01 61 00 - Product Requirements.pdf

PDF 222 KB Posted

Attached to
Contract 2026-01: Maintenance & Emergency Contract (Excavation) – Project No. 7297. 0444
Solicitation number
Not on record
Issued by
York County, Pennsylvania

About this file

This is a Product Requirements specification document prepared by Herbert, Rowland & Grubic, Inc. for West Manchester Township's Contract 2026-01: Maintenance & Emergency Contract (Excavation), Project No. 7297.0444, located in Pennsylvania. The specification establishes standards for all products to be furnished and incorporated into the work, including materials, equipment, and systems. Products must comply with specified reference standards and requirements, be new and undamaged at time of installation, and include all necessary accessories, trim, finish, and fasteners for complete installation. The document defines product selection procedures, including provisions for named products, "or equal" substitutions (requiring approval through submittal), and basis-of-design products. Contractors must confirm manufacturer production capacity to meet project requirements on schedule. Sealed bids for the emergency and maintenance work related to West Manchester Township's sanitary and storm sewer collection systems are due by 10:00 AM local time on Wednesday, May 20, 2026, with public opening on PennBID. Bidding documents are available at https://pennbid.bonfirehub.com/, and prospective bidders are urged to register as plan holders. No pre-bid conference will be held for this project.

All products must be domestic products (mined, manufactured, fabricated, or produced in the United States or its territories) unless otherwise specified. Products shall be delivered in manufacturer's original sealed containers with labels and instructions intact, with delivery coordinated to minimize on-site storage and prevent overcrowding of construction spaces. Storage and handling must follow manufacturer's instructions, with sensitive products protected in weathertight, climate-controlled enclosures and exterior fabricated products placed on sloped supports aboveground. Bid security in the form of a Certified Check or Bid Bond is required in an amount not less than 10% of the bid amount. The specification reserves the Engineer's right to limit product selection to those with warranties not in conflict with contract requirements, and it establishes procedures for visual selection specifications where applicable, distinguishing between standard range and full range selections for colors, patterns, and textures.

View the file

Other files

File Type Posted
32 92 19 - Seeding.pdf PDF
31 05 16 - Aggregates For Earthwork.pdf PDF
00 45 36 EEO Certificate.pdf PDF
01 22 00 - Unit Prices.pdf PDF
33 05 05.31 - Hydrostatic Testing.pdf PDF
00 01 01 - YO Cover.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
31 23 16 - Excavation.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
00 73 53 - Anti-Pollution Measures.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
32 12 16 - Asphalt Paving.pdf PDF
31 23 19 - Dewatering.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 01 10 - Table of Contents.pdf PDF
01 42 00 - References.pdf PDF
31 23 16.13 - Trenching.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
Sanitary and Storm Sewer Maintenance & Emergency Construction Details.pdf PDF
33 42 00 - Stormwater Conveyance.pdf PDF
31 10 00 - Site Clearing.pdf PDF
02 57 00 - Sinkhole Remediation.pdf PDF
33 31 11 - Public Sanitary Sewerage Gravity Piping.pdf PDF
33 05 05.43 - Mandrel Testing.pdf PDF
03 20 00 - Concrete Reinforcing.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
00 63 13 - RFI Form.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
00 52 00 - Agmnt btw Own and Cntr for Const Con Stip Price.pdf PDF
31 23 23 - Fill.pdf PDF
33 05 61 - Concrete Manholes and Inlets.pdf PDF
32 13 13 - Concrete Paving.pdf PDF
03 30 00 - Cast-in-Place Concrete.pdf PDF
31 25 00 - Erosion And Sedimentation Controls.pdf PDF
32 17 23 - Pavement Markings.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
31 05 13 - Soils For Earthwork.pdf PDF
33 05 05.36 - Vacuum Testing.pdf PDF
02 41 13.23 - Utility Line Removal.pdf PDF
33 05 05.41 - Air Testing.pdf PDF
33 31 23 - Sanitary Sewerage Force Main Piping.pdf PDF
31 23 16.26 - Rock Removal.pdf PDF
00 31 43 - Permit Applications.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
32 11 23 - Aggregate Base Courses.pdf PDF
00 63 36 - Work Order Form.pdf PDF
Show 40 more

Latest 50 of 69 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01 61 00 - PRODUCT REQUIREMENTS

Herbert, Rowland & Grubic, Inc. 01 61 00 - 1 007297.0444

SECTION 01 61 00 - PRODUCT REQUIREMENTS

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. Products.

B. Product delivery requirements.

C. Product storage and handling requirements.

D. Product options.

1.2 DEFINITIONS

A. Products: Items purchased for incorporating into the Work, whether purchased for Project or taken from previously purchased stock. The term "product" includes the terms "material," "equipment," "system," and terms of similar intent:

1. Named Products: Items identified by manufacturer's product name, including make or model number or other designation shown or listed in manufacturer's published product literature that is current as of date of the Contract Documents.

2. New Products: Items that have not previously been incorporated into another project or facility. Products salvaged or recycled from other projects are not considered new products.

3. “Or Equal” Product: Product that is demonstrated and approved through submittal process to have the indicated qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics that equal or exceed those of specified product.

B. Basis of Design Product: The Project was designed generally around the first or singularly named manufacturers. Where a specific manufacturer's product is named, including make or model number or other designation, it is to establish the significant qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics. If the Contractor chooses to furnish an alternately named manufacturer or product, a substitution request must be made in accordance with paragraph 7.05 of the General Conditions.

1.3 PRODUCTS

A. At minimum, comply with specified requirements and reference standards.

B. Specified products define standard of quality, type, function, dimension, appearance, and performance required.

C. Furnish products of qualified manufacturers that are suitable for intended use. Furnish products of each type by single manufacturer unless specified otherwise. Confirm that

Herbert, Rowland & Grubic, Inc. 01 61 00 - 2 007297.0444 manufacturer's production capacity can provide sufficient product, on time, to meet Project requirements.

D. Domestic Products: Except where specified otherwise, domestic products are required and interpreted to mean products mined, manufactured, fabricated, or produced in United States or its territories.

1.4 PRODUCT DELIVERY REQUIREMENTS

A. Comply with delivery requirements in Section 01 74 19 - Construction Waste Management and Disposal.

B. Transport and handle products according to manufacturer's instructions.

C. Deliver products in manufacturer's original sealed container or packaging, complete with labels/instructions for storing, handling, unpacking, protecting, and installing.

D. Promptly inspect shipments to ensure products comply with requirements, quantities are correct, and products are undamaged.

E. Provide equipment and personnel to handle products; use methods to prevent soiling, disfigurement, or damage.

F. Schedule delivery to minimize long-term storage at Project site and to prevent overcrowding of construction spaces:

1. Coordinate delivery with installation to ensure minimum storage for items that are hazardous, easily damaged, or sensitive to deterioration, theft, and other losses.

1.5 PRODUCT STORAGE AND HANDLING REQUIREMENTS

A. Store and protect products according to manufacturer's instructions.

B. Store products with seals and labels intact and legible.

C. Store sensitive products in weathertight, climate-controlled enclosures in an environment suitable to product.

D. For exterior storage of fabricated products, place products on sloped supports aboveground.

E. Provide off-Site storage and protection when Site does not permit on-Site storage or protection.

F. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of products.

G. Store loose granular materials on solid flat surfaces in well-drained area. Prevent mixing with foreign matter.

Herbert, Rowland & Grubic, Inc. 01 61 00 - 3 007297.0444

H. Provide equipment and personnel to store products; use methods to prevent soiling, disfigurement, or damage.

I. Arrange storage of products to permit access for inspection. Periodically inspect to verify products are undamaged and are maintained in acceptable condition.

1.6 PRODUCT OPTIONS

A. Products Specified by Reference Standards or by Description Only: Products complying with specified reference standards or description.

B. Products Specified by Naming One or More Manufacturers: Products of one of manufacturers named and complying with Specifications; no options or substitutions allowed.

C. Products Specified by Naming One or More Manufacturers with Provision for Substitutions: Submit Request for Substitution for any manufacturer not named.

PART 2 - PRODUCTS

2.1 PRODUCT SELECTION PROCEDURES

A. General Product Requirements: Provide products that comply with the Contract Documents, that are undamaged and that are new at time of installation:

1. Provide products complete with accessories, trim, finish, fasteners, and other items needed for a complete installation and indicated use and effect.

2. Standard Products: If available, and unless custom products or nonstandard options are specified, provide standard products of types that have been produced and used successfully in similar situations on other projects.

3. Engineer reserves the right to limit selection to products with warranties not in conflict with requirements of the Contract Documents.

B. Product Selection Procedures:

1. Product: Where Specifications name a single product and manufacturer, provide the named product. Where Specifications include a list of names of both products and manufacturers, provide one of the products listed that complies with requirements.

2. Manufacturer/Source: Where Specifications name a single manufacturer or source, provide a product by the named manufacturer or equal source that complies with requirements. Where Specifications include a list of manufacturers' names, provide a product by one of the manufacturers listed that complies with requirements.

3. Basis-of-Design Product: Where Specifications name a product and manufacturer, provide the specified product. Where Work Orders and Specifications indicate sizes, profiles, dimensions, and other characteristics that are based on the product named provide named product. Comply with provisions in Part 2 "Product Substitutions" Article for consideration of an unnamed product or system.

Herbert, Rowland & Grubic, Inc. 01 61 00 - 4 007297.0444

4. Visual Selection Specification: Where Specifications include the phrase "as selected from manufacturer's colors, patterns, textures" or a similar phrase, select a product that complies with other specified requirements:

a. Standard Range: Where Specifications include the phrase "standard range of colors, patterns, textures" or similar phrase, Owner and Engineer will select color, pattern, density, or texture from manufacturer's product line that does not include premium items.

b. Full Range: Where Specifications include the phrase "full range of colors, patterns, textures" or similar phrase, Owner and Engineer will select color, pattern, density, or texture from manufacturer's product line that includes both standard and premium items.

PART 3 - EXECUTION - Not Used.

END OF SECTION