This Statement of Work describes repair and renovation requirements for Buildings 17903 and 17904, live fire training facilities. The project has a total performance period of 180 days, consisting of 60 days for design and 120 days for construction, with standard working hours from 7:00 AM to 5:00 PM. Design efforts require 95% and 100% complete drawings, respectively, which must be stamped by a licensed professional engineer with live fire training structure experience. All materials must be suitable for live fire training facilities, with fire protection liner panels required at 1-inch thickness unless otherwise specified by the engineer.
Building 17903 work includes removing and replacing railings on an elevated platform with new 3-inch diameter circular handrails and safety rails, installing a 40-inch wide swinging gate with locking mechanism and non-skid steps, removing the existing electrical box and thermocouples and installing a permanent pyrometer with new thermocouple locations (top of flash cell, top of viewing cell, and flash cell floor), and replacing 26 fire protection liner panels in various dimensions (12 panels at 20" × 48", 10 panels at 20" × 34", and 4 panels at 20" × 36"). Building 17904 work encompasses installing fire protection liner panels and protective trim on ground floor doors and shutters only, removing and replacing structural framing around doors and shutters, replacing all four exterior personnel doors with sliding locks and pull handles, removing and replacing an interior personnel door between the hallway and stairs with panels on the hallway-facing surface, replacing damaged sheet metal paneling in the hallway and installing new liner panels, installing a new double-swinging self-closing door in the burn room to hallway opening with a 3-inch floor gap, removing and replacing nine window shutters with appropriate locking mechanisms and holdback features, repainting the entire exterior and tower interior metal surfaces using marine grade enamel paint, removing and reinstalling the building number plate, removing existing standpipe and sprinkler connections and installing an FDC Siamese fitting with internal 4×4×4 Tee fitting, removing and replacing hallway sprinkler head and pipe to the main vertical pipe, performing a 5,000-pound pull test on a rappel anchor with certification, inspecting and tightening or replacing loose or missing fasteners on metal siding and stairs, removing and replacing a pyrometer with six thermocouples installed at specified ceiling and floor locations, removing the existing ladder and installing a 12-foot tall, 18-inch wide ship's ladder with 56-inch offset and fall protection system, and removing and replacing the roof hatch with a stainless steel hatch and two hold down clamps.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment - FA480126R00050002.pdf | ||
| Solicitation Amendment FA480126R00050002 SF 30.pdf | ||
| Wall Picture 1.jpeg | JPEG file | |
| Wall Picture 3.jpeg | JPEG file | |
| Answers.pdf | ||
| SOW Rev 1 - Repair Bldgs 17903 17904 July 31 2026.pdf | ||
| Wall Picture 2.jpeg | JPEG file | |
| Wall Picture 4.jpeg | JPEG file | |
| WT 17518487 Questions.docx | DOCX document | |
| Solicitation Amendment - FA480126R00050001.pdf | ||
| Solicitation Amendment FA480126R00050001 SF 30.pdf | ||
| Site Visit QA Memorandum Amendment 01.pdf | ||
| As-Built Drawing 1.pdf | ||
| Site Visit QA Memorandum.pdf | ||
| Bldg 17904 Inspection Report - Edited.pdf | ||
| Solicitation - FA480126R0005.pdf | ||
| As-Built Drawing 2.pdf | ||
| As-Built Drawing 3.pdf | ||
| Bldg 17903 Inspection Report - Edited.pdf | ||
| WT 17518487 AF Form 66.xlsx | XLSX spreadsheet |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
REPAIR BLDGS 17903 & 17904
Dec 2, 2025
PROJECT SPECIFIC INFORMATION:
1. Location: Bldgs 17904 & 17903
2. Design Effort: 95% & 100% Drawings
3. Performance Period: 180 days total. Design: 60 days. Construction: 120 days
4. Working Hours: Standard - 7:00 am to 5:00 pm
5. Restricted Area: No
SCOPE OF WORK:
1. The Contractor shall repair Bldgs 17903 & 17904. These are live fire training buildings.
2. Three as-built drawings for Bldg 17904 are attached. An inspection report for each building is also attached.
3. A complete set of drawings shall be submitted for approval. They shall be stamped by a licensed professional engineer with live fire training structure experience.
4. All material used on this project shall be as specified by the engineer, and suitable for use on live fire training facilities.
5. The existing fire protection liner panels are 1" thick. The new panels shall be 1" thick, unless otherwise specified by the engineer.
BLDG 17903 WORK SCOPE:
• See Page 2 in the inspection report. It shows an elevated platform. Remove the existing railings. Install an approximate 3" diameter circular handrail 42" above the platform on all three sides, except where the gate will be. Install another circular safety rail 20" below the top handrail. Install a 6" high metal kickplate below the rails.
• At the end of the platform away from the building, install a 40" wide swinging gate.
The gate will open in towards the building. The gate shall have a sliding locking mechanism on it.
• Install 40" wide steps below the gate leading to the ground. The steps shall be 6" to 7" high and 12" deep. They shall have a non-skid surface. Install handrails on both sides of the steps.
• See Page 3. Remove and dispose the existing electrical box, wiring, and three (3) thermocouples. Install a permanent pyrometer mounted to the exterior siding where the box was. Install new wiring and three (3) new thermocouples inside the building. The new thermocouples shall be located at the top of the flash cell, the top of the viewing cell, and flash cell floor.
• See Pages 7 and 8. Remove and replace the existing liner panels inside the building.
There is a total of 26 panels that need to be replaced. Twelve (12) panels are 20" x 48". Ten (10) panels are 20" x 34". Four (4) panels are 20" x 36". These four panels are on the doors.
BLDG 17904 WORK SCOPE:
• See Page 9 of the inspection report. Install fire protection liner panels on the inside surface of all doors and shutters on the ground floor only. The doors and shutters on the second and third floors do not need any panels.
• See Page 5 of the inspection report. Install liner panels and protective trim material around the entire interior perimeter for all doors and shutters on the ground floor only.
• Remove and replace the structural framing around all doors and shutters.
• All doors and shutters shall have continuous stainless steel hinges, except as noted.
• There are four (4) exterior personnel doors in this building. The as-built drawings show five doors, but that is incorrect. Remove and replace all four doors and framing. See Page 8 in the inspection report. Install a sliding lock and a pull handle on the outside. No hardware on the inside.
• See Page 10. There are panels on the walls in the Burn Room. Some of the gaps between the panels are too wide. Adjust the panels so they are in accordance with the engineer’s recommendations.
• See Page 6. There is an existing interior personnel door between the Hallway and the stairs on the ground floor. Remove and replace this door and frame. The door swing shall remain the same. This door will have panels on the inside surface, which faces the Hallway. Install a pull handle on the outside surface, which faces the stairwell. Install a sliding locking bolt on the inside of the door.
• See Page 4. The sheet metal paneling on the walls and ceiling in the Hallway is damaged. Remove this paneling and replace it with appropriate material as recommended by the engineer. Then install new liner panels on the ceiling and walls.
• See Page 10 - right side picture. There is a walkway opening between the Burn Room and Hallway. Install a new door and frame in this opening. Install self-closing, double swinging hinges for this door. These hinges do not have to be continuous. Install fire panels and pull handles on both sides of the door. There shall be a 3" gap between the floor and the bottom of the door.
• See Page 19. There are nine (9) total window shutters. The shutters are about 3' x 3'-6" in size. Remove and replace the shutters. The shutters on the ground floor shall open outwards, and shall have the locking bolts on the outside. The other shutters shall open inwards, and shall have the locking bolts on the inside. All shutters shall have holdback mechanisms to keep them fully open when necessary.
• Repaint the entire exterior of the building, including the stairs and railings. Paint all the metal surfaces in the tower interior, including the stairs and railings. Pressure wash all surfaces, and perform any other appropriate surface preparation. Use marine grade enamel paint. Submit color chart for color selection.
• Remove and reinstall the building number plate.
• See Page 12 – right side picture. It shows two existing pipe connections. One is for the standpipe, and one is for the sprinkler system. Remove and dispose both of these pipes. Install an FDC Siamese fitting, similar to the one shown in the inset picture. The outside connections will be 2.5". Install a 4 x 4 x 4 Tee fitting on the inside of the building to connect the Siamese with the standpipe and sprinkler system. Install any other pipe fittings and accessories as required. Repair the metal siding as required.
• See Page 4. It shows a sprinkler pipe and head in the Hallway. Remove and replace the sprinkler head and pipe all the way back to the main vertical sprinkler pipe near the new Siamese fitting.
• See Page 15 – left side picture. It shows a rappel anchor. Perform 5,000-lb pull test on the anchor. Submit certification paperwork once complete.
• Inspect the metal siding and stairs for any loose or missing fasteners. Tighten any loose fasteners, and replace any missing ones.
• See Page 11. Remove and replace the pyrometer, wiring, and six (6) thermocouples.
Install two at opposite ends of the large burn cell ceiling. Two in the small cell at the same locations as existing. And one at 5' above the floor in each cell.
• See Page 16. Remove the existing ladder. Install a ship’s ladder - 12' tall, 18" wide, with a 56" offset. Install a fall protection system.
• See Page 17. Remove and replace the roof hatch. Install a stainless steel hatch, same size as existing. Install two hold down clamps.