This document contains a construction cost estimate template and details of a Multiple Award Construction Contract solicitation. The template provides a standardized format for contractors to submit cost summaries and supporting data for government review and analysis. It includes line items for materials, labor hours and rates, other direct costs, and total prices with overhead, profit, bonds, and taxes.

The solicitation is for indefinite delivery indefinite quantity construction contracts at Ellsworth Air Force Base. The procurement aims to award three contracts for new construction, renovation, alteration, demolition, and repair work through design-build or design-bid-build methods. Services include trades like carpentry, roofing, electrical, and HVAC. The contract period is from award date to June 2021, with a minimum of $500 guaranteed for each and maximum of $18 million total. The solicitation targets Service Disabled Veteran Owned, 8(a), and HUBZone small businesses. It will be issued through Federal Business Opportunities on or around November 14, 2018.

FA469019RA003 Atch 20g

View the file

Other versions and copies of AF Form 3052

File Revision Posted Attached to
Attachment E - Blank Sample AF Form 3052.xls Revision not stated Robins AFB Paving Multi-Award IDIQ
Attachment 5 - PNQS 24-4829 Airfield Improvements AF Form 3052 - Amendment 0002.xlsx Revision not stated Maxwell AFB - Airfield Repairs - Amendment 0006
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
B6 AF Form 3052 - Construction Cost Estimate.pdf Revision not stated Emergent Requirements Construction IDIQ (Single-Award)
AF Form 3052 (Blank) ReplCath Prot 240026 at Multi Facs -- .xlsx Revision not stated FBNV240026 Replace Cathodic Protection Test Points DMAFB
FBNV240017 - AF Form 3052 Blank.xlsx Revision not stated FA487724R0020 - Upgrade PGS Fire System
Attachment 4 - JUBJ 22 1016 Construct RIC - AF Form 3052.xlsx Revision not stated Construct Research Information Center (Solicitation Amendment 0002)
Attachment 4 - PNQS 24-3992 Replace Localizer Pad - AF Form 3052.xlsx Revision not stated PNQS 24-3992 Replace Localizer Pad (Solicitation Amendment 0001)
05. FBNV230009_AF Form 3052 (Blank).xlsx Revision not stated Solicitation - Repair Command Post Bldg 2300 - DMAFB
B941 Replace AHU AF Form 3052 - Construction Cost Estimate.xlsx Revision not stated Bldg 941 Replace Air Handling Unit 1
AF Form 3052.xlsx Revision not stated BLDG 4868 Additional Electrical Panel for DMAFB
Atch 7 AF Form 3052.xlsx Revision not stated B324 Add Sewer Line, FE Warren AFB, WY
AF Form 3052-Construction Cost Estimate Breakdown (3).xlsx Revision not stated Barnes Center Command Suite Modification Bldg. 832 Gunter Annex (Amendment 0003)
5. AF Form 3052-BLANK.xlsx Revision not stated Replace Swamp Cooler B5045
Copy of Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Battery Room - Maxwell AFB, AL (Solicitation)
Attachment 4 - PNQS 23-0379 Connect Fire Mains - AF Form 3052.xlsx Revision not stated PNQS 23-0379 Connect Fire Mains Bldgs. 849 & 1143, MAFB & Gunter Annex
17. AF Form 3052 (Blank) - FBNV190002.xlsx Revision not stated Repair and Construct Primary Electric Distribution
Attachment 2.12 - AF Form 3052 Construction Cost Estimate Breakdown Template.xlsx Revision not stated Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM
Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Rooms, Building 1410 Gunter
Show all 20

Who attaches AF Form 3052

Other files

File Type Posted
Atch_32_-_Follow_on_Q&A_Updated_1MAY19.pdf PDF
Solicitation_Amendment_FA469019RA0030013_SF_30.pdf PDF
Atch_31_Follow_on_Q&As_26APR19.pdf PDF
Atch_20f_Bid_Schedule-25_Apr_19.doc DOC document
Solicitation_Amendment_FA469019RA0030012_SF_30.pdf PDF
Atch_30_Follow_on_Q&A_25APR19.pdf PDF
Solicitation_Amendment_FA469019RA0030011_SF_30.pdf PDF
Solicitation_Amendment_FA469019RA0030010_SF_30.pdf PDF
Atch_20b_SOW_Updated_23APR19.pdf PDF
Atch_20a_GIPR_23APR19.pdf PDF
Atch_29_Follow_on_Q&As_23APR19.pdf PDF
Solicitation_Amendment_FA469019RA0030009_SF_30.pdf PDF
Solicitation_Amendment_FA469019RA0030008_SF_30.pdf PDF
Atch_28_-_Follow_on_Q&As.pdf PDF
Solicitation_Amendment_FA469019RA0030007_SF_30.pdf PDF
Attach_27_bTrack_with_Contours_and_Utilities.pdf PDF
Attach_27_c_CE_Track_Manholes.pdf PDF
Solicitation_Amendment_FA469019RA0030006_SF_30.pdf PDF
Attach_27_a_Site_Vist_QAs_as_of_6_Mar_19.pdf PDF
Solicitation_Amendment_FA469019RA0030005_SF_30.pdf PDF
Solicitation_Amendment_FA469019RA0030004_SF_30.pdf PDF
Atch_25_Site_Vist_Q&As_14FEB19.pdf PDF
Atch_26_X-XX_PROJECT_TITLE.dwg DWG drawing
Atch_24_Site_Visit_Minutes_24JAN19.pdf PDF
Solicitation_Amendment_FA469019RA0030003_SF_30.pdf PDF
Atch_23_Site_Visit_Minutes.pdf PDF
Solicitation_Amendment_FA469019RA0030002_SF_30.pdf PDF
Solicitation_Amendment_FA469019RA0030001_SF_30.pdf PDF
Atch_20_FOPR_Construct_Bath_House_3JAN19.pdf PDF
Atch_20e_6_Percent_Limit_on_Design_Fee_for_Contractors.pdf PDF
Atch_13_NAFGeneral_Provisions-21Jan15.pdf PDF
Atch_16c_-_WD_SD180001_Heavy-Highway_6_Apr_18.pdf PDF
Atch_16a_-_WD_SD180002_Residental-Penn_5_Jan_18.pdf PDF
Atch_1_Utility_Outages.pdf PDF
Atch_7_Ellsworth_Fire_Protection.pdf PDF
Atch_10_Electrical_Systems-15_Jan_15.pdf PDF
Atch_20a_GIPR_6NOV18.pdf PDF
Atch_12_General_Provisions_-_8NOV18.pdf PDF
Atch_20b_SOW_6NOV18.pdf PDF
Atch_16b_-_WD_SD180006_Residental-Meade_5_Jan_18.pdf PDF
Atch_11_Underground_Electrical_20Aug15.pdf PDF
Solicitation_-_FA469019RA003.pdf PDF
Atch_22,_SECTION_M_-_EVALUATION_BASIS_FOR_AWARD_2JAN19.pdf PDF
Atch_20c_Drawing_1_Track_Utilities_Latrine_6NOV18.pdf PDF
Atch_20_FOPR_Construct_Bath_House.pdf PDF
Atch_20d_RMD_KTR_to_Complete.pdf PDF
Atch_4_Spec_Section_01000_-20_Aug_15.pdf PDF
Atch_9_Submittal_Form_3000-1_Sep_03.pdf PDF
Atch_19_Past_Performance_Questionairre.docx DOCX document
Atch_18_Past_Performance_Information.docx DOCX document
Show 40 more

Latest 50 of 96 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COVER

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR:PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
LINE #ITEMUNIT OF MEASURE (2)QTY (3)UNITTOTALMAN HOUR\ DAYSAVG RATETOTALOTHER DIRECT COSTSLINE TOTAL
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
Page Totals$0.00$0.00$0.00$0.00

&LAF Form 3052 JAN 88 (Computer Generated)

LABOR COST

MATERIAL COST

BACK

TOTAL MATERIAL COSTS$0.00
TOTAL LABOR COSTS$0.00
TOTAL OTHER DIRECT COSTS$0.00
TOTAL DIRECT COSTS$0.00
OVERHEAD (%) _______$0.00
SUBTOTAL$0.00
PROFIT (%) _______$0.00
SUBTOTAL PRICE$0.00
BONDS (%) _______$0.00
SUBTOTAL PRICE$0.00
Excise Tax (%) _______$0.00
TOTAL PRICE$0.00
DATE PREPARED:_______________FIRM NAME:_____________________________
_____________________________________________________________________________
TITLE(Signature)

INSTRUCTIONS FOR COMPLETING AF FORM 3052

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all costs

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples-squareyards-SY, cubic yards-CY, Square feet-SF, linear feet-LF, board feet-BF, each-EA, Pound-LB).

Col 3 Quantity. Contractors estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7, and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of significant dollar value.

Col 10 Line Total. Self-explanatory.

NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows.

INSTRUCTIONS TO OFFERORS

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summery of incurred and estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3(e) and 3-807.4)

2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of

a. The existing, verifiable data

b. The judgmental factors applied in projecting from known data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

(reverse of AF Form 3052 JAN 88 Computer Generated)

File details come from the government source that posted it. Updated .