This is a technical specification document for aggregate base courses prepared by Herbert, Rowland & Grubic, Inc. for West Manchester Township in Pennsylvania, related to Contract 2026-01: Maintenance & Emergency Contract (Project No. 7297.0444). The specification establishes requirements for aggregate subbase and aggregate base course materials to be used in the township's sanitary sewer and storm sewer collection and conveyance systems repair projects. Materials must comply with PennDOT No. 2A, Type C aggregate standards and be sourced from PennDOT-approved suppliers. Work includes substrate verification through proof rolling with loaded triaxle vehicles, aggregate spreading and placement, and compaction to 98 percent maximum density according to established standards. Field quality control requires laboratory and field compaction testing in compliance with ASTM standards at a minimum frequency of one test per 200 linear feet of sewer main trench. Tolerances are specified at 1/4 inch variation from flat surfaces and thickness, and 1/2 inch variation from elevation. The sealed bid deadline is 10:00 AM on Wednesday, May 20, 2026, with bids submitted online through PennBID.
The specification requires bid security of not less than 10 percent in the form of a Certified Check or Bid Bond. All aggregate materials must originate from single sources throughout the work and meet PennDOT specifications. Contractors must submit materials source certification, manufacturer's certificates, and material slips documenting the amount of materials utilized from producers. The work constitutes emergency and maintenance services for the township's existing utility infrastructure, with specific work items and scope defined through Work Orders issued by West Manchester Township. No pre-bid conference is scheduled, and all official notifications and bidding documents are available exclusively through the PennBID website at https://pennbid.bonfirehub.com/.
View the file
Other files
Show 40 more
Latest 50 of 69 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
32 11 23 - AGGREGATE BASE COURSES
Herbert, Rowland & Grubic, Inc. 32 11 23 - 1 007297.0444
SECTION 32 11 23 - AGGREGATE BASE COURSES
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Aggregate subbase.
2. Aggregate base course.
B. Related Sections:
1. Section 31 23 16.13- Trenching: Compacted fill under base course.
2. Section 31 23 23 - Fill: Compacted fill under base course.
3. Section 32 12 16 - Asphalt Paving: Binder and finish asphalt courses.
4. Section 32 13 13 - Concrete Paving: Finish concrete surface course.
1.2 REFERENCES
A. Pennsylvania Department of Transportation (PennDOT):
1. Publication 19 – Field and Laboratory Test Methods, latest edition.
2. Publication 408 - Specifications, latest edition, as amended.
B. Commonwealth of Pennsylvania, Pennsylvania Code, Title 67, Transportation, Department of Transportation:
1. Chapter 459, Occupancy of Highways by Utilities, as supplemented or revised.
2. Chapter 213, Work Zone Traffic Control (PennDOT Chapter 213).
C. American Association of State Highway and Transportation Officials:
1. AASHTO M288 - Standard Specification for Geotextile Specification for Highway
Applications.
D. ASTM International:
1. ASTM D1556 - Standard Test Method for Density and Unit Weight of Soil in Place by the Sand-Cone Method.
2. ASTM D2167 - Standard Test Method for Density and Unit Weight of Soil in Place by the Rubber Balloon Method.
3. ASTM D2922 - Standard Test Method for Density of Soil and Soil-Aggregate in
Place by Nuclear Methods (Shallow Depth).
4. ASTM D2940 - Standard Specification for Graded Aggregate Material For Bases or
Subbases for Highways or Airports.
5. ASTM D3017 - Standard Test Method for Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth).
1.3 SUBMITTALS
A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.
B. Materials Source: Submit name of aggregate materials suppliers.
Herbert, Rowland & Grubic, Inc. 32 11 23 - 2 007297.0444
C. Manufacturer's Certificate: Certify Products meet or exceed specified requirements.
D. Material Slips: Furnish certification of the amount of materials utilized from the producer in accordance with PennDOT specifications.
1.4 QUALITY ASSURANCE
A. Furnish each aggregate material from single source throughout the Work.
B. All aggregate must originate from a source approved by PennDOT meeting according to PennDOT standards.
PART 2 - PRODUCTS
2.1 AGGREGATE MATERIALS
A. Base Aggregate: PennDOT No. 2A, Type C aggregate as specified in Section 31 05 16.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Section 01 73 00 - Execution Requirements: Verification of existing conditions before starting work.
B. Verify compacted substrate is dry and ready to support paving and imposed loads.
1. Proof roll substrate with loaded triaxle (GVW 75,000 pounds) in minimum two perpendicular passes to identify soft spots.
2. Remove soft substrate and replace with compacted fill as specified in Section
31 23 23.
C. Verify substrate has been inspected, gradients and elevations are correct.
3.2 PREPARATION
A. Correct irregularities in substrate gradient and elevation by scarifying, reshaping, and re-compacting.
B. Do not place fill on soft, muddy, or frozen surfaces.
3.3 AGGREGATE PLACEMENT
A. Spread aggregate over prepared substrate to total compacted thickness as indicated on Standard Construction Details.
B. Roller compact aggregate to 98 percent maximum density.
C. Level and contour surfaces to elevations, profiles, and gradients indicated.
Herbert, Rowland & Grubic, Inc. 32 11 23 - 3 007297.0444
D. Maintain optimum moisture content of fill materials to attain specified compaction density.
E. Use mechanical tamping equipment in areas inaccessible to compaction equipment.
3.4 TOLERANCES
A. Section 01 40 00 - Quality Requirements: Tolerances.
B. Maximum Variation From Flat Surface: 1/4 inch measured with 10 foot straight edge.
C. Maximum Variation From Thickness: 1/4 inch.
D. Maximum Variation From Elevation: 1/2 inch.
3.5 FIELD QUALITY CONTROL
A. Section 01 40 00 - Quality Requirements: Field inspecting, testing, adjusting, and balancing.
B. Laboratory compaction testing will be performed according to ASTM D1557 or AASHTO T180.
C. Field compaction testing will be performed according to ASTM D2922 and ASTM D3017.
D. When tests indicate Work does not meet specified requirements, remove Work, replace and retest.
E. Frequency of Tests: Comply with PennDOT requirements, but a minimum of one test for every 200 LF of sewer main trench.
3.6 COMPACTION
A. Compact materials to 98 percent of maximum density as determined from test strip, according to ASTM D2940.