This is a Pavement Markings specification document prepared by Herbert, Rowland & Grubic, Inc. for West Manchester Township in Pennsylvania, applicable to Project No. 7297.0444 (Contract 2026-01: Maintenance & Emergency Contract). The specification establishes requirements for traffic lines, markings, legends, paint, and glass beads applied to pavement surfaces. Products and materials must comply with PennDOT Publication 408 and applicable AASHTO and ASTM standards, with all materials required to be listed in PennDOT Bulletin 15. The specification covers both painted pavement markings and thermoplastic compounds, including asphalt and Portland cement concrete primers, preformed reflectorized tape compliant with ASTM D4505, and raised pavement markers. Application work must be performed by companies with minimum three years' experience, with surface preparation including cleaning, drying, and removal of existing markings prior to application. Manufacturers must have minimum three years' experience in producing specified products. The specification requires submission of product data and certifications, with work to be inspected by the Engineer after pavement spots are placed and prior to applying traffic lines. No pre-bid conference was held for this project, with sealed bids due by 10:00 AM local time on Wednesday, May 20, 2026, submitted online through PennBID.

The specification mandates compliance with West Manchester Township Construction and Materials Specifications Manual and requires adherence to specific ambient conditions, including minimum surface temperature of 40 degrees Fahrenheit for thermoplastic application and prohibition of application below 50 degrees Fahrenheit within 24 hours. All paint must comply with maximum VOC limits established by State or Environmental Protection Agency standards. Concrete surfaces must cure for 28 days before markings are applied, and final wearing course must be placed and accepted prior to marking application. A short-term traffic control plan must be submitted to the Owner and Engineer at least seven days before commencing work. Quality control includes inspection for incorrect location, insufficient thickness, line width, coverage, retention, and insufficient bonding, with repair or replacement required for non-compliant markings. Protection requirements mandate use of traffic cones to prevent vehicular and pedestrian traffic on freshly applied markings until track-free, with minimum 30 minutes dry time. Bidders must provide bid security of no less than 10 percent in the form of a certified check or bid bond.

View the file

Other files

File Type Posted
32 92 19 - Seeding.pdf PDF
31 05 16 - Aggregates For Earthwork.pdf PDF
00 45 36 EEO Certificate.pdf PDF
01 22 00 - Unit Prices.pdf PDF
33 05 05.31 - Hydrostatic Testing.pdf PDF
00 01 01 - YO Cover.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
31 23 16 - Excavation.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
00 73 53 - Anti-Pollution Measures.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
32 12 16 - Asphalt Paving.pdf PDF
31 23 19 - Dewatering.pdf PDF
01 61 00 - Product Requirements.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 01 10 - Table of Contents.pdf PDF
01 42 00 - References.pdf PDF
31 23 16.13 - Trenching.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
Sanitary and Storm Sewer Maintenance & Emergency Construction Details.pdf PDF
33 42 00 - Stormwater Conveyance.pdf PDF
31 10 00 - Site Clearing.pdf PDF
02 57 00 - Sinkhole Remediation.pdf PDF
33 31 11 - Public Sanitary Sewerage Gravity Piping.pdf PDF
33 05 05.43 - Mandrel Testing.pdf PDF
03 20 00 - Concrete Reinforcing.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
00 63 13 - RFI Form.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
00 52 00 - Agmnt btw Own and Cntr for Const Con Stip Price.pdf PDF
31 23 23 - Fill.pdf PDF
33 05 61 - Concrete Manholes and Inlets.pdf PDF
32 13 13 - Concrete Paving.pdf PDF
03 30 00 - Cast-in-Place Concrete.pdf PDF
31 25 00 - Erosion And Sedimentation Controls.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
31 05 13 - Soils For Earthwork.pdf PDF
33 05 05.36 - Vacuum Testing.pdf PDF
02 41 13.23 - Utility Line Removal.pdf PDF
33 05 05.41 - Air Testing.pdf PDF
33 31 23 - Sanitary Sewerage Force Main Piping.pdf PDF
31 23 16.26 - Rock Removal.pdf PDF
00 31 43 - Permit Applications.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
32 11 23 - Aggregate Base Courses.pdf PDF
00 63 36 - Work Order Form.pdf PDF
Show 40 more

Latest 50 of 69 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

32 17 23 - PAVEMENT MARKINGS

Herbert, Rowland & Grubic, Inc. 32 17 23 - 1 007297.0444

SECTION 32 17 23 - PAVEMENT MARKINGS

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Traffic lines and markings.

2. Legends.

3. Paint.

4. Glass beads.

B. Related Requirements:

1. Section 32 12 16 - Asphalt Paving: Asphalt paving for roads, parking areas, and sidewalks.

2. Section 32 13 13 - Concrete Paving: Concrete paving for roads, parking areas, and sidewalks.

1.2 REFERENCE STANDARDS

A. Materials shall comply with PennDOT Publication 408 and applicable AASHTO and ASTM standards.

1.3 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Product Data: Submit manufacturer’s product data for pavement marking materials.

C. Certification: Submit certification that pavement marking materials are listed in PennDOT Bulletin 15 and comply with PennDOT Publication 408.

1.4 QUALITY ASSURANCE

A. Perform Work in accordance with West Manchester Township Construction and Materials Specifications Manual.

1.5 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing products specified in this Section with minimum three years' experience.

B. Applicator: Company specializing in performing Work of this Section with minimum three years' experience.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Section 01 61 00 - Product Requirements: Requirements for transporting, handling, storing, and protecting products.

Herbert, Rowland & Grubic, Inc. 32 17 23 - 2 007297.0444

B. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage.

C. Storage:

1. According to manufacturer instructions.

2. Paint:

a. Invert containers several days prior to use if paint has been stored more than two months.

b. Minimize exposure to air when transferring paint.

c. Seal drums and tanks when not in use.

D. Protection:

1. Protect materials from moisture and dust by storing in clean, dry location remote from construction operations areas.

2. Provide additional protection according to manufacturer instructions.

1.7 AMBIENT CONDITIONS

A. Application shall comply with PennDOT Publication 408 requirements.

B. Do not apply materials if surface and ambient temperatures are outside temperature ranges required by paint product manufacturer.

C. Do not apply exterior coatings during rain or snow if relative humidity is outside range required by paint manufacturer, or if moisture content of surfaces exceeds that required by paint manufacturer.

D. Minimum Conditions: Do not apply paint if temperatures are or are expected to fall below 50 deg. F within 24 hours after application.

E. Thermoplastic Compound: Do not apply unless pavement surface temperature is minimum 40 deg. F and rising.

F. Maximum VOCs: Do not exceed limit required by State or Environmental Protection Agency.

1.8 WARRANTY

A. Section 01 78 36 - Warranties: Requirements for warranties.

PART 2 - PRODUCTS

2.1 PAINTED PAVEMENT MARKINGS

A. Manufacturers:

1. Furnish materials according to Pennsylvania Department of Transportation

Bulletin 15, Qualified Products List for Construction.

Herbert, Rowland & Grubic, Inc. 32 17 23 - 3 007297.0444

B. Traffic paint shall conform to PennDOT Publication 408 and be listed in PennDOT Bulletin 15.

C. Thermoplastic Compound:

1. Binder Component: Hydrocarbon resin with pigment, beads, and filler uniformly dispersed.

2. Asphalt Concrete Primer:

a. Description: Thermosetting adhesive with a solids content of pigment reinforced synthetic rubber and synthetic plastic resin dissolved or dispersed in a volatile organic solvent.

b. Solids Content: Not less than 10 percent by weight at 70 deg. F and 60 percent relative humidity.

c. Wet Film Thickness: 0.005 inch, plus or minus 0.03 inch.

3. Portland Cement Concrete Primer: Epoxy resin primer, as recommended by manufacturer of thermoplastic compound.

D. Preformed Tape:

1. Description: Adherent reflectorized strip.

2. Comply with ASTM D4505, Type I or IV.

E. Raised Pavement Markers:

1. Per PennDOT Publication 408.

2.2 SOURCE QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements: Requirements for testing, inspection, and analysis.

B. Materials shall be tested and certified in accordance with PennDOT Publication 408.

PART 3 - EXECUTION

3.1 PREPARATION

A. Section 01 73 00 - Execution Requirements: Requirements for application preparation.

B. Do not apply paint to concrete surfaces until concrete has cured for 28 days.

C. Do not apply markings until final wearing course is placed and accepted.

D. Agitate paint for 1 to 15 minutes prior to application to ensure even distribution of pigment.

E. Maintenance and Protection of Traffic:

1. Submit short term traffic control plan to Owner and Engineer for approval a minimum of 7 days before commencing work.

2. Prevent interference with marking operations and prevent traffic on newly applied markings before dry.

Herbert, Rowland & Grubic, Inc. 32 17 23 - 4 007297.0444

F. Surface Preparation.

1. Clean and dry paved surfaces prior to painting. Remove curing compounds and contaminants that may affect adhesion.

2. Blow or sweep surface free of dirt, debris, oil, grease, or gasoline.

3. Spot location of final pavement markings, as specified and as indicated on

Drawings, by applying pavement spots 25 feet o.c.

4. Request inspection by Engineer after placing pavement spots and prior to applying traffic lines.

3.2 DEMOLITION

A. Remove existing markings in an acceptable manner, using methods that will cause least damage to pavement structure or surface.

B. Do not remove existing pavement markings by painting over with blank paint.

C. Repair pavement or surface damage caused by removal methods.

D. Clean and repair existing , remaining, or reinstalled lines and legends.

3.3 APPLICATION

A. Pavement markings shall be applied in accordance with PennDOT Publication 408, including Sections 960 and 962, and manufacturer recommendations.

B. Locations, dimensions, and types of markings shall be as indicated on the Drawings or as directed in the Work Order.

3.4 FIELD QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements: Requirements for inspecting and testing.

B. Inspect for incorrect location, insufficient thickness, line width, coverage, retention, uncured or discolored material, and insufficient bonding.

C. Acceptance:

1. Repair lines and markings which after application and curing do not meet following criteria:

a. Incorrect location.

b. Insufficient thickness, width, coverage, or retention.

c. Uncured or discolored material.

d. Insufficient bonding.

3.5 CLEANING

A. Collect and legally dispose of residues from painting operations.

Herbert, Rowland & Grubic, Inc. 32 17 23 - 5 007297.0444

3.6 PROTECTION

A. Section 01 73 00 - Execution Requirements: Requirements for protecting finished Work.

B. Protect painted pavement markings from vehicular and pedestrian traffic until paint is dry and track free.

C. Unless material is track free at end of paint application convoy, use traffic cones to protect markings from traffic until track free.

D. If vehicle crosses a marking and tracks it, or if splattering or overspray occurs, eradicate affected marking and resultant tracking and apply new markings.

E. Follow manufacturer instructions or use minimum of 30 minutes of dry time.

F. Barrier cones are satisfactory protection for materials being dried.

3.7 MAINTENANCE

A. Section 01 73 00 - Execution Requirements: Requirements for maintenance service.

B. Maintain markings during maintenance period and replace any markings that fade, fail, or become illegible.

END OF SECTION