This is a technical specification document for rock removal work prepared by Herbert, Rowland & Grubic, Inc. for West Manchester Township in Pennsylvania as part of Contract 2026-01, a maintenance and emergency contract for excavation work. The specification defines the scope of rock removal operations during excavation activities, including the mechanical methods required to break and remove rock encountered during construction. The work encompasses identifying and removing trench rock (defined as solid mineral material exceeding 1/6 cubic yard in volume or material that cannot be removed by a 3/4 cubic yard capacity excavator without drilling or blasting), with finished rock surfaces required to be relatively uniform. Specific requirements include excavating to six inches below pipe invert elevation in utility trenches and maintaining a width 16 inches wider than pipe diameter. The sealed bid deadline for the overall contract is 10:00 AM local time on Wednesday, May 20, 2026, with bids to be publicly opened through PennBID. Bidding documents are available through the designated website at https://pennbid.bonfirehub.com/, and no pre-bid conference will be held. Bid security is required in the form of a certified check or bid bond in an amount not less than 10%.

The specification requires that all rock removal work follow mechanical methods including trenchers, hydraulic breakers, rippers, or other specialized equipment, with materials excavated from the site to be removed in their entirety. The contractor must provide bearing surface preparation, remove shaled layers to ensure sound bases, and request visual inspection by the Engineer and inspection agency before subsequent work installation. Unauthorized rock removal must be corrected in accordance with backfilling and compacting requirements outlined in Section 31 23 23. The contract represents ongoing maintenance and emergency work for West Manchester Township's sanitary sewer and storm sewer collection and conveyance systems, with work to be performed upon issuance of work orders by the Owner. Field quality control procedures and submittal requirements follow standard specifications referenced in the technical standards.

View the file

Other files

File Type Posted
32 92 19 - Seeding.pdf PDF
31 05 16 - Aggregates For Earthwork.pdf PDF
00 45 36 EEO Certificate.pdf PDF
01 22 00 - Unit Prices.pdf PDF
33 05 05.31 - Hydrostatic Testing.pdf PDF
00 01 01 - YO Cover.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
31 23 16 - Excavation.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
00 73 53 - Anti-Pollution Measures.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
32 12 16 - Asphalt Paving.pdf PDF
31 23 19 - Dewatering.pdf PDF
01 61 00 - Product Requirements.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 01 10 - Table of Contents.pdf PDF
01 42 00 - References.pdf PDF
31 23 16.13 - Trenching.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
Sanitary and Storm Sewer Maintenance & Emergency Construction Details.pdf PDF
33 42 00 - Stormwater Conveyance.pdf PDF
31 10 00 - Site Clearing.pdf PDF
02 57 00 - Sinkhole Remediation.pdf PDF
33 31 11 - Public Sanitary Sewerage Gravity Piping.pdf PDF
33 05 05.43 - Mandrel Testing.pdf PDF
03 20 00 - Concrete Reinforcing.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
00 63 13 - RFI Form.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
00 52 00 - Agmnt btw Own and Cntr for Const Con Stip Price.pdf PDF
31 23 23 - Fill.pdf PDF
33 05 61 - Concrete Manholes and Inlets.pdf PDF
32 13 13 - Concrete Paving.pdf PDF
03 30 00 - Cast-in-Place Concrete.pdf PDF
31 25 00 - Erosion And Sedimentation Controls.pdf PDF
32 17 23 - Pavement Markings.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
31 05 13 - Soils For Earthwork.pdf PDF
33 05 05.36 - Vacuum Testing.pdf PDF
02 41 13.23 - Utility Line Removal.pdf PDF
33 05 05.41 - Air Testing.pdf PDF
33 31 23 - Sanitary Sewerage Force Main Piping.pdf PDF
00 31 43 - Permit Applications.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
32 11 23 - Aggregate Base Courses.pdf PDF
00 63 36 - Work Order Form.pdf PDF
Show 40 more

Latest 50 of 69 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

31 23 16.26 - ROCK REMOVAL

Herbert, Rowland & Grubic, Inc. 31 23 16.26 - 1 007297.0444

SECTION 31 23 16.26 - ROCK REMOVAL

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Removing identified and discovered rock during excavation.

B. Related Sections:

1. Section 31 23 16.13 - Trenching: Trenching and backfilling for utilities.

2. Section 31 23 23 - Fill: Backfill materials.

1.2 DEFINITIONS

A. Trench Rock: Solid mineral material with volume in excess of 1/6 cu yd or solid material that cannot be removed with 3/4 cu yd capacity excavator without drilling or blasting.

1.3 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Submittal procedures.

1.4 SCHEDULING

A. Schedule Work to avoid disruption to occupied buildings nearby.

PART 2 - PRODUCTS – NOT USED.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify site conditions and note subsurface irregularities affecting Work of this section.

3.2 PREPARATION

A. Identify required lines, levels, contours, and datum.

3.3 ROCK REMOVAL BY MECHANICAL METHOD

A. Excavate and remove rock by mechanical method:

1. Break rock using trenchers, hydraulic breakers, rippers or other specialized equipment. Break rock to lines and grades shown on the drawings, or as required to complete the work. Finished rock surface should be relatively uniform.

B. Cut away rock at bottom of excavation to form level bearing.

C. Remove shaled layers to provide sound and unshattered base.

31 23 16.26 - ROCK REMOVAL

Herbert, Rowland & Grubic, Inc. 31 23 16.26 - 2 007297.0444

D. In utility trenches, excavate to 6 inches below invert elevation of pipe and 16 inches wider than pipe diameter.

E. Remove excavated materials from site.

F. Correct unauthorized rock removal in accordance with backfilling and compacting requirements of Section 31 23 23.

3.4 FIELD QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements: Field inspecting, testing, adjusting, and balancing.

B. Request visual inspection of bearing surfaces by Engineer and inspection agency before installing subsequent work.

END OF SECTION