pdf PDF
03 30 00 - Cast-in-Place Concrete.pdf PDF
31 25 00 - Erosion And Sedimentation Controls.pdf PDF
32 17 23 - Pavement Markings.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
31 05 13 - Soils For Earthwork.pdf PDF
33 05 05.36 - Vacuum Testing.pdf PDF
02 41 13.23 - Utility Line Removal.pdf PDF
33 05 05.41 - Air Testing.pdf PDF
33 31 23 - Sanitary Sewerage Force Main Piping.pdf PDF
31 23 16.26 - Rock Removal.pdf PDF
00 31 43 - Permit Applications.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
32 11 23 - Aggregate Base Courses.pdf PDF
00 63 36 - Work Order Form.pdf PDF
Show 40 more

Latest 50 of 69 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

31 23 19 - DEWATERING

Herbert, Rowland & Grubic, Inc. 31 23 19 - 1 007297.0444

SECTION 31 23 19 - DEWATERING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Dewatering system.

2. Surface water control system.

3. System operation and maintenance.

4. Water disposal.

B. Related Sections:

1. Section 31 05 16 - Aggregates for Earthwork: Filter sand.

2. Section 31 23 16 - Excavation: Excavation for structures below ground water table.

3. Section 31 23 16.13 - Trenching: Trenching for utilities below ground water table.

4. Section 31 25 00 - Erosion and Sedimentation Controls: Surface water runoff control.

1.2 REFERENCES

A. ASTM International:

1. ASTM C33 - Standard Specification for Concrete Aggregates.

1.3 DEFINITIONS

A. Dewatering includes the following:

1. Lowering of ground water table and intercepting horizontal water seepage to prevent ground water from entering excavations and trenches.

2. Reducing piezometric pressure within strata to prevent failure or heaving of excavations and trenches.

3. Disposing of removed water.

B. Surface Water Control: Removal of surface water within open excavations.

1.4 SYSTEM DESCRIPTION

A. Furnish standby equipment stored at Project site and ready for immediate use upon failure of dewatering equipment. Provide the following standby equipment, but not less than one of each type:

1. Dewatering Pumps.

2. Pump Power Units.

3. Portable Electric Generators.

4. Filter bags.

5. Associated hoses and fittings.

Herbert, Rowland & Grubic, Inc. 31 23 19 - 2 007297.0444

1.5 PERFORMANCE REQUIREMENTS

A. Design dewatering systems to:

1. Lower water table within areas of excavation to permit Work to be completed on dry and stable subgrade.

2. Relieve hydrostatic pressures in confined water bearing strata below excavation to eliminate risk of uplift or other instability of excavation.

3. Prevent damage to adjacent properties, buildings, structures, utilities, and facilities from construction operations.

4. Prevent loss of fines, quick condition, or softening of foundation subgrade.

5. Maintain stability of sides and bottoms of excavations and trenches.

B. Design surface water control systems to:

1. Collect and remove surface water and seepage entering excavation.

1.6 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Product Data: Submit data for each of the following:

1. Dewatering Pumps: Indicate sizes, capacities, priming method, characteristics.

2. Pumping equipment for control of surface water within excavation.

C. Field Reports: Test and monitoring reports as specified in Field Quality Control article.

1.7 QUALITY ASSURANCE

A. Comply with authorities having jurisdiction for the following:

1. Water discharge and disposal from pumping operations.

B. Obtain National Pollutant Discharge Elimination System (NPDES) permit (as necessary), for storm water discharge from construction sites.

1.8 COORDINATION

A. Coordinate work to permit the following construction operations to be completed on dry stable substrate.

1. Excavation for structures specified in Section 31 23 16.

2. Trenching for utilities specified in Section 31 23 16.13.

PART 2 - PRODUCTS

2.1 DEWATERING EQUIPMENT

A. Select dewatering equipment to meet specified performance requirements.

Herbert, Rowland & Grubic, Inc. 31 23 19 - 3 007297.0444

2.2 ACCESSORIES

A. Valves and Fittings: Furnish valves and fittings to isolate each well from header pipe and to prevent loss of pump prime.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Section 01 73 00 - Execution Requirements: Verification of existing conditions before starting work.

B. Notify the PA One Call System not less than three working days before performing Work:

1. Request underground utilities to be located and marked within and surrounding construction areas.

3.2 PREPARATION

A. Protect existing adjacent buildings, structures, and improvements from damage caused by dewatering operations.

3.3 DEWATERING SYSTEM

A. Install dewatering system in accordance with shop drawings.

B. Locate system components to allow continuous dewatering operations without interfering with installation of permanent Work and existing public rights-of-way, sidewalks, and adjacent buildings, structures, and improvements.

3.4 SURFACE WATER CONTROL SYSTEM

A. Provide ditches, berms, and other devices to divert and drain surface water from excavation area as specified in Section 31 25 00.

B. Divert surface water and seepage water within excavation areas into sumps and pump water into settling basins in accordance with requirements of agencies having jurisdiction.

C. Control and remove unanticipated water seepage into excavation.

3.5 SYSTEM OPERATION AND MAINTENANCE

A. Operate dewatering system continuously until backfill is minimum 2 feet above normal ground water table elevation.

B. When dewatering system cannot control water within excavation, notify Engineer and stop excavation work:

1. Supplement or modify dewatering system and provide other remedial measures to control water within excavation.

2. Demonstrate dewatering system operation complies with performance requirements before resuming excavation operations.

Herbert, Rowland & Grubic, Inc. 31 23 19 - 4 007297.0444

C. Modify dewatering and surface water control systems when operation causes or threatens to cause damage to new construction, existing site improvements, adjacent property, or adjacent water wells.

D. Correct unanticipated pressure conditions affecting dewatering system performance.

E. Do not discontinue dewatering operations without Engineer's approval.

3.6 WATER DISPOSAL

A. Prior to dewatering, evaluate site conditions. Evaluate flow path to minimize erosion and the transport of sediment to storm drains and receiving waters.

B. Discharge water into areas that are well vegetated and stable. Pollutants and sediments must be removed prior to discharging to a storm drain, waterbody, or wetland.

C. Dispose of water removed by dewatering in a manner that does not endanger public health, property, and portions of the work under construction or completed. Dispose of water in a manner that avoids inconvenience to others. Provide sumps, sedimentation tanks, and other flow control devices as required.

3.7 SYSTEM REMOVAL

A. Remove dewatering and surface water control systems after dewatering operations are discontinued.

B. Repair damage caused by dewatering and surface water control systems or resulting from failure of systems to protect property.

END OF SECTION